Vous êtes sur la page 1sur 21

Customer : IGO Manual : AMM

Type : A318/A319/A320/A321 Selected applicability : 016-016


Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

** ON A/C ALL

TASK 29-22-00-720-003-A
Operational Check of RAT Manual Deployment and Functional Check of RAT using Ground Test Unit, followed by
Check of Filter Indicator

WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN
CAUSE DAMAGE TO THE EQUIPMENT.

WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.

WARNING: MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU EXTEND/RETRACT
THE RAT.

WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS
POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.

WARNING: AVOID PROLONGED EXPOSURE TO HYDRAULIC FLUID ON YOUR SKIN FLUSH OIL FROM
YOUR SKIN WITH WATER. WEAR PROTECTIVE CLOTHING, GOGGLES AND FACE MASK.
HYDRAULIC FLUID OIL IS POISONOUS AND CAN PENETRATE YOUR SKIN AND INTO YOUR
BODY.

WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL
MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.

1. Reason for the Job


Refer to the MPD TASK: 292000-04
OPERATIONAL CHECK OF RAT MANUAL DEPLOYMENT AND FUNCTIONAL CHECK OF RAT USING
GROUND TEST UNIT, FOLLOWED BY CHECK OF FILTER INDICATOR

NOTE: It is permitted to use the tools Part Numbers HFK02, PGRAT1, 13-6600-3600 or BH4016A1 as an al-
ternative to the tools Part Numbers AGE11212 and AE89415Z.

NOTE: It is permitted to use the tools Part Numbers AGE10600A, AGE10600B, AGE10600C, Testfuchs RAT-
MK, Hycom HRT01 and BH4016A2 as an alternative to the tool Part Number AGE10600D.

NOTE: It is permitted to use the tool Part Number BH4016A3 as an alternative to the tool Part Number RSIK1.

2 Job Set-up Information


A. Fixtures, Tools, Test and Support Equipment

REFERENCE QTY DESIGNATION


No specific 1 CONTAINER-FUEL RESISTANT, TRANSPARENT PLASTIC
No specific 1 DRIFT - PUNCH

Print Date: May 27, 2018 Page 1 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

REFERENCE QTY DESIGNATION


No specific 1 GROUND POWER CART - HYDRAULIC, RESERVOIR MIN. 150 L
No specific 1 PLIERS - NOSE, SOFT, LONG
No specific AR SAFETY BARRIER(S)
No specific AR SAFETY CLIP - CIRCUIT BREAKER
No specific AR WARNING NOTICE(S)
No specific Torque wrench: range to between 86 and 95 lbf.in
(0.97 and 1.07 m.daN)
No specific Torque wrench: range to between 132.76 and 159.31 lbf.in
(1.50 and 1.80 m.daN)
(98D29208246001) 1 DEVICE-SAFETY,RAT
(98D29208581000) 1 PROTECTION EQUIPMENT - RAT
(AGE10600D) 1 CHECK-MOTOR GROUND,RAT
(RSIK1) 1 KIT SAFETY-RAT,INTERFACE

B. Work Zones and Access Panels

ZONE/ACCESS ZONE DESCRIPTION


190 BELLY FAIR, AIR CONDITIONING & HYD COMPT
195 HYDRAULIC COMPT AND FAIRINGS
197 REAR FAIRING
195BB, 197EB

C. Referenced Information

REFERENCE DESIGNATION
(Ref. 12-13-29-600-001-A). Servicing of the Ram Air Turbine (RAT)
(Ref. 24-41-00-861-002-A). Energize the Aircraft Electrical Circuits from the External Power
(Ref. 24-41-00-861-002-A-01). Energize the Aircraft Electrical Circuits from the APU
(Ref. 24-41-00-861-002-A-02). Energize the Aircraft Electrical Circuits from Engine 1(2)
(Ref. 24-41-00-862-002-A). De-energize the Aircraft Electrical Circuits Supplied from the External
Power
(Ref. 24-41-00-862-002-A-01). De-energize the Aircraft Electrical Circuits Supplied from the APU
(Ref. 24-41-00-862-002-A-02). De-energize the Aircraft Electrical Circuits Supplied from the Engine
1(2)
(Ref. 29-00-00-910-002-A). Safety Procedures of the Hydraulic System
(Ref. 29-22-00-860-008-A). Removal of the Safety Device of the Ram Air Turbine
(Ref. 29-22-00-869-006-A). Retraction of the Ram Air Turbine (RAT) on the Ground
(Ref. 29-22-51-000-010-A). Removal of the Ram Air Turbine
(Ref. 29-22-51-000-013-A). Removal of the RAT Filter Element
(Ref. 29-22-51-400-010-A). Installation of the Ram Air Turbine
(Ref. 29-22-51-400-013-A). Installation of the RAT Filter Element
(Ref. 29-22-51-680-003-A). Draining of the Ram Air Turbine Oil Drain Tank
(Ref. 31-60-00-860-001-A). EIS Start Procedure
(Ref. 31-60-00-860-002-A). EIS Stop Procedure
(Ref. 29-22-51-000-013-A). Removal of the RAT Filter Element (for corrective action)
(Ref. 29-22-51-400-013-A). Installation of the RAT Filter Element (for corrective action)
(Ref. 29-22-53-000-010-A). Removal of the RAT Actuator (for corrective action)
(Ref. 29-22-53-400-010-A). Installation of the RAT Actuator (for corrective action)
Installation of the RAT Safety Interface Kit SHEET 1

