Vous êtes sur la page 1sur 14

AIP SUPPLEMENT

INDIA
TEL: 91-11-24632950 01/2018
AERONAUTICAL INFORMATION SERVICE
Extn: 2219/2233
AIRPORTS AUTHORITY OF INDIA
AFS: VIDDYXAX
RAJIV GANDHI BHAVAN
FAX: 91-11-24615508
SAFDARJUNG AIRPORT 01 JAN 2018
Email: gmais@aai.aero
NEW DELHI – 110003
File No. AAI/ATM/AIS/09-09/2018
Following supplement is issued for information, guidance and necessary action.

sd/-
S. RAHEJA
OFFICIATING CHAIRMAN
AIRPORTS AUTHORITY OF INDIA
CHECKLIST OF CURRENT AIP SUPPLEMENTS
(Updated upto 31st December 2017)

AIPS No. SUBJECT


1989
33/1989 IAL Procedures - Kota Aerodrome

1990
02/1990 NDB IAL Procedure - Rourkela Aerodrome

1991
19/1991 RWY dimensions/declared distances of Kolhapur Aerodrome

1999
09/1999 Transition of World Geodatic System – 1984

30/1999 Requirements for holders of Flight Crew Licenses issued by contracting states

2002
13/2002 NDB IAL Procedure – Kolhapur Aerodrome

2003
21/2003 Aerodrome Elevation

2007
Implementation of air traffic flow management procedures over Bay of Bengal, South Asia and
25/2007
Pakistan through Kabul FIR
2008
33/2008 RNAV SIDs and STARs – Ahmedabad Airport

34/2008 RNAV SIDs and STARs – Mumbai Airport


35/2008 VOR Procedure Runway 27 – Fursatganj Airport

Airports Authority of India AIP Supplement 01/2018 Page 1 of 14


36/2008 VOR Procedure Runway 09 – Fursatganj Airport

37/2008 ILS Procedure Runway 27 – Fursatganj Airport

40/2008 Establishment, Operation of a Central Reporting Agency for Data link services

46/2008 NDB Circling Procedure Runway 04/22 – Gondia Airport (CAT A/B/C)
47/2008 VOR Procedure Runway 04 – Gondia Airport (CAT A/B/C)

48/2008 VOR Procedure Runway 22 – Gondia Airport (CAT A/B/C)

2009
29/2009 RNAV SIDs & STARs – Chennai International Airport

2010
09/2010 Helicopter Routing – CSI Airport, Mumbai/Juhu

14/2010 RNAV-1 (GNSS or DME/DME/IRU) SIDS and STARs – RGI Airport, Shamshabad

2011
09/2011 NON-RNAV Standard Instrument Departure Procedure – Cochin International Airport

61/2011 RNAV-1 (GNSS) SIDs and STARs – Thiruvananthapuram Airport

67/2011 NON-RNAV SIDs – RWY 27 , Cochin International Airport

68/2011 RNP-1 STARs & RNAV (GNSS) Approach RWY 27 – Cochin International Airport

2012
10/2012 Transponder Operating Procedures on Ground

11/2012 ENR 1.10 Flight Planning

12/2012 VOR Runway 27 (CAT A/B/C), DME Required – Jalgaon Airport


13/2012 VOR Runway 09 (CAT A/B), DME Required – Jalgaon Airport

14/2012 Aerodrome data – Jalgaon Airport


Commissioning of Cargo Stands 104, 105 & 106 Commissioning of Taxiway L2
15/2012
Indira Gandhi International Airport, New Delhi
17/2012 ILS Runway 26 (DME Required) (CAT A/B/C) – Tirupati Airport
Establishment of New RNP 10 Connector Routes V30 & V31 to Provide Connectivity to
18/2012
Tiruchirrappali from ATS Routes N563 and M300
Establishment of New RNAV 5 ATS Routes Q1, Q2, Q3, Q4, Q5, Q6 and Q7 Connecting Delhi
19/2012
to Mumbai/Ahmedabad/Udaipur/Vadodara
22/2012 Aerodrome Data – Mangalore Airport

23/2012 Establishment of Control Zone Daman


24/2012 ILS Runway 26 (DME Required) – Vijayawada Airport
Implementation of Data Link Services
i Departure Clearance (DCL)
27/2012
ii Data Link – Automatic Terminal Information Service (D-ATIS)
iii Data Link – Meteorological Information for Aircraft in Flight (D-VOLMET)
28/2012 ILS Procedure RWY 19, (DME Required), Khajuraho Airport

Airports Authority of India AIP Supplement 01/2018 Page 2 of 14


29/2012 ILS Procedure Runway 25, Chennai Airport

31/2012 VOR Procedure Runway 25, Chennai Airport

32/2012 VOR Procedure Runway 07, Chennai Airport

35/2012 Aerodrome Obstacle Charts – Type A, Mangalore Airport


Runway Capacity Enhancement Measures - Rajiv Gandhi International Airport, Shamshabad
36/2012
(Hyderabad)
38/2012 Changes to the ICAO Model Flight Plan Form

