OTWAY BASIN
South Australia
ANNUAL REPORT
1 INTRODUCTION 3
3 EXPLORATION ACTIVITY 3
3.1 Drilling 3
4 ADMINISTRATION 5
4.1 Data Submission 5
5 COMPLIANCE 6
6 EXPENDITURE STATEMENT 6
Petroleum Exploration Licence PEL 495 was granted on March 2nd 2009, for a five year term.
In accordance with the requirements of Section 33 of the Petroleum Regulations 2000, this
report covers the activities conducted by Cooper Energy Ltd in Year 1, from March 2nd 2009 to
March 1st 2010.
The conditions of the Licence provided for unspecified geophysical/geological studies and
permit administration in Year 1. This was undertaken satisfactorily. Additionally, the seismic
reprocessing and petrophysics scheduled for Year 2 was undertaken instead in Year 1, with
the approval of PIRSA.
3 Exploration Activity
3.1 Drilling
At the onset of the reprocessing, emphasis was placed on the primary reservoir target -
the Sawpit sandstone section. Early results showed encouraging improvements at this
level. Amplitude preserving techniques combined with the pre stack migration gave
improvements at this level. There was, however, some attenuation of the fault plane
information that needed enhancement. Further work, employing some different
interpolation parameters (and post stack TauP filtering), retrieved the fault plane
information at the expense of some shallow continuity.
Work performed during the first permit year focussed on reinterpretation of the permit
dataset and the creation of a ranked prospect and leads portfolio. As a result of this
work, a Permit Interpretation and Prospectivity Report was compiled. This report
contains revised prospects and leads which have been risked and ranked, enabling
permit-wide potential hydrocarbon resources to be calculated.
A petrophysical interpretation was also undertaken on five wells, in order to gain a better
understanding of the characteristics of the primary reservoir facies. A Petrophysics
Report was compiled from this study.
The remaining work commitment required to be carried out in Permit Year 2 consists of
unspecified geophysical/geological studies comprising finalisation of seismic
reprocessing and inversion with a view to advancing a prospect to drill-ready status.
4 Administration
Cooper Energy, as Operator of PEL 495, has complied with all relevant conditions under the
Petroleum Act 2000 and the Petroleum Regulations 2000.
The activities covered by this report are administered under the Petroleum & Gas Act (2000)
and the Petroleum & Gas Regulations (2000).
6 Expenditure Statement
Pursuant to Regulation 33(3) under the Act, Cooper Energy Limited has submitted
to PIRSA a list of expenditure for Permit Year 1 as Appendix I.