Print Date: May 27, 2018 Page 2 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

REFERENCE DESIGNATION
Installation of the RAT Ground-Checkout Unit and the Flow Control Test Kit SHEET 1
Installation of the RAT Flow-Control Test Kit SHEET 1
Installation of the RAT Flow Control Test Kit (Tronair) SHEET 1
Installation of the RAT Flow Control Test Kit SHEET 1

Print Date: May 27, 2018 Page 3 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

Z195
A

E
B
13

7 B
11
1
12
4

D C
5

6
C
4 2
3
7 8
E 9

10

N_MM_292200_5_CAM0_01_00

Figure 29-22-00-991-03500-00-A / SHEET 1/1 - Installation of the RAT Safety Interface Kit
** ON A/C ALL

Print Date: May 27, 2018 Page 4 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

BLUE HYDRAULIC GROUND


SERVICE PANEL

A
2006GM

A
195BB
197EB

2008GM

RAT GROUND
CHECKOUT UNIT

RAT FLOW CONTROL


TEST KIT

N_MM_292200_5_DLM0_01_00

Figure 29-22-00-991-02400-00-A / SHEET 1/1 - Installation of


the RAT Ground-Checkout Unit and the Flow Control Test Kit
** ON A/C ALL

Print Date: May 27, 2018 Page 5 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

BLUE HYDRAULIC GROUND


SERVICE PANEL

2006GM

A
195BB
197EB

2008GM A

RAT FLOW CONTROL


TEST KIT

N_MM_292200_5_DLN0_01_00

Figure 29-22-00-991-03000-00-A / SHEET 1/1 - Installation of the RAT Flow-Control Test Kit
** ON A/C ALL

Print Date: May 27, 2018 Page 6 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

A
BLUE HYDRAULIC GROUND
SERVICE PANEL

2006GM

ELECTRICAL 195BB
CONNECTOR 197EB

2008GM

RAT FLOW CONTROL


TEST KIT

N_MM_292200_5_BAM0_01_00

Figure 29-22-00-991-03100-00-A / SHEET 1/1 - Installation of the RAT Flow Control Test Kit (Tronair)
** ON A/C ALL

Print Date: May 27, 2018 Page 7 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

A
BLUE HYDRAULIC GROUND
SERVICE PANEL

2006GM

A
195BB
197EB

2008GM
ELECTRICAL
CONNECTOR

RAT FLOW CONTROL


TEST KIT

N_MM_292200_5_BCM0_01_00

Figure 29-22-00-991-03200-00-A / SHEET 1/1 - Installation of the RAT Flow Control Test Kit
** ON A/C ALL

Print Date: May 27, 2018 Page 8 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

3. Job Set-up
Subtask 29-22-00-941-085-A
A. Safety Precautions
(1) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and
your local regulations.
(2) Put the WARNING NOTICE(S) in position to tell persons that the RAT is in operation.
Subtask 29-22-00-010-083-A
B. Open access doors 197EB and 195BB.
Subtask 29-22-00-865-110-A
C. Make sure that this(these) circuit breaker(s) is(are) closed:

PANEL DESIGNATION FIN LOCATION


49VU HYD/HYD/PRESS/XMTR 1841GN C11

** ON A/C 016-022, 024-100, 103-109, 111-150, 201-201, 203-250, 350-350


49VU HYD/RAT/CTL 2801GE D14

** ON A/C ALL
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
Subtask 29-22-00-865-111-A
D. Open, safety and tag this(these) circuit breaker(s):

PANEL DESIGNATION FIN LOCATION


105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
Subtask 29-22-00-860-110-A
E. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) .
(2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001)
(3) Make sure that the SAFETY DEVICE-RAT (98D29208246000) or the DEVICE-
SAFETY,RAT (98D29208246001) is removed from the RAT stowage compartment
(Ref. AMM TASK 29-22-00-860-008) .
(4) Close the access door 195BB.

WARNING: MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU EXTEND/RETRACT
THE RAT.

4. Procedure

NOTE: Make sure that a second person is in position to observe the extension of the RAT before you push the
MAN RAT ON pushbutton.

Subtask 29-22-00-710-068-A
A. Operational Test of the Manual Deployment of the RAT

Print Date: May 27, 2018 Page 9 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

ACTION RESULT
1.On the ECAM control panel: On the lower ECAM DU:
· Push the HYD pushbutton. · The HYD page is shown.

· The RAT triangle symbol is shown white.


