3/4" thick rendering in cement and sand 1:3 finished smooth(masonary filling)( for CBSL Mathara )

Per Square
Materials
1.75 cwt cement @ 635.00 = 1111.25 5,556.25
0.08 cube sand @ 5000.00 = 400.00 2,000.00
water 10 gals. @ 1.00 = 10.00 50.00

Labour
1 1/4 days mason @ 800.00 = 1000.00
2 days U/Sk labourers @ 600.00 = 1200.00
1/4 day U/Sk labourer @ 600.00 = 150.00
Rate per Square #REF! 9,956.25
#REF! #REF! 12,943.13
1,392.68

24.79

25.25
or CBSL Mathara )
1 Removing top soil to a depth not exceeding 6"

Per Square
Consider an area of 10.00 Sqrs.
i.e. 5 Cubes of excavation

10 days U/Sk labourer @ 750.00 = 7500.00


Rate per Square Rs.
Rate with Mark-up Rs.

2 Excavation over site to reduce level

Per Cube

5/8 day U/Sk labourer @ 750.00 = 468.75


Rate per Cube Rs.
Rate with Mark-up Rs.

3 Excavation in trenches for Walls / column pits in Soft / loose soil

Per Cube

1 day U/Sk labourer @ 750.00 = 750.00


Rate per Cube Rs.
Rate with Mark-up Rs.

4 Excavation in trenches for Walls / Column Pits (Ordinary soil)

Per Cube

2 1/4 day U/Sk labourer @ 750.00 = 1687.50


Rate per Cube Rs.
Rate with Mark-up Rs.

5 Excavation in trenches for Walls / Column Pits (Hard / dense soil)

Per Cube

3 1/2 days U/Sk labourer @ 750.00 = 2625.00


Rate per Cube Rs.
Rate with Mark-up Rs.

6 Excavation in trenches for Walls / Column Pits (Mud / wet soil)


( Earthwork and dewatering paid for separately)
Per Cube

3 days U/Sk labourer @ 750.00 = 2250.00


Rate per Cube Rs.
Rate with Mark-up Rs.

7 Excavation in trenches for walls / column pits in soft distintegrated rock

Per Cube

2 1/2 days U/Sk labourer @ 750.00 = 1875.00


Rate per Cube Rs.
Rate with Mark-up Rs.

8 Excavation in trenches for walls / column pits in Hard rock

Per Cube
Materials
0.75 lbs blasting powder @ = 0.00
10 L.ft. fuse @ = 0.00
1 lb jumper steel @ = 0.00
Fual & forge - 20 % of material cost @ 0.00 = 0.00

Labour
1 day Sk labourer @ 1000.00 = 1000.00
2 days U/Sk labourer @ 750.00 = 1500.00
Rate per Cube Rs.
Rate with Mark-up Rs.

9 Earth work - Backfilling & Compacting (Earth available at site)

Per Cube

1 day U/Sk labourer @ 750.00 = 750.00


Rate per Cube Rs.
Rate with Mark-up Rs.

10 Back filling to trenches with imported materials

Per Cube

1.00 cube earth delivered at site @ 1600.00 = 1600.00


Allow 15% compaction, filling & compacting @ = 240.00
1¼ U/Sk labourer @ 750.00 = 937.50
Rate per Cube Rs.
Rate with Mark-up Rs.
11 Earthwork support (open planking in trenches up to a depth of 5' 0")

Consider trench 15' 0" long 3' 0" wide and 5' 0" depth
open planking to both faces. Total area 150 Sq.ft.

Per 150 Sq.ft.


Materials
17.50 Cu.ft. class II timber (4 uses) @ 875.00 = 3828.13
Add 5% of above for wedges @ = 191.41

Labour
1 day carpenter @ 1000.00 = 1000.00
3 days U/Sk labourer @ 750.00 = 2250.00
Rate per Sqr. Rs. 7269.53
Rate with Mark-up Rs.

12 Earthwork support (Close planking) in trenches up to 5' 0" dapth

Consider trench 15' 0" long 3' 0" wide and 5' 0" hight
of planking to both faces.Total area 150 Sq.ft.

Per 150 Sq.ft.


Materials
30.00 Cu.ft. Class II timber (4 Uses) @ 875.00 = 6562.50
Add 5% on above for wedges @ = 328.13

Labour
2 days carpenter @ 1000.00 = 2000.00
6 days U/Sk labourer @ 750.00 = 4500.00
Rate per Sqr Rs. 13390.63
Rate with Mark-up Rs.

13 Earthwork support (close planking) in deep excavation in trenches up to 15' 0" depth

Consider trench of length of 15' 0" width 5' 6" at top 3' 6" bottom
Total area 450 Sq.ft.

Per 450 Sq.ft.


Materials
100.00 Cu.ft. class II timber (4 Uses) @ 875.00 = 21875.00
Add 5% on above for wedges @ = 1093.75

Labour
8 days carpenter @ 1000.00 = 8000.00
20 days U/Sk labourer @ 750.00 = 15000.00
Rate per Sqr Rs. 45968.75
Rate with Mark-up Rs.
14 Mixing Concrete 1:3:6 (1 1/2")

Per Cube
Materials
13 cwt cement @ 740.00 = 9620.00
0.53 cubes sand @ 7180.00 = 3805.40
0.92 cube metal @ 3250.00 = 2990.00
1/3 day hire of mixer @ 4000.00 = 1333.33
water ( 110 gals. ) @ 1.00 = 110.00

Labour
1/3 day skilled laboures @ 1000.00 = 333.33
6/3 days U/Sk laboures @ 750.00 = 1500.00
Rate per Cube Rs.
Rate with Mark-up Rs.

15 Mixing Concrete 1:2 ½:5 (1")

Per Cube
Materials
14 cwt cement @ 740.00 = 10360.00
0.6 cubes sand @ 7180.00 = 4308.00
0.90 cube metal @ 2800.00 = 2520.00
1/3 day hire of mixer @ 4000.00 = 1333.33
water ( 110 gals. ) @ =

Labour
1/3 day skilled laboures @ 1000.00 = 333.33
6/3 days U/Sk laboures @ 750.00 = 1500.00
Rate per Cube Rs.
Rate with Mark-up Rs.

16 Mixing concrete 1:2:4 ( 3/4" )

Per Cube
Materials
18 cwt cement @ 740.00 = 13320.00
0.5 cubes sand @ 7180.00 = 3590.00
0.88 cubes 3/4" Metal @ 4700.00 = 4136.00
1/3 day hire of mixer @ 4000.00 = 1333.33
water 120 gals @ =

Labour
1/3 day skilled labourer @ 1000.00 = 333.33
6/3 days U/Sk labourer @ 750.00 = 1500.00
Rate per Cube Rs.
Rate with Mark-up Rs.

17 Mixing concrete 1:1 ½:3 ( 3/4" )

Per Cube
Materials
23 cwt cement @ 740.00 = 17020.00
0.42 cubes sand @ 7180.00 = 3015.60
0.82 cubes 3/4" Metal @ 4700.00 = 3854.00
1/3 day hire of mixer @ 4000.00 = 1333.33
water 120 gals @ 1.00 = 120.00

Labour
1/3 day skilled labourer @ 1000.00 = 333.33
6/3 days U/Sk labourer @ 750.00 = 1500.00
Rate per Cube @
Rate with Mark-up @

18 Mixing concrete 1:1:2 ( 3/4" )

Per Cube
Materials
31 cwt cement @ 740.00 = 22940.00
0.44 cubes sand @ 7180.00 = 3159.20
0.96 cubes 3/4" Metal @ 4700.00 = 4512.00
1/3 day hire of mixer @ 4000.00 = 1333.33
water 200 gals @ =

Labour
1/3 day skilled labourer @ 1000.00 = 333.33
6/3 days U/Sk labourer @ 750.00 = 1500.00
@
Rate with Mark-up @

19 2" thick cement concrete screed in foundation at depths not exceeding 5' 0"

Per Square

Materials
1/6 cube concrete @ 19692.07 = 3282.01
Add 10% for wastage 328.20

Labour
1/8 day Sk labourer @ 1000.00 = 125.00
½ day U/Sk labourer @ 750.00 = 375.00
Rate per Square Rs.
Rate with Mark-up Rs.

20 3" thick cement concrete screed in foundation at depth not exceeding 5' 0"

Per Square

Materials
1/4 cube concrete @ 24212.67 = 6053.17
Add 10% for wastage = 605.32

Labour
1/8 day Sk labourer @ 1000.00 = 125.00
3/4 day U/Sk labourer @ 750.00 = 562.50
Rate per Square Rs.
Rate with Mark-up Rs.

21 6" thick cement concrete floor (mass concrete).

Per Square

Materials
0.5 cube concrete @ 33777.87 = 16888.93
Add 5% for wastage = 844.45
Water (200 gals)
Labour
½ day Sk labourer @ 1000.00 = 500.00
1 ¼ day U/Sk labourer @ 750.00 = 937.50
Rate per Square Rs.
Rate with Mark-up Rs.

22 Cement concrete in 4 ½" x 6" columns in ground floor

Consider 24 Nos. of columns


4 1/2" x 6" each 10' 0" high
i.e. 0.45 cubes

Per 0.45 Cubes

Materials
0.45 cube concrete @ 24212.67 = 10895.70
Add 10% for wastage @ = 1089.57
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
3 days U/Sk labourers @ 750.00 = 2250.00
1 day Sk labourer (vibrator) @ 1000.00 = 1000.00

Curing
Jute Hessian 10 Sq. ft. @ 1.50 = 15.00
Water 170 gals. @ =
1 days U/Sk labourer @ 750.00 = 750.00
Rate per Cube Rs. 22000.27
Rate with Mark-up Rs.

* For Columns in 1st floor add 3% for ground


floor rate
Rate with Mark-up Rs.

* For Columns in 2nd floor add 5% for ground


floor rate
Rate with Mark-up Rs.

* For Columns in 3rd floor add 7% for ground


floor rate
Rate with Mark-up Rs.

23 Cement concrete in 6" x 6" columns in ground floor


Consider 18 Nos. of columns
6" x 6" each 10' 0" high
i.e. 0.45 cubes

Per 0.45 Cubes

Materials
0.45 cube concrete @ 24212.67 = 10895.70
Add 10% for wastage @ = 1089.57
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
3 days U/Sk labourers @ 750.00 = 2250.00
1 day Sk labourer @ 1000.00 = 1000.00

Curing
Jute Hessian 80 Sq. ft. @ 1.50 = 120.00
Water 140 gals. @ =
1 1/2 days U/Sk labourer @ 750.00 = 1125.00
Rate per Cube Rs. 22480.27
Rate with Mark-up Rs.

* For Columns in 1st floor add 3% for ground


floor rate
Rate with Mark-up Rs.

* For Columns in 2nd floor add 5% for ground


floor rate
Rate with Mark-up Rs.

