JOB SAFETY ANALYSIS

Ref
INSTALLATION OF FAHU’S AND AHU’S Date 04-06-2018
Rev 000

Who might Current Risk Responsible Final Risk


Task (Steps) Potential Hazard Consequence details Existing Control Additional Control
be affected Con Prob Risk person Cons Prob Risk

Pre use inspection of


the tool and electric
Safe Use of power
cables shall be carried
tools training shall be
out by the operative.
arranged for the
Double insulated tools
operatives.
shall be used to
prevent electric shock.
All power tools to be
Electric Shock Operatives Cable management 4 3 12 Supervisor/ 4 2 8
110v.
property shall be carried out to Engineer/
Flying particles prevent slips, trips and Workers/
Power supply to be
falls. Safety
taken through ELCB
Eye injuries Power supply to be cut
only.
off while repairs or
Main contactors
Noise changing grinding
instruction to be
Use of Electrical blades.
followed.
Powered tools Fire All combustibles
PAT test will conduct
materials to be moved
under the
Un inspected tools from the area or
supervisoion of
should be covered
electrical engineer
Lack of PPEs with fire blankets.
Powertools inspection
Ear defenders shall be
done and colour will
HAVS provided to the
followed
operatives for hearing
protection.
Serviceable, inspected
fire extinguisher to be
kept near the working
area.
All tools and
equipment’s shall be
Page 1 of 8
JOB SAFETY ANALYSIS
Ref
INSTALLATION OF FAHU’S AND AHU’S Date 04-06-2018
Rev 000

inspected and color


coded by a competent
person.
All mandatory PPE
Wear during work
eg:helmet,shoes,googl
es,face protection/ear
puff,mask
Job rotatation giving
to operaters to
prevent HAVS.
Main Contractors
Permit to work system
shall be followed.
Maximum 20 kg will
Back Injuries load manually during
work
Sprains SWL system will follow
Safety Precautions
Safe Manual handling
with the workforce to
Strains methods shall be
be discussed by the
Operatives, adopted by keeping
supervisor.
Hernias property the back straight and
Manual Supervision to monitor
knees bended to
handling of the task. Supervisor/
Slips and Trips prevent back injuries.
installing grills, 5 3 15 Manual Handling Engineer/ 4 2 8
Lifting of heavy load
diffusers & training to the Workers
Work related upper should be avoided and
louvers operatives shall be
limbs disorder shall be lifted by
delivered.
mechanical means or
TBT conducted to
Cuts injuries by team lift.
workers about SWL,
Area shall be kept
ergonomics hazards.
Lack of PPEs clean and tidy to
prevent slips and falls.
Ergonomics hazards Adequate personnel
protective
Page 2 of 8
JOB SAFETY ANALYSIS
Ref
INSTALLATION OF FAHU’S AND AHU’S Date 04-06-2018
Rev 000

equipment’s to be
worn by the
operatives to prevent
cuts injuries caused by
sharp edges.
Job rotation or
sufficient breaks shall
be given to the
workers.
Tool box talks to be
conducted by the
concerned supervisor
prior the task.
Provision of cool
drinking water in the
area to be ensured.

Equipment should
certified by 3rd party
Falling men Area should be Engineer ensure the
Workers barricaded supervisor is following
Falling objects and Supervisor Work with the PTW system
materials Nearby presence of Banks
workers men Proper traffic
Equipment failure Operator should be management system Supervisor/
Working above
certified by 3rd party 5 5 25 Engineer/ 4 2 8
MEWP
Give tool box talk Operator cross check Workers
Un slope ground before starting the the equipment
condition work Regularly
Keep fire extinguisher
Weather condition on the platform of Moniter the weather
MEWP condition
Roofing condition Use safety harness
Follow main
Page 3 of 8
JOB SAFETY ANALYSIS
Ref
INSTALLATION OF FAHU’S AND AHU’S Date 04-06-2018
Rev 000

contractor PTW
System
Follow the checklist
provided by main
contractor
Close supervision of
work
Activivty will stop
when the wind speed
exceed more than 20
knot.
Attend main
contractor training
awareness program
Full body harness
Prior toolbox talk
inspection should be
before starting the
done every month.
work
PTW system should be
Workers/nearb Barricaded the work
followed Store/Engineer
Slip trip & fall y workers area is relevant 4 4 16 3 3 9
Ensure working under s/HSE Advisor
hazards Tie the power tools
close monitoring
Working at Falling men and tools
Ensure the
height Falling materials Proper monitoring
communication is
Horse play Use only double lane
proper
Weather condition full body harness
Ensure the full body
Awareness of weather
harness is inspected
condition
by main contractor
During work at height
Monitor the weather
not allowed to use
condition
shock absorber prior
to bypass or less than
6 meter.