At the RAT stowage area:
CAU- DO NOT PUSH THE RAT MAN ON PUSH-
TION: BUTTON SWITCHES FOR MORE THAN
1 MINUTE YOU WILL CAUSE DAMAGE
IF YOU PUSH THE RAT MAN ON PUSH-
BUTTON SWITCHES FOR MORE THAN 1
MINUTE.

CAU- DO NOT PUSH THE RAT MAN ON PUSH-


TION: BUTTON SWITCHES FOR MORE THAN
1 MINUTE YOU WILL CAUSE DAMAGE
IF YOU PUSH THE RAT MAN ON PUSH-
BUTTON SWITCHES FOR MORE THAN 1
MINUTE.

2.On overhead panel 40VU:


· Lift the guard and push the RAT MAN ON switch. · The RAT fully extends.

On the glare shields:

· The MASTER CAUTION lights come on and you


can hear a single chime.

On the HYD page of the lower ECAM DU:

· The RAT triangle symbol changes to green when


the RAT is fully extended.

On the upper ECAM DU:

· The legends HYD RAT FAULT and RAT OUT are


shown in amber.
3.Retract the RAT (Ref. AMM TASK 29-22-00-869- The RAT retracts in its stowage area.
006) .
4.On overhead panel 21VU: At the RAT stowage area:
· Lift the guard and push the MAN ON/AUTO · The RAT extends.
switch in the EMER ELEC PWR section.
On the glareshields:

· The MASTER CAUTION lights come on and you


can hear a single chime.

On the HYD page of the lower ECAM DU:

· The RAT triangle symbol changes to green when


the RAT is fully extended.

On the upper ECAM DU:

Print Date: May 27, 2018 Page 10 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

ACTION RESULT

· The legends HYD RAT FAULT and RAT OUT are


shown in amber.

Subtask 29-22-00-865-112-A
B. Open, safety and tag this(these) circuit breaker(s):

PANEL DESIGNATION FIN LOCATION


121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
Subtask 29-22-00-210-072-A
C. Inspection of the RAT
(1) Make sure that the RAT down-lock is engaged:
(a) Manually push the RAT in the retraction direction.
(b) If you push the RAT with a sudden force, the RAT can move in the retraction direction. This is
permitted.
(c) If you push the RAT with a constant force, the RAT can move in the retraction direction. This
is not permitted and you must replace the actuator (Ref. AMM TASK 29-22-53-000-010) and
(Ref. AMM TASK 29-22-53-400-010) .
(2) Make sure that the RAT and the attachment parts are in the correct condition.
(3) Inspection of the RAT Gearbox Interface
(a) Do a leakage inspection of the RAT gearbox:
1 If there is a leakage, replace the RAT (Ref. AMM TASK 29-22-51-000-010) and
(Ref. AMM TASK 29-22-51-400-010) .
(b) Examine the RAT oil-level sight-glass on the gearbox housing (you must see oil in the sight
glass):
1 If the oil level is low and the RAT interface is dry, add oil (Ref. AMM TASK 12-13-29-600-
001) .
(4) Do a check of the differential pressure indicator of the RAT filter:
(a) Make sure that the RAT filter is not blocked (differential pressure indicator is in).
(b) If the differential pressure indicator is out, replace the RAT filter element (Ref. AMM TASK 29-
22-51-000-013) and (Ref. AMM TASK 29-22-51-400-013)
(5) Make sure that the switch 28VDC on RAT control panel (3GE) is in the OFF position.
Subtask 29-22-00-480-059-A

WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.


WORK ON THE HYDRAULIC SYSTEMS CAN BE DANGEROUS.

D. Installation of the Ground Support Equipment with the RAT Safety Interface Kit (RSIK)
(Ref. Fig. Installation of the RAT Safety Interface Kit SHEET 1)
(Ref. Fig. Installation of the RAT Ground-Checkout Unit and the Flow Control Test Kit SHEET 1)
(Ref. Fig. Installation of the RAT Flow-Control Test Kit SHEET 1)
(Ref. Fig. Installation of the RAT Flow Control Test Kit (Tronair) SHEET 1)
(Ref. Fig. Installation of the RAT Flow Control Test Kit SHEET 1)
(1) Do a leakage inspection of the CHECK-MOTOR GROUND,RAT (AGE10600D) interface.

Print Date: May 27, 2018 Page 11 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

(2) Make sure that there is no blockage or kink in the CHECK-MOTOR GROUND,RAT (AGE10600D)
return line.
(3) Install the CHECK-MOTOR GROUND,RAT (AGE10600D) on the RAT with RAT Safety Interface Kit
(RSIK) as follows:

NOTE: If the CHECK-MOTOR GROUND,RAT (AGE10600D) is not available, you can also use
these check motors:
- Tronair AGE10600A
- Tronair AGE10600B
- Tronair AGE10600C
- Testfuchs RATMK
- Hycom HRT01
- BH4016A2.

NOTE: If the KIT SAFETY-RAT,INTERFACE (RSIK1) is not available, you can also use this safety
interface:
- BH4016A3.

