Name of Project Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
:
Limits : Location: Veruela Agusan del Sur
Appropriation/Contract Amount: ₱4,817,435.73 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
801 (1) Removal of Obstruction & Structures lumpsum 1.00 P.E. Cert. - 1
803 (1)a Structure Excavation cu.m. 151.09 P.E. Cert. - 1
804(1)b Embankment cu.m. 50.00 P.E. Cert. - 1
804(4) Gravel Fill cu.m. 65.26 P.E. Cert. - 1
B. Other General Requirements
B.5 Removal of Obstruction & Structures each 2.00 P.E. Cert. - 1
B.7 Occupational Safety and Health Program month 3.00 P.E. Cert. - 1
B.9 Mobilization / Demobilization lumpsum 1.00 P.E. Cert. - 1
Plain and Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 24.12 *
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 9.66 *
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 17.71 *
900(1)c6 Structural Concrete (Beams/Girder) cu.m. 0.75 *
Reinforcing Steel
APPROVED :
MARCELINO M. OPERARIO
District Engineer
s
844.12
0.35
0.70
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 8, 2018
Date
Project : Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
Veruela Agusan del Sur
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 1 - 7, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions of
the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
A. Earthworks
801 (1) Removal of Obstruction & Structures 1.00 ls ls ### 1.00 ls 100.00%
803 (1)a Structure Excavation 151.09 cu.m. cu.m.
### 151.09 cu.m. 100.00%
804(1)b Embankment 50.00 cu.m. cu.m. cu.m. 0.00%
804(4) Gravel Fill 65.26 cu.m. cu.m. 65.26 cu.m. 100.00%
B. Other General Requirements
B.5 Removal of Obstruction & Structures 2.00 each 1.00 each 2.00 each 100.00%
B.7 Occupational Safety and Health Program 3.00 month month 1.50 month 50.00%
B.9 Mobilization / Demobilization 1.00 lumpsum lumpsum 0.50 lumpsum 50.00%
Structural Concrete-Footing
Plain and Reinforced Concrete Works & Slab on
Structural Concrete-Footing & Tie
900(1)c2 Fill 24.12 cu.m 14.12 cu.m 24.12 cu.m 100.00%
900(1)c3 Beam
(fc=3,000 9.66 cu.m cu.m 9.66 cu.m
Structural psi @ 28 days) 100.00%
Concrete-Columns(fc=3,000 17.71 cu.m
900(1)c4 (fc=3,000 psi @ 28 days) cu.m cu.m 0.00%
Structural
psi Concrete-Beams(fc=3,000 psi
@ 28 days) 0.75 cu.m
900(1)c6 cu.m cu.m 0.00%
@ 28 days)
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 6,152.70 kls. kls. ### kls. 100.00%
Forms and Falsework
903(1) Forms and Falsework 1.00 lumpsum 1.00 lumpsum 1.00 lumpsum 100.00%
C. FINISHING
Carpentry and Joinery Works
1003(2)a1 Ceiling 4.5mm fiber cement board on metal frame 91.00 sq.m sq.m sq.m 0.00%
1003(5)a1 Fascia Board 28.50 mts. mts. mts. 0.00%
CorrugatedFabricated
Metal Roofing
Metal Roofing Accessory(Ridge/Hip
1013(2)a Rolls Gauge 3.00 lm lm lm 0.00%
1013(2)c Fabricated Metal Roofing Accessory(Gutter) 3.00 lm lm lm 0.00%
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims 14.40 sq.m sq.m sq.m 0.00%
1018(2) Unglazed Tiles 52.50 sq.m sq.m sq.m 0.00%
PrepaintedPrepainted
Metal Sheets
Metal Sheets-above 0.427mm.