39/2012 Establishment of Danger Area VAD 223 – (LPR Khamaria Jabalpur)

40/2012 Re-alignment of ATS Route W45

42/2012 Establishment of New ATS Route W137

44/2012 ILS Procedure Runway 19R (DME Required), Kolkata Airport

2013
03/2013 ILS (Z) DME Procedure Runway 27 (DME Required) – Mumbai Airport
04/2013 ILS (Y) DME Procedure Runway 27 (DME Required) – Mumbai Airport

05/2013 Commissioning of Aircraft Stands – Bangalore International Airport, Bangalore


06/2013 Establishment of ATS Routes W138 & W140
Establishment of RNAV 5 ATS Routes
07/2013 Q8 [RNAV 5] Between Chennai and Mumbai &
Q9 [RNAV 5] Between Mumbai and Chennai
09/2013 Aerodrome Data – Rajahmundry Airport
11/2013 VOR Procedure Runway 12 (DME Required) – CAT A/B – Ludhiana Airport

12/2013 VOR Procedure Runway 30 (DME Required) – CAT A/B – Ludhiana Airport
13/2013 Establishment of ATS Route L875
14/2013 Establishment of ATS Route L756

15/2013 Aerodrome Data – Ranchi Airport


16/2013 Re-alignment of ATS Routes W113 [East Bound] and W113 [West Bound]

17/2013 Establishment of Connector ATS Route T1

18/2013 Helicopter Operations in Arunachal Pradesh


Re-commissioning of Apron & Revised Aerodrome Data
19/2013
Rajiv Gandhi International Airport Shamshabad (Hyderabad)
Establishment of RNAV 5 ATS Routes
20/2013 Q10 [RNAV5] Between Chennai and Kolkata &
Q11 [RNAV 5] Between Kolkata and Chennai
Delhi Airport Collaborative Decision Making (DA-CDM)
21/2013
Indira Gandhi International Airport, New Delhi
Establishment of RNAV 5 ATS Routes
23/2013 Q12 [RNAV 5] Between Thiruvananthapuram & Mumbai
Q13 [RNAV 5] Between Mumbai & Thiruvananthapuram
24/2013 Establishment of Aerodrome Traffic Zone (ATZ) Thanjavur

Airports Authority of India AIP Supplement 01/2018 Page 3 of 14


27/2013 Aerodrome Data – Shimla Airport

28/2013 Establishment of ATS Route W139


Establishment of User Preferred Route (UPR) Geographic Zone in Chennai FIR and Mumbai
29/2013
FIR
Commissioning of Aircraft Stands 01 to 03 & Re-alignment of Stands 04 to 09
30/2013
Bangalore International Airport, Bangalore
31/2013 ILS CAT-I Procedure Runway 27 (DME Required) – Lucknow Airport

33/2013 VOR Procedure Runway 27 (DME Required) – Lucknow Airport


34/2013 VOR Procedure Runway 09 (DME Required) – Lucknow Airport

36/2013 Establishment of Connector ATS Routes V33, V34 and V35


37/2013 RNAV-1 (GNSS) SIDs & STARs – Guwahati Airport

38/2013 Re-Alignment of Restricted Area- NAL

39/2013 Aeronautical Charts – Sri Guru Ram Dass Jee international Airport Amritsar

40/2013 Aerodrome Data – Pantnagar Airport


43/2013 Aerodrome Obstacle Chart – Type A Vadodara Airport
44/2013 Aerodrome Obstacle Chart – Type A – Guwahati International Airport

45/2013 ATC Surveillance Minimum Altitude Chart – Cochin International Airport, Cochin
46/2013 Aeronautical Charts – Dehradun Airport

47/2013 Aeronautical Charts – Sri Guru Ram Dass Jee International Airport, Amritsar
Implementation of Indian Satellite Based Augmentation System GPS Aided GEO Augmented
48/2013
Navigation (GAGAN) System
49/2013 Longitudinal Separation Minima on Domestic ATS Routes.

2014
03/2014 List of Aerodromes Equipped for Night Operations.

04/2014 Aerodrome Data – Raipur Airport (VARP).


05/2014 Aeronautical Charts – Kangra Airport (VIGG).

06/2014 Aerodrome Data – Salem Airport (VOSM).

07/2014 Aerodrome Data – Tuticorin Airport (VOTK).

08/2014 Aerodrome Data – Thiruvananthapuram Airport (VOTV).


Commissioning of Three Aircraft Stands (801, 802 & 803), Pushback Procedure and Aerodrome
09/2014 Chart & Parking Docking Charts
Indira Gandhi International Airport, New Delhi (VIDP)
11/2014 Re-alignment of Restricted Airspace VIR149 (Bhatinda).

12/2014 Realignment of Delhi TMA.


