QCTM Requirements for Ball mill Productions

The General Booklet for Ball mill QCTM Documents:

According to our correspondence the following documents shall be added to


QCTM before fabrication at workshop:

1- ITP (inspection test plan) including production stages and inspection steps
and its importance as Hold, Witness or Review points.
2- Material lists and certificates including welding consumables and steel
finished products used in ball mill fabrication and their vendors
3- Welding Data Book including:
- WPS(welding procedure specification) shall be comprised of the
following items:
o Welding consumables
o Joint Designation
o Base materials
o Preheat and Post weld if needed
o Welding process parameters and number of passes etc.
- WQT(related welder qualification tests)
- PQR(prequalification tests)
Note: WPS, PQR and WQT shall be according to European or American
standards (American is preferable).
4- Approved Drawings
5- Procedure for Preheat and Post weld heat treatment including Time
temperature diagrams and the process of heat treatment according to
related standards.
6- NDT Booklet including:
- NDT extent
- NDT procedure
QCTM Requirements for Ball mill Productions

- NDT methods
- NDT and Weld Map for PJP, CJP and fillet welds according to related
standards and designations.
7- FFS (fitness for service) procedure during commissioning.
8- The following Checklist is proposed for Final Book gathering:
Final Book Checklist of Mechanical Equipment and Steel Structure

No. Final Book ITEMS Remarks

Approved technical specification, Data


1
sheet*
Approved QCP (Quality Control
2
Plan)*
3 Material list & Material certificate
4 Dimension and Visual test report
NDT reports and other specified Test
5
records
Executed welding procedure (W.P.S.)
6
for critical welding
Heat treatment chart, stress relieving
7
report
Mechanical running test, functional
test, performance test, On/Off load
8
Test, Type Test, report etc as per
approved ITP
9 Factory Acceptance Test report (FAT)
Surface preparation/painting inspection
10
report
Other test & inspection report and
11 certificate based on ITP and client
contract
12 List of sub vendors
13 All test procedure based on ITP
14 IC (Inspection Certificate)
Approved General and detailed
15
drawing*