1014(1)b1 Longspan-corrugated type 1,263.17 sq.m. sq.m. sq.m. 0.00%
Cement Plaster Finish
1027(1) Cement Plaster Finish 167.87 sq. m. sq. m. sq. m. 0.00%
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works(Masonry/Concrete) 115.92 sq.m. sq.m. sq.m. 0.00%
1032(1)a3 Painting Works(Steel) 250.00 sq.m. sq.m. sq.m. 0.00%
Masonry Works
1046(1)b CHB Non Load Bearing-including RSB100mm. 167.87 sq.m. sq.m. sq.m. 0.00%
Metal Structures
1047(1) Structural Steel (Roof Framing) 1.00 lumpsum lumpsum lumpsum 0.00%
1047(2)a Structural Steel (Roof Framing) 364.91 kls. kls. kls. 0.00%
1047(2)c Structural Steel (Purlins) 5,568.75 kls. kls. kls. 0.00%
1047(3)a Metal Structure Accessories (Bolts) 257.87 pcs pcs pcs 0.00%
1047(3)b Metal Structure Accessories (Sagrods) 388.29 pcs pcs pcs 0.00%
1047(3)c Metal Structure Accessories (Turnbuckle) 44.00 pcs pcs pcs 0.00%
1047(5)b Metal Structure Accessories (Steel Plate) 589.19 kls. kls. kls. 0.00%
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 8, 2018
Date
Project : Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
Veruela, Agusan del Sur
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 1 - 7, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions of
the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes(PVC/uPVC)-20mm dia 32.00 length length length 0.00%
1100(2)d1 PVC/uPVC Coupling-20mm dia 18.00 pcs pcs pcs 0.00%
1100(3)c1 PVC/uPVC Adapter-20mm dia 20.00 pcs pcs pcs 0.00%
1100(4)d1 PVC/uPVC Elbow-20mm dia 26.00 pcs pcs pcs 0.00%
1100(8)a2 Conduit Clamp-20mm dia 225.00 pcs pcs pcs 0.00%
1100(9)a2 G.I. Wire #16 3.00 kilo kilo kilo 0.00%
1100(10) PVC Solvent Cement 2.00 can can can 0.00%
1100(11)a2 Octagonal Junction Box(PVC/uPVC) 13.00 pcs pcs pcs 0.00%
1100(11)b2 Utility Boxes(PVC/uPVC) 7.00 pcs pcs pcs 0.00%
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) 2.00 length length length 0.00%
Wires & Wiring Devices
1101(1)a6 Electrical Wire(3.5mm2 TW/THHN/THWN) 3.00 roll roll roll 0.00%
1101(1)a7 Electrical Wire(5.5mm2 TW/THHN/THWN) 3.50 roll roll roll 0.00%
Duplex (2 Single Pole Wall Switches on one
1101(7)a2 switch plate)
7.00 set set set 0.00%
Note:
Project on-going…
Project : Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
Veruela Agusan del Sur
Contractor: MN BAYALS
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 8 - 15, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions of
the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
A. Earthworks
801 (1) Removal of Obstruction & Structures 1.00 ls ls ### 1.00 ls 100.00%
803 (1)a Structure Excavation 151.09 cu.m. cu.m.### 151.09 cu.m. 100.00%
804(1)b Embankment 50.00 cu.m. cu.m. cu.m. 0.00%
804(4) Gravel Fill 65.26 cu.m. cu.m. 65.26 cu.m. 100.00%
B. Other General Requirements
B.5 Removal of Obstruction & Structures 2.00 each each 2.00 each 100.00%
B.7 Occupational Safety and Health Program 3.00 month month 1.50 month 50.00%
B.9 Mobilization / Demobilization 1.00 lumpsum lumpsum 0.50 lumpsum 50.00%
Plain and Reinforced Concrete Works & Slab on
Structural Concrete-Footing
900(1)c2 Fill
Structural Concrete-Footing & Tie 24.12 cu.m cu.m 24.12 cu.m 100.00%
(fc=3,000 psi @ 28 days)
900(1)c3 Beam 9.66 cu.m 9.66 cu.m 9.66 cu.m 100.00%
Structural Concrete-Columns(fc=3,000
900(1)c4 (fc=3,000 psi @ 28 days) 17.71 cu.m cu.m cu.m 0.00%
psi @ 28 days)
Structural Concrete-Beams(fc=3,000 psi
900(1)c6 0.75 cu.m cu.m cu.m 0.00%
@ 28 days)
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 6,152.70 kls. kls. ### kls. 100.00%
Forms and Falsework
903(1) Forms and Falsework 1.00 lumpsum lumpsum 1.00 lumpsum 100.00%
C. FINISHING
Carpentry Ceiling
and Joinery
4.5mmWorks
fiber cement board on metal
1003(2)a1 frame 91.00 sq.m sq.m sq.m 0.00%
1003(5)a1 Fascia Board 28.50 mts. mts. mts. 0.00%
CorrugatedFabricated
Metal Roofing
Metal Roofing Accessory(Ridge/Hip
1013(2)a Rolls Gauge 3.00 lm lm lm 0.00%
1013(2)c Fabricated Metal Roofing Accessory(Gutter) 3.00 lm lm lm 0.00%
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims 14.40 sq.m sq.m sq.m 0.00%
1018(2) Unglazed Tiles 52.50 sq.m sq.m sq.m 0.00%
PrepaintedPrepainted
Metal Sheets
Metal Sheets-above 0.427mm.