NOTE: The function of the KIT SAFETY-RAT,INTERFACE (RSIK1) is to prevent the RAT gearbox
from damage from the ground test motor (high pressure leakage).

(a) Remove the bolts (3), the washers (2) and the cover plate (1).

NOTE: If the adapter pinion (13) is installed, go to step (h).

(b) Push in the adapter pinion (11) of the CHECK-MOTOR GROUND,RAT (AGE10600D) (7).
(c) Use the PLIERS - NOSE, SOFT, LONG and the DRIFT - PUNCH to remove the locking spring
(12) from the relief groove.
(d) Remove the adapter pinion (11).
(e) Install the adapter pinion (13) to the CHECK-MOTOR GROUND,RAT (AGE10600D) (7).
(f) Push in the adapter pinion (13) of the CHECK-MOTOR GROUND,RAT (AGE10600D) (7).
(g) Use the PLIERS - NOSE, SOFT, LONG and the DRIFT - PUNCH to install the locking spring
(12). Make sure the adapter pinion (13) is installed correctly.

NOTE: When you pull the adapter pinion (13), it must not come out.

(h) Loosely install the screws (5) to the RAT from the KIT SAFETY-RAT,INTERFACE (RSIK1) .
(i) TORQUE the screws (5) to between 132.76 and 159.31 lbf.in (1.50 and 1.80 m.daN).
(j) Install the adapter plate (6) on the screws (5).

NOTE: All arrows on the adapter plate (6) must point to the RAT.

(k) Loosely install the CHECK-MOTOR GROUND,RAT (AGE10600D) (7), on the screws (5) with
the washers (8) and the nuts (9).
(l) TORQUE the nuts (9) to between 132.76 and 159.31 lbf.in (1.50 and 1.80 m.daN).
(m) Connect the discharge hose to the adapter plate (6) and to the CONTAINER-FUEL RESISTANT,
TRANSPARENT PLASTIC.
(n) Connect the hydraulic hoses of the CHECK-MOTOR GROUND,RAT (AGE10600D) to a
GROUND POWER CART - HYDRAULIC, RESERVOIR MIN. 150 L.

Print Date: May 27, 2018 Page 12 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

NOTE: The motor flow during the test is approximately 140 +8 l.min or -8 l.min (37.0 +2.1
USgal.mn or -2.1 USgal.mn) at 206 bar (2988 psi). For the function test of the RAT-gov-
ernor, the motor flow will increase. Thus, the capacity of the ground power cart must be
140 l.min (37 USgal.mn) at 206 bar (2987.7766 psi).

NOTE: On the hydraulic ground-power cart, make sure that the reservoir selector valve is set to:
- The open loop position
or
- The test stand reservoir position.

(o) Make sure that the drain hole points down when the CHECK-MOTOR
GROUND,RAT (AGE10600D) is installed.
(p) If installed, remove the drain plug (10) of the CHECK-MOTOR GROUND,RAT (AGE10600D) .

NOTE: For the CHECK-MOTOR GROUND, RAT AGE10600A, B, C, D or Hycom HRT01 the
drain plug (10) must be removed.

NOTE: For the CHECK-MOTOR GROUND, RAT RATMK (Testfuchs motor) or BH4016A2 the
drain plug (10) must not be removed.

(q) If the CHECK-MOTOR GROUND,RAT (AGE10600D) has an adjustment valve, make sure that
the valve is in the fully open position.

NOTE: Only the CHECK-MOTOR GROUND, RAT AGE10600A has an adjustment valve.

(4) Install the RAT Flow Control Test Kit:

WARNING: MAKE SURE THAT THE PROTECTIVE EQUIPMENT IS STABLE AND CANNOT
MOVE DURING THE TEST. IF THE PROTECTIVE EQUIPMENT MOVES, THERE IS A
RISK THAT:
- IT WILL TOUCH AND CAUSE DAMAGE TO THE RAT
- BROKEN PARTS WILL CAUSE INJURY TO PERSONS.

(a) If you use the FLOW CONTROL TEST - RAT (AE89415Z) and the GROUND - CHECKOUT
UNIT, RAT (AGE11212) (refer to the Reason for Job statement, Paragraph 1., for more tool
data):
1 Connect the hydraulic hoses of the FLOW CONTROL TEST - RAT (AE89415Z) to the
ground connectors of the ground service panel (Blue hydraulic system).

NOTE: If the FLOW CONTROL TEST - RAT (AE89415Z) is not available, you can also use
these flow control test kits:
- HFK02
- Tronair 13-6600-3600
- Testfuchs PGRAT1
- BH4016A1.

