Académique Documents
Professionnel Documents
Culture Documents
✔ Woodward GAP 2.18 and GAP 3 ✔ DCS (C200/C300) Honeywell ✔ Leadership and decision ✔ FBD for DCS
✔ Experion PKS R301 and R410 ✔ Woodward Micronet making skills ✔ Ladder logic for PLC
Academics
Title Institute Score Date
Bachelor of Engineering (BE) NED University of Engineering & Technology, 82% 2012
Karachi
Higher Secondary Certificate-HSC Government Dehli College, Karachi 83% 2008
Experience 5 years
Company Designation Duration
K-Electric Deputy Manager Jan 2018 - Present 4 months
Work History
K-Electric Jan 2018 - Present (4 months)
Hands on experience of preparation & implementation of maintenance plan and strategy for PMs and CMs of GTs, STs, FGCs and chillers in
accordance of quality standards
Involved in root cause analysis and recommendations of repeated, critical and complex faults of main machine sets of GT and ST
Ensured the availability of spares, consumables & tools in inventory management system, liaising with suppliers & vendors, raise, evaluate
and chase procurement process for timely completion of maintenance projects and availability of spares and consumables
Involved in Contractual Service Agreement (CSA) with General Electric for 4 x LM6000 gas turbines for predictable operating costs, risk
mitigation, spare parts management (replenishment through claim process), and hourly based preventive maintenances
Maintenance management and troubleshooting of 4 x 48.5 MW GE Aero-derivative LM6000 GT, 4 x McQuay Chiller WSC-126, 1 x 26MW GE
Thermodyne 8-11MC9 ST and 1 x 120 ton/hr IEG HRSG, 1 x RO plant and Balance of Plant
Maintenance & calibration experience of pressure and temperature transmitter/transducer, pressure and temperature switches, vibration
probes, LEL sensors, magnetic chip detectors, optical flame detectors, solenoid operated valves and shut-off actuators (Siemens, Rosemount,
Yokogawa and Woodward)
Hands on experience of working with hardware and software of Turbine Control System Woodward Micronet (GAP, Control Assistant and iFix),
GE Fanuc (Cimplicity, and Proficy Machine Edition), Allen Bradley SLC500, GuardLogix, ControlLogix and Bently Nevada 3500 measuring
systems (Acceleration, Velocity and Vibration)
Hands on experience of SAP PM Module (Plant Maintenance) and MM Module (Materials Management)
Maintenance & calibration experience of industrial instruments and valves (Siemens, Rosemount and Yokogawa and Woodward)
Used safety and environmental tools including PTW
Learned operations and maintenances of gas turbines, steam turbines, HRSG/boiler, water treatment plant/RO plant, chiller units and fuel
gas compressor
Maintained up-to-date backups, images and computers
Performed monthly, semi-annual and annual preventive maintenance
Projects
Steam Turbine recommissioning Aug 2016 - Feb 2017 (6 months)
Company: K-Electric
Removed and installed turbine supervisory instruments. Tested the governor and critical valves. Checked Woodward 505 and Bentley Nevada.
Simulate over speed probes, functionally tested all emergency switches. Online turbine testing for emergency switches, for over speed (both from
Woodward 505 and Bentley Nevada 2OO3 logic), for generator reverse power after generator synchronization on grid. Finally tested STG-2 package
on full load of around 24 MW.
GT LM6000 chip detector installation Jan 2015 - Feb 2016 (1.1 years)
Company: K-Electric
Successfully implemented remote monitoring of LM6000 gas turbine sump C, D and E (optional) chip detectors on DCS for early detection of
unmonitored bearings thereby increasing reliability and reduction of bearing permanent damage.
Gas Chromatograph installation & commissioning to optimize gas turbine output Dec 2014 - Apr 2015 (4 months)
against fuel quality
Company: K-Electric
Installation and Commissioning of Natural Gas Chromatograph ABB NGC-8206 and use of Calorific Value and Specific Gravity in Gas Turbine control
for optimized fuel consumption.
Company: K-Electric
Installation and Commissioning of 1 x GE Thermodyne 8-9MC9 steam turbine, 1 x 120 ton/hr heat recovery steam generator and balance of plant.
From erection till commissioing, contributed in difficult situations, used technical skills for problem solving.
Awards
Title Authority Date
National Engineering Robotics Competition participation NUST EME 2012
certificate