Realignment of ATS Routes W30 [WEST BOUND], W30 [EAST BOUND]
13/2014
W31 [WEST BOUND], W31 [EAST BOUND], A466 and A589.
14/2014 Establishment of Connector ATS Route V36 and V37.

16/2014 Aeronautical Charts – Raipur Airport (VARP)

Airports Authority of India AIP Supplement 01/2018 Page 4 of 14


17/2014 Aeronautical Charts – Vijayawada Airport (VOBZ)

18/2014 Automatic Dependent Surveillance-Broadcast (ADS-B) Out Based ATS Surveillance Services

19/2014 Aerodrome Data – Surat Airport (VASU)

21/2014 Aeronautical Charts – Birsa Munda Airport, Ranchi (VERC)


22/2014 VOR Procedure Runway 09 (CAT A/B) (DME Required) – Porbandar Airport (VAPR)

23/2014 VOR Procedure Runway 27 (CAT A/B) (DME Required) – Porbandar Airport (VAPR)

25/2014 Establishment of Connector ATS Route V38 and V39


27/2014 Aeronautical Charts – Ahmedabad International Airport (VAAH)

30/2014 Restructuring of Mumbai Flight Information Region

31/2014 Restructuring of Delhi Flight Information Region

32/2014 Restructuring of Kolkata Flight Information Region


33/2014 Establishment of Oceanic Airspace in Kolkata FIR

34/2014 Restructuring of Nagpur Control Area

36/2014 Establishment of Lower Area Control Centre Varanasi (LBN)

40/2014 Establishment of Lower Area Control Centre Guwahati (LGT)

41/2014 Establishment of Upper Area Control Centre Guwahati (UGT)


42/2014 Establishment of Lower Area Control Centre Agartala (LAT)
44/2014 Aeronautical Charts – Surat Airport (VASU)

45/2014 Aeronautical Charts – Tiruchirappalli International Airport (VOTR)


Radio Communication Failure Procedures
47/2014
Indira Gandhi International Airport, New Delhi (VIDP)
Implementation of 30 NM Longitudinal Separation Between RNP4 Approved Aircraft on
48/2014
RNP10 Routes
50/2014 Hot Spot Locations – Indira Gandhi International Airport, New Delhi (VIDP)
51/2014 Establishment of ATS Route W141 and W142

52/2014 ATC Surveillance Minimum Altitude Chart-Chaudhary Charan Singh Airport, Lucknow (VILK)

53/2014 ILS (Z) Procedure RWY 02 – Guwahati Airport (VEGT)


54/2014 ILS (Y) Procedure RWY 02 – Guwahati Airport (VEGT)

55/2014 ILS (X) Procedure RWY 02 – Guwahati Airport (VEGT)

56/2014 VOR Procedure RWY 02 – Guwahati Airport (VEGT)

57/2014 VOR Procedure RWY 20 – Guwahati Airport (VEGT)

58/2014 ATC Surveillance Minimum Altitude Chart – Guwahati Airport (VEGT)

59/2014 Aerodrome Chart – Guwahati Airport (VEGT)


75/2014 Establishment Of Prohibited Airspace VAP 224 (Khambaliya)
76/2014 Realignment of ATS Route B209

Airports Authority of India AIP Supplement 01/2018 Page 5 of 14


77/2014 Establishment of CDR3 Route J1

78/2014 Aerodrome Data – Vijayawada Airport (VOBZ)


ATC Surveillance Minimum Altitude Chart
79/2014
Sri Guru Ram Dass Jee International Airport Amritsar (VIAR)
80/2014 Aeronautical Charts – Agartala Airport (VEAT)

81/2014 ATC Surveillance Minimum Altitude Chart – Agartala Airport (VEAT)


82/2014 ATC Surveillance Minimum Altitude Chart – Jaipur International Airport (VIJP)
ATC Surveillance Minimum Altitude Chart
83/2014
Dr. Baba Saheb Ambedkar International Airport Nagpur (VANP)
84/2014 ATC Surveillance Minimum Altitude Chart – Tiruchirappalli International Airport (VOTR)
85/2014 ATC Surveillance Minimum Altitude Chart – Lal Bahadur Shastri Airport Varanasi (VIBN)

86/2014 Aeronautical Charts – Imphal Airport (VEIM)

87/2014 Aeronautical Charts – Patna Airport (VEPT)

88/2014 Restructuring of VOD 175 (Thumba) in Chennai FIR


Runway Capacity Enhancement Measures
89/2014
Chhatrapati Shivaji International Airport Mumbai (VABB)
90/2014 Realignment of Mumbai TMA
91/2014 Realignment of Ahmedabad TMA

92/2014 Realignment of Rajkot CTR


93/2014 Establishment of ATS Routes W143 and W144
94/2014 VOR Procedure Runway 12 (DME Required), Chennai Airport (VOMM)