* For Columns in 3rd floor add 7% for ground


floor rate
Rate with Mark-up Rs.

24 Cement concrete in 9" x 9" columns in ground floor

Consider 8 Nos. of columns


9" x 9" each 10' 0" high
i.e. 0.45 cubes

Per 0.45 Cubes

Materials
0.45 cube concrete @ 24212.67 = 10895.70
Add 10% for wastage @ = 1089.57
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
3 days U/Sk labourers @ 750.00 = 2250.00
1 day Sk labourer @ 1000.00 = 1000.00

Curing
Jute Hessian 60 Sq. ft. @ 1.50 = 90.00
Water 100 gals. @ =
½ day U/Sk labourer @ 750.00 = 375.00
Rate per Cube Rs. 21,700.27
Rate with Mark-up Rs.

* For Columns in 1st floor add 3% for ground


floor rate
Rate with Mark-up Rs.

* For Columns in 2nd floor add 5% for ground


floor rate
Rate with Mark-up Rs.

* For Columns in 3rd floor add 7% for ground


floor rate
Rate with Mark-up Rs.

25 Cement concrete in 12" x 12" columns in ground floor

Consider 5 Nos. of columns


12" x 12" each 10' 0" high
i.e. 0.50 cubes

Per 0.50 Cubes

Materials
0.50 cube concrete @ 24212.67 = 12106.33
Add 5% for wastage @ = 605.32
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
3 days U/Sk labourers @ 750.00 = 2250.00
1 day Sk labourer @ 1000.00 = 1000.00

Curing
Jute Hessian 40 Sq. ft. @ 1.50 = 60.00
Water 100 gals. @ =
1½ day U/Sk labourer @ 750.00 = 1125.00
Rate per Cube Rs. 23146.65
Rate with Mark-up Rs.

* For Columns in 1st floor add 3% for ground


floor rate
Rate with Mark-up Rs.

* For Columns in 2nd floor add 5% for ground


floor rate
Rate with Mark-up Rs.

* For Columns in 3rd floor add 7% for ground


floor rate
Rate with Mark-up Rs.

26 Cement concrete in 13 1/2" x 13 1/2" columns in ground floor

Consider 4 Nos. of columns


13 1/2" x 13 1/2" each 10' 0" high
i.e. 0.51 cubes

Per 0.51 Cubes

Materials
0.51 cube concrete @ 24212.67 = 12348.46
Add 5% for wastage @ = 617.42
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
3 days U/Sk labourers @ 750.00 = 2250.00
1 day Sk labourer @ 1000.00 = 1000.00

Curing
Jute Hessian 45 Sq. ft. @ 1.50 = 67.50
Water 100 gals. @ =
1 1/2 days U/Sk labourer @ 750.00 = 1125.00
Rate per Cube Rs. 23408.38
Rate with Mark-up Rs.

* For Columns in 1st floor add 3% for ground


floor rate
Rate with Mark-up Rs.
* For Columns in 2nd floor add 5% for ground
floor rate
Rate with Mark-up Rs.

* For Columns in 3rd floor add 7% for ground


floor rate
Rate with Mark-up Rs.

27 Cement Concrete in 6" x 6" beam up to 1st floor level

Consider 180 L.ft. of beam 6" x 6" i.e. 0.45 cubes

Per 0.45 cubes


Materials
0.45 cubes concrete @ 24212.67 = 10895.70
Add 10% for wastage @ = 1089.57
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
1 day Sk labourer (vibrator) @ 1000.00 = 1000.00
4 days U/Sk labourer @ 750.00 = 3000.00

Curing
Jute Hessian 90 Sq.ft. @ 1.50 = 135.00
Water 180 gals @ =
1½ days U/Sk labourer @ 750.00 = 1125.00
Rate per Cube Rs. 23245.27
Rate with Mark-up Rs.

28 Cement Concrete in 9" x 6" beam up to 1st floor level

Consider 120 L.ft. of beam 6" x 6" i.e. 0.45 cubes

Per 0.45 cubes


Materials
0.45 cubes concrete @ 24212.67 = 10895.70
Add 10% for wastage @ = 1089.57
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
1 day Sk labourer (vibrator) @ 1000.00 = 1000.00
4 days U/Sk labourer @ 750.00 = 3000.00

Curing
Jute Hessian 75 Sq.ft. @ 1.50 = 112.50
Water 150 gals @ =
1½ days U/Sk labourer @ 750.00 = 1125.00
Rate per Cube @ 23222.77
Rate with Mark-up @

29 Cement Concrete in 9" x 9" beam up to 1st floor level

Consider 80 L.ft. of beam 6" x 6" i.e. 0.45 cubes

Per 0.45 cubes


Materials
0.45 cubes concrete @ 24212.67 = 10895.70
Add 10% for wastage @ = 1089.57
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
1 day Sk labourer (vibrator) @ 1000.00 = 1000.00
4 days U/Sk labourer @ 750.00 = 3000.00

Curing
Jute Hessian 60 Sq.ft. @ 1.50 = 90.00
Water 120 gals @ =
1½ days U/Sk labourer @ 750.00 = 1125.00
Rate per Cube Rs. 23200.27
Rate with Mark-up Rs.

30 5" thick R.C.C. floor slab in 1st floor

Consider 5" thick slab 10' 0" x 12' 0" volume of concrete 50 Cu.ft.

Per 50 Cu.ft.
Materials
50.00 Cu.ft. concrete @ 242.13 = 12106.33
Add 10% for wastage @ = 1210.63
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
1 day Sk labourer (vibrator) @ 1000.00 = 1000.00
4 days U/Sk labourer @ 750.00 = 3000.00

Curing
Jute Hessian 30 sq.ft. @ 1.50 = 45.00
Water 90 gals @ =
1½ days U/Sk labourer @ 750.00 = 1125.00
Rate per Cube. Rs. 24486.97
Rate with Mark-up Rs.

31 6" thick R.C.C. floor slab in 1st floor

Consider 10' 0" x 10' 0" panel = 50 Cu.ft.

Per 50 Cu.ft.
Materials
50.00 Cu.ft. concrete @ 196.92 = 9846.03
Add 10% for wastage @ = 984.60
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
1 day Sk labourer (vibrator) @ 1000.00 = 1000.00
4 days U/Sk labourer @ 750.00 = 3000.00

Curing
Jute Hessian 25 sq.ft. @ 1.50 = 37.50
Water 90 gals @ =
1½ days U/Sk labourer @ 750.00 = 1125.00
Rate per Cube. Rs. 21993.14
Rate with Mark-up Rs.

32 Cement concrete 4½" x 6" lintols in ground floor

Consider 240 L.ft. of lintols i.e. 45 Cu.ft. concrete

Materials
45.00 Cu.ft. cement concrete @ 196.92 = 8861.43
Add 10% for wastage @ = 886.14
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
1 day Sk labourer ( Vibrator ) @ 1000.00 = 1000.00
4 days U/Sk labourers @ 750.00 = 3000.00

Curing
Jute Hessian 10 Sq. ft. @ 1.50 = 15.00
Water 90 gals. @ =
1 1/2 days U/Sk labourer @ 750.00 = 1125.00
Rate per L.ft. Rs. 20887.57
Rate with Mark-up Rs.
33 Cement concrete 9" x 4" lintols in ground floor

Consider 180 L.ft. of lintols i.e. 45 Cu.ft. concrete

Materials
45.00 Cu.ft. cement concrete @ 196.92 = 8861.43
Add 10% for wastage @ = 886.14
1 day hire of vibrator @ 250.00 = 250.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
1 day Sk labourer ( Vibrator ) @ 1000.00 = 1000.00
4 days U/Sk labourers @ 750.00 = 3000.00

Curing
Jute Hessian 45 Sq. ft. @ 1.50 = 67.50
Water 90 gals. @ =
1 1/2 days U/Sk labourer @ 750.00 = 1125.00
Rate per L.ft. Rs. 17190.07
Rate with Mark-up Rs.

34 Cement concrete 9" x 9" lintols in ground floor

Consider 80 L.ft. of lintols i.e. 45 Cu.ft. concrete

Materials
45.00 Cu.ft. cement concrete @ 196.92 = 8861.43
Add 10% for wastage @ = 886.14
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
1 day Sk labourer ( Vibrator ) @ 1000.00 = 1000.00
4 days U/Sk labourers @ 750.00 = 3000.00

Curing
Jute Hessian 60 Sq. ft. @ 1.50 = 90.00
Water 90 gals. @ =
1 1/2 days U/Sk labourer @ 750.00 = 1125.00
Rate per L.ft. Rs. 20962.57
Rate with Mark-up Rs.

35 Cement concrete 9" x 12" lintols in ground floor

Consider 60 L.ft. of lintols i.e. 45 Cu.ft. concrete


Materials
45.00 Cu.ft. cement concrete @ 196.92 = 8861.43
Add 10% for wastage @ = 886.14
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
1 day Sk labourer ( Vibrator ) @ 1000.00 = 1000.00
4 days U/Sk labourers @ 750.00 = 3000.00

Curing
Jute Hessian 55 Sq. ft. @ 1.50 = 82.50
Water 90 gals. @ =
1 1/2 days U/Sk labourer @ 750.00 = 1125.00
Rate per L.ft. Rs. 20955.07
Rate with Mark-up Rs.

36 Cement concrete 12" x 15" lintols in ground floor

Consider 36 L.ft. of lintols i.e. 45 Cu.ft. concrete

Materials
45.00 Cu.ft. cement concrete @ 196.92 = 8861.43
Add 10% for wastage @ = 886.14
1 day hire of vibrator @ 4000.00 = 4000.00

Labour
1 day mason @ 1000.00 = 1000.00
1 day carpenter @ 1000.00 = 1000.00
1 day Sk labourer ( Vibrator ) @ 1000.00 = 1000.00
4 days U/Sk labourers @ 750.00 = 3000.00

Curing
Jute Hessian 40 Sq. ft. @ 1.50 = 60.00
Water 90 gals. @ =
1 1/2 days U/Sk labourer @ 750.00 = 1125.00
Rate per L.ft. Rs. 20932.57
Rate with Mark-up Rs.

37 Sawn timber formwork 9" x 9" cement concrete column in ground floor

Per Sq.ft.

Consider column length of 5' 0" contact area 15.0 Sq.ft.


