Vous êtes sur la page 1sur 1

SCHEDULE OF SLABS "WARE HOUSE"

THICKNESS OF BOTTOM STEEL EXTRA TOP STEEL AT SUPPORT L/4


SLAB NOS. TYPE OF SLAB TYPE - C
SLAB SHORT SPAN LONG SPAN SHORT SPAN LONG SPAN

SCHEDULE OF BEAMS
1
CONCRTE GRADE:-M25
EXTRA STEEL AT TOP OF COLUMNS
SIZE OF BEAM BOTTOM CURTAILED STIRRUPS
BEAM NOS. TOP STEEL SUPPORT 1 SUPPORT 2 REMARKS
B X D IN mm STEEL STEEL
COLUMN NO STEEL COLUMN NO STEEL BAR OF DIA 0 TO 2d 2d TO CENTER

ELEVATIONAL DETAILS FOR LINTEL BEAM (VLB1)

SECTION 1 - 1 SECTION 2 - 2

ELEVATIONAL DETAILS FOR LINTEL BEAM (VLB27)

SECTION A - A

TYP. REINFORCEMENT DETAILS OF BEAM


ELEVATIONAL DETAILS FOR STUB COLUMN (STC)
REFERENCE IS CODES CONCRETE GRADE - M25 PROJECT
WIND SPEED:- 44m/sec 49 x DIA OF BAR
NOTES : 39 x DIA OF BAR
EARTQUAKE:- ZONE-III
ARCHITECT
= 50m.m.
TITLE
= 50m.m.
= 40m.m.
= 25m.m. JOB NO. DRG. NO. DATE OF
ISSUE DRN. DESIGN
4) ALL STEEL IS TOR STEEL OF GRADE Fe 500 N/mmSq.
= 25m.m.
5) S.B.C. OF SOIL ASSUMED IS 10 /25 / 50 T/Sq M. = 40m.m.
6) COLUMNS AND FOOTINGS ARE DESIGNED
FOR REFER KEY ELEVATION.
= 25m.m. Sunil Mutalik & Associates
= 25m.m. STRUCTURAL CONSULTANTS
7) DESIGN OF CENTRING, SHUTTERING, AND CONCRETE MIX = 25m.m.
IS CONTRACTOR/CLIENTS/SITE RESPONSIBLITY. = 25m.m.
= 25m.m.
10) WE WILL NOT BE RESPONSIBLE FOR ANY LEGAL
KEY ELEVATION REVISION
OR APPROVAL REGARDING THE APPROVED
ARCHITECTURAL PLAN.

\\server\drawing\mumbai\idw\2017\pune (aundh)\rcc drawings\cad dwgs\str-103-details of lintel beam.dxf

Vous aimerez peut-être aussi