95/2014 VOR Procedure Runway 30 (DME Required), Chennai Airport (VOMM)


96/2014 ATC Surveillance Minimum Altitude Chart, Patna Airport (VEPT)
98/2014 Aeronautical Charts, Barapani Airport (VEBI)

99/2014 Revised Nomenclature of Restricted Area – VER 203 Bihta


100/2014 Aeronautical Charts, Tuticorin Airport (VOTK)
Establishment of Control Zone Panagarh Aerodrome (VEPH) and Aerodrome Traffic Zone
101/2014
Durgapur Airport (VEDG)
2015
03/2015 Establishment of RNAV 5 (CDR-1) ATS Routes Q16 and Q17

04/2015 Establishment of ATS Route W145

05/2015 ATC Surveillance Minimum Altitude Chart – Bhubaneshwar Airport (VEBS)

06/2015 NDB Procedure Runway 28 (CAT A & B) – Tuticorin Airport (VOTK)

07/2015 Aerodrome Data – Vadodara Airport (VABO)


08/2015 Aerodrome Data – Ahmedabad Airport (VAAH)
09/2015 Aerodrome Data – Patna Airport (VEPT)

10/2015 ATC Surveillance Minimum Altitude Chart – Calicut International Airport (VOCL)

Airports Authority of India AIP Supplement 01/2018 Page 6 of 14


11/2015 Realignment of VAD 218 (Kathiawar) in Mumbai FIR

13/2015 Establishment of ATS Route P895 [RNP10]

14/2015 Realignment of ATS Route L518 [RNP10]

15/2015 Radio Communication Failure Procedures – Lal Bahadur Shastri Airport, Varanasi (VIBN)
Commissioning of Runway Edge Lights & Runway Guard Lights RWY 09L/27R
16/2015
Rajiv Gandhi International Airport Shamshabad (VOHS)
17/2015 Aerodrome Data – Hubli Airport (VOHB)

18/2015 VOR Procedure Runway 26 (Cat A/B/C) (DME Required) – Hubli Airport (VOHB)

19/2015 NDB Visual Circling (CAT A & B) – Hubli Airport (VOHB)

20/2015 Establishment of ATS Route W146

22/2015 Establishment of ATS Route W147

23/2015 Amendment to ATS Route R457

24/2015 Establishment of Domestic ATS Route [Conditional Route (CDR 2)] J4


25/2015 Establishment of Prohibited Area VOP 197 (Kudankulam)

29/2015 Aeronautical Chart – Surat Airport (VASU)


30/2015 Revised Declared Distances – Thiruvananthapuram International Airport (VOTV)

31/2015 Details of Aircraft Stands, Pushback Procedures – Calicut International Airport (VOCL)

32/2015 Aerodrome Data – Belgaum Airport (VOBM)


33/2015 Aerodrome Data – Agatti Airport (VOAT)
34/2015 VOR Procedure Runway 09L (DME Required) – Shamshabad Airport (VOHS)

35/2015 VOR Procedure Runway 27R (DME Required) – Shamshabad Airport (VOHS)
36/2015 RNAV 1 (GNSS) SIDs & STARs – Goa Airport (VOGO)
37/2015 ILS (Z) Procedure Runway 27 (DME Required) – Tiruchirappalli International Airport (VOTR)

38/2015 ILS (Y) Procedure Runway 27 (DME Required) – Tiruchirappalli International Airport (VOTR)
39/2015 VOR Procedure Runway 09 (DME Required) – Tiruchirappalli International Airport (VOTR)

40/2015 VOR Procedure Runway 27(DME Required) – Tiruchirappalli International Airport (VOTR)

41/2015 Establishment of Lower Control Area – Kolkata


42/2015 Establishment of Upper Control Area – Kolkata

43/2015 Establishment of Lower Control Area – Patna (LPT)

44/2015 Establishment of Lower Control Area – Bhubaneswar (LBS)

45/2015 Establishment of Upper Control Area – Varanasi (UBN)


46/2015 Establishment of Connector ATS Route V40
47/2015 Re-alignment of Control Zone Rajahmundry (VORY)
48/2015 Re-alignment of Control Zone Varanasi

Airports Authority of India AIP Supplement 01/2018 Page 7 of 14


50/2015 ATC Surveillance Minimum altitude Chart – Coimbatore Airport (VOCB)

51/2015 Aeronautical Charts – Rajkot Airport (VARK)

55/2015 Establishment of Domestic ATS Route J2 [Conditional Route (CDR 2)]

56/2015 Establishment of Domestic ATS Route J3 [Conditional Route (CDR 3)]


57/2015 Establishment of ATS Route Q18 [RNAV 5]

58/2015 Establishment of RNAV 2 ATS Routes Q19 and Q20

59/2015 Establishment of Connector ATS Route V41


60/2015 Establishment of Control Zone Agatti (VOAT)
RNAV-1 (GNSS or DME/DME/IRU) SIDs & STARs
61/2015
Kempegowda International Airport Bengaluru
62/2015 Establishment of Domestic ATS Route J7 [Conditional Route (CDR2)]