(a) Making mould
Materials
18.15 Sq.ft. 1" thick class II timber @ 25.00 = 453.75
17.10 L.ft. 2" x 2" class II timber in yokes @ 22.14 = 378.59
16.12 L.ft. 2" x 1" class II timber battens @ 18.00 = 290.16
1 1/2 lb wire nails @ 60.00 = 90.00

Fabricating
1/2 day carpenter @ 1000.00 = 500.00
1/2 day U/Sk labourer @ 750.00 = 375.00

Assuming four uses 2087.50 = 521.88

(b) Assembling ( Per use )


Materials
12 Nos. 16mm 18" long bolts (20 uses) @ 30.00 = 18.00
1 Litter ,mould oil @ 30.00 = 30.00
35 L.ft. 4" x 2" props ( 10 uses ) @ 35.00 = 122.50

Labour
1/4 day carpenter @ 1000.00 = 250.00
1/4 day U/Sk labourer @ 750.00 = 187.50

(c) Dismantling cleaning & repairing ( Per use )

1/4 day carpenter @ 1000.00 = 250.00


1/4 day U/Sk labourer @ 750.00 = 187.50
Rate per Sqr. Rs. 1567.38
Rate with Mark-up Rs.

38 Sawn timber formwork 14" x 14" cement concrete column in shaft

Per Sq.ft.

Consider column length of 3' 2" contact area 15.0 Sq.ft.

(a) Making mould


Materials
13.20 Sq.ft. 1" thick class II timber @ 25.00 = 330.00
17.10 L.ft. 2" x 2" class II timber in yokes @ 22.14 = 378.59
16.12 L.ft. 2" x 1" class II timber battens @ 18.00 = 290.16
1 1/2 lb wire nails @ 60.00 = 90.00

Fabricating
1/2 day carpenter @ 1000.00 = 500.00
1/2 day U/Sk labourer @ 750.00 = 375.00

Assuming four uses 1963.75 490.94

(b) Assembling ( Per use )


Materials
12 Nos. 16mm 18" long bolts (20 uses) @ 30.00 = 18.00
1 Litter ,mould oil @ 30.00 = 30.00
35 L.ft. 4" x 2" props ( 10 uses ) @ 35.00 = 122.50
Labour
1/4 day carpenter @ 1000.00 = 250.00
1/4 day U/Sk labourer @ 750.00 = 187.50

(c) Dismantling cleaning & repairing ( Per use )

1/4 day carpenter @ 1000.00 = 250.00


1/4 day U/Sk labourer @ 750.00 = 187.50
Rate per Sqr Rs. 1536.44
Rate with Mark-up Rs.

39 Sawn timber formwork for concrete lintels in ground floor

Consider 9" x 4" beam of 38' 10'' long contact area 55 sq.ft.

(a) Making the mould


Materials
60 sq.ft. 1" timber planks @ 25.00 = 1500.00
24 L.ft. 2" x 1" battens @ 5.00 = 120.00
45 L.ft 2" x 2" ledgers @ 10.00 = 450.00
30 L.ft. 4" x 2" bearers at bottom of mould @ 22.00 = 660.00
2 lbs. wire nails @ 60.00 = 120.00

Labour
1 1/2 days carpenter @ 1000.00 = 1500.00
2 days U/sk labourers @ 750.00 = 1500.00

Assuming 4 uses cost per use 5850.00 1462.50


Add 10% for repairs 146.25

(b) Assembling
Materials
110 L.ft. 4" x 2" Vertical props @ 22.00 = 2420.00
80 L.ft. 2" x 2" bracing to mould and props @ 10.00 = 800.00
50 L.ft. 2" x 2" bracing to a set of props @ 10.00 = 500.00
6.0 Sq.ft. 1" timber base plate to props @ 25.00 = 150.00
22 Nos. wedges @ 2.00 = 44.00

Assuming 6 uses 3914.00 652.33


Add 10% for repairs 65.23

(c) Labour and sundries


Labour
1 day carpenter @ 1000.00 = 1000.00
2days U/Sk labourers @ 750.00 = 1500.00
1/2 gal mould oil @ 135.00 = 67.50
1/2 lbs nails @ 60.00 = 30.00
(d) Dismantling and Cleaning
Labour
1/2 day carpenter @ 1000.00 = 500.00
2 days U/Sk labourer @ 750.00 = 1500.00
Rate per Sqr Rs. 6923.82
Rate with Mark-up Rs.

40 Sawn timber formwork for concrete beams in ground floor

Consider 9" x 12" beam of 20' 0'' long contact area 55 sq.ft.

(a) Making the mould


Materials
60 sq.ft. 1" timber planks @ 25.00 = 1500.00
24 L.ft. 2" x 1" battens @ 5.00 = 120.00
45 L.ft 2" x 2" ledgers @ 10.00 = 450.00
30 L.ft. 4" x 2" bearers at bottom of mould @ 22.00 = 660.00
2 lbs. wire nails @ 60.00 = 120.00

Labour
1 1/2 days carpenter @ 1000.00 = 1500.00
2 days U/sk labourers @ 750.00 = 1500.00

Assuming 4 uses cost per use 5850.00 1462.50


Add 10% for repairs 146.25

(b) Assembling
Materials
110 L.ft. 4" x 2" Vertical props @ 22.00 = 2420.00
80 L.ft. 2" x 2" bracing to mould and props @ 10.00 = 800.00
50 L.ft. 2" x 2" bracing to a set of props @ 10.00 = 500.00
6.0 Sq.ft. 1" timber base plate to props @ 25.00 = 150.00
22 Nos. wedges @ 2.00 = 44.00

Assuming 6 uses 3914.00 652.33


Add 10% for repairs 65.23

(c) Labour and sundries


Labour
1 day carpenter @ 1000.00 = 1000.00
2days U/Sk labourers @ 750.00 = 1500.00
1/2 gal mould oil @ 135.00 = 67.50
1/2 lbs nails @ 60.00 = 30.00

(d) Dismantling and Cleaning


Labour
1/2 day carpenter @ 1000.00 = 500.00
2 days U/Sk labourer @ 750.00 = 1500.00
Rate per Sqr Rs. 6923.82
Rate with Mark-up Rs.

41 Sawn timber formwork for underside of first floor slab (entrance door area concrete)

Consider a slab of dimensions 20' 0" x 10' 0"


Contact area = 2.0 Sqrs.

(a) Making panels


Materials
220 Sq.ft. 1" thick tongue and grooved timber
planks @ 25.00 = 5500.00
121 L.ft. 4" x 2" runners at 2' 0" centers @ 22.00 = 2662.00
4 lbs wire nails @ 60.00 = 240.00

Labour
3 days carpenter @ 1000.00 = 3000.00
3 days U/Sk labourer @ 750.00 = 2250.00

Assuming 4 uses cost per use 13652.00 3413.00


Add 20% for repairs 682.60

(b) Assembling
Materials
690 L.ft. 4" x 2" vertical timber props (10 uses) @ 22.00 = 1518.00
66 L.ft. 2" x 2" bracing for props @ 10.00 = 660.00
122 Nos. wedges @ 0.75 = 91.50
33 Sq.ft. 1" base plates for props @ 25.00 = 825.00

Assuming 6 uses cost of materials for assembling for 3094.50 515.75

Add 20% of above for repairs 103.15

(c) Labour and Sundries for Assembling

1 day carpenter @ 1000.00 = 1000.00


4 days U/Sk labourer @ 750.00 = 3000.00
1 gal mould oil for assembling @ 135.00 = 135.00
2 lbs wire nails @ 60.00 = 120.00

(d) Dismantling & cleaning


Labour
1/2 day carpenter @ 1000.00 = 500.00
2 days U/Sk labourer @ 750.00 = 1500.00
. Rate per Square Rs. 10969.50
Rate with Mark-up Rs.

42 Mild / Tor Steel reinforcements to lintels, slabs, beams or columns.


for 1 cwt
Materials
1 cwt M.S./ T.S. rods including transport to site @ 85525.00 = 4276.25
(Allow for wastage 15%) @ = 641.44
1 1/2 lbs 16 BWG binding wire @ 52.50 = 78.75
Add 1.15 % of steel cost for spaces or chairs @ 4996.44 = 749.47

Labour
1 day blacksmith @ 750.00 = 750.00
1 day U/Sk labourer @ 750.00 = 750.00
Rate per Ton Rs.
Rate with Mark-up Rs.

43 Brick work in cement sand 1:5 in foundation up to D.P.C.

Per Cube
Materials
1450 bricks @ 6.00 = 8700.00
Add 5% wastage @ = 435.00
4.00 cwt cement @ 740.00 = 2960.00
0.25 cubes sand @ 7180.00 = 1795.00
water (150 gals) @ =

Labour
3 days mason @ 1000.00 = 3000.00
4 days U/Sk labourer @ 750.00 = 3000.00
Rate per Cube Rs.
Rate with Mark-up Rs.

44 Brick work in cement & sand 1:8 in foundation up to D.P.C.

Per Cube
Materials
1450 bricks @ 6.00 = 8700.00
Add 5% wastage @ = 435.00
2 1/3 cwt cement @ 740.00 = 493.33
3/8 cubes sand @ 7180.00 = 2692.50
water (150 gals) @ =

Labour
3 days mason @ 250.00 = 750.00
4 days U/Sk labourer @ 550.00 = 2200.00
Rate per Cube Rs.
Rate with Mark-up Rs.
45 Brick work in cement & sand 1:5 in 4½" thick walls in ground floor.

Per Square
Materials
600 bricks @ 6.00 = 3600.00
Add 5% wastage @ = 180.00
1.30 cwt cement @ 740.00 = 962.00
0.10 cubes sand @ 7180.00 = 718.00
water (150 gals) @ =

Labour
1½ days mason @ 1000.00 = 1500.00
2 days U/Sk labourer @ 750.00 = 1500.00
Scaffolding - Add 5% @ 3000.00 = 150.00
Rate per Square Rs.
Rate with Mark-up Rs.

46 9" thick brick wall cement and sand 1:5 in ground floor

Per Square
Materials
1200 bricks @ 6.00 = 7200.00
Add 5% for wastage @ = 360.00
3.00 cwt cement @ 635.00 = 2032.00
0.20 Cubes sand @ 7180.00 = 2154.00
water 115 gals. @ =

Labour
2 1/4 days mason @ 1000.00 = 2250.00
3 3/4 days U/Sk labourers @ 750.00 = 2812.50
Scaffolding - Add 3% @ 5062.50 = 151.88
Rate per Square Rs.
Rate with Mark-up Rs.

47 Brickwork 13½" thick in cement and sand 1:5 in superstructure ground floor

Per Square
Materials
1630 bricks @ 6.00 = 9780.00
Add 5% for wastage @ = 489.00
4.50 cwt cement @ 740.00 = 3330.00
0.30 Cubes sand @ 7180.00 = 2154.00
water 170 gals. @ =

Labour
3½ days mason @ 1000.00 = 3500.00
5½ days U/Sk labourers @ 750.00 = 4125.00
Scaffolding - Add 2% @ 7625.00 = 152.50
Rate per Square Rs.
Rate with Mark-up Rs.

