PRICE SCHEDULE
1. Contract Price 1.1 The Contract Price for the entire Scope of Facilities
including all the contractual obligations of the Contractor
together with its Sub-Contractor / Vendors, is indicated in
the Article-2 of the Contract.
2. Contract Price 2.1 The break-up of the Contract Price is indicated in the
Break up Summary Price Schedule and detailed break-up of
Summary Prices is given in the following Tables, hereafter.
(However, in case the Contractor is a Consortium of two or
more parties, the break-up of the Contract Price is to be
indicated separately for each member of Consortium, in
the Table given at 1C).
Table Descriptions
Prices ( Currency)
Sl.
Description Indian (Supplies & Services
No.
Foreign including all duties and taxes
at base date)
a b c d
1 Design & engineering
(For Indigenous portion Refer - Table 1B)
2 Supply of Plant & equipment incl.technological Structure
a) Imported (FOB) Refer Table - 2A
b) Indigenous ( at site) Refer - Table 3A
3 Civil Engg. Works incl. supplies Refer Table 4A
4 Refractories
Supply of steel fabricated and various Building Structures for erection
5
of Plant & Machinery (Refer Table - 5A)
Storage, Handling, Erection, Commissioning, and PG tests of Plant
6
and equipment, Bulding structure and refractories - Refer Table-6A
Foreign supervision charges in India during Erection, Start-up, Testing,
7 Commissioning and PG tests of Plant and equipment for
------------ Mandays
8 Training Charges (Refer Table - 6B)
a) Foreign Training Charges for -------------- mandays
b) Indian Training Charges for -------------- mandays
9 For all items quoted in Foreign currency
a)Ocean Freight
b)Customs, Port clearance (excluding duties & cess to be paid by
Employer) and Inland transportation from Indian port to site
10 a) Comprehensive/Transit,Storage cum erection insurance
b) Marine insurance For all items quoted in Foreign currency
11 Total Contract Price ( 1 to 10 )
12 Operation & Maintenence Cost (O&M) for 5 years (Refer Table-7B
& 8A)
13 Total Contract Price including O & M Cost (11 +12)
Value of Supplies, on which Entry Tax has been considered (Refer foot note no.6 ), is Rs. ------------------
Notes:
1 Bidders to quote in summary price schedule based on which evaluation will be done and bidders shall also submit price
break-up in tables 1B, 2A to 7A along with the Price Bid
2 In case of consortium, the price for each member will be indicated for their scope of work in Table 1C
3 In case of arithmetic error in totaling, corrected arithmetic total will be considered.
4 In case of discrepancy between words and figures and / or arithmetic error in totaling, corrected arithmetic total will be
considered.
5 Remarks / Footnotes / Comments furnished in un-priced bids will prevail, if any discrepancy is found in furnishing any
Remarks / Footnotes / Comments between un-priced bids and priced bids.
6 Bidders to indicate the value of supplies on which Entry Tax are to be borne by them and not required to be loaded for the
evaluation of their Price, failing which Entry Tax will be loaded for the full value of Supplies.
7 The prices for indigenous supply and services shall include basic price, excise duty, sales tax, VAT, octroi, turn over tax
(TOT), freight , insurance, Works Contract Tax, Service Tax and other duties, taxes and levies etc. as may be applicable.
While the basic price will constitute the consideration under the contract, the payment of duties, taxes, levies etc., will be
reimbursed (on actual) against documentary evidence to be produced by the contractor. In no case the reimbursement
towards duties and taxes etc., shall exceed the amount specified in price schedule tables except for statutory variations. In
case the actual taxes and duties paid by the contractor are less than those indicated in the price schedule, the difference
will not be paid to the contractor, since the taxes and duties are reimbursable to the contractor on actual against
documentary evidence. Please refer GCC Clause No. 14, Taxes & Duties.
(PRICE IN RS
LAKHS)
1 Excise duty :
2 CST
3 VAT :
4 Service Tax :
5 Work Contract Tax :
6 Any other tax ( Pl. Specify ) :
TABLE - 1C
NMDC - 3.0 Mt/Yr Integrated Steel Plant
PRICE - CONSORTIUM MEMBER WISE
PACKAGE -
Bidder's Ref No.
11 Total Price ( 1 to 10 )
12 Operation & Maintenence Cost (O&M) for 5 years (Refer Table-7B
& 8A)
13 Total Contract Price including O & M Cost (11 +12)
Signature of Tenderer
with date and seal
TABLE-2A
PRICE
SL.