1014(1)b1 Longspan-corrugated type 1,263.17 sq.m. sq.m. sq.m. 0.00%
Cement Plaster Finish
1027(1) Cement Plaster Finish 167.87 sq. m. sq. m. sq. m. 0.00%
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works(Masonry/Concrete) 115.92 sq.m. sq.m. sq.m. 0.00%
1032(1)a3 Painting Works(Steel) 250.00 sq.m. sq.m. sq.m. 0.00%
Masonry Works
1046(1)b CHB Non Load Bearing-including RSB100mm. 167.87 sq.m. sq.m. sq.m. 0.00%
Metal Structures
1047(1) Structural Steel (Roof Framing) 1.00 lumpsum lumpsum lumpsum 0.00%
1047(2)a Structural Steel (Roof Framing) 364.91 kls. kls. kls. 0.00%
1047(2)c Structural Steel (Purlins) 5,568.75 kls. kls. kls. 0.00%
1047(3)a Metal Structure Accessories (Bolts) 257.87 pcs pcs pcs 0.00%
1047(3)b Metal Structure Accessories (Sagrods) 388.29 pcs pcs pcs 0.00%
1047(3)c Metal Structure Accessories (Turnbuckle) 44.00 pcs pcs pcs 0.00%
1047(5)b Metal Structure Accessories (Steel Plate) 589.19 kls. kls. kls. 0.00%
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 16, 2018
Date
Project : Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
Veruela, Agusan del Sur
Contractor: MN BAYALAS CONSTRUCTION
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 8 - 15, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions of
the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes(PVC/uPVC)-20mm dia 32.00 length length length 0.00%
1100(2)d1 PVC/uPVC Coupling-20mm dia 18.00 pcs pcs pcs 0.00%
1100(3)c1 PVC/uPVC Adapter-20mm dia 20.00 pcs pcs pcs 0.00%
1100(4)d1 PVC/uPVC Elbow-20mm dia 26.00 pcs pcs pcs 0.00%
1100(8)a2 Conduit Clamp-20mm dia 225.00 pcs pcs pcs 0.00%
1100(9)a2 G.I. Wire #16 3.00 kilo kilo kilo 0.00%
1100(10) PVC Solvent Cement 2.00 can can can 0.00%
1100(11)a2 Octagonal Junction Box(PVC/uPVC) 13.00 pcs pcs pcs 0.00%
1100(11)b2 Utility Boxes(PVC/uPVC) 7.00 pcs pcs pcs 0.00%
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) 2.00 length length length 0.00%
Wires & Wiring Devices
1101(1)a6 Electrical Wire(3.5mm2 TW/THHN/THWN) 3.00 roll roll roll 0.00%
1101(1)a7 Electrical Wire(5.5mm2 TW/THHN/THWN) 3.50 roll roll roll 0.00%
Duplex (2 Single Pole Wall Switches on one
1101(7)a2 switch plate)
7.00 set set set 0.00%
Duplex Convenience Outlet/Receptacle,
1101(8)a2 Grounding Type
8.00 set set set 0.00%
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers 1.00 set set set 0.00%
Lighting Fixture
1103(4)a7 Compact Flourescent
Die-Cast Aluminum SpotLamp
- Floodlight with
1103(12)a3 electrocoat gray paint 5.00 set set set 0.00%
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia 22.67 meter meter meter 0.00%
1208(5) Steel Brass Metal Nosing 12.00 meter meter meter 0.00%
Note:
Project on-going…
1st report 1 - 7
2nd report 8 - 15
3rd report 16 - 22
Project : Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
Contractor: MN BAYALS
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 16 - 22, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions
of the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
A. Earthworks
801 (1) Removal of Obstruction & Structures 1.00 ls ls ### 1.00 ls 100.00%
803 (1)a Structure Excavation 151.09 cu.m.
