Meeting Agenda
* Introductions
* Design Presentation
* Small Group Q & A
Whittemore Park
June 20, 2018
Agenda
Arlington Master Plan
Arlington Open Space and Rec Plan
Mass Ave Streetscape Plan
Arlington Arts and Culture Action Plan
• Park identified as needing renovation
• Site identified as a location with great potential for
shared experience: arts, cultural, and passive recreation
Open House Online Survey Public Forum 1 Design Day Public Forum 2
• Open Discussion • 515 Responses • Presentation and • Mock-up Meeting at Park • Presentation of
with 25+ Residents Discussion of 3 Options Prefered Options
about Design Possibilities
Call with Mass Historic Meeting with Tree Warden
Feb 2015- April 4 April 6 Mar 26- May 5 May 17 June 2 June 6 June 13 June 18 June 20
Aug 2017 2018 2018 May 9 2018 2018 2018 2018 2018 2018 2018
2018
Whittemore Park
June 20, 2018
Meeting History
Finalize Design Plan Finalize Construction Docs-Construction
• Annotated Design Plan • Develop design in detail, plans, and specifications
• Develop budget models/ cost estimates • On-going construction on site
• Develop potential construction schedule and phasing
Plan Review
• Local Review
• State Review
Whittemore Park
June 20, 2018
Future Schedule
DESIGN GOALS
° Enhance small and large gathering opportunities
Whittemore Park
June 20, 2018
Design Goals
Whittemore Park
May 17, 2018
Existing Plan
Whittemore Park
June 20, 2018
Proposed Plan
Whittemore Park
June 20, 2018
Existing View
Whittemore Park
June 20, 2018
Existing
Whittemore Park
June 20, 2018
Existing
Whittemore Park
June 20, 2018
Existing- Seating
Crowley Cottrell, LLC
281 Summer St, 6th Floor WHITTEMORE PARK
0 10 20 FT
Whittemore Park
Boston, MA 02210 Proposed Seating
617.338-8400 crowleycottrell.com June 12, 2018
Scale: 1" = 20 ft June 20, 2018
Existing- Seating
Crowley Cottrell, LLC
281 Summer St, 6th Floor WHITTEMORE PARK
0 10 20 FT
Whittemore Park
Boston, MA 02210 Existing Lighting
617.338-8400 crowleycottrell.com June 12, 2018
Scale: 1" = 20 ft June 20, 2018
Existing- Lighting
Crowley Cottrell, LLC
281 Summer St, 6th Floor WHITTEMORE PARK
0 10 20 FT
Whittemore Park
Boston, MA 02210 Proposed Lighting
617.338-8400 crowleycottrell.com June 12, 2018
Scale: 1" = 20 ft June 20, 2018
Proposed- Lighting
Crowley Cottrell, LLC
281 Summer St, 6th Floor WHITTEMORE PARK
0 10 20 FT
Whittemore Park
Boston, MA 02210 Existing Monuments
617.338-8400 crowleycottrell.com June 12, 2018
Scale: 1" = 20 ft June 20, 2018
Existing- Trees
5 trees slated for removal
by Arlington tree warden
Proposed Option
Whittemore Park
June 20, 2018
Proposed Alternative
Whittemore Park
June 20, 2018
Exsiting
Whittemore Park
June 20, 2018
Public Forum
Whittemore Park
June 20, 2018