DESCRIPTION UNIT Quantity
NO. FOB value in FE FE Adopted
a b c d e h
I Supply of Imported Plant & Equipment
b) Technological structure
c) Cranes, Hoists and Trolleys
d)Ventillation, air-conditioning and other pollution
control equipment
e) Utilities & Services
- Gas facilities
- Compressed air facilities
- Water Supply and Sewrage facilities
a) Main equipment
c) Transformers,Powerdistribution, lighting,
Earthing, Lighting protection and Cabling
6 Commissioning Spares
Total
Signature of Tenderer
Total ( In Words) with date and seal
TABLE - 3A
PRICE SCHEDULE FOR SUPPLY OF INDIGENOUS PLANT AND EQUIPMENT INCLUDING TECHNOLOGICAL STRUCTURE
In Rs Lakhs
Inland Freight
SL. TOTAL Excise duty upto site Entry tax/ Octroi/
DESCRIPTION Weight UNIT Quantity TOTAL FOR/FOT
NO. BASIC incl.edu.cess CST VAT including TOT/ Any other
PRICE
PRICE on e service tax, levy
edu.cess
a b c d e f g h I j k l
I Supply of Indigenous Plant & Equipment
a) Main equipment
b) Technological structure
c) Cranes, Hoists and Trolleys
d)Ventillation, air-conditioning and other
pollution control equipment
e) Utilities & Services
- Gas facilities
- Compressed air facilities
- Water Supply and Sewrage facilities
Percentage rates of taxes and duties( including Education Cess) included in the above price
1 Excise duty : Sl.No Service Tax & Education cess included in Inland Freight at column 'j'
2 CST : 1 Freight amount included in 'j' (Amount in Rs.)
Indicate the Freight amount on which service tax was considered
3 VAT : 2 in Rs.
4 Service Tax : 3 % of Service Tax & Education cess considered on '2'
5 Work Contract Tax : 4 Amount of service tax & Edu.cess as per '3'
Signature of Tenderer
6 Any other tax ( Pl. Specify ) :
with date and seal
TABLE-4A
PRICE in Rs Lakhs
SL.No DESCRIPTION Unit Quantity RATE/ UNIT Service Tax Any other Taxes &
Basic price incl. Levies ( Bidder to TOTAL PRICE
Edu.cess Specify)
a b c d e f g h I
Civil Engineering Works including
all supplies
II Civil work
1 Excavation m3
7 Brickwork m3
9 Flooring m2
10 Plastering m2
12 Railway tracks m
Sub-total -II
Percentage rates of taxes and duties( including Education Cess) included in the above price
1 Excise duty :
2 CST
3 VAT :
4 Service Tax :
5 Work Contract Tax :
6 Any other tax ( Pl. Specify ) :
Signature of Tenderer
with date and seal
TABLE - 5A
PRICE SCHEDULE FOR SUPPLY OF STEEL FABRICATED AND VARIOUS BUILDING STRUCTURES FOR ERECTION OF PLANT & MACHINERY
PRICE in Rs lakhs
Excise Entry tax/
SL. RATE/
DESCRIPTION Unit Quantity Duty incl. Octroi/ TOT/
No UNIT Basic price CST VAT TOTAL PRICE
Edu. Any other
cesson f levy
a b c d e f g h i j k
I Supply of Building Structures
a) Fabricated at Contractor's site T
Percentage rates of taxes and duties( including Education Cess) included in the above price
1 Excise duty
2 CST
3 VAT
4 Service Tax
5 Work Contract Tax
6 Any other tax ( Pl. Specify )
Signature of Tenderer
with date and seal
TABLE - 6A
Price in Rs lakhs
Service Tax
Sl. NO. Items Unit Qty
Basic incl. edu. Total
cess
a. b c d e f g
1 Mechanical Plant & Equipment
a) Main equipment T
b) Technological Structures T
c) Cranes, Hoists and Trolleys
d) Ventilation and Air-conditioning and other T
pollution control equipment
e) Utilities and services
- Gas facilities T
- Compressed air facilities T
- Water supply and sewrage facilities T
f)Building and yard utilities T
g) Laboratory and testing equipment T
h) Fire protection system T
i) Other Miscellaneous equipment T
6 Refractories
a) Indigenous refractories T
b) Imported refractories T
8 Any Other
TOTAL( 1 to 8)
Total ( In Words)
Percentage rates of taxes and duties( including Education Cess) included in the above price
1 Excise duty :
2 CST
3 VAT :
4 Service Tax :
5 Work Contract Tax :
6 Any other tax ( Pl. Specify ) :
Signature of Tenderer
with date and seal
TABLE - 6B
A FOREIGN TRAINING
Rate per
No. of
Sl. NO. Description Manday
Mandays Total Price
(FE)
in FE
a. b c d e
TOTAL
* For Foreign Training, For Taxes and duties refer to clause 14.3 & 14.4 of GCC
B TRAINING IN INDIA
TOTAL
Percentage rates of taxes and duties( including Education Cess) included in the above price 'B'
1 Excise duty :
2 CST
3 VAT :
4 Service Tax :
5 Work Contract Tax :
6 Any other tax ( Pl. Specify ) :
Signature of Tenderer
with date and seal
TABLE-7A
7 Erection of refractories
Reference Sub clause No.2.9 of Appendix-4
Signature of Tenderer
with date and seal
TABLE - 7B
Others
Foreign
Nos. Tonne Basic ED CST (to be Total
currency
specified)
a b c d e f g h I j
Supply of Imported 5 years
A
O&M Spares
- - - - -
1 - - - - -
2 - - - - -
3 - - - - -
4 - - - - -
5 - - - - -
6 - - - - -
Total (A)
Supply of Indigenous 5 years
B.I
O&M Spares
1 -
2 -
3 -
4 -
5 -
6 -
Total (B. I)
B. II Inland Transportation
Total ( B = BI+BII )
Total ( A + B )
Percentage rates of taxes and duties( including Education Cess) included in the above price
1 Excise duty :
2 CST
3 VAT :
4 Service Tax :
5 Work Contract Tax :
6 Any other tax ( Pl. Specify ) :