2 Install the PROTECTION EQUIPMENT - RAT (98D29208581000) .


3 Connect the GROUND - CHECKOUT UNIT, RAT (AGE11212) or the TEST KIT, FLOW
CONTROL - RAT (HFK02) to the connector 3GE-B on the RAT control panel.
(b) If you use the TEST KIT, FLOW CONTROL - RAT (HFK02) :

Print Date: May 27, 2018 Page 13 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

1 Connect the hydraulic hoses of the FLOW CONTROL TEST KIT - RAT to the ground
connectors of the ground service panel of the (Blue hydraulic system).
2 Install the PROTECTION EQUIPMENT - RAT (98D29208581000) .
3 Connect the electrical connector of the FLOW CONTROL TEST KIT - RAT to the connector
3GE-B on the RAT control panel.
(c) If you use the TEST - UNIT, RAT (13-6600-3600) :
1 Connect the hydraulic hoses of the FLOW CONTROL TEST KIT - RAT to the ground
connectors of the ground service panel (Blue hydraulic system).
2 Install the PROTECTION EQUIPMENT - RAT (98D29208581000) .
3 Connect the electrical connector of the FLOW CONTROL TEST KIT - RAT to the connector
3GE-B on the RAT control panel.
(d) If you use the TEST - EQUIPMENT, RAT (PGRAT1) :
1 Connect the hydraulic hoses of the FLOW CONTROL TEST KIT - RAT to the ground
connectors of the ground service panel (Blue hydraulic system).
2 Install the PROTECTION EQUIPMENT - RAT (98D29208581000) .
3 Connect the electrical connector of the FLOW CONTROL TEST KIT - RAT to the connector
3GE-B on the RAT control panel.
(e) If you use the RAT TEST EQUIPMENT (BH4016A) :
1 Connect the hydraulic hoses of the FLOW CONTROL TEST KIT - RAT to the ground
connectors of the ground service panel (Blue hydraulic system).
2 Install the PROTECTION EQUIPMENT - RAT (98D29208581000) .
3 Connect the electrical connector of the FLOW CONTROL TEST KIT - RAT to the connector
3GE-B on the RAT control panel.
Subtask 29-22-00-865-113-A
E. Make sure that this(these) circuit breaker(s) is(are) closed:

PANEL DESIGNATION FIN LOCATION

** ON A/C 016-022, 024-100, 103-109, 111-150, 201-201, 203-250, 350-350


49VU HYD/RAT/CTL 2801GE D14

** ON A/C ALL
Subtask 29-22-00-210-073-A
F. Lamp Test on the RAT Control Panel
(1) On RAT control panel 3GE push and hold the "LAMP TEST" switch in the TEST position:
· The ACTUATOR PRESSURE warning lamp comes on (red).
· The INTERLOCK WARNING lamp comes on (amber).
· The RAT STOWED lamp comes on (green).
(2) Release the LAMP TEST switch, each lamp goes out.
Subtask 29-22-00-720-056-A
G. Functional Test of the RAT (Spin-Up and Governing Test) with the FLOW CONTROL TEST -
RAT (AE89415Z) and the GROUND - CHECKOUT UNIT, RAT (AGE11212) or the TEST KIT, FLOW
CONTROL - RAT (HFK02) or the TEST - UNIT, RAT (13-6600-3600) or the TEST - EQUIPMENT,
RAT (PGRAT1) or the RAT TEST EQUIPMENT (BH4016A)

Print Date: May 27, 2018 Page 14 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

WARNING: KEEP ALL PERSONS AWAY FROM THE AREA WHEN YOU PRESSURIZE THE BLUE
HYDRAULIC SYSTEM. WHEN YOU PRESSURIZE THE BLUE HYDRAULIC SYSTEM,
THE RAT CAN TURN AT MORE THAN 5000 RPM.

WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.

WARNING: ALWAYS WEAR RUBBER GLOVES, GOGGLES AND PROTECTIVE CLOTHES WHEN
YOU DO THIS TASK.

(1) Obey the hydraulic safety procedure (Ref. AMM TASK 29-00-00-910-002) .

NOTE: Always monitor the transparent discharge hose and the fluid container. When the hydraulic
fluid flows from the RSIK through the discharge hose into the container, stop the test imme-
diately to prevent damage to the RAT gearbox. If the hydraulic fluid is there, the ground test
motor is damaged. The damage causes leakage in the direction of the RSIK. The hydraulic
fluid from the motor can cause damage to the RAT gearbox. At the beginning of the leakage,
the RSIK can move the fluid. If the leakage occurs, replace the ground test motor and exam-
ine the RAT gearbox for the damage that the hydraulic fluid caused.

(2) Make sure that the Blue hydraulic system is serviceable.

NOTE: The operation of the Blue electric pump is necessary to pre-charge the Blue hydraulic system
accumulator for the spin-up and governing test.

(3) You must look at the temperature gage of the FLOW CONTROL TEST - RAT (AE89415Z) or the
TEST KIT, FLOW CONTROL - RAT (HFK02) or the TEST - UNIT, RAT (13-6600-3600) or the
TEST - EQUIPMENT, RAT (PGRAT1) or the RAT TEST EQUIPMENT (BH4016A) during the test.
The test values can be out of tolerance if the temperature increases to more than 60 deg.C (140.00
deg.F). If so, you must stop the test, let the temperature decrease and do the test again.
(4) Do the test that follows:

ACTION RESULT
1.On the TEST KIT, FLOW CONTROL - On the GCU:
RAT (HFK02) or the TEST - UNIT, RAT (13-
6600-3600) or the TEST - EQUIPMENT,
RAT (PGRAT1) or the GROUND - CHECK-
OUT UNIT, RAT (AGE11212) or the RAT TEST
EQUIPMENT (BH4016A) (GCU):
· Set the POWER ON/OFF switch to ON. · If installed, the POWER light comes on.