63/2015 Establishment of Domestic ATS Route J8 [Conditional Route (CDR2)]

64/2015 Amendment to ATS Route Designators ‘V’ Routes V001 to V029


66/2015 Re-alignment of Control Zone – Bhopal (VABP)

67/2015 Establishment of Control Area – Bhopal


68/2015 Re-alignment of Control Zone – Indore (VAID)

69/2015 Establishment of Control Area – Indore

70/2015 Re-alignment of Control Zone – Surat (VASU)


71/2015 Re-alignment of Control Zone – Nagpur (VANP)
72/2015 Aerodrome Data – Jabalpur Airport (VAJB)

73/2015 Establishment of Control Zone – Kadapa (VOCP)


74/2015 Establishment of Connector ATS Route V42
75/2015 Establishment of Connector ATS Route V43

76/2015 Establishment of Domestic ATS Route W148


77/2015 Aerodrome Data – Durgapur Airport (VEDG)

78/2015 Re-alignment of Control Zone – Ranchi (VERC)

79/2015 Establishment of Control Area – Ranchi


80/2015 Re-alignment of Control Zone – Kolkata (VECC)
Airport Collaborative Decision Making (A-CDM, Mumbai)
82/2015
Chhatrapati Shivaji International Airport, Mumbai (VABB)
83/2015 Aerodrome Data – Mysore Airport (VOMY)
Radio Communication Failure Procedures
84/2015
Chhatrapati Shivaji International Airport, Mumbai (VABB)
85/2015 Aerodrome Data – Chennai International Airport, Chennai (VOMM)
88/2015 Aerodrome Data – Ozar Airport (VAOZ)

89/2015 Establishment of Domestic ATS Route J5 [Conditional Route (CDR 2)]

Airports Authority of India AIP Supplement 01/2018 Page 8 of 14


Commissioning of Link Taxiway C1 & C2
91/2015
Dr. Babasaheb Ambedkar International Airport Nagpur (VANP)
93/2015 Standard Taxi Route (STR) Procedure–Rajiv Gandhi International Airport Shamshabad (VOHS)

94/2015 Re-alignment of Prohibited Area VIP 89 (Rashtrapati Bhawan)

95/2015 ILS Procedure RWY 09 – Indira Gandhi International Airport New Delhi (VIDP)

96/2015 ILS Procedure RWY 10 – Indira Gandhi International Airport New Delhi (VIDP)
97/2015 ILS (Cat-I) Procedure RWY 11 – Indira Gandhi International Airport New Delhi (VIDP)

98/2015 ILS Procedure RWY 27 – Indira Gandhi International Airport New Delhi (VIDP)

99/2015 ILS (Cat-I) Procedure RWY 28 – Indira Gandhi International Airport New Delhi (VIDP)

100/2015 ILS (Cat-I) Procedure RWY 29 – Indira Gandhi International Airport New Delhi (VIDP)
ILS (Cat-II/IIIA/IIIB) Procedure RWY 11
101/2015
Indira Gandhi International Airport New Delhi (VIDP)
ILS (Cat-II/IIIA/IIIB) Procedure RWY 28
102/2015
Indira Gandhi International Airport New Delhi (VIDP)
ILS (Cat-II/IIIA/IIIB) Procedure RWY 29
103/2015
Indira Gandhi International Airport New Delhi (VIDP)
104/2015 VOR (Z) Procedure RWY 09 – Indira Gandhi International Airport New Delhi (VIDP)
105/2015 VOR (Z) Procedure RWY 10 – Indira Gandhi International Airport New Delhi (VIDP)

106/2015 VOR Procedure RWY 11 – Indira Gandhi International Airport New Delhi (VIDP)

107/2015 NDB Procedure RWY 27 – Indira Gandhi International Airport New Delhi (VIDP)

108/2015 VOR (Z) Procedure RWY 28 – Indira Gandhi International Airport New Delhi (VIDP)
109/2015 VOR Procedure RWY 29 – Indira Gandhi International Airport New Delhi (VIDP)

2016
03/2016 ENR 5.2 Military Exercise and Training area and Air Defence Identification Zone (ADIZ)

04/2016 Establishment of Connector ATS Route V44

05/2016 VOR Procedure RWY 09 (CAT A/B), (DME Required) – Mysore Airport (VOMY)
06/2016 VOR Procedure RWY 27 (CAT A/B), (DME Required) – Mysore Airport (VOMY)
07/2016 Establishment of ATS Route J9 Conditional Route [CDR 2]

08/2016 Establishment of ATS Route J10 Conditional Route [CDR 2]