### 151.09 cu.m. 100.00%
804(1)b Embankment 50.00 cu.m. cu.m. cu.m. 0.00%
804(4) Gravel Fill 65.26 cu.m. cu.m. 65.26 cu.m. 100.00%
B. Other General Requirements
B.5 Removal of Obstruction & Structures 2.00 each each 2.00 each 100.00%
B.7 Occupational Safety and Health Program 3.00 month month 1.50 month 50.00%
B.9 Mobilization / Demobilization 1.00 lumpsum lumpsum 0.50 lumpsum 50.00%
Plain and Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 24.12 cu.m cu.m 24.12 cu.m 100.00%
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 9.66 cu.m cu.m 9.66 cu.m 100.00%
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi 17.71 cu.m 17.71 cu.m 17.71 cu.m 100.00%
900(1)c6 Structural Concrete-Beams(fc=3,000 psi @ 0.75 cu.m cu.m cu.m 0.00%
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 6,152.70 kls. kls. ### kls. 100.00%
Forms and Falsework
903(1) Forms and Falsework 1.00 lumpsum lumpsum 1.00 lumpsum 100.00%
C. FINISHING
Carpentry Ceiling
and Joinery
4.5mmWorks
fiber cement board on metal
1003(2)a1 frame 91.00 sq.m sq.m sq.m 0.00%
1003(5)a1 Fascia Board 28.50 mts. mts. mts. 0.00%
CorrugatedFabricated
Metal Roofing
Metal Roofing Accessory(Ridge/Hip
1013(2)a Rolls Gauge 3.00 lm lm lm 0.00%
1013(2)c Fabricated Metal Roofing Accessory(Gutter) 3.00 lm lm lm 0.00%
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims 14.40 sq.m sq.m sq.m 0.00%
1018(2) Unglazed Tiles 52.50 sq.m sq.m sq.m 0.00%
PrepaintedPrepainted
Metal Sheets
Metal Sheets-above 0.427mm.
1014(1)b1 Longspan-corrugated type 1,263.17 sq.m. sq.m. sq.m. 0.00%
Cement Plaster Finish
1027(1) Cement Plaster Finish 167.87 sq. m. sq. m. sq. m. 0.00%
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works(Masonry/Concrete) 115.92 sq.m. sq.m. sq.m. 0.00%
1032(1)a3 Painting Works(Steel) 250.00 sq.m. sq.m. sq.m. 0.00%
Masonry Works
1046(1)b CHB Non Load Bearing-including RSB100mm. 167.87 sq.m. sq.m. sq.m. 0.00%
Metal Structures
1047(1) Structural Steel (Roof Framing) 1.00 lumpsum lumpsum lumpsum 0.00%
1047(2)a Structural Steel (Roof Framing) 364.91 kls. kls. kls. 0.00%
1047(2)c Structural Steel (Purlins) 5,568.75 kls. kls. kls. 0.00%
1047(3)a Metal Structure Accessories (Bolts) 257.87 pcs pcs pcs 0.00%
1047(3)b Metal Structure Accessories (Sagrods) 388.29 pcs pcs pcs 0.00%
1047(3)c Metal Structure Accessories (Turnbuckle) 44.00 pcs pcs pcs 0.00%
1047(5)b Metal Structure Accessories (Steel Plate) 589.19 kls. kls. kls. 0.00%
Project : Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
Veruela, Agusan del Sur
Contractor: MN BAYALAS CONSTRUCTION
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 16 - 22, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions of
the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes(PVC/uPVC)-20mm dia 32.00 length length length 0.00%
1100(2)d1 PVC/uPVC Coupling-20mm dia 18.00 pcs pcs pcs 0.00%
1100(3)c1 PVC/uPVC Adapter-20mm dia 20.00 pcs pcs pcs 0.00%
1100(4)d1 PVC/uPVC Elbow-20mm dia 26.00 pcs pcs pcs 0.00%
1100(8)a2 Conduit Clamp-20mm dia 225.00 pcs pcs pcs 0.00%
