Vous êtes sur la page 1sur 6
HM Scaffolding i Supplies Limited ERECTION 4 No"V PRESSINGS IN EACH CONNECTION CLUSTER J J tae ta ‘as ee) 99" STANDARD ‘TOE BOARD BRACKET 1.78 (0849) ee vo Hh ——— 4 i men ee iS rows | 38) ae 80" LEDGER (123) 42" BATTEN, Se eee oe —_______ | 2052 0" BATTEN, oI 7122) ; é 42° RETURN TRANSOM | ay 1 eT ats 60" LEDGER 4032" +—_e—4 42 TRANSOM a kb sue STAGE BRACKETS "800 13.640) 60" BATTEN 23k9 57g tz oa 120" DIAGONAL BRACE, Hf Scaffolding i Supplies Limited 7] gating a poston ofriahest ground level along scaffold run place 4 ‘adjustable bases in thir approxi positions forthe fet bay. ne, 4 rere ERECTION GUIDE Insert a transom between the two standards at ‘he lowest level. Do not tighten the wedges yet On the outside face ofthe standard link 2 third standard tothe frame by inserting a ledger ino the pockets 2 above the botiom asa guardrail HM Scaffolding i Supplies Limited Ties ERECTION GUIDE Every inside standard must be tied at intervals up its length of 8 metres of less for safe working standard load of 18kN and at Intervals of 6 metres o less fr safe working Standard load of 25KN, ‘The first level of ties must not be higher than 4 metres above ground level and no more than 4 metres ofscafold should be ever bul above the top level of ties already fixed during erection. Please contact your local depot for any addtional information required, ‘The holding valve ofthe rng type dled in anchor te is ahvays dependant on the strength value ofthe brickwork or bullding face to which ti attached, In some cases, sione facing, cavity walls, defective or unsound brickwork may ot be suitable for his typeof te and in such cases the ‘manufacturers advice should be sought. ‘Where there Is any doubt as tothe efficiency of the proposed fixing locations, sample testing inthe fing areas. ‘Should be caried out, Test flue loads below 125KN pul ‘out indicate inufiient strength for one anchor. Existing anchors should always be checked for compatible tivead sizes. ‘When fing to stone work, the client should be made aware of the possibilty of straining from rng fies and anchors. Suppliers fixing instructions should be folowed, and only Reveal Tie 7 csp ttt tc 0 oto regued. ‘thee na ther igs erate hen he umber revel tos shoul bo saypamentd Wen wea thay rt bo ony thle nd regulary checked for ocd of rven pack ‘even es shold ot bse when a scald equtes ob sheet Drilled-in Anchor Ties te net tn arco “Te tubes connected veh rght ange couplers. Te brace Lip Ties “Those tes may be used in nations vere tvogh es camot be paced andar wel as aby es oer parapets or baconics, bi be sol shay be Used Esweieeuimtea ERECTION GUIDE Compete the bay by joining the two standards wih te transom ain drawings 1-4 Eerricetimtes ERECTION GUIDE AD Ente sein is ve before drving ‘wedges home. Do this a8 each bay I. Further transoms are inserted in the same way asthe frst bay 13 t Before proceeding any higher, battens ‘should be placed between transoms to provide a working piatform. (These ‘ean be moved up as the scafild progresses If decking isnot needed at thisievel) 15 ‘Add ledgers and transoms as on first bay, ‘Cotinue to deck out work ing platfoms 28 before eneuring the scaffold le adequately tied. (see overeat) | ‘Once the base lit has been levelled and wedges driven home, 16 44 Sbeleeseetos Riteked., iphone merce ei oes Fs toe boards on al Standards on the base standards, Wen top platform lve reached, ensire 9. ‘outer and end standards extend at least two 5a) octets above te pio level 0 fata Ng Suara canbe msered Fs Esrrieetimtes ERECTION GUID ‘ace brace should be ed at east very DE cates my to tre otic tae ofthe scald ‘ony, 2i-zagging Up the sali 20 Sipe esi cd pata tah ed, 21 eee br erent

Vous aimerez peut-être aussi