48 9" thick brick walls in cement and sand 1:8 in superstructure ground floor

Per Square (i.e. 0.75 cubes)


Materials
1200 bricks @ 6.00 = 7200.00
Add 5% for wastage @ = 360.00
1.75 cwt cement @ 635.00 = 1111.25
0.30 Cubes sand @ 7180.00 = 2154.00
water 115 gals. @ =

Labour
2 1/4 days mason @ 800.00 = 1800.00
3 days U/Sk labourers @ 600.00 = 1800.00
Scaffolding - Add 3% @ 3600.00 = 108.00
Rate per Square Rs. 14533.25
Rate with Mark-up Rs.

49 4½" thick brick wall (wire cut) in cement and sand 1:5 in ground floor.

Per Square
Materials
550 wire cut bricks @ 12.00 = 6600.00
Add 2% wastage @ = 132.00
1.20 cwt cement @ 740.00 = 888.00
0.08 cubes sand @ 7180.00 = 574.40
water (30 gals) @ =

Labour
1½ days mason @ 1000.00 = 1500.00
2 days U/Sk labourer @ 750.00 = 1500.00
Scaffolding - Add 5% @ 3000.00 = 150.00
Rate per Square Rs.
Rate with Mark-up Rs.

50 9" thick in cement and sand 1:5 wire cut bricks.

Per Square
Materials
1050 wire cut bricks @ 12.00 = 12600.00
Add 4% for wastage @ = 504.00
2.50 cwt cement @ 740.00 = 1850.00
0.18 Cubes sand @ 7180.00 = 1292.40
water 100 gals. @ =

Labour
2 1/4 days mason @ 1000.00 = 2250.00
3 3/4 days U/Sk labourers @ 750.00 = 2812.50
Scaffolding - Add 3% @ 5062.50 = 151.88
Rate per Square Rs.
Rate with Mark-up Rs.

51 13½" thick brick wall (wire cut) in cement and sand 1:5 in ground floor

Per Square
Materials
1630 wire cut bricks @ 12.00 = 19560.00
Add 5% for wastage @ = 978.00
4.50 cwt cement @ 740.00 = 3330.00
0.30 Cubes sand @ 7180.00 = 2154.00
water 150 gals. @ =

Labour
3 3/4 days mason @ 1000.00 = 3750.00
5½ days U/Sk labourers @ 750.00 = 4125.00
Scaffolding - Add 2% @ 7875.00 = 157.50
Rate per Square Rs.
Rate with Mark-up Rs.

52 Extra over for facing including raised pointing 1/8" thick in cement and sand
1:1 mixture in ground floor.

Per Square
Materials
0.50 cwt cement @ 740.00 = 370.00
1.00 cu.ft. sand @ 7180.00 = 7180.00
1/10 gals acid @ 900.00 = 90.00
Water 10 gals @ =

Labour
5 days mason @ 1000.00 = 5000.00
3½ days U/Sk labourer @ 750.00 = 2625.00
Rate per Square Rs.
Rate with Mark-up Rs.

53 3" thick floor paved in lime mortar 2:5 in ground floor.

Per Square
Materials
350 bricks @ 6.00 = 2100.00
1.20 cwt slaked lime @ 400.00 = 480.00
0.11 cubes sand @ 7180.00 = 789.80
Water (45 gals) @ =

Labour
1¼ days mason @ 1000.00 = 1250.00
2½ days U/Sk labourer @ 750.00 = 1875.00
Rate per Square Rs.
Rate with Mark-up Rs.

54 Steps 1' 1½" x 0' 6" in brick in cement and sand 1:5 with ½" thick cement
and sand 1:2 rendering including necessary excavation.

Per 10 L.ft.
Materials
120 bricks @ 6.00 = 720.00
0.50 cwt cement @ 740.00 = 370.00
0.05 cubes sand @ 7180.00 = 359.00
Water (15 gals) @ =

Labour
½ day mason @ 1000.00 = 500.00
½ day U/Sk labourer @ 750.00 = 375.00
Rate per L.ft. Rs. 2324.00
Rate with Mark-up Rs.

55 Brick drains in cement and sand 1:5, 9" wide and 6" - 9" average dapth
including cement rendering ½" thick 1:2 to exposed faces with 1' 6"
ramp including necessary excavation.

Per 10 L.ft.
Materials
140 bricks @ 6.00 = 840.00
0.80 cwt cement @ 740.00 = 592.00
0.05 cubes sand @ 7180.00 = 359.00
water 20 gals. @ =

Labour
1¼ days mason @ 1000.00 = 1250.00
1¼ days U/Sk labourer @ 750.00 = 937.50
Rate per L.ft. Rs. 3978.50
Rate with Mark-up Rs.

56 Brick drains in cement and sand 1:5, 9" wide and 6" - 9" average dapth
including cement rendering ½" thick 1:2 to exposed faces without
ramp including necessary excavation.
Per 10 L.ft.
Materials
110 bricks @ 6.00 = 660.00
0.70 cwt cement @ 740.00 = 518.00
0.04 cubes sand @ 7180.00 = 287.20
water 15 gals. @ =

Labour
1 days mason @ 1000.00 = 1000.00
1¼ days U/Sk labourer @ 750.00 = 937.50
Rate per L.ft. Rs. 3402.70
Rate with Mark-up Rs.

57 8" thick hollow block work in cement and sand mortar 1:5
in ground floor (Cavities unfilled)

Per Square
10' 0" x 10' 0" area (size of each block 16" x 8" x 8")

Materials
112 hollow cement blocks @ 50.00 = 5600.00
Allow 5% for wastage 280.00
0.75 cwt cement @ 635.00 = 476.25
0.06 cubes sand @ 7180.00 = 430.80

Labour
1 1/2 days mason @ 800.00 = 1200.00
2 1/2 days U/Sk labourers @ 600.00 = 1500.00

Scaffolding - Add 3% 2700.00 81.00


Rate per Square Rs.
Rate with Mark-up Rs.

58 4" thick hollow block work in cement and sand mortar 1:5
in ground floor (Cavities unfilled)

Per Square
10' 0" x 10' 0" area (size of each block 16" x 8" x 4")

Materials
112 hollow cement blocks @ 40.00 = 4480.00
Allow 5% for wastage 224.00
0.40 cwt cement @ 635.00 = 254.00
0.03 cubes sand @ 7180.00 = 215.40

Labour
1 days mason @ 800.00 = 800.00
2 days U/Sk labourers @ 600.00 = 1200.00

Scaffolding - Add 5% 2000.00 100.00


Rate per Square Rs.
Rate with Mark-up Rs.

59 Random rubble masonry in cement mortar 1:5 in foundation

Per Cube (14" thick)


Materials
1.30 cubes 6" - 9" rubble @ 2750.00 = 3575.00
5.00 cwt cement @ 740.00 = 3700.00
0.30 cube sand @ 7180.00 = 2154.00
water 100 gals. @ =

Labour
4 days mason @ 1000.00 = 4000.00
6 days U/Sk labourer @ 750.00 = 4500.00
Rate per Cube Rs.
Rate with Mark-up Rs.

60 Random rubble masonry in cement mortar 1:5 in superstructure

Per Cube (14" thick)


Materials
1.30 cubes 6" - 9" rubble @ 2750.00 = 3575.00
5.00 cwt cement @ 740.00 = 3700.00
0.30 cube sand @ 7180.00 = 2154.00
water 100 gals. @ =

Labour
4½ days mason @ 1000.00 = 4500.00
7 days U/Sk labourer @ 750.00 = 5250.00

Rate per Cube Rs.


Rate with Mark-up Rs.

61 Pressed floor tiles bedded in ½" cement mortar 1:2 and pointing in
neat cement in ground floor.

Per Square
Materials
225 pressed tiles 8" x 8" @ 27.50 = 6187.50
Add 5% for wastage on cutting . = 309.38
1¼ cwt cement @ 740.00 = 925.00
0.7 cubes sand @ 7180.00 = 502.60
¼ lb wax polish @ 137.50 = 34.38
¼ lb coloured pigment @ 12.50 = 3.13
2 lbs cotton waste @ 5.00 = 10.00

Labour
4 days mason @ 1000.00 = 4000.00
4 days U/Sk labourer @ 750.00 = 3000.00
½ day U/Sk labourer for polising @ 750.00 = 375.00
Rate per Square Rs.
Rate with Mark-up Rs.

62 Glazed tiles fixed to walls including bedding in cement mortar


1:2 and raking in ground floor.

Per Square
Materials
400 glazed tiles 6" x 6" @ 18.50 = 7400.00
Add 10% for wastage on cutting . 740.00
2½ cwt cement @ 740.00 = 1850.00
0.11 cubes sand @ 7180.00 = 789.80
1 lb white cement @ 12.50 = 12.50

Labour
4 days mason @ 1000.00 = 4000.00
4 days U/Sk labourer @ 750.00 = 3000.00
¼ day U/Sk labourer for cleaning @ 750.00 = 187.50
Rate per Square Rs.
Rate with Mark-up Rs.

63 Terrazzo floor tiles on ½" thick cement and sand 1:2 in ground floor.

Per Square
Materials
100 12" x 12" terrazzo tiles @ 100.00 = 10000.00
Add 5% for wastage = 500.00
1¼ cwt cement @ 740.00 = 925.00
0.07 cubes sand @ 7180.00 = 502.60
2 lbs Coloured pigment @ 12.50 = 25.00
½ lb wax polish @ 137.50 = 68.75
2 lbs cotton waste @ 5.00 = 10.00

Labour
4 days mason @ 1000.00 = 4000.00
3 days U/Sk labourer @ 750.00 = 2250.00
½ day U/Sk labourer (polishing) @ 750.00 = 375.00
Rate per Square Rs.
Rate with Mark-up Rs.
64 Timber framework for calicut pattern tile hip roof in single storey building
consisting of wall plate, beam, ridge plate, rafters, etc.

Per 6.00 Squares


Materials
34.00 cu.ft. Class I timber @ 1300.00 = 44200.00
Add 10% for wastage @ = 4420.00
660 L.ft. 2" x 1" reepers @ 18.07 = 11926.20
Add 5% wastage @ = 596.31
8 lbs wire nails 6" long @ 60.00 = 480.00
2 lbs wire nails 2" long @ 60.00 = 120.00

Labour
7 days carpenter @ 1000.00 = 7000.00
8 days U/Sk labourer @ 750.00 = 6000.00
Rate per Square Rs. 74742.51
Rate with Mark-up Rs.

65 Roof covering with calicut pattern clay tiles in single storyed building

Per 6.00 Square


Materials
750 tiles @ 15.00 = 11250.00

Labour
3 days carpenter @ 1000.00 = 3000.00
3 days U/Sk labourer @ 750.00 = 2250.00
Rate per Square Rs. 16500.00
Rate with Mark-up Rs.

66 Timber framwork for corrugated asbestos sheet roof in singled


storied building

Per 3.60 Squares


Materials
13 1/4 Cu.ft. timber purlings @ 875.00 = 11593.75
Add 10% for wastage @ = 1159.38

Labour
2 1/2 days carpenter @ 1000.00 = 2500.00
3 days U/Sk labourers @ 750.00 = 2250.00
Rate per Square Rs. 17503.13
Rate with Mark-up Rs.

