APPENDIX - 1

PRICE SCHEDULE

1. Contract Price 1.1 The Contract Price for the entire Scope of Facilities
including all the contractual obligations of the Contractor
together with its Sub-Contractor / Vendors, is indicated in
the Article-2 of the Contract.
2. Contract Price 2.1 The break-up of the Contract Price is indicated in the
Break up Summary Price Schedule and detailed break-up of
Summary Prices is given in the following Tables, hereafter.
(However, in case the Contractor is a Consortium of two or
more parties, the break-up of the Contract Price is to be
indicated separately for each member of Consortium, in
the Table given at 1C).
Table Descriptions

1A Summary Price Schedule


1B Price Schedule for Indigenous Design &
Engineering.
1C Price for each member of the consortium
will be indicated for their scope of work

2A Price Schedule for Supply of Plant &


Equipment and Technological Structures
(Imported Supplies quoted in foreign
currencies)
3A Price Schedule for Supply of Plant &
Equipment and Technological Structures
(Indigenous Supplies)

4A Price Schedule for Civil Engineering Works,


including all Supplies
5A Price Schedule for Supply of Steel Fabricated
and Various Building Structures for Erection
of Plant & Machinery
6A Price Schedule for Storage, Handling, Erection,
Commissioning and Performance Guarantee
Tests of Plant & Equipment, Building Steel
Structures, Sheeting, Glazing & final Painting
and Refractories
6B Price Schedule for Training.

7A Value of "Po" for Calculation of Price


Adjustment due to Variation in Price Indices
(Appendix-4)
7B Price Schedule For Annual Operation &
Maintenance For Five (5) Years
8A Price schedule for 5 year O&M spares (GCC
clause 7.4.3)
2.2 The “Po” shall be the prices as on Base Date excluding all
duties, taxes, and any other levies. The values of Po for
the purpose of Price Adjustment clause stipulated in the
Sub-Clause 2.1 to 2.9 of the Appendix 4, are to be given
in Table-2 hereof.
TABLE- 1A

NMDC - 3.0 Mt/Yr Integrated Steel Plant

SUMMARY PRICE SCHEDULE

PACKAGE - PACKAGE NO.-

Bidder's Ref No.

Prices ( Currency)
Sl.
Description Indian (Supplies & Services
No.
Foreign including all duties and taxes
at base date)
a b c d
1 Design & engineering
(For Indigenous portion Refer - Table 1B)
2 Supply of Plant & equipment incl.technological Structure
a) Imported (FOB) Refer Table - 2A
b) Indigenous ( at site) Refer - Table 3A
3 Civil Engg. Works incl. supplies Refer Table 4A
4 Refractories
Supply of steel fabricated and various Building Structures for erection
5
of Plant & Machinery (Refer Table - 5A)
Storage, Handling, Erection, Commissioning, and PG tests of Plant
6
and equipment, Bulding structure and refractories - Refer Table-6A
Foreign supervision charges in India during Erection, Start-up, Testing,
7 Commissioning and PG tests of Plant and equipment for
------------ Mandays
8 Training Charges (Refer Table - 6B)
a) Foreign Training Charges for -------------- mandays
b) Indian Training Charges for -------------- mandays
9 For all items quoted in Foreign currency
a)Ocean Freight
b)Customs, Port clearance (excluding duties & cess to be paid by
Employer) and Inland transportation from Indian port to site
10 a) Comprehensive/Transit,Storage cum erection insurance
b) Marine insurance For all items quoted in Foreign currency
11 Total Contract Price ( 1 to 10 )
12 Operation & Maintenence Cost (O&M) for 5 years (Refer Table-7B
& 8A)
13 Total Contract Price including O & M Cost (11 +12)

Total contract Price in words (Sl. No. 13):


Indian currency :
Foreign Cureign Currency :