09/2016 Establishment of Control Zone – Bhatinda

10/2016 Establishment of Control Zone – Adampur


Establishment of Temporary Segregated Area (TSA)
11/2016
TSA 701 (A) [Adampur] & TSA 701 (B) [Adampur]
12/2016 Establishment of Temporary Restricted Area (TRA) TRA 501 [BHUJ]
17/2016 Establishment of ATS Route W15

18/2016 Amendment to ATS Route W19


19/2016 Establishment of ATS Route W20

Airports Authority of India AIP Supplement 01/2018 Page 9 of 14


20/2016 Establishment of ATS Route W42

21/2016 Establishment of ATS Route W118

22/2016 Establishment of ATS Route V45

23/2016 Establishment of ATS Route W43


24/2016 Establishment of ATS Route W47

25/2016 Establishment of ATS Route W153

26/2016 Establishment of ATS Route W57


27/2016 Establishment of ATS Route W71

28/2016 Amendment of ATS Route W81

29/2016 Establishment of ATS Route T8

30/2016 Establishment of ATS Route T6


31/2016 Establishment of ATS Route T7

32/2016 Helicopter routing to and from Indira Gandhi International Airport New Delhi (VIDP)

33/2016 Re-alignment of prohibited Area – VAP 2

34/2016 Aerodrome Data – Raja Bhoj Airport, Bhopal (VABP)

35/2016 Establishment of Aerodrome Traffic Zone Cochin (NAVY) (VOCC)


Withdrawal of Danger Area VOD 172 (A) [COCHIN-I]
36/2016
Re-Designation of Danger Area VOD 172 (B) [COCHIN-II]
37/2016 GEN 3.6 Search And Rescue
38/2016 Aerodrome Data – Madurai Airport (VOMD)

39/2016 Establishment of RNP 2 ATS Route Q 21


40/2016 Establishment of RNP 2 ATS Route Q 22
41/2016 Establishment of RNP 2 ATS Route Q 23

42/2016 Establishment of RNP 2 ATS Route Q 24


43/2016 VOR Visual Circling procedure (CAT A/B) (DME Required) – Barapani Airport (VEBI)

44/2016 Aeronautical Chart – Belgaum Airport ( VOBM)

45/2016 Helicopter routings within Kolkata CTR


46/2016 VOR Procedure Rwy 08 (CAT A/B) (DME Required) – Jamshedpur Airport (VEJS)

47/2016 ATC Surveillance Minimum altitude Chart – Mangalore Airport (VOML)

49/2016 Aerodrome Data – Puducherry Airport (VOPC)

50/2016 Aerodrome Data – Dehradun (VIDN)


51/2016 VOR Procedure RWY 27 (DME Required) – Jaipur Airport (VIJP)
53/2016 NDB Procedure RWY 23 (CAT A/B) (DME Required) – Kandla Airport (VAKE)
54/2016 Helicopter VFR Routings RGI airport Shamshabad (VOHS) and Begumpet Airport (VOHY)

Airports Authority of India AIP Supplement 01/2018 Page 10 of 14


56/2016 Aerodrome Data – Calicut International Airport (VOCL)

57/2016 Aeronautical Charts – Calicut International Airport (VOCL)

59/2016 Low Visibility Procedures – Chaudhary Charan Singh Airport, Lucknow (VILK)

60/2016 Low Visibility Procedures – Jaipur International Airport, Jaipur (VIJP)


61/2016 Aerodrome Data – Jaipur International Airport, Jaipur (VIJP)

62/2016 Aerodrome Data – Chaudhary Charan Singh Airport Lucknow (VILK)

63/2016 VOR Procedure Runway 09 (DME Required) – Jaipur International Airport (VIJP)
64/2016 ILS (Z) Procedure Runway 27 (DME Required) – Jaipur International Airport (VIJP)

65/2016 ILS (Y) Procedure Runway 27 (DME Required) – Jaipur International Airport (VIJP)
ILS CATII/IIIA/IIIB Procedure Runway 27 (DME Required)
66/2016
Jaipur International Airport (VIJP)
ILS CATII/IIIA/IIIB Procedure Runway 27 (DME Required)
67/2016
Chaudhary Charan Singh Airport, Lucknow (VILK)
68/2016 Aerodrome Data – Coimbatore Airport (VOCB)
69/2016 ILS (Z) Procedure RWY 23 – Coimbatore International Airport, Coimbatore (VOCB)
70/2016 ILS (Y) Procedure RWY 23 – Coimbatore International Airport, Coimbatore (VOCB)

71/2016 VOR (Z) Procedure RWY 23 – Coimbatore International Airport, Coimbatore (VOCB)
72/2016 VOR Procedure RWY 05 – Coimbatore International Airport, Coimbatore (VOCB)

73/2016 Radio Communication Failure Procedures – Kolkata Airport (VECC)

74/2016 NDB Procedure RWY 11 (CAT A/B) – Kadapa Airport (VOCP)


75/2016 Establishment of ATS Route L524 [RNP10]