67 Roof covering with corrugated asbestos sheets

Per 3.60 Squares


Materials
420 Sq.ft. asbestos corrugated sheets @ 26.00 = 10920.00
72 Nos. roofing screws and washers @ 4.50 = 324.00

Labour
1 day carpenter @ 1000.00 = 1000.00
2 days U/Sk labourers @ 750.00 = 1500.00
Rate per Square Rs. 13744.00
Rate with Mark-up Rs.

68 One layer half round clay tiles over corrugated asbastos roof covering

Per Square

Materials
650 half round clay tiles @ 4.50 = 2925.00

Labour
2 days U/Sk labourer @ 750.00 = 1500.00
Rate per Square Rs.
Rate with Mark-up Rs.

69 Asbastos close fittings ridging fixed complete with roofing screws or bolts (hook)

Per 13' 4" length


Materials
4 pairs ridges 3' 8" long @ 56.00 = 224.00
16 roofing screws or bolts @ 4.50 = 72.00

Labour
¼ day carpenter @ 1000.00 = 250.00
¼ day U/Sk labourer @ 750.00 = 187.50
Rate per L.ft. Rs. 733.50
Rate with Mark-up Rs.

70 Ridging covering with calicut pattern ridge tiles bedded in cement


lime sand mortar 1:1:4

Per 12 L.ft. ridging


Materials
9 ridge tiles @ 28.00 = 252.00
1/3 cwt cement @ 740.00 = 246.67
0.02 cubes sand @ 7180.00 = 143.60
15 lbs slaked lime @ 4.00 = 60.00
1/2 lbs colouring powder @ 175.00 = 87.50

Labour
1/4 day mason @ 1000.00 = 250.00
1/4 day U/Sk labourer @ 750.00 = 187.50
Rate per L.ft. Rs. 1227.27
Rate with Mark-up Rs.

71 3/4" x 9" high valance board fixed with brass screws to ends of rafters
(for tile roofing)

Per 100 L.ft.


Materials
75.00 sq.ft. 1" planks @ 72.58 = 5443.50
Add 5% for wastage @ = 272.18
70 Nos. 1½" brass screws @ 4.00 = 280.00

Labour
3 days carpenter @ 1000.00 = 3000.00
3 days U/Sk labourer @ 750.00 = 2250.00
Scaffolding - Add 5% @ 5250.00 = 262.50
Rate per L.ft. Rs. 11508.18
Rate with Mark-up Rs.

72 3/4" x 9" high barge board fixed with brass screws at 2' 0" centers
to side of rafters.

Per 100 L.ft.


Materials
75.00 sq.ft. 1" planks @ 72.58 = 5443.50
Add 5% for wastage @ = 272.18
50 Nos. 1½" brass screws @ 4.00 = 200.00

Labour
3 days carpenter @ 1000.00 = 3000.00
3 days U/Sk labourer @ 750.00 = 2250.00
Scaffolding - Add 5% @ 5250.00 = 262.50
Rate per L.ft. Rs. 11428.18
Rate with Mark-up Rs.

73 Timber Framework for 4' 0" x 4' 0" flat asbastos ceiling. Comparising of
4" x 2" joists and 2" x 2" beares in class I timber

Per 1.95 Square


Materials
8.00 Cu.ft. timber class I @ 1300.00 = 10400.00
1 lb 2" nails @ 60.00 = 60.00
26 Nos. fibre / plastic plugs @ 2.50 = 65.00
25 lbs cement @ 7.40 = 185.00
2.00 Cu.ft. sand @ 71.80 = 143.60
2" brush - ¼ use @ 200.00 = 50.00
1/3 gal tarnap @ 80.00 = 26.67

Labour
2½ days carpenter @ 1000.00 = 2500.00
½ day mason @ 1000.00 = 500.00
1½ days U/Sk labourer @ 750.00 = 1125.00
Scaffolding - Add 3% @ 4125.00 = 123.75
Rate per Square Rs. 15179.02
Rate with Mark-up Rs.

74 Horizontal ceiling lining using 4' 0" x 4' 0" flat asbestos cement sheets fixed with
and including beading and cove moulding on timber framework.

Per 1.95 Square


Materials
210 Sq.ft. flat asbastos sheets @ 55.50 = 11655.00
60 L.ft. 2" x 2" halmilla cove moulding @ 52.00 = 3120.00
125 L.ft. 1½" x ½" halmilla beading @ 10.00 = 1250.00
¼ lb 1¼ nails @ 60.00 = 15.00
8 doz. ½" brace screws @ 15.00 = 120.00

Labour
1½ days carpenter @ 1000.00 = 1500.00
2 days U/Sk labourer @ 750.00 = 1500.00
Scaffolding - Add 3% @ 3000.00 = 90.00
Rate per Square Rs. 19250.00
Rate with Mark-up Rs.
Rate per m2 with out proffit 1062.21
75 3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on
4" x 2" class I timber joist at 2' 0" centres with 1½" brass nails.

Consider room 15' 0" x 13' 0" i.e. 1.95 Sqrs.

Materials
115 L.ft. 4" x 2" timber joists @ 107.00 = 12305.00
21 sq.ft. 6" x 3/4" Lunumidella ceiling planks @ 13.50 = 283.50
3 lbs cement @ 7.40 = 22.20
4.00 cu.ft. sand @ 71.80 = 287.20
4 kg. 1½" brass nails @ 2.50 = 10.00

Labour

Making holes, fixing joists & Making good -


½ day mason @ 1000.00 = 500.00
1 day carpenter @ 1000.00 = 1000.00
3 days U/Sk labourer @ 750.00 = 2250.00
Fixing ceiling boards
3 days carpenter @ 1000.00 = 3000.00
4 days U/Sk labourer @ 750.00 = 3000.00
Scaffolding - Add 3% @ 6000.00 = 180.00
Rate per Square Rs. 22837.90
Rate with Mark-up Rs.
1260.18
76 3/4" x 6" wide tongued and grooved Lunumidella ceiling boards fixed to undersideof roof
rafters, with ½" brass nails including leveling with timber strips where necessary.

Consider room 15' 0" x 12' 0" i.e. 1.80 Squares

Materials
200.00 sq.ft. ceiling planks @ 27.00 = 5400.00
2.00 Kg 3/4" nails @ 15.00 = 30.00
4.00 Kg 1½" nails @ 15.00 = 60.00

Labour 2700.00
Rate per Square Rs. 8190.00
PAINTING
Rate per Square
Rate with Mark-up Rs.

77 Door single hung 3' 3" x 7' 0" high overall with frame having 1¼" thick sash and
3¼" x 2¼" timber frame.

Per 22.75 square feet ( 3' 3" x 7' 0")


Materials
a) Frame -
1½ cu.ft. 4" x 3" timber @ 898.18 = 1347.27
2 no. spur stones @ 12.50 = 25.00
6 no. fiber/plastic plugs with 4" long brass screws @ 9.00 = 54.00
2 no. 5/8" mild steel dowels 4" long @ 25.00 = 50.00

b) Sash -
14 sq.ft. 1½" planks @ 96.00 = 1344.00
5 Sq.ft. 1" planks @ 72.58 = 362.90

Labour
5 days carpenter @ 1000.00 = 5000.00
1½ days U/Sk labourer @ 750.00 = 1125.00
Rate per Sqr Ft Rs. 9308.17
Rate with Mark-up Rs.

78 Door glazed and panelled double hung 4' 0" x 7' 0" high overall with frame including
1¼" thick sash and 3¼" x 2¼" frame.
Per 28.00 square feet ( 4' 0" x 7' 0")
Materials
a) Frame -
1 2/3 cu.ft. 4" x 3" timber @ 898.18 = 1496.97
2 no. spur stones @ 12.50 = 25.00
6 no. fiber/plastic plugs with 4" long brass screws @ 9.00 = 54.00
2 no. 5/8" mild steel dowels 4" long @ 25.00 = 50.00

b) Sashes -
16 sq.ft. 1½" planks @ 96.00 = 1536.00
7 Sq.ft. 1" planks @ 72.58 = 508.06

Labour
6 days carpenter @ 1000.00 = 6000.00
2 days U/Sk labourer @ 750.00 = 1500.00
Rate per Sqr Ft Rs. 11170.03
Rate with Mark-up Rs.

79 Plywood Door single hung 3' 1½" x 6' 11½" overall with frame having 1¼" thick
sash and 3¼" x 2¼" frame.

Per 21.75 square feet ( 3' 1½" x 6' 1½")


Materials
a) Frame -
1.80 cu.ft. 4" x 3" timber @ 898.18 = 1616.73
2 no. spur stones @ 12.50 = 25.00
6 no. fiber/plastic plugs with 4" long brass screws @ 9.00 = 54.00

b) Sashes -
1 no. 6' 9" x 2' 9" plywood sash @ 1897.64 = 1897.64

Labour
3/4 day carpenter @ 1000.00 = 750.00
3/8 day U/Sk labourer @ 750.00 = 281.25
¼ day mason ( fixing frame) @ 1000.00 = 250.00
¼ day U/Sk labourer (-do-) @ 750.00 = 187.50
Rate per Sqr Ft Rs. 4624.62
Rate with Mark-up Rs.

80 Door ledged, braced and battened single hung 2' 6" x 6' 6" overall, with frame
having 7/8" thick tongued & grooved planks and 3¼" x 2¼" frame.

Per 16.25 square feet ( 2' 6" x 6' 6")


Materials
a) Frame -
1.70 cu.ft. 4" x 3" timber @ 898.18 = 1526.91
2 no. spur stones @ 12.50 = 25.00
6 no. fiber/plastic plugs with 4" long brass screws @ 9.00 = 54.00
2 no. 5/8" mild steel dowels 4" long @ 25.00 = 50.00

b) Sashes -
21.00 sq.ft. 1" thick planks @ 72.58 = 1524.18
3 doz. 1¼" long brass screws @ 3.50 = 10.50

Labour
2¼ days carpenter @ 1000.00 = 750.00
1 day U/Sk labourer @ 750.00 = 281.25
¼ day mason ( fixing frame) @ 1000.00 = 250.00
¼ day U/Sk labourer (-do-) @ 750.00 = 187.50
Rate per Sqr Ft Rs. 4659.34
Rate with Mark-up Rs.

81 Window glazed 7' 0" x 4' 0" overall, with frame comprising 3 no. openable sashes
and 3¼" x 2¼" frame and mullions.

Per Window 7' 0" x 4' 0" (sashes) i.e. per 28.00 sq.ft.
Materials
a) Frame -
3.20 cu.ft. 4" x 3" timber @ 74.10 = 237.12
4 no. fiber/plastic plugs with 4" long brass screws @ 9.00 = 36.00

b) Sashes -
9.25 sq.ft. 3" x 1½" timber @ 37.05 = 342.71

Labour
6 days carpenter @ 1000.00 = 6000.00
2½ days U/Sk labourer @ 750.00 = 1875.00
½ day mason ( fixing frame) @ 1000.00 = 500.00
½ day U/Sk labourer (-do-) @ 750.00 = 375.00
Rate per Sqr Ft Rs. 9365.83
Rate per Cube Rs.