Value of Supplies, on which Entry Tax has been considered (Refer foot note no.6 ), is Rs. ------------------
Notes:
1 Bidders to quote in summary price schedule based on which evaluation will be done and bidders shall also submit price
break-up in tables 1B, 2A to 7A along with the Price Bid
2 In case of consortium, the price for each member will be indicated for their scope of work in Table 1C
3 In case of arithmetic error in totaling, corrected arithmetic total will be considered.
4 In case of discrepancy between words and figures and / or arithmetic error in totaling, corrected arithmetic total will be
considered.
5 Remarks / Footnotes / Comments furnished in un-priced bids will prevail, if any discrepancy is found in furnishing any
Remarks / Footnotes / Comments between un-priced bids and priced bids.
6 Bidders to indicate the value of supplies on which Entry Tax are to be borne by them and not required to be loaded for the
evaluation of their Price, failing which Entry Tax will be loaded for the full value of Supplies.
7 The prices for indigenous supply and services shall include basic price, excise duty, sales tax, VAT, octroi, turn over tax
(TOT), freight , insurance, Works Contract Tax, Service Tax and other duties, taxes and levies etc. as may be applicable.
While the basic price will constitute the consideration under the contract, the payment of duties, taxes, levies etc., will be
reimbursed (on actual) against documentary evidence to be produced by the contractor. In no case the reimbursement
towards duties and taxes etc., shall exceed the amount specified in price schedule tables except for statutory variations. In
case the actual taxes and duties paid by the contractor are less than those indicated in the price schedule, the difference
will not be paid to the contractor, since the taxes and duties are reimbursable to the contractor on actual against
documentary evidence. Please refer GCC Clause No. 14, Taxes & Duties.

Signature of authorised signatory


(Official seal of Company)
TABLE - 1B

PACKAGE- Package No. -

PRICE SCHEDULE FOR INDIGENOUS DESIGN & ENGINEERING

(PRICE IN RS
LAKHS)

SL.No. Items Indiagenious


Design &
Engineering
a b c
1 Basic Cost
2 Service tax
3 Education Cess on service Tax
4 Any other taxes, duties & levies (Bidder to specify)
Total
Total Design & Engineering (In words) --------------------------------------------

Percentage rates of taxes and duties( including Education Cess) included


in the above price

1 Excise duty :
2 CST
3 VAT :
4 Service Tax :
5 Work Contract Tax :
6 Any other tax ( Pl. Specify ) :
TABLE - 1C
NMDC - 3.0 Mt/Yr Integrated Steel Plant
PRICE - CONSORTIUM MEMBER WISE
PACKAGE -
Bidder's Ref No.

Consortium Consortium Consortium Consortium


Sl. Member 1 (Name of Member 2 (Name of Member 3 (Name of Member 4 (Name of
Description
No. Bidder) Bidder) Bidder) Bidder)
Currency Currency Currency Currency
a b
1 Design & engineering

2 Supply of Plant & equipment incl.technological Structure


a) Imported (FOB)
b) Indigenous ( at site)
3 Civil Engg. Works incl. supplies
4 Refractories
Supply of steel fabricated and various Building Structures for
5
erection of Plant & Machinery (Refer Table - 5A)
Storage, Handling, Erection, Commissioning, and PG tests of
6
Plant and equipment, Bulding structure and refractories -
Foreign supervision charges in India during Erection, Start-up,
7 Testing, Commissioning and PG tests of Plant and equipment for
------------ Mandays
8 Training Charges
a) Foreign Training charges for ---------- mandays
b) Indian Training Charges for ------------ mandays
9 For all items quoted in Foreign currency
a)Ocean Freight

b)Customs, Port clearance (excluding duties & cess to be paid by


Employer) and Inland transportation from Indian port to site
a) Comprehensive/Transit,Storage cum erection insurance
10
b) Marine insurance For all items quoted in Foreign currency

11 Total Price ( 1 to 10 )
12 Operation & Maintenence Cost (O&M) for 5 years (Refer Table-7B
& 8A)
13 Total Contract Price including O & M Cost (11 +12)

Signature of Tenderer
with date and seal
TABLE-2A

NMDC - 3.0 Mt/Yr Integrated Steel Plant


PACKAGE- PACKAGE NO.-

PRICE SCHEDULE FOR SUPPLY OF IMPORTED PLANT AND EQUIPMENT INCLUDING


TECHNOLOGICAL STRUCTURE

PRICE
SL.
DESCRIPTION UNIT Quantity
NO. FOB value in FE FE Adopted
a b c d e h
I Supply of Imported Plant & Equipment

Mechanical Plant and equipment consists of the


1
followings:
Main equipment Pumps , Blowers, HRSCC , UF,
RO System, Centrifuge, Ozone Treatment
system, Degassifier system, Zero Liquid
discharge Plant comprising of Centrifuge,Multi
Effect Evaporator, Chemical dosing facilities,
Mobile waste collection system, Pipes &
fittings, Valves ETC.