1100(9)a2 G.I. Wire #16 3.00 kilo kilo kilo 0.00%
1100(10) PVC Solvent Cement 2.00 can can can 0.00%
1100(11)a2 Octagonal Junction Box(PVC/uPVC) 13.00 pcs pcs pcs 0.00%
1100(11)b2 Utility Boxes(PVC/uPVC) 7.00 pcs pcs pcs 0.00%
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) 2.00 length length length 0.00%
Wires & Wiring Devices
1101(1)a6 Electrical Wire(3.5mm2 TW/THHN/THWN) 3.00 roll roll roll 0.00%
1101(1)a7 Electrical Wire(5.5mm2 TW/THHN/THWN) 3.50 roll roll roll 0.00%
1101(7)a2
Duplex (2 Single Pole Wall Switches on one switch plate) 7.00 set set set 0.00%
1101(8)a2
Duplex Convenience Outlet/Receptacle, Grounding Type 8.00 set set set 0.00%
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers 1.00 set set set 0.00%
Lighting Fixture
1103(4)a7 Compact Flourescent
Die-Cast Aluminum SpotLamp
- Floodlight with
1103(12)a3 electrocoat gray paint 5.00 set set set 0.00%
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia 22.67 meter meter meter 0.00%
1208(5) Steel Brass Metal Nosing 12.00 meter meter meter 0.00%
Note:
Project on-going…
1st report 1 - 7
2nd report 8 - 15
3rd report 16 - 22
Project : Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
Veruela, Agusan del Sur
Contractor: MN BAYALS
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 23 - 30, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions
of the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
A. Earthworks
801 (1) Removal of Obstruction & Structures 1.00 ls ls ### 1.00 ls 100.00%
803 (1)a Structure Excavation 151.09 cu.m. cu.m.
### 151.09 cu.m. 100.00%
804(1)b Embankment 50.00 cu.m. cu.m. cu.m. 0.00%
804(4) Gravel Fill 65.26 cu.m. cu.m. 65.26 cu.m. 100.00%
B. Other General Requirements
B.5 Removal of Obstruction & Structures 2.00 each each 2.00 each 100.00%
B.7 Occupational Safety and Health Program 3.00 month month 1.50 month 50.00%
B.9 Mobilization / Demobilization 1.00 lumpsum lumpsum 0.50 lumpsum 50.00%
Plain and Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 24.12 cu.m cu.m 24.12 cu.m 100.00%
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 9.66 cu.m cu.m 9.66 cu.m 100.00%
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi 17.71 cu.m cu.m 17.71 cu.m 100.00%
900(1)c6 Structural Concrete-Beams(fc=3,000 psi @ 0.75 cu.m cu.m cu.m 0.00%
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 6,152.70 kls. kls. ### kls. 100.00%
Forms and Falsework
903(1) Forms and Falsework 1.00 lumpsum lumpsum 1.00 lumpsum 100.00%
C. FINISHING
Carpentry Ceiling
and Joinery
4.5mmWorks
fiber cement board on metal
1003(2)a1 frame 91.00 sq.m sq.m sq.m 0.00%
1003(5)a1 Fascia Board 28.50 mts. mts. mts. 0.00%
CorrugatedFabricated
Metal Roofing
Metal Roofing Accessory(Ridge/Hip
1013(2)a Rolls Gauge 3.00 lm lm lm 0.00%
1013(2)c Fabricated Metal Roofing Accessory(Gutter) 3.00 lm lm lm 0.00%
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims 14.40 sq.m sq.m sq.m 0.00%
1018(2) Unglazed Tiles 52.50 sq.m sq.m sq.m 0.00%
PrepaintedPrepainted
Metal Sheets
Metal Sheets-above 0.427mm.