Page 4 of 8
JOB SAFETY ANALYSIS
Ref
INSTALLATION OF FAHU’S AND AHU’S Date 04-06-2018
Rev 000

We only use
competent and trained
operator certified by
Equipment not in 3rd party and Main contractor’s
good condition approved. instruction and site
Injury due to rules and regulation to
Workers/opera Trained banks man & 20 Supervisor/
crushing by Operator 4 5 be followed. 3 3 9
tors/ riggers Engineer/
machine. Adequate supervision
Toolbox talks prior to Workers
Overhangs, incorrect to be provided.
angle, side collapse, start work. All excavation area
fall slip and trip. Reverse alarm must be shall be barricaded
Using MEWPs
Collision engaged. and necessary
Horseplay Follow the site speed signage’s to be
Failure of hydraulic limits and traffic rules. engaged.
hoses Toolbox talks and
3rd Party certified
Atmospheric necessary training to
condtion boom lift & Scissor lift be provided from
Unstable or Uneven to be used agnice.
ground condition Area should be Working near
barricaded. trenches/edges/excav
Scissor lift outrigger ation/floor opening
should be extended will not allowed
Give awareness to
while the boom is
operaters about head
extending. protection
Outrigger extended on
& compacted ground.
Work will suspend
when the wind speed
exceeds 20 knot.
Mewp will not exceed
the Safe working

Page 5 of 8
JOB SAFETY ANALYSIS
Ref
INSTALLATION OF FAHU’S AND AHU’S Date 04-06-2018
Rev 000

load(as per
manufacturer
instruction)

Must follow scaff tag


system
Scaffolder must have
3rd party training
Supervisor/eng 3 2 6
Slip/ Fall and trip Workers/nearb certificate
Use of scaffold, 4 5 20 Monitor the work ineers/hse
hazard y workers Scaffolding log should
and ladder Communicate with officer
Property damage maintained
workers
Falling person Use only full body
Avoid lone working
Falling Materials harness with double
Do not use un
line yard
inspected full body
Follow main
harness
contractor PTW
Inspect the ladder
system
when its coming to
Give toolbox talk
site store
before starting work
Do not use single line
During using of ladder
full body harness
one person should
Stop the activity when
hold the ladder
the scaffold is not in
Full body harness
good condition
double lane should be
100% tie off
Double lane should
hook to the hook point
while moving also

Page 6 of 8
JOB SAFETY ANALYSIS
Ref
INSTALLATION OF FAHU’S AND AHU’S Date 04-06-2018
Rev 000

Risk Matrix
Descriptor Likely Frequency Probability

Frequent Occurs frequently 5

Often Occurs several times per year 4

Likely Has occurred more than once 3

Possible Has occurred 2

Rare Never occurred 1

Likelihood (From Table 2) Consequence (From Table 1)


Insignificant (1) Minor (2) Moderate (3) Major (4) Catastrophic (5)
Rare (1) 1 2 3 4 5
Possible (2) 2 4 6 8 10
Likely (3) 3 6 9 12 15
Often (4) 4 8 12 16 20
Frequent/ Almost Certain (5)
5 10 15 20 25

15 - 25 Extreme Risk Activity or industry should not proceed in current form.


Activity or industry should be modified to include remedial planning and action and be subject to detailed OSH
8 - 12 High Risk
assessment.

4-6 Moderate Risk Activity or industry can operate subject to management and /or modification.

1-3 Low Risk No immediate action required, unless escalation of risk is possible.

Page 7 of 8
JOB SAFETY ANALYSIS
Ref
INSTALLATION OF FAHU’S AND AHU’S Date 04-06-2018
Rev 000

RISK ASSESSMENT ORIENTATION ATTENDEES


Name Date Designation Comments Signature
1 Shajin Sayed HSE officer

Page 8 of 8