b) Technological structure
c) Cranes, Hoists and Trolleys
d)Ventillation, air-conditioning and other pollution
control equipment
e) Utilities & Services
- Gas facilities
- Compressed air facilities
- Water Supply and Sewrage facilities

f) Building and Yard utilities

g) Laboratory and other testing equipment

h) Fire protection system

i)Other Miscellaneous equipment

2 Electrical Plant and equipment

a) Main equipment

b) Motors and controls

c) Transformers,Powerdistribution, lighting,
Earthing, Lighting protection and Cabling

d)Other Miscellaneous equipment

3 Instrumentation, Control and Cabling

4 Automation including Computers

Telecommunication system including cabling and


5
CCTV

6 Commissioning Spares

7 Oil, Grease, Lubricants & Chemicals

8 Special Tools and Tackles

Total
Signature of Tenderer
Total ( In Words) with date and seal
TABLE - 3A

NMDC - 3.0 Mt/Yr Integrated Steel Plant


PACKAGE- PACKAGE NO.-

PRICE SCHEDULE FOR SUPPLY OF INDIGENOUS PLANT AND EQUIPMENT INCLUDING TECHNOLOGICAL STRUCTURE

In Rs Lakhs
Inland Freight
SL. TOTAL Excise duty upto site Entry tax/ Octroi/
DESCRIPTION Weight UNIT Quantity TOTAL FOR/FOT
NO. BASIC incl.edu.cess CST VAT including TOT/ Any other
PRICE
PRICE on e service tax, levy
edu.cess
a b c d e f g h I j k l
I Supply of Indigenous Plant & Equipment

Mechanical Plant and equipment consists of


1 the followings:
Main equipment Pumps , Blowers, HRSCC ,
UF, RO System, Centrifuge, Ozone
Treatment system, Degassifier system,
Zero Liquid discharge Plant comprising of
Centrifuge,Multi Effect Evaporator, Chemical
dosing facilities, Mobile waste collection
system, Pipes & fittings, Valves ETC.

a) Main equipment
b) Technological structure
c) Cranes, Hoists and Trolleys
d)Ventillation, air-conditioning and other
pollution control equipment
e) Utilities & Services
- Gas facilities
- Compressed air facilities
- Water Supply and Sewrage facilities

f) Building and Yard utilities


g) Laboratory and other testing equipment
h) Fire protection system
i)Other Miscellaneous equipment
2 Electrical Plant and equipment
a) Main equipment
b) Motors and controls
c) Transformers,Powerdistribution, lighting,
Earthing, Lighting protection and Cabling
d)Other Miscellaneous equipment
3 Instrumentation, Control and Cabling
4 Automation including Computers
Telecommunication system including cabling
5 and CCTV
6 Commissioning spares
7 Oil, Grease, Lubricants & Chemicals
8 Special Tools and Tackles
TOTAL ( 1 to 7)
TOTAL( In Words)

Percentage rates of taxes and duties( including Education Cess) included in the above price

1 Excise duty : Sl.No Service Tax & Education cess included in Inland Freight at column 'j'
2 CST : 1 Freight amount included in 'j' (Amount in Rs.)
Indicate the Freight amount on which service tax was considered
3 VAT : 2 in Rs.
4 Service Tax : 3 % of Service Tax & Education cess considered on '2'
5 Work Contract Tax : 4 Amount of service tax & Edu.cess as per '3'
Signature of Tenderer
6 Any other tax ( Pl. Specify ) :
with date and seal
TABLE-4A

NMDC - 3.0 Mt/Yr Integrated Steel Plant


PACKAGE - PACKAGE NO.-

PRICE SCHEDULE FOR CIVIL ENGINEERING WORKS INCLUDING ALL SUPPLIES

PRICE in Rs Lakhs

SL.No DESCRIPTION Unit Quantity RATE/ UNIT Service Tax Any other Taxes &
Basic price incl. Levies ( Bidder to TOTAL PRICE
Edu.cess Specify)

a b c d e f g h I
Civil Engineering Works including
all supplies

Dismantling work ( Plant & Equipment ,


I
Buildings , Structures, Foundations etc.)