82 ½" clear sheet glass panels exceeding 1' 0" but not exceeding 4 square feet
cut and fixed with timber beadings to doors and windows.

Consider sash 3' 0"x 4' 0" high with 3" x 1¼" style and 4 no. glass panels.

Per 9.00 Sq.ft.


Materials
9.00 sq.ft. glass panels @ 2528.60 = 22757.40
30 L.ft. ½" x ½" beading @ 1.50 = 45.00
4 no. brass panel pins @ 0.75 = 3.00
Labour
½ day glazier @ 600.00 = 300.00
½ day U/Sk labourer @ 750.00 = 375.00
Rate per Sqr Ft Rs. 23480.40
Rate with Mark-up Rs.

83 Ironmongary (Butt hinges 5" x 2½" )

Materials
1½ pairs butt hinges @ 75.00 = 112.50
2 doz. 3/4" brass screws @ 1.50 = 3.00

Labour
¼ day carpenter @ 1000.00 = 250.00
¼ day U/Sk labourer @ 750.00 = 187.50
Rate per Pair Rs. 553.00
Rate with Mark-up Rs.

84 Tee hinges 6" x 12"

Materials
1 pair tee hinges @ 80.00 = 80.00
1½ doz. 3/4" iron screws @ 0.75 = 1.13

Labour
2 hrs. carpenter @ 125.00 = 250.00
2 hrs. U/Sk labourer @ 93.75 = 187.50
Rate per pair Rs.
Rate with Mark-up Rs.

85 Rim lock

Materials
1 rim lock with screws @ 750.00 = 750.00

Labour
2 hrs. carpenter @ 125.00 = 250.00
2 hrs. U/Sk labourer @ 93.75 = 187.50
Rate per No. Rs.
Rate with Mark-up Rs.

86 Mortice lock

Materials
1 mortice lock with screws @ 1350.00 = 1350.00

Labour
½ day carpenter @ 1000.00 = 500.00
½ day U/Sk labourer @ 750.00 = 375.00
Rate per No. Rs.
Rate with Mark-up Rs.

87 Casement stays

Materials
4 casement stays @ 45.00 = 180.00
16 no. ½" brass screws @ 1.25 = 20.00

Labour
2 hrs. carpenter @ 125.00 = 250.00
2 hrs. U/Sk labourer @ 93.75 = 187.50
Rate for No. Rs. 637.50
Rate with Mark-up Rs.

88 Door closer (Hydraulic)

Materials
1 door closer @ 2500.00 = 2500.00
8 no. 3/4" brass screws @ 1.50 = 12.00

Labour
2 hrs. carpenter @ 125.00 = 250.00
2 hrs. U/Sk labourer @ 93.75 = 187.50
Rate pet No. Rs.
Rate with Mark-up Rs.

89 Tower / Skeleton brass bolts

Materials
1 Tower / Skeleton bolt @ 90.00 = 90.00
10 no. brass screws @ 1.25 = 12.50

Labour
½ hr. carpenter @ 125.00 = 62.50
½ hr. U/Sk labourer @ 93.75 = 46.88
Rate per No. Rs.
Rate with Mark-up Rs.

90 Barrel bolt 4"

Materials
1 barrel bolt @ 80.00 = 80.00
8 no. ½" brass screws @ 1.25 = 10.00
Labour
½ hr. carpenter @ 125.00 = 62.50
½ hr. U/Sk labourer @ 93.75 = 46.88
Rate per No. Rs.
Rate with Mark-up Rs.

91 Casement fasteners.

Materials
6 casement fasteners @ 40.00 = 240.00
24 no. ½" brass screws @ 1.25 = 30.00

Labour
½ day carpenter @ 1000.00 = 500.00
½ day U/Sk labourer @ 750.00 = 375.00
Rate per No. Rs. 1145.00
Rate with Mark-up Rs.

92 Spring louded fanlight catches

Materials
6 brass fanlight catches @ 40.00 = 240.00
2 doz. ½" brass screws @ 15.00 = 30.00

Labour
½ day carpenter @ 1000.00 = 500.00
½ day U/Sk labourer @ 750.00 = 375.00
Rate per No. Rs. 1145.00
Rate with Mark-up Rs.

93 Draw rings

Materials
6 draw rings @ 35.00 = 210.00
1 doz. ½" brass screws @ 15.00 = 15.00

Labour
1 hr. carpenter @ 125.00 = 125.00
1 hr. U/Sk labourer @ 93.75 = 93.75
Rate per No. Rs. 443.75
Rate with Mark-up Rs.

94 3/4" thick DPC, in cement sand 1:2 finished with 2 coats hot tar and
blinded with sand.

Per Square
Materials
2.25 cwt cement @ 740.00 = 1665.00
0.11 cube sand @ 7180.00 = 789.80
1 1/2 gals bitumen @ 675.00 = 1012.50
Fire wood (10 lbs) @ 1.50 = 15.00
water 10 gals. @ 1.00 = 10.00

Labour
1¼ days mason @ 1000.00 = 1250.00
2½ days U/Sk labourer @ 750.00 = 1875.00
Rate per Square Rs.
Rate with Mark-up Rs.

95 5/8" thick plastering to wall in lime and sand 1:5 including floating with lime putty.

Per Square
Materials
1.30 cwt slaked lime @ 400.00 = 520.00
0.07 cube sand @ 7180.00 = 502.60
water 10 gals @ 1.00 = 10.00

Labour
1 day mason @ 1000.00 = 1000.00
1¼ days U/Sk labourer @ 750.00 = 937.50

Scaffolding - Add 3% 1937.50 58.13


Rate per Square Rs.
Rate with Mark-up Rs.

96 5/8" thick plastering to wall in cement sand 1:3 including cement floating

Per Square
Materials
1.4 cwt cement @ 740.00 = 1036.00
0.06 cube sand @ 7180.00 = 430.80
water 10 gals @ 1.00 = 10.00

Labour
1 day mason @ 1000.00 = 1000.00
1 1/2 days U/Sk labourer @ 750.00 = 1125.00

Scaffolding - Add 5% 2125.00 106.25


Rate per Square Rs.
Rate with Mark-up Rs.

97 3/8" thick plastering to soffit slab in cement and sand 1:3 including
floating with lime putty.
Per Square
Materials
0.80 cwt cement @ 740.00 = 592.00
0.16 cwt slaked lime @ 400.00 = 64.00
0.05 cubes sand @ 7180.00 = 359.00
water 5 gals. @ 1.00 = 5.00

Labour
2½ days masons @ 1000.00 = 2500.00
2½ days U/Sk labourers @ 750.00 = 1875.00
Scaffolding - Add 3% @ 4375.00 = 131.25
Rate per Square Rs.
Rate with Mark-up Rs.

98 3/8" thick plastering to sides and soffit of beams in cement and sand 1:3 including
floating with lime putty.

Per Square
Materials
0.80 cwt cement @ 740.00 = 592.00
0.16 cwt slaked lime @ 400.00 = 64.00
0.03 cubes sand @ 7180.00 = 215.40
water 5 gals. @ 1.00 = 5.00

Labour
2 days masons @ 500.00 = 1000.00
2 days U/Sk labourers @ 400.00 = 800.00
Scaffolding - Add 3% @ 1800.00 = 54.00
Rate per Square Rs.
Rate with Mark-up Rs.
2730.40
3549.52 35.50 381.93

99 5/8" thick plastering to wall in lime cement and sand 1:1:5 finished
semi-rough with wooden float

Per Square
Materials
0.80 cwt cement @ 740.00 = 592.00
0.40 cwt slaked lime @ 400.00 = 160.00
0.07 cubes sand @ 7180.00 = 502.60
water 10 gals. @ 1.00 = 10.00

Labour
1day mason @ 1000.00 = 1000.00
1¼ days U/Sk labourers @ 750.00 = 937.50
Scaffolding - Add 3% 1937.50 58.13
Rate per Square Rs.
Rate with Mark-up Rs.
3260.23
4238.29 42.38 456.04

100 5/8" thick plastering to wall in lime cement and sand 1:1:5
finished smooth with lime putty floating

Materials
0.80 cwt cement @ 740.00 = 592.00
0.60 cwt slaked lime @ 400.00 = 240.00
0.07 cubes sand @ 7180.00 = 502.60
water 10 gals. @ =

Labour
1½ days masons @ 1000.00 = 1500.00
1½ days U/Sk labourers @ 750.00 = 1125.00
Rate per Square Rs.
Rate with Mark-up Rs.

101 ½" thick rendering in cement and sand 1:3 finished smooth

Per Square
Materials
1.07 cwt cement @ 740.00 = 791.80
0.05 cube sand @ 7180.00 = 359.00
water 10 gals. @ =

Labour
1 day mason @ 1000.00 = 1000.00
1½ days U/Sk labourer (curing) @ 750.00 = 1125.00
Rate per Square Rs.
Rate with Mark-up Rs.

102 ½" thick rendering in cement and sand 1:3 floors, finished smooth

Per Square
Materials
1.50 cwt cement @ 740.00 = 1110.00
0.05 cube sand @ 7180.00 = 359.00
water 10 gals. @ =

Labour
1 day mason @ 1000.00 = 1000.00
1½ days U/Sk labourer @ 750.00 = 1125.00
¼ day U/Sk labourer (curing) @ 750.00 = 187.50
Rate per Square Rs.
Rate with Mark-up Rs.

103 3/4" thick rendering in cement and sand 1:3 finished smooth

Per Square
Materials
1.75 cwt cement @ 740.00 = 1295.00
0.08 cube sand @ 7180.00 = 574.40
water 10 gals. @ 1.00 = 10.00

Labour
1 1/4 days mason @ 1000.00 = 1250.00
2 days U/Sk labourers @ 750.00 = 1500.00
1/4 day U/Sk labourer (curing) @ 750.00 = 187.50
Rate per Square Rs.
Rate with Mark-up Rs.

104 3/4" thick rendering in cement and sand 1:2 in floors finished smooth

Per Square
Materials
2.25 cwt cement @ 740.00 = 1665.00
0.08 cube sand @ 7180.00 = 574.40
water 10 gals. @ =

Labour
1 1/4 days mason @ 1000.00 = 1250.00
2 days U/Sk labourers @ 750.00 = 1500.00
1/4 day U/Sk labourer (curing) @ 750.00 = 187.50
Rate per Square Rs.
Rate with Mark-up Rs.