1014(1)b1 Longspan-corrugated type 1,263.17 sq.m. sq.m. sq.m. 0.00%
Cement Plaster Finish
1027(1) Cement Plaster Finish 167.87 sq. m. sq. m. sq. m. 0.00%
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works(Masonry/Concrete) 115.92 sq.m. sq.m. sq.m. 0.00%
1032(1)a3 Painting Works(Steel) 250.00 sq.m. sq.m. sq.m. 0.00%
Masonry Works
1046(1)b CHB Non Load Bearing-including RSB100mm. 167.87 sq.m. sq.m. sq.m. 0.00%
Metal Structures
1047(1) Structural Steel (Roof Framing) 1.00 lumpsum lumpsum lumpsum 0.00%
1047(2)a Structural Steel (Roof Framing) 364.91 kls. kls. kls. 0.00%
1047(2)c Structural Steel (Purlins) 5,568.75 kls. kls. kls. 0.00%
1047(3)a Metal Structure Accessories (Bolts) 257.87 pcs pcs pcs 0.00%
1047(3)b Metal Structure Accessories (Sagrods) 388.29 pcs pcs pcs 0.00%
1047(3)c Metal Structure Accessories (Turnbuckle) 44.00 pcs pcs pcs 0.00%
1047(5)b Metal Structure Accessories (Steel Plate) 589.19 kls. kls. kls. 0.00%
Project : Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
Veruela, Agusan del Sur
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- mentioned
project for the period April 23 - 30, 2018. We further certify that we have found that the quality of materials in the following
items of work corresponding to the quality accomplished conforms with the Standard Specifications an Special Provisions of
the contract viz :
Quantity Accomplished
ITEM NO.: DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL : ACCOMPL.
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes(PVC/uPVC)-20mm dia 32.00 length 32.00 length 32.00 length 100.00%
1100(2)d1 PVC/uPVC Coupling-20mm dia 18.00 pcs 18.00 pcs 18.00 pcs 100.00%
1100(3)c1 PVC/uPVC Adapter-20mm dia 20.00 pcs 20.00 pcs 20.00 pcs 100.00%
1100(4)d1 PVC/uPVC Elbow-20mm dia 26.00 pcs 26.00 pcs 26.00 pcs 100.00%
1100(8)a2 Conduit Clamp-20mm dia 225.00 pcs 225.00 pcs 225.00 pcs 100.00%
1100(9)a2 G.I. Wire #16 3.00 kilo 3.00 kilo 3.00 kilo 100.00%
1100(10) PVC Solvent Cement 2.00 can 2.00 can 2.00 can 100.00%
1100(11)a2 Octagonal Junction Box(PVC/uPVC) 13.00 pcs 13.00 pcs 13.00 pcs 100.00%
1100(11)b2 Utility Boxes(PVC/uPVC) 7.00 pcs 7.00 pcs 7.00 pcs 100.00%
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) 2.00 length 2.00 length 2.00 length 100.00%
Wires & Wiring Devices
1101(1)a6 Electrical Wire(3.5mm2 TW/THHN/THWN) 3.00 roll roll roll 0.00%
1101(1)a7 Electrical Wire(5.5mm2 TW/THHN/THWN) 3.50 roll roll roll 0.00%
1101(7)a2
Duplex (2 Single Pole Wall Switches on one switch plate) 7.00 set set set 0.00%
1101(8)a2
Duplex Convenience Outlet/Receptacle, Grounding Type 8.00 set set set 0.00%
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers 1.00 set set set 0.00%
Lighting Fixture
1103(4)a7 Compact Flourescent
Die-Cast Aluminum SpotLamp
- Floodlight with
1103(12)a3 electrocoat gray paint 5.00 set set set 0.00%
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia 22.67 meter meter meter 0.00%
1208(5) Steel Brass Metal Nosing 12.00 meter meter meter 0.00%
Note:
Project on-going…
1st report 1 - 7
2nd report 8 - 15
3rd report 16 - 22
April 2018
Month Year
Project : Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
Veruela Agusan del Sur
ALDREN A. ABULOG
(P. Project Engineer,Gov't)
c. Inspection
25.16% 42.48%
(Current Month) Total to Date
PREPARED BY:
SUBMITTED BY:
LEODEGARIO M. MAZO
Engineer III
Chief, Quality Assurance Section
MN BAYALAS CONSTRUCTION
STATUS OF TEST
Date: April 1, 201
Project: Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy. Emilia
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electroc 4.00 set P.E. Cert. - 1 0 1
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia 22.67 meter P.E. Cert. - 1 0 1
1208(5) Steel Brass Metal Nosing 12.00 meter P.E. Cert. - 1 0 1
Summary for 900(1);
CCS 3 sets
Reinforced Concrete 52.24 cu.m (Footing/Column,
2 1
Beam & Slab)
a.) Portland Cement 474 bags Q-1 1 0
b.) Screened & Washed Fine Aggregate 26.58 cu.m Q-1, G-1 1 0
c.) Screened & Washed Coarse Aggregate 52.24 cu.m Q-1, G-1 1 0
d.) Water - - PE Cert. - 1 1 0
PHYSICAL ACCOMPLISHMENT 72.90%
PREPARED BY:
LEGEND
M- Mechanical or Sieve Analysis P- Plastic and Liquid Limits Test