II Civil work

1 Excavation m3

2 Piling ( Diameter and capacity wise ) Nos


- Average length m

3 Plain Cement Concrete m3

4 Heat Resistant Concrete m3

5 Reinforced Cement Concrete

a) Below Ground Level m3


b) At Ground Floor m3
c) In Superstructure m3

6 Reinforcement steel works T

7 Brickwork m3

8 Doors, Windows & Ventilators m2

9 Flooring m2

10 Plastering m2

11 Road and Paved areas m2

12 Railway tracks m

13 Any other items not mentioned above

Sub-total -II

Total price (I+ II)


Total ( in Words)

Percentage rates of taxes and duties( including Education Cess) included in the above price

1 Excise duty :
2 CST
3 VAT :
4 Service Tax :
5 Work Contract Tax :
6 Any other tax ( Pl. Specify ) :

Signature of Tenderer
with date and seal
TABLE - 5A

NMDC - 3.0 Mt/Yr Integrated Steel Plant

PACKAGE - PACKAGE NO.-

PRICE SCHEDULE FOR SUPPLY OF STEEL FABRICATED AND VARIOUS BUILDING STRUCTURES FOR ERECTION OF PLANT & MACHINERY

PRICE in Rs lakhs
Excise Entry tax/
SL. RATE/
DESCRIPTION Unit Quantity Duty incl. Octroi/ TOT/
No UNIT Basic price CST VAT TOTAL PRICE
Edu. Any other
cesson f levy
a b c d e f g h i j k
I Supply of Building Structures
a) Fabricated at Contractor's site T

Sheeting Materials for Roof/ Side/


II
Gable Cladding

a) Galvanised Corrugated Seel ( GCS)


m2
Sheet
b) Precoated Sheets m2
c) Polycarbonate sheets m2
d) Other m2
Sub-total (II)
TOTAL( I + II)
Total ( in Words)

Percentage rates of taxes and duties( including Education Cess) included in the above price

1 Excise duty
2 CST
3 VAT
4 Service Tax
5 Work Contract Tax
6 Any other tax ( Pl. Specify )

Signature of Tenderer
with date and seal
TABLE - 6A

NMDC - 3.0 Mt/Yr Integrated Steel Plant


PACKAGE - PACKAGE No.

PRICE SCHEDULE FOR RECEIPT,UNLOADING & STORAGE,TRANSPORTATION FROM


STORE TO ERECTION SITE, ERECTION,INCLUDING SUPERVISION, START-UP,
TESTING, COMMISSIONING & P.G. TESTS FOR PLANT & EQUIPMENT,
BULIDING STEEL STRUCTURES, SHEETING, GLAZING AND FINAL PAINTING AND REFRACTORIES

Price in Rs lakhs
Service Tax
Sl. NO. Items Unit Qty
Basic incl. edu. Total
cess
a. b c d e f g
1 Mechanical Plant & Equipment
a) Main equipment T
b) Technological Structures T
c) Cranes, Hoists and Trolleys
d) Ventilation and Air-conditioning and other T
pollution control equipment
e) Utilities and services
- Gas facilities T
- Compressed air facilities T
- Water supply and sewrage facilities T
f)Building and yard utilities T
g) Laboratory and testing equipment T
h) Fire protection system T
i) Other Miscellaneous equipment T

2 Electrical Plant and equipment


a) Main equipment
b) Motors and Controls
c) Transformers, Powerdistribution, Lighting,
Earthing, Lighting protection and cabling
d) Other Miscellaneous equipment

3 Instrumentation, Control and Cabling

4 Automation including Computers

Telecommunication system including Cabling and


5
CCTV

6 Refractories
a) Indigenous refractories T

b) Imported refractories T

7 Building Steel Structures incl. Sheeting

8 Any Other
TOTAL( 1 to 8)
Total ( In Words)

Percentage rates of taxes and duties( including Education Cess) included in the above price

1 Excise duty :
2 CST
3 VAT :
4 Service Tax :
5 Work Contract Tax :
6 Any other tax ( Pl. Specify ) :

Signature of Tenderer
with date and seal
TABLE - 6B

NMDC - 3.0 Mt/Yr Integrated Steel Plant


PACKAGE - PACKAGE NO:

PRICE SCHEDULE FOR TRAINING

A FOREIGN TRAINING

Rate per
No. of
Sl. NO. Description Manday
Mandays Total Price
(FE)
in FE
a. b c d e