105 3/4" thick rendering in cement and sand 1:2 coloured cement floors finished smooth

Per Square
Materials
2.25 cwt cement @ 740.00 = 1665.00
0.08 cube sand @ 7180.00 = 574.40
5 lbs powdered pigment @ 12.50 = 62.50
water 10 gals. @ =

Labour
1 1/4 days mason @ 1000.00 = 1250.00
2 days U/Sk labourers @ 750.00 = 1500.00
1/4 day U/Sk labourer (curing) @ 750.00 = 187.50
Rate per Square Rs.
Rate with Mark-up Rs.

106 ½" x 6" skirting in cement and sand 1:3 projected or flush to walls finished
with floating including forming groove.

Per 10 L.ft.
Materials
0.10 cwt cement @ 740.00 = 74.00
0.003 cube sand @ 7180.00 = 21.54
0.25 lbs powdered pigment @ 12.50 = 3.13

Labour
3/8 day mason @ 1000.00 = 375.00
5/16 day U/Sk labourer @ 750.00 = 234.38
Rate per L.ft. Rs. 708.04
Rate with Mark-up Rs.

107 Prepare and apply one coat of preservative (oil type) to structural timber including
touching up cut ends etc. after fixing.

Per one Square


Materials
2.75 ltr. wood preservative (oil type) @ 314.00 = 863.50
3" brush (1/10 use) @ 250.00 = 25.00

Labour
3/4 day painter @ 1000.00 = 750.00
½ day U/Sk labourer @ 750.00 = 375.00
Rate per Square Rs.
Rate with Mark-up Rs.

108 Prepare surface of steel truss and apply two coats of anticorrosive primer.

Consider one Square


Materials
2¼ ltr. anti-corrosive primer @ 324.75 = 730.69
0.15 ltr. mineral turpentine or thinner @ 150.00 = 22.50
1 wire brush @ 75.00 = 75.00
2" brush (1/3 use) @ 200.00 = 66.67

Labour
1½ days painter @ 1000.00 = 1500.00
1½ days U/Sk labourer @ 750.00 = 1125.00
Rate per Square Rs.
Rate with Mark-up Rs.
109 Apply one coat of anti-corrosive primer and two coats of enamel paint on
already shop primed and erected steel roof truss.

Consider one Square


Materials
0.20 ltr. anti-corrosive primer @ 324.75 = 64.95
1 1/3 ltr. enamel paint @ 693.00 = 924.00
0.20 ltr. mineral turpentine or thinner @ 150.00 = 30.00
2" brush (1/5 use) @ 200.00 = 40.00

Labour
2½ days painter @ 1000.00 = 2500.00
1 day U/Sk labourer @ 750.00 = 750.00
Scaffolding - Add 3% @ 3250.00 = 97.50
Rate per Square Rs.
Rate with Mark-up Rs.

110 Prepare and apply two coats of primer and finishing coat of enamel paint
to mild steel (angle / flat) gate.

Consider 50 Sq.ft.
Materials
1½ ltr. anti-corrosive primer @ 324.75 = 487.13
2/3 ltr. enamel paint @ 693.00 = 462.00
0.20 ltr. mineral turpentine or thinner @ 150.00 = 30.00
½" wire brush @ 75.00 = 75.00
2" brush (1/5 use) @ 200.00 = 40.00

Labour
½ day painter @ 1000.00 = 500.00
3/4 day U/Sk labourer @ 750.00 = 562.50
Rate per Sqr Rs. 2156.63
Rate with Mark-up Rs.

111 Painting steel on new work with 2 coats of anti-corrosive paint

Per Square
Materials
2/3 ltr. anti-corrosive paint @ 424.00 = 282.67
2" brush (1/5 use) @ 200.00 = 40.00

Labour
1½ days painter @ 1000.00 = 1500.00
Rate per Square Rs.
Rate with Mark-up Rs.

112 Painting new timber work with two coats wood preservative.
Per Square
Materials
½ gal wood preservative @ 1413.00 = 706.50
2" brush (1/5 use) @ 200.00 = 40.00

Labour
½ day painter @ 1000.00 = 500.00
Rate per Square Rs.
Rate with Mark-up Rs.

113 Preparing and painting wood work with primer and two coats enamel paint

Per Square
Materials
3/4 ltr. primer @ 314.00 = 235.50
2.50 ltr. enamel paint (2 coats) @ 693.00 = 1732.50
2" brush (1/10 use) @ 200.00 = 20.00
2 sand papers @ 16.00 = 32.00

Labour
1½ days painter @ 1000.00 = 1500.00
½ day U/Sk labourer @ 750.00 = 375.00
Rate per Square Rs.
Rate with Mark-up Rs.

114 White or colour washing two coats in single storey.

Per 10 Squares
Materials
0.50 cwt boiled lime @ 1000.00 = 500.00
2 lbs salt @ 20.00 = 40.00
½ lb yellow ochre @ 0.00 = 0.00
2 ozs blue @ 75.00 = 150.00
6" brush (1/3 use) @ 40.00 = 13.33
water 10 gals. @ =

Labour
2½ days painter @ 1000.00 = 2500.00
2½ days U/Sk labourer @ 750.00 = 1875.00
Scaffolding - Add 3% @ 4375.00 = 131.25
Rate per Square Rs. 5209.58
Rate with Mark-up Rs.

115 White or colour wasing in two storyed building

Per 10 Square
(As per above)
Add ½ day painter @ 1000.00 = 500.00
½ day U/Sk labourer @ 750.00 = 375.00
Scafolding - add 3% 875.00 26.25
Rate per Square Rs. 6110.83
Rate with Mark-up Rs.

116 Prepare and apply one coat of Alkali resistant primer and two
coats of emulsion paint to walls

Per Square
Materials
Primer 0.90 ltr primer @ 568.00 = 511.20
1.40 ltr emulsion paint @ 538.00 = 753.20
water 0.10 gals. @ =
6" brush (1/10 use) @ 375.00 = 375.00
2 sand papers @ 16.00 = 32.00

Labour
1 1/4 day painter @ 1000.00 = 1250.00

Scaffolding - Add 3% @ 1250.00 = 37.50


Rate per Square Rs.
Rate with Mark-up Rs.

117 Cement washing to walls of single storeyed building 2 coats

Per 10 Square
Materials
5/8 cwt cement @ 740.00 = 462.50
1 - 6" coir brush @ 40.00 = 40.00
water 5 gals @ =

Labour
2 days painter @ 1000.00 = 2000.00
2 days U/Sk labourer @ 750.00 = 1500.00
Scaffolding - Add 3% @ 3500.00 = 105.00
Rate per Square Rs. 4107.50
Rate with Mark-up Rs.

118 Painting walls with emulsion paint (2 coats)

Per Square
Materials
1 st coat - 1/6 emulsion paint @ 538.00 = 89.67
2 nd coat - 1/8 emulsion paint @ 538.00 = 67.25
6" brush - (1/10 use) @ 375.00 = 37.50
0.10 gals water @ =

Labour
3/4 days painter @ 1000.00 = 750.00
Scaffolding - Add 3% @ 750.00 = 22.50
Rate per Square Rs.
Rate with Mark-up Rs.

119 Prepare and apply one coat alkali ressistant primer and two coats of emulsion
paint to soffit of slabs.

Consider 1.00 Sqrs.


Materials
0.90 ltr. primer @ 568.00 = 511.20
1.50 ltr. emulsion paint @ 538.00 = 807.00
6" brush (1/10 use) @ 375.00 = 37.50

Labour
1¼ days painter @ 1000.00 = 1250.00
Scaffolding - Add 3% @ 1250.00 = 1587.50
Rate per Square Rs.
Rate with Mark-up Rs.

120 Varnising two coats with copal varnish after sand papering.

Per Square
Materials
0.40 gals (1.80 ltr.) varnish @ = #VALUE!
3" brush (1/3 use) @ 250.00 = 83.33

Labour
½ day painter @ 1000.00 = 500.00
½ day U/Sk labourer @ 750.00 = 375.00
Rate per Square Rs.
Rate with Mark-up Rs.

121 Wax polishing to timber in panals & floors

Per Square
Materials
3/4 lb. wax polish @ 137.50 = 103.13
½ doz. sheets sand paper @ 192.00 = 96.00
1/10 floor brush @ 350.00 = 35.00
½ yards flannel cloth @ 15.00 = 7.50

Labour
3 hrs. U/Sk labourer @ 93.75 = 281.25
Rate per Square Rs.
Rate with Mark-up Rs.

122 ½" diameter PVC pipes fixed to walls (specials paids separately)

Per 10 L.ft.
Materials
13 L.ft. pipes @ 122.10 = 1587.30
3 clips and nails @ 20.00 = 60.00
2 grms solvent cement @ 1.45 = 2.90

Labour
1 hr. plumber @ 93.75 = 93.75
1 hr. U/Sk labourer @ 93.75 = 93.75
Rate per L.ft. Rs. 1837.70
Rate with Mark-up Rs.

123 3/4" diameter PVC pipes fixed to walls (specials paids separately)

Per 10 L.ft.
Materials
13 L.ft. pipes @ 262.00 = 3406.00
3 clips and nails @ 20.00 = 60.00
3 grms solvent cement @ 1.45 = 4.35

Labour
1 hr. plumber @ 93.75 = 93.75
1 hr. U/Sk labourer @ 93.75 = 93.75
Rate per L.ft. Rs. 3657.85
Rate with Mark-up Rs.

124 1" diameter PVC pipes fixed to walls (specials paids separately)

Per 100 L.ft.


Materials
100 L.ft. pipes @ 392.00 = 39200.00
Add 5% for wastage @ = 1960.00
8 - 1" dia. sockets @ 21.90 = 175.20
32 grms solvent cement @ 1.45 = 46.40
35 clips and nails @ 20.00 = 700.00

Labour
½ day plumber @ 750.00 = 750.00
½ day U/Sk labourer @ 750.00 = 750.00
Rate per L.ft. Rs. 43581.60
Rate with Mark-up Rs.
125 1¼" diameter PVC pipes fixed to walls (specials paids separately)

Per 100 L.ft.


Materials
100 L.ft. pipes @ 580.00 = 58000.00
Add 5% for wastage @ = 2900.00
8 - 1¼" dia. sockets @ 21.00 = 168.00
48 grms solvent cement @ 1.45 = 69.60
35 clips and nails @ 20.00 = 700.00

Labour
3/4 day plumber @ 750.00 = 562.50
3/4 day U/Sk labourer @ 750.00 = 562.50
Rate per L.ft. Rs. 62962.60
Rate with Mark-up Rs.

126 1½" diameter PVC pipes laid to walls (specials paids separately)

Per 100 L.ft.


Materials
100 L.ft. pipes @ 840.00 = 84000.00
Add 5% for wastage @ = 4200.00
8 - 1½" dia. sockets @ 41.25 = 330.00
64 grms solvent cement @ 1.45 = 92.80
35 clips and nails @ 20.00 = 700.00

Labour
3/4 day plumber @ 750.00 = 562.50
3/4 day U/Sk labourer @ 750.00 = 562.50
Rate per L.ft. Rs. 90447.80
Rate with Mark-up Rs.