2017
01/2017 Checklist of Current AIP Supplements
02/2017 Public Holidays
03/2017 ENR 1.4: ATS Airspace Classification and Description

04/2017 Low Visibility Procedure – Rajiv Gandhi International Airport Shamshabad (VOHS)
Details of Aircraft Stands Apron 1 (Domestic) & Apron 2 (International)
05/2017 Pushback And Taxi Procedures
Ahmedabad International Airport (VAAH)
Realignment of Aircraft Stands At Terminal-II
06/2017
Indira Gandhi International Airport, New Delhi (VIDP)
07/2017 Aerodrome Data – Cochin International Airport (VOCI)

08/2017 Realignment of Domestic ATS Route W100

09/2017 Aerodrome Data – Kandla Airport (VAKE)

10/2017 VOR Procedure RWY 05 (DME Required)(CAT A, B & C) – Rajahmundry Airport (VORY)
11/2017 VOR Procedure RWY 23 (DME Required)(CAT A, B & C) – Rajahmundry Airport (VORY)

12/2017 ENR 1.9.21 Flexible use of Airspace

Airports Authority of India AIP Supplement 01/2018 Page 11 of 14


13/2017 Establishment of Conditional ATS Route J17

14/2017 Establishment of Conditional ATS Route J18

15/2017 Amendment of ATS Route W116

16/2017 Establishment of Temporary Reserved Area TRA809 [Bengaluru]


17/2017 Realignment of ATS Route L301

18/2017 Realignment of ATS Route L505

19/2017 Realignment of ATS Route M638


20/2017 Realignment of ATS Route P518

21/2017 Realignment of ATS Route V1


Establishment of Temporary Reserved Area TRA808 (A) [Vishakhapatnam] & TRA808 (B)
22/2017
[Vishakhapatnam]
23/2017 RNAV (GNSS) Procedure RWY 05 – Ahmedabad International Airport (VAAH)

24/2017 RNAV (GNSS) Procedure RWY 23 – Ahmedabad International Airport (VAAH)


25/2017 Central Air Traffic Flow Management C-ATFM India

26/2017 Aerodrome Data – Chaudhary Charan Singh Airport Lucknow (VILK)


27/2017 Helicopter VFR Routes – Chennai Airport (VOMM)
RNAV-1 (GNSS) SIDs and STARs
28/2017
Netaji Subhash Chandra Bose International Airport Kolkata (VECC)
29/2017 Establishment of Connector ATS Route V46

30/2017 Establishment of Connector ATS Route V48


31/2017 Establishment of Connector ATS Route V49

32/2017 Establishment of Connector ATS Route V58

33/2017 Restructuring of Lucknow Control Area


34/2017 Aeronautical Charts – Kandla Airport (VAKE)
35/2017 Aerodrome Data Chhatrapati Shivaji International Airport, Mumbai (VABB)
Standard Procedures for Pushback and Startup of Aircraft Chhatrapati Shivaji International
36/2017
Airport, Mumbai (VABB)
37/2017 AD 1.5 Status of Licensing of Aerodromes
Commissioning of Taxiways after modification
38/2017
Chhatrapati Shivaji International Airport Mumbai (VABB)
39/2017 Low Visibility Procedure – Indira Gandhi International Airport Delhi (VIDP)

40/2017 Radio Communication Failure Procedures – Dibrugarh Airport (VEMN)

41/2017 Establishment of ATS Route Q26 Conditional Route (CDR 2)

42/2016 Establishment of ATS Route J19 Conditional Route (CDR 1)


43/2017 Establishment of Domestic ATS Route W151
44/2017 Establishment of Domestic ATS Route W152