· The SPEED and the PRESSURE indicators


show the digit 8 for approximately 2 seconds.
2.Adjust the flow on the FLOW CONTROL
TEST - RAT (AE89415Z) or the TEST KIT,
FLOW CONTROL - RAT (HFK02) or the TEST
- UNIT, RAT (13-6600-3600) or the TEST -
EQUIPMENT, RAT (PGRAT1) or the RAT
TEST EQUIPMENT (BH4016A) to 0 l.min (0
USgal.min).
3.On overhead panel 50VU: On overhead panel 50VU on the P/BSW:
· Set the P/BSW LEAK MEASUREMENT · The OFF light comes on.
VALVES/B to OFF.

Print Date: May 27, 2018 Page 15 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

ACTION RESULT
4.On overhead panel 40VU:
· Make sure that the P/BSW BLUE/ELEC PUMP
is set to AUTO (The OFF light on the P/BSW is
off).
On overhead panel 50VU:
WAR BE CAREFUL WHEN YOU DO WORK
NING: IN THE AREA ADJACENT TO THE EX-
TENDED RAT. IF THE BLUE HYDRAUL-
IC SYSTEM IS PRESSURIZED, THE RAT
BLADES CAN TURN. THIS CAN CAUSE
INJURY TO PERSONS AND/OR DAM-
AGE TO EQUIPMENT.

WAR BE CAREFUL WHEN YOU DO WORK


NING: IN THE AREA ADJACENT TO THE EX-
TENDED RAT. IF THE BLUE HYDRAUL-
IC SYSTEM IS PRESSURIZED, THE RAT
BLADES CAN TURN. THIS CAN CAUSE
INJURY TO PERSONS AND/OR DAM-
AGE TO EQUIPMENT.

5.On overhead panel 50VU:

NOTE: The pressurization of the Blue hydraulic


system will show that the check valve is
not blocked in the open position.

· Set the P/BSW BLUE PUMP OVRD to ON. · The ON light in the P/BSW comes on

· The Blue electric pump starts.


On the HYD page of the lower ECAM DU:

· A pressure of 3000 +/- 100 psi is shown.


At the RAT:
· The turbine blades of the RAT do not turn.
6.On the hydraulic ground-power cart: At the RAT:
· Supply a pressure of approximately 206 bar · The turbine blades of the RAT turn. Make sure
(3000 psi). that the RAT turns in a counterclockwise direc-
tion.

NOTE: Counterclockwise is when you stay behind


the RAT and look in the flight direction.

On the GCU:

· The SPEED (RPM) indicator shows 5000 +/- 250


RPM.

NOTE: The SPEED (RPM) indicator can show


5000 +/- 250 RPM if the pressure is less
than 206 bar (3000 psi).

Print Date: May 27, 2018 Page 16 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

ACTION RESULT

CAU- YOU MUST STOP THE TEST IMMEDI-


TION: ATELY IF THE RAT TURNS MORE THAN
5500 RPM.

CAU- YOU MUST STOP THE TEST IMMEDI-


TION: ATELY IF THE RAT TURNS MORE THAN
5500 RPM.

7.Continue with the pump test.

Subtask 29-22-00-720-057-A
H. Functional Test of the RAT (Pump Test) with the FLOW CONTROL TEST - RAT (AE89415Z) and the
GROUND - CHECKOUT UNIT, RAT (AGE11212) or the TEST KIT, FLOW CONTROL - RAT (HFK02)
or the TEST - UNIT, RAT (13-6600-3600) or the TEST - EQUIPMENT, RAT (PGRAT1) or the RAT
TEST EQUIPMENT (BH4016A)

WARNING: KEEP ALL PERSONS AWAY FROM THE AREA WHEN YOU PRESSURIZE THE BLUE
HYDRAULIC SYSTEM. WHEN YOU PRESSURIZE THE BLUE HYDRAULIC SYSTEM,
THE RAT CAN TURN AT MORE THAN 5000 RPM.

WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.

WARNING: ALWAYS WEAR RUBBER GLOVES, GOGGLES AND PROTECTIVE CLOTHES WHEN
YOU DO THIS TASK.

(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002) .
(2) Do the test that follows:

ACTION RESULT
1.On overhead panel 40VU: On overhead panel 40VU:
· Set the P/BSW BLUE/ELEC PUMP to OFF. · The OFF light in the P/BSW comes on

· The Blue electric pump stops.