C- Compaction of Test D- Field Density Test
Q- Quality Test SF- Shrinkage Factor Test
FT- Free Test IR- Inspection Report
-One test of every layer of 20 cu.m. distance between test holes not to exceed 150 linear meters.
-One set by Cylinder samples for every dry pouring but not exceed 75 cu.m
-One set by beam samples for every dry pouring but not exceed 75 cu.m.
ON
Date: April 1, 2018
Brgy. Emilia
Work
Accom.
100.00%
100.00%
0.00%
100.00%
100.00%
50.00%
50.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
66.66%
100.00%
100.00%
100.00%
100.00%
42.48%
N A. ABULOG
ineer - II
ct Engineer I
Project :
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stage) @ Brgy.
Emilia For the period: April 1 - 30, 2018
Location : Veruela Agusan del Sur
Note:
Project on-going…
CONCERN REMARKS
* Accreditation of PE/PI A
ALDREN A. ABULOG PPE-I
Accreditation No.
* Accreditation of Contractors'/Consultants'
ME B
JIMMY F. CABURNAY JR. ME-I
Project on going…
Acreditation No. 4493
* Limits of Assignment of PE/ME C
None
None
REMARKS
Project on going…
April 8, 2018
Date
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
@ Brgy. Emilia
Name of Project :
Contractor : MN BAYALAS
I hereby certify that Item 804(4) which represents the Gravel Fill of the above named projec
with a total quantity of Sixty Five and 26/100 (65.26) cubic meter was done in accordance to the
approved plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 8, 2018
Date
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item B.5 which represents the Occupational safety and Health Program
the above named project with a total quantity of Two (2) each was done in accordance to the approv
plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 8, 2018
Date
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item B.7 which represents the Occupational safety and Health Program
the above named project with a total quantity of Three (3) months was done in accordance to the
approved plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 900(1)c2 which represents the Structural Concrete (Footing) of the
above named project with a total quantity of Twenty Four and 12/100 (24.12) cubic meters was done
accordance to the approved plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
I hereby certify that Item 900(1)c4 which represents the Structural Concrete Footing & tiebe
of the above named project with a total quantity of Nine and 26/100 (9.26) cubic meter was done in
accordance to the approved plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Contractor : MN BAYALAS
I hereby certify that Item 902(1)a2 which represents the Reinforcing Steel Deformed of the
above named project with a total quantity of Six-Thousand One-hundred Fifty Two and 70/100 (6152
kilograms was done in accordance to the approved plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 900(1)c4 which represents the Structural Concrete Columns of the
above named project with a total quantity of Seventeen and 71/100 (17.71) cubic meters was done i
accordance to the approved plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 900(1)c6 which represents the Structural Concrete Slab of the abo
named project with a total quantity of 75/100 (0.75) cubic meter was done in accordance to the appr
plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 1027(1) which represents the Cement Plaster Finish of the above
named project with a total quantity of Sixty Three (63) square meters was done in accordance to the
approved plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 1046(2)b which represents the CHB Non load bearing of the abov
named project with a total quantity of Sixty Three (63) square meters was done in accordance to the
approved plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 1100(1)f1 which represents the Polyvinyl Chloride Pipes of the abo
named project with a total quantity of Twenty Four (24) Length was done in accordance to the appro
plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
I hereby certify that Item 1100(2)d1, 1100(3)c1, 1100(4)d1, and 1100(8)a2 which represents
Conduits Boxes and Fittings of the above named project with a total quantity of Two-Hundred Eighty