45/2017 Establishment of Domestic ATS Route W156

Airports Authority of India AIP Supplement 01/2018 Page 12 of 14


46/2017 Establishment of Domestic ATS Route W157
47/2017 Establishment of Domestic ATS Route W158
48/2017 Establishment of Domestic ATS Route W159
49/2017 Establishment of ATS Route W160
50/2017 Establishment of Lower Control Area - Jaipur (LJP)
51/2017 ILS (Y) Procedure RWY 26 – Udaipur Airport (VAUD)
Commissioning of Rapid Exit Taxiways and Change In Designator of Taxiways
52/2017
Kempegowda International Airport, Bengaluru (VOBL)
RNAV-1 (GNSS/DME-DME-IRU) SIDs & STARs
53/2017
Indira Gandhi International Airport, New Delhi (VIDP)
54/2017 Realignment of Srinagar Control Zone
55/2017 Establishment of Temporary Reserved Area TRA 702(A) [Srinagar] and TRA 702(B) [Srinagar]
56/2017 Establishment of Connector ATS Route V59
57/2017 Establishment of ATS Route W161
58/2017 Low Visibility Procedure – Guwahati Airport (VEGT)
59/2017 Low Visibility Procedure – Jai Prakash Narayan International Airport (VEPT)
60/2017 Low Visibility Procedure – Kempegowda International Airport, Bengaluru (VOBL)
Commissioning of Taxiway B & Revised
61/2017 Aeronautical Charts Rajiv Gandhi International
Airport Shamshabad (Hyderabad) (VOHS)
62/2017 Provision of Simple Touch Down Zone Lights – Calicut International Airport (VOCL)
63/2017 Aerodrome Data – Kadapa Airport (VOCP)
Work activities on Aircraft movement areas
64/2017 Chhatrapati Shivaji International Airport, Mumbai (VABB)
[0330 UTC of 01 Oct 2017 to 1130 UTC of 10 June 2018]
Aerodrome Data
65/2017
Chhatrapati Shivaji International Airport, Mumbai (VABB)
66/2017 Aerodrome Data – Chhatrapati Shivaji International Airport, Mumbai (VABB)
67/2017 Low Visibility Procedure – Lal Bahadur Shastri Airport, Varanasi (VEBN)
Low Visibility Procedure
68/2017
Sri Guru Ram Dass Jee International Airport, Amritsar (VIAR)
Correction to Restricted Airspace VER 85-I Hashimara (A), VER 85-II Hashimara (B)
69/2017
& VER 85-III Hashimara (C)
70/2017 ILS procedure RWY 07 – Chennai International Airport (VOMM)
71/2017 Hot Spot locations – Chennai International Airport, Chennai (VOMM)
Commissioning of RWY centre line lights, Touch Down Zone Lights and Taxiway "M"
72/2017
Chennai International Airport (VOMM)
ILS CATII/III A/III B Procedure Runway 34
73/2017
Sri Guru Ram Dass Jee International Airport, Amritsar (VIAR)
74/2017 Establishment of Connector ATS Route V60
75/2017 Establishment of Connector ATS Route V62
76/2017 Realignment of ATS Route W54
77/2017 Realignment of ATS Route W82

Airports Authority of India AIP Supplement 01/2018 Page 13 of 14


78/2017 Realignment of ATS Route W103
79/2017 Low Visibility Procedure – Ahmedabad International Airport (VAAH)
80/2017 Establishment of Domestic ATS Route W11
81/2017 Establishment of Domestic ATS Route W162
82/2017 Realignment of Danger area VOD 177 (Kavalur)
84/2017 GEN 3.5 Meteorological Services
85/2017 Establishment of Connector Route V57
86/2017 Establishment of Conditional Route J13
87/2017 Establishment of Conditional Route J14
88/2017 Establishment of Conditional Route J15
89/2017 Establishment of Conditional Route J16
90/2017 Establishment of Temporary Reserved Areas TRA807(A), TRA807(B) and TRA807(C)
91/2017 Establishment of Restricted Area VOR182 [SULUR]
92/2017 VOR Procedure RWY 08 (DME Required) (CAT A, B & C) Vijayawada Airport (VOBZ)
93/2017 GEN 1.7: Differences from ICAO Standards, Recommended Practices and Procedures
94/2017 Establishment of Conditional Route J11
95/2017 ATC Surveillance Minimum Altitude Chart – Tiruchirappalli International Airport (VOTR)
96/2017 Establishment of Connector ATS Route V47
97/2017 Establishment of Connector ATS Route V30
Establishment Of Temporary Reserved Areas TRA603(A) And TRA603(B) at Purnea On Trial
98/2017
Basis From 01 Feb To 25 Apr 2018
99/2017 ATC Surveillance Minimum Altitude Chart – Coimbatore International Airport (VOCB)
100/2017 Low Visibility Procedures –Netaji Subhash Chandra Bose International Airport Kolkata (VECC)
ILS CAT II/IIIA/IIIB Procedure Runway 01R
101/2017
Netaji Subhash Chandra Bose International Airport Kolkata (VECC)
Commissioning of link taxiways P and L
102/2017
Sri Guru Ram Dass Jee International Airport Amritsar (VIAR)
103/2017 Aerodrome Data – Netaji Subhash Chandra Bose International Airport Kolkata (VECC)
104/2017 Commissioning of taxiway P1 at Indira Gandhi International Airport, New Delhi (VIDP)
105/2017 Restructuring of Temporary segregated areas (TSA) at Ramnad
106/2017 Realignment of Connector ATS Route V41
107/2017 Establishment of ATS Route L639 [Conditional Route (CDR 2)]
108/2017 VOR Procedure RWY 26 (CATA/B/C) (DME Required) – Hubli Airport (VOHB)
109/2017 Aerodrome Data – Indore Airport (VAID)
110/2017 Aerodrome Data – Mysore Airport (VOMY)
Realignment of Aircraft stands at Terminal – II
111/2017
Indira Gandhi International Airport, New Delhi (VIDP)
CANCELLATION:
i. AIP Supplement 01/2017

Airports Authority of India AIP Supplement 01/2018 Page 14 of 14

Vous aimerez peut-être aussi