2.Adjust the flow on the FLOW CONTROL On the GCU:
TEST - RAT (AE89415Z) or the TEST KIT,
FLOW CONTROL - RAT (HFK02) or the TEST · A minimum pressure of 2320 psi is shown.
- UNIT, RAT (13-6600-3600) or the TEST -
EQUIPMENT, RAT (PGRAT1) or the RAT · The SPEED (RPM) indicator shows more than
TEST EQUIPMENT (BH4016A) to 30 l.min (8 4600 RPM.
USgal.min).
3.Continue with the RAT running and the anti-stall
device test.

Subtask 29-22-00-720-058-A
J. Functional Test of the RAT (Anti-Stall Device Test) with the FLOW CONTROL TEST - RAT (AE89415Z)
and the GROUND - CHECKOUT UNIT, RAT (AGE11212) or the TEST KIT, FLOW CONTROL -
RAT (HFK02) or the TEST - UNIT, RAT (13-6600-3600) or the TEST - EQUIPMENT, RAT (PGRAT1)
or the RAT TEST EQUIPMENT (BH4016A)

Print Date: May 27, 2018 Page 17 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

WARNING: KEEP ALL PERSONS AWAY FROM THE AREA WHEN YOU PRESSURIZE THE BLUE
HYDRAULIC SYSTEM. WHEN YOU PRESSURIZE THE BLUE HYDRAULIC SYSTEM,
THE RAT CAN TURN AT MORE THAN 5000 RPM.

WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.

WARNING: ALWAYS WEAR RUBBER GLOVES, GOGGLES AND PROTECTIVE CLOTHES WHEN
YOU DO THIS TASK.

(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002) .
(2) Do the test that follows:

ACTION RESULT
1.Adjust the flow on the FLOW CONTROL TEST
- RAT (AE89415Z) to 0 l.min (0 USgal.min).
2.On the hydraulic ground-power cart:

· Decrease the pressure to 180 bar (2610 psi).


3.Adjust the flow on the FLOW CONTROL On the GCU:
TEST - RAT (AE89415Z) or the TEST KIT,
FLOW CONTROL - RAT (HFK02) or the TEST · The SPEED (RPM) indicator shows 3900 - 250 +
- UNIT, RAT (13-6600-3600) or the TEST - 400 RPM.
EQUIPMENT, RAT (PGRAT1) or the RAT
TEST EQUIPMENT (BH4016A) to 60 l.min (16 · The PRESSURE (PSI) indicator shows 1885 +/-
USgal.min). 290 psi.

NOTE: In these conditions the RAT pump operates


in anti-stall range. It can cause oscilation
of RAT rpm, flow and pressure because of
anti-stall valve sensitivity. If the rpm and
pressure values are in the limits this condi-
tion is permitted.

4.Adjust the flow on the FLOW CONTROL On the GCU:


TEST - RAT (AE89415Z) or the TEST KIT,
FLOW CONTROL - RAT (HFK02) or the TEST · The SPEED (RPM) indicator shows 4600 RPM
- UNIT, RAT (13-6600-3600) or the TEST - or more.
EQUIPMENT, RAT (PGRAT1) or the RAT
TEST EQUIPMENT (BH4016A) to 0 l.min (0 · The PRESSURE (PSI) indicator shows pressure
USgal.min). of 2320 psi or more.

Subtask 29-22-00-860-111-A
K. Depressurize the hydraulic supply to the CHECK - MOTOR GROUND, RAT.
Subtask 29-22-00-080-057-A

WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.


WORK ON THE HYDRAULIC SYSTEMS CAN BE DANGEROUS.

L. Removal of the Ground Support Equipment with the RAT Safety Interface Kit (RSIK)
(Ref. Fig. Installation of the RAT Safety Interface Kit SHEET 1)
(Ref. Fig. Installation of the RAT Ground-Checkout Unit and the Flow Control Test Kit SHEET 1)
(Ref. Fig. Installation of the RAT Flow-Control Test Kit SHEET 1)

Print Date: May 27, 2018 Page 18 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

(Ref. Fig. Installation of the RAT Flow Control Test Kit (Tronair) SHEET 1)
(Ref. Fig. Installation of the RAT Flow Control Test Kit SHEET 1)

NOTE: If it necessary to continue the RAT ground check, keep the adapter pinion (13) to the motor.

(1) If the FLOW CONTROL TEST - RAT (AE89415Z) is installed:


