Vous êtes sur la page 1sur 10

Pearl GTL

Project
LINDE ENGINEERING

Shell Project No: HP-3000-QAT Contractor Project No: 5887


Project Document Number: T- 4.234.572 Project Rev.: A Page 2 of 8

Purchase Order Number: 2MH127

Tag/Item Number(s): N/A

Unit(s): ASU

PCWBS: Z
QATAR SHELL GTL PROJECT (PEARL)
C2 AIR SEPARATION UNITS CONSTRUCTION

E A 15.02.09 Ready for Construction SB EO AG RFC

D O 04.01.09 Company Comments Incorporated SB AB AG CCI

C O 30.12.08 Issued for Company Comments SB AB AG ICC

B 18.12.08 Issued for Review SB EO AG IFR

A 25.11.08 Issued for Internal Review SB EO AG IIR

GAMA Project Prepared Checked Approved


Date Description Status
Rev. Rev By By By
No. No. ORIGINATOR

Document Title:

ITP FOR INSTALLATION OF GYPSUM BOARD


LINDEGINEERING AG (BUILDINGS)
Contractor Document No.
LOC470
GAM ITP QAC GTL 044 E
Gama Qatar Co. W. L. L. Org. Doc. Disc. Geogr. Seq. Rev.
Vendor Code
Code Type Code Area No No

Project Document Number: T- 4.234.572 Rev No: A


QSGTL PEARL PROJECT Document No.: GAM-ITP-QAC-GTL- 044
C2 ASU Construction Works
ITP FOR INSTALLATION OF GYPSUM BOARD Date: 15.02.2009 Rev. E
(Buildings)
S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE


H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Responsible
Item Activity Test Frequency Reference Document Acceptance Criteria Verifying Documents S X C A
Party

1.0 METHOD STATEMENTS/PROCEDURES


Method Statements / Project Specifications
Prior to start of Subcontractor Method
1.1 Procedures Project Requirements QA/QC & Material Approval H R R
activity Statements / Procedure
Preparation Request
2.0 MATERIALS CERTIFICATES
Verification of T.4.234582 , DEP Manufacturers Manufacturers
QC – Civil
2.1 Acoustical & rock wool 100% 34.17.00.32-Gen & DEP Technical data sheet, Technical data H R R
Inspector
material. 34.17.10.30-Gen certificates sheets & certificates
Storage and handling T.4.234.582 , DEP
Manufacturer’s QC – Civil
2.2 of Acoustical & rock 100% 34.17.00.32-Gen & DEP Visual confirmation I S S
recommendation. Inspector
wool material. 34.17.10.30-Gen
3.0 INSPECTIONS

Environmental DEP 34.17.00.32-


Conditions T.4.234.582 , DEP
Gen & DEP QC – Civil GAM-QCR-QAC-
3.1 100% 34.17.00.32-Gen & DEP I S S
1. Ambient temp. 34.17.10.30-Gen & Inspector GTL- 168
34.17.10.30-Gen
Manufacturer’s data
sheet
DEP 34.17.00.32-
Inspection for surface
Gen & DEP
preparation ( Repairing T.4.234.582 & QC – Civil GAM-QCR-QAC-
3.2 100% 34.17.10.30-Gen & I W S
the surface of R.C.C T.4.234.555 Inspector GTL-166
Manufacturer’s data
Wall)
sheet
T- 4.234.572 Rev. A Page 4
QSGTL PEARL PROJECT Document No.: GAM-ITP-QAC-GTL- 044
C2 ASU Construction Works
ITP FOR GYPSUM BOARD INSTALLATION Date: 15.02.2009 Rev. E
(Buildings)
S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE


H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Responsible
Item Activity Test Frequency Reference Document Acceptance Criteria Verifying Documents S X C A
Party

Inspection for T.4.234.582 , DEP T.4.234.555 -


QC – Civil GAM-QCR-QAC-
3.3 installation of framing 100% 34.17.00.32-Gen & DEP Procedure for I W S
Inspector GTL-168
system 34.17.10.30-Gen Building works
Inspection for 100% T.4.234.582 & Manufacturer’s
QC – Civil GAM-QCR-QAC-
3.4 Installation of Conduits Manufacturer’s recommendation &
Inspector GTL-168 I S S
(If applicable) recommendation RFC drawings
Inspection for 40mm 100% T.4.234.582 & Manufacturer’s
QC – Civil GAM-QCR-QAC-
3.5 thick rock wool Manufacturer’s recommendation &
Inspector GTL-168 I W S
insulation recommendation RFC drawings

In process inspection T.4.234.582 &


100% Manufacturer’s QC – Civil GAM-QCR-QAC-
3.6 of Gypsum Board Manufacturer’s
recommendation Inspector GTL-168
Installation system recommendation I S S

Site Engineer & Check Records &


Final inspection & Punch Mechanical Completion Punch List
3.7 100% Visual confirmation QC – Civil I H W
Listing Documentation
Inspector

T- 4.234.572 Rev. A Page 5


QSGTL PEARL PROJECT Document No.: GAM-ITP-QAC-GTL- 044
C2 ASU Construction Works
ITP FOR GYPSUM BOARD INSTALLATION Date: 15.02.2009 Rev. E
(Buildings)
S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE


H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Responsible
Item Activity Test Frequency Reference Document Acceptance Criteria Verifying Documents S X C A
Party

Disposal of high risk T.13.377.450- Check & ensure in Site Engineer


wastes such as rock Construction waste Hazard area
3.8 100% Visual I S S
wool waste & gypsum Management Procedure ,flammable area any
board waste. paint material

T- 4.234.572 Rev. A Page 6


QSGTL-PEARL GTL PROJECT
C2-ASU-Construction Project
Inspection Form for Surface
Preparation(Buildings)
GAM-QCR-QAC-GTL-166
GAM-ITP-QAC-GTL- Date :
Rev. O

Location Bldg/Area:

Drawing No:

Tag No and Tag description :

Item Details of Activity Remarks

Sign off will Confirm Released to Next activity


GAMA QATAR LINDE QSGTL or its PMC

Name

Signature

Date
QSGTL PEARL PROJECT

C2 ASU Construction Works


Gypsum Board , Suspended Ceiling Date:
FORM NO: GAM-QCR-
QAC-GTL-168 Rev. O works & Rock Wool Installation
Check List ITP No: GAM–ITP–QAC–GTL-

Report No:
Item description:
Item location/area:
0
Drawing reference: Ambient Temp. : C
Tag No & Description:

COMPLIANCE
Ref. DETAIL OF ACTIVITY REMARKS
YES NO N/A
1 GYPSUM BOARD WORK
Dimensionally correct plumb, level and
1.1
square etc ... complete.
Screws, Anchors, U-Channels, Studs,
1.2
Brackets fixing.
Application of Joint Filler or joint tape etc
1.3
... complete.
2 SUSPENDED CEILING
Hangers, channels, studs, furring correctly
2.1
spaced, braced. Plumbed and level
Material application and jointing correctly
2.2
installed at ceilings, openings and fittings
2.3 Trims are installed level and clean.
ROCK WOOL INSULATION ( Roof &
3
Wall)
Positioning, grouting and curing in accord
3.1 with codes of practice and vendor
instructions
Finish with plumb, level, clean and free
3.2
from spalls
Gaps and coursing, expansion joints,
3.3 stained joints are in accord with the
relevant drawing and specifications
All works are Completed with final
4 touch-ups

5 Work area is clean and free from debris

SIGN OFF AS ACCEPTED


GAMA QATAR LINDE QSGTL or its PMC

Name

Signature

Date

Vous aimerez peut-être aussi