127 2" diameter PVC pipes laid to walls (specials paids separately)

Per 100 L.ft.


Materials
100 L.ft. pipes @ 2910.00 = 291000.00
Add 5% for wastage @ = 14550.00
8 - 2" dia. sockets @ 77.50 = 620.00
64 grms solvent cement @ 1.45 = 92.80
35 clips and nails @ 20.00 = 700.00

Labour
3/4 day plumber @ 750.00 = 562.50
3/4 day U/Sk labourer @ 750.00 = 562.50
Rate per L.ft. Rs. 308087.80
Rate with Mark-up Rs.
128 3" diameter PVC pipes fixed to walls (specials paids separately)

Per 100 L.ft.


Materials
100 L.ft. pipes @ 135.00 = 13500.00
Add 5% for wastage @ = 675.00
8 - 3" dia. sockets @ 112.85 = 902.80
200 grms solvent cement @ 1.45 = 290.00
35 clips and nails @ 20.00 = 700.00

Labour
1 day plumber @ 750.00 = 750.00
1 day U/Sk labourer @ 750.00 = 750.00
Rate per L.ft. Rs. 17567.80
Rate with Mark-up Rs.

129 Excavation for laying ½" to 3" dia. meter PVC pipes in ground not
less than 1' - 6' deep, back filling & compacting.

Per 100 L.ft.


Labour
2¼ days U/Sk labourer @ 750.00 = 1687.50
Rate per L.ft. Rs. 1687.50
Rate with Mark-up Rs.

130 Chasing brickwork for laying ½" to 1½" dia. PVC pipes and making good
average depth 2" (Pipes and specials paid separately)

Per 100 L.ft.


Materials
0.10 cwt cement @ 740.00 = 74.00
0.01 cubes sand @ 7180.00 = 71.80

Labour
3 days mason @ 1000.00 = 3000.00
3 days U/Sk labourer @ 750.00 = 2250.00
Rate per L.ft. Rs. 5395.80
Rate with Mark-up Rs.

131 Chasing brickwork for laying ½" to 3" dia. PVC pipes in ground or floor and
making good. Average depth 3" (Pipes and specials paid separately)

Per 100 L.ft.


Materials
0.20 cwt cement @ 740.00 = 148.00
0.03 cubes sand @ 7180.00 = 215.40
Labour
3½ days mason @ 1000.00 = 3500.00
3½ days U/Sk labourer @ 750.00 = 2625.00
Rate per L.ft. Rs. 6488.40
Rate with Mark-up Rs.

132 ½" dia. PVC elbows

Per 10 Specials
Materials
10 - ½" elbows @ 10.10 = 101.00
20 grms solvent cement @ 1.45 = 29.00

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 317.50
Rate with Mark-up Rs.

133 3/4" dia. PVC elbows

Per 10 specials
Materials
10 - 3/4" dia. elbows @ 9.25 = 92.50
30 grms solvent cement @ 1.45 = 43.50

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 323.50
Rate with Mark-up Rs.

134 1" dia. PVC elbows

Per 10 specials
Materials
10 - 1" dia. elbows @ 18.06 = 180.60
40 grms solvent cement @ 1.45 = 58.00

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 426.10
Rate with Mark-up Rs.

135 1¼" dia. PVC elbows

Per 10 specials
Materials
10 no. 1¼" dia. elbows @ 31.60 = 316.00
60 grms solvent cement @ 1.45 = 87.00

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 590.50
Rate with Mark-up Rs.

136 1½" dia. PVC elbows

Per 10 specials
Materials
10 - 1½" dia. elbows @ 73.00 = 730.00
80 grms solvent cement @ 1.45 = 116.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 1221.00
Rate with Mark-up Rs.

137 2" dia. PVC elbows

Per 10 specials
Materials
10 - 2" dia. elbows @ 116.00 = 1160.00
140 grms - solvent cement @ 1.45 = 203.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 1738.00
Rate with Mark-up Rs.

138 2½" dia. PVC elbows

Per 10 specials
Materials
10 - 2½" dia. elbows @ 121.00 = 1210.00
200 grms - solvent cement @ 1.45 = 290.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 1875.00
Rate with Mark-up Rs.

139 3" dia. PVC elbows

Per 10 specials
Materials
10 - 3" dia. elbows @ 480.00 = 4800.00
240 grms - solvent cement @ 1.45 = 348.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 5523.00
Rate with Mark-up Rs.

140 ½" dia. PVC bends

Per 10 Specials
Materials
10 - ½" bends @ 6.15 = 61.50
20 grms solvent cement @ 1.45 = 29.00

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 278.00
Rate with Mark-up Rs.

141 3/4" dia. PVC bends

Per 10 specials
Materials
10 - 3/4" dia. bends @ 11.65 = 116.50
30 grms solvent cement @ 1.45 = 43.50

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 347.50
Rate with Mark-up Rs.

142 1" dia. PVC bends

Per 10 specials
Materials
10 - 1" dia. bends @ 23.40 = 234.00
40 grms solvent cement @ 1.45 = 58.00

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 479.50
Rate with Mark-up Rs.

143 1¼" dia. PVC bends


Per 10 specials
Materials
10 no. 1¼" dia. bends @ 44.90 = 449.00
60 grms solvent cement @ 1.45 = 87.00

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 723.50
Rate with Mark-up Rs.

144 1½" dia. PVC bends

Per 10 specials
Materials
10 - 1½" dia. bends @ 86.70 = 867.00
80 grms solvent cement @ 1.45 = 116.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 1358.00
Rate with Mark-up Rs.

145 2" dia. PVC bends

Per 10 specials
Materials
10 - 2" dia. bends @ 173.10 = 1731.00
140 grms - solvent cement @ 1.45 = 203.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 2309.00
Rate with Mark-up Rs.

146 2½" dia. PVC bends

Per 10 specials
Materials
10 - 2½" dia. bends @ = #VALUE!
200 grms - solvent cement @ 1.45 = 290.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. #VALUE!
Rate with Mark-up Rs.

147 3" dia. PVC bends


Per 10 specials
Materials
10 - 3" dia. bends @ 494.30 = 4943.00
240 grms - solvent cement @ 1.45 = 348.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 5666.00
Rate with Mark-up Rs.

148 ½" dia. PVC specials viz Tees.

Per 10 Tees.
Materials
10 - ½" dia. Tees @ 12.90 = 129.00
30 grms - solvent cement @ 1.45 = 43.50

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 547.50
Rate with Mark-up Rs.

149 3/4" dia. PVC specials viz Tees.

Per 10 Tees.
Materials
10 - 3/4" dia. Tees @ 21.70 = 217.00
45 grms - solvent cement @ 1.45 = 65.25

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 657.25
Rate with Mark-up Rs.

150 1" dia. PVC specials viz Tees.

Per 10 Tees.
Materials
10 - 1" dia. Tees @ 36.80 = 368.00
60 grms - solvent cement @ 1.45 = 87.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 830.00
Rate with Mark-up Rs.

151 1¼" dia. PVC specials viz Tees.

Per 10 Tees.
Materials
10 - 1¼" dia. Tees @ 35.20 = 352.00
90 grms - solvent cement @ 1.45 = 130.50

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 857.50
Rate with Mark-up Rs.

152 1½" dia. PVC specials viz Tees.

Per 10 Tees.
Materials
10 - 1½" dia. Tees @ 55.00 = 550.00
120 grms - solvent cement @ 1.45 = 174.00

Labour
1 day plumber @ 750.00 = 750.00
Rate per 1 No. Rs. 1474.00
Rate with Mark-up Rs.

153 2" dia. PVC specials viz Tees.

Per 10 Tees.
Materials
10 - 2" dia. Tees @ 147.80 = 1478.00
210 grms - solvent cement @ 1.45 = 304.50

Labour
1 day plumber @ 750.00 = 750.00
Rate per 1 No. Rs. 2532.50
Rate with Mark-up Rs.

154 2½" dia. PVC specials viz Tees.

Per 10 Tees.
Materials
10 - 2½" dia. Tees @ 165.00 = 1650.00
300 grms - solvent cement @ 1.45 = 435.00

Labour
1½ days plumber @ 750.00 = 1125.00
Rate per 1 No. Rs. 3210.00
Rate with Mark-up Rs.

155 3" dia. PVC specials viz Tees.

Per 10 Tees.
Materials
10 - 3" dia. Tees @ 369.60 = 3696.00
360 grms - solvent cement @ 1.45 = 522.00

Labour
1½ days plumber @ 750.00 = 1125.00
Rate per 1 No. Rs. 5343.00
Rate with Mark-up Rs.

156 ½" dia. sockets.

Per 10 Specials
Materials
10 - ½" socket @ 10.70 = 107.00
20 grms solvent cement @ 1.45 = 29.00

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 323.50
Rate with Mark-up Rs.

157 3/4" dia. sockets.

Per 10 specials
Materials
10 - 3/4" dia. sockets @ 8.35 = 83.50
30 grms solvent cement @ 1.45 = 43.50

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 314.50
Rate with Mark-up Rs.

158 1" dia. sockets.

Per 10 specials
Materials
10 - 1" dia. sockets @ 21.90 = 219.00
40 grms solvent cement @ 1.45 = 58.00

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 464.50
Rate with Mark-up Rs.

159 1¼" dia. sockets.

Per 10 specials
Materials
10 no. 1¼" dia. sockets @ 21.00 = 210.00
60 grms solvent cement @ 1.45 = 87.00

Labour
2 hrs. plumber @ 93.75 = 187.50
Rate per 1 No. Rs. 484.50
Rate with Mark-up Rs.

160 1½" dia. sockets.

Per 10 specials
Materials
10 - 1½" dia. sockets @ 41.25 = 412.50
80 grms solvent cement @ 1.45 = 116.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 903.50
Rate with Mark-up Rs.

161 2" dia. sockets.

Per 10 specials
Materials
10 - 2" dia. sockets @ 77.50 = 775.00
140 grms - solvent cement @ 1.45 = 203.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 1353.00
Rate with Mark-up Rs.

162 2½" dia. sockets.

Per 10 specials
Materials
10 - 2½" dia. sockets @ 77.00 = 770.00
200 grms - solvent cement @ 1.45 = 290.00
Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 1435.00
Rate with Mark-up Rs.

163 3" dia. sockets.

Per 10 specials
Materials
10 - 3" dia. sockets @ 112.85 = 1128.50
240 grms - solvent cement @ 1.45 = 348.00

Labour
½ day plumber @ 750.00 = 375.00
Rate per 1 No. Rs. 1851.50
Rate with Mark-up Rs.

164 6" dia. half round PVC eaves gutter fixed to timber valance board
including gutter joiner and brackets fixed at 18" centers

Consider 24.00 L.