(a) Disconnect the electrical connector of the GROUND - CHECKOUT UNIT, RAT (AGE11212)
from the RAT control panel.
(2) If the TEST - UNIT, RAT (13-6600-3600) is installed:
(a) Disconnect the electrical connector of the TEST - UNIT, RAT (13-6600-3600) from the RAT
control panel.
(3) If the TEST - EQUIPMENT, RAT (PGRAT1) is installed:
(a) Disconnect the electrical connector of the TEST - EQUIPMENT, RAT (PGRAT1) from the RAT
control panel.
(4) If the TEST KIT, FLOW CONTROL - RAT (HFK02) is installed:
(a) Disconnect the electrical connector of the TEST KIT, FLOW CONTROL - RAT (HFK02) from the
RAT control panel.
(5) If the RAT TEST EQUIPMENT (BH4016A) is installed:
(a) Disconnect the electrical connector of the RAT TEST EQUIPMENT (BH4016A) from the RAT
control panel.
(6) Remove the PROTECTION EQUIPMENT - RAT (98D29208581000) .
(7) Remove the CHECK-MOTOR GROUND,RAT (AGE10600D) (7) with the RAT Safety Interface Kit
(RSIK):
(a) Disconnect the hydraulic hoses from the hydraulic ground-power cart.
(b) Disconnect the discharge hose from adapter plate (6) and the container.
(c) Remove the nuts (9), the washers (8), the CHECK-MOTOR GROUND,RAT (AGE10600D) (7),
the adapter plate (6) and the screws (5).
(8) Do an inspection of the CHECK-MOTOR GROUND,RAT (AGE10600D) (7) drive shaft and the
adjacent area:
(a) Make sure that there is no leakage.
(9) Install the drain plug (10), if removed during the installation of the CHECK-MOTOR
GROUND,RAT (AGE10600D) (7).
(10) Disconnect the hydraulic hoses from the ground connectors of the ground service panel of the Blue
hydraulic system.
(11) Remove the FLOW CONTROL TEST - RAT (AE89415Z) or the TEST - UNIT, RAT (13-6600-3600)
or the TEST - EQUIPMENT, RAT (PGRAT1) or the TEST KIT, FLOW CONTROL - RAT (HFK02)
or the RAT TEST EQUIPMENT (BH4016A) .
(12) Install the hydraulic caps on the ground connectors.
Subtask 29-22-00-210-074-A
M. Inspection of the RAT after the Functional Test
(1) Inspection of the Indicator
(a) Examine the RAT and make sure that the differential pressure indicator is in the "in" position.
1 If the differential pressure indicator is popped out, replace the filter (Ref. AMM TASK 29-22-
51-000-013) and (Ref. AMM TASK 29-22-51-400-013) .

Print Date: May 27, 2018 Page 19 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

(2) Examine the RAT pump/gearbox splitline and the drain plug of the RAT gearbox for external leakage.
Make sure that the external leakage is not more than:
· 60 drops an hour when the RAT is in operation,
· 2 drops an hour when the RAT is not in operation.

NOTE: The given values are only for the RAT pump/gearbox splitline and the drain plug and not for
the hydraulic connections. If you are not sure of the source of the leaks, it is necessary to:
- Pressurize the Blue hydraulic system with 3000 psi
- Examine the hydraulic connections and the related components.

(3) Inspection of the RAT Gearbox


(a) Do an inspection of the rear bearing in the RAT gearbox interface area:
1 If the bearing is damaged, replace the RAT (Ref. AMM TASK 29-22-51-000-010) and
(Ref. AMM TASK 29-22-51-400-010) .
(b) Do a leakage inspection of the RAT.
(c) Examine the RAT oil level:
1 If the fluid level is high and the interface is wet, replace the RAT (Ref. AMM TASK 29-22-51-
000-010) and (Ref. AMM TASK 29-22-51-400-010) .
2 If the fluid level is low and the interface is dry, add oil (Ref. AMM TASK 12-13-29-600-001) .
3 If the fluid level is low and the interface is wet, replace the RAT (Ref. AMM TASK 29-22-51-
000-010) and (Ref. AMM TASK 29-22-51-400-010) .
(4) Install the cover plate (1), the washers (2) and the bolts (3).
(5) TORQUE the bolts (3) to between 86 and 95 lbf.in (0.97 and 1.07 m.daN).
Subtask 29-22-00-680-054-A
N. Do the draining of the RAT oil drain tank (Ref. AMM TASK 29-22-51-680-003) .
5. Close-up
Subtask 29-22-00-860-112-A
A. Put the aircraft back to its initial configuration.
(1) On overhead panel 50VU, push the LEAK MEASUREMENT VALVES/B (the OFF legend of the this
pushbutton switch is off).
(2) On overhead panel 40VU, push the P/BSW BLUE/ELEC PUMP (the OFF legend of the this
pushbutton switch is off).
(3) Retract the RAT (Ref. AMM TASK 29-22-00-869-006) .
(4) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002)
(5) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) .
Subtask 29-22-00-865-114-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):

PANEL DESIGNATION FIN LOCATION


105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
Subtask 29-22-00-410-078-A

Print Date: May 27, 2018 Page 20 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : IGO Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 016-016
Rev. Date : May 01, 2018
29-22-00-720-003-A - Operational Check of RAT Manual Deployment and Functional
Check of RAT using Ground Test Unit, followed by Check of Filter Indicator

C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 197EB.
Subtask 29-22-00-942-068-A
D. Removal of the Ground Support Equipment
(1) Remove the warning notice(s).
(2) Remove the safety barriers.
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other
items.

End of document

Print Date: May 27, 2018 Page 21 of 21


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

Vous aimerez peut-être aussi