BAR CHART SCHEDULE

MAY JUNE
ACTIVITY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 BASEBOARD REPAIR
2 INSIDE-OUTSIDE OF DOOR- RETOUCH
3 REPAINTING OF WALLS OF STORAGE ROOM
4 GROUT AT TOP CORNER OF DOOR
5 REPLACEMENT OF BASEBOARD
6 RELOCATE OUTLET @ LIVING AREA + CEILING LIGHTS
7 COVE LIGHTS (VARIABLE SCHEDULE)
8 ADDITIONAL SOCKETS
9 RETOUCH OF DOOR JOINTS
10 REPLACEMENT OF FLOOR WOOD PANELS (IF WOOD IS AVAILABLE)
11 RETOUCH OF PAINT
12 DOOR JAMB - PAINT RETOUCH
13 RETOUCH PAINT AROUND WALL LIGHTS
14 TILES RETOUCH
15 ROOF TILES RETOUCH
16 TILES REPAIR
17 PAINTING OF BLOCK HINGE
18 TILES INSTALLATION (IF TILES ARE AVAILABLE)
REPAINTING OF I BEAM (GARAGE) - WILL BE SCHEDULED AFTER
19
REMOVAL OF TEMPERED GLASS
20 FOOT BOLT FOR GATE
21 INSTALL CANOPY (LAUNDRY)