Three (283) pieces was done in accordance to the approved plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 1100(9)a2 which represents the G.I. Wire #16 of the above named
project with a total quantity of Three (3) kilos was done in accordance to the approved plans &
specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 1100(10) which represents the PVC Solvent Cement of the above
named project with a total quantity of Two (2) can was done in accordance to the approved plans &
specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
May 2, 2018
Date
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 100(11)a2 which represents the Octagonal Junction Box of the ab
named project with a total quantity of Thirteen (13) pieces was done in accordance to the approved p
& specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
May 2, 2018
Date
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 100(11)b2 which represents the Utility Boxes of the above named
project with a total quantity of Seven (7) pieces was done in accordance to the approved plans &
specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
May 2, 2018
Date
CERTIFICATION
Construction (Completion) of Multi-Purpose Building (Covered Court w/ Stag
Name of Project : @ Brgy. Emilia
Contractor : MN BAYALAS
I hereby certify that Item 1100(14)b which represents the Grounding Rod Copper Clad of th
above named project with a total quantity of Two (2) length was done in accordance to the approved
plans & specifications.
ALDREN A. ABULOG
Project Engineer I
R.13.11.6/qas/ads II/fconolIIIfiles
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 8, 2018
Date
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
ALDREN A. ABULOG
Project Engineer I
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 8, 2018
Date
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
ALDREN A. ABULOG
Project Engineer I
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
April 8, 2018
Date
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
ALDREN A. ABULOG
Project Engineer I
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
)c4 which represents the Structural Concrete Footing & tiebeam
quantity of Nine and 26/100 (9.26) cubic meter was done in
ecifications.
ALDREN A. ABULOG
Project Engineer I
ALDREN A. ABULOG
Project Engineer I
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
ALDREN A. ABULOG
Project Engineer I
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
ALDREN A. ABULOG
Project Engineer I
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
ALDREN A. ABULOG
Project Engineer I
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
2)b which represents the CHB Non load bearing of the above
xty Three (63) square meters was done in accordance to the
ALDREN A. ABULOG
Project Engineer I
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
1)f1 which represents the Polyvinyl Chloride Pipes of the above
enty Four (24) Length was done in accordance to the approved
ALDREN A. ABULOG
Project Engineer I
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
2)d1, 1100(3)c1, 1100(4)d1, and 1100(8)a2 which represents the
e named project with a total quantity of Two-Hundred Eighty
ance to the approved plans & specifications.
ALDREN A. ABULOG
Project Engineer I
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
9)a2 which represents the G.I. Wire #16 of the above named
kilos was done in accordance to the approved plans &
ALDREN A. ABULOG
Project Engineer I
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
ALDREN A. ABULOG
Project Engineer I
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
May 2, 2018
Date
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
ALDREN A. ABULOG
Project Engineer I
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
May 2, 2018
Date
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)
ALDREN A. ABULOG
Project Engineer I
Republic of the Philippines
NT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
TRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
May 2, 2018
Date
IFICATION
etion) of Multi-Purpose Building (Covered Court w/ Stage)