TOTAL
* For Foreign Training, For Taxes and duties refer to clause 14.3 & 14.4 of GCC

B TRAINING IN INDIA

Rate per Total Price


No. of
Sl. NO. Description Manday in Indian
Mandays
(IN Indian Rupees)
a. b c d e

TOTAL

Percentage rates of taxes and duties( including Education Cess) included in the above price 'B'

1 Excise duty :
2 CST
3 VAT :
4 Service Tax :
5 Work Contract Tax :
6 Any other tax ( Pl. Specify ) :

Signature of Tenderer
with date and seal
TABLE-7A

NMDC - 3.0 Mt/Yr Integrated Steel Plant


VALUE OF "Po" FOR CALCULATION OF PRICE ADJUSTMENT DUE TO
VARIATION IN PRICE INDICES IN ACCORDANCE TO
PROVISIONS OF APPENDIX-4

Sl.No. Description Value of Po


a b c
Supply of Indegenous Mechanical Plant and Equipment
1
including Technological Structures (Item No.1 of Table-3A)
Reference Sub clause No.2.3 of Appendix-4

2 Supply of Indegenous Electrical Plant and Equipment


(Item No.2 of Table-3A)
Reference Sub clause No.2.4 of Appendix-4

3 Erection of Mechanical and Electrical Plant and Equipment


Reference Sub clause No.2.5 of Appendix-4

Supply of Steel Fabricated and Various Building Structures for


4
Erection of Plant & Machinery
a) When steel issued by Employer on Cost Recovery Basis
Reference Sub clause No.2.6.1 of Appendix-4

b) When steel is procured by Contractor


Reference Sub clause No.2.6.2 of Appendix-4

Erection of Steel Structures including Sheetin, Glazing and Final


5
painting
Reference Sub clause No.2.7 of Appendix-4

6 Civil Engineering works including all necessary supplies


Reference Sub clause No.2.8 of Appendix-4

7 Erection of refractories
Reference Sub clause No.2.9 of Appendix-4

Signature of Tenderer
with date and seal
TABLE - 7B

NMDC - 3.0 Mt/Yr Integrated Steel Plant


PACKAGE- PACKAGE NO.
Price Schedule For Annual Operation & Maintenance For Five (5) Years

Sl. No. Items/Descriptions Number Total in INR


for five (5)
years
A Manpower Deployment
I Site in charge (Graduate engineer)
II (Mechanical/Chemical/Civil)
For in basis
Operations on 3 (three) Shift
Shift wise deployment of personnel to carry out various
i) operational (Operation)
Supervisor
ii) Supervisor (Maintenance-Mechanical)
iii) Supervisor (Maintenance-Electrical/Instrumentaion)
iv) Operator
v) Mechanic Elect & Mech
vi) Helper / Unskilled
- Service Tax ---------%
- Any other tax (specify) @ ------------%
TOTAL (A)
B Supply of Chemicals, consumables, membrane
replacement
- Excise Duty @ --%
- CST @ -----%
- VAT @ ---------%
- Any other tax (specify) @ --------%
TOTAL (B)
Total (A+B) including duties & taxes
NOTE: The above prices are strictly as per for detail scope of work mentioned in
TS.
TABLE-8A

NMDC - 3.0 Mt/Yr Integrated Steel Plant


PACKAGE- PACKAGE NO.

PRICE SCHEDULE FOR SUPPLY OF 5 YEARS O&M SPARES

FOB Price (for


Price (in Indian rupees)
SL. NO. Item Quantity imported
(for indegenous spares)
spares)

Others
Foreign
Nos. Tonne Basic ED CST (to be Total
currency
specified)
a b c d e f g h I j
Supply of Imported 5 years
A
O&M Spares
- - - - -
1 - - - - -
2 - - - - -
3 - - - - -
4 - - - - -
5 - - - - -
6 - - - - -
Total (A)
Supply of Indigenous 5 years
B.I
O&M Spares
1 -
2 -
3 -
4 -
5 -
6 -
Total (B. I)

B. II Inland Transportation

Total ( B = BI+BII )
Total ( A + B )

Percentage rates of taxes and duties( including Education Cess) included in the above price

1 Excise duty :
2 CST
3 VAT :
4 Service Tax :
5 Work Contract Tax :
6 Any other tax ( Pl. Specify ) :