LINDE ENGINEERING
Unit(s): ASU
PCWBS: Z
QATAR SHELL GTL PROJECT (PEARL)
C2 AIR SEPARATION UNITS CONSTRUCTION
Document Title:
Location Bldg/Area:
Drawing No:
Name
Signature
Date
QSGTL PEARL PROJECT
Report No:
Item description:
Item location/area:
0
Drawing reference: Ambient Temp. : C
Tag No & Description:
COMPLIANCE
Ref. DETAIL OF ACTIVITY REMARKS
YES NO N/A
1 GYPSUM BOARD WORK
Dimensionally correct plumb, level and
1.1
square etc ... complete.
Screws, Anchors, U-Channels, Studs,
1.2
Brackets fixing.
Application of Joint Filler or joint tape etc
1.3
... complete.
2 SUSPENDED CEILING
Hangers, channels, studs, furring correctly
2.1
spaced, braced. Plumbed and level
Material application and jointing correctly
2.2
installed at ceilings, openings and fittings
2.3 Trims are installed level and clean.
ROCK WOOL INSULATION ( Roof &
3
Wall)
Positioning, grouting and curing in accord
3.1 with codes of practice and vendor
instructions
Finish with plumb, level, clean and free
3.2
from spalls
Gaps and coursing, expansion joints,
3.3 stained joints are in accord with the
relevant drawing and specifications
All works are Completed with final
4 touch-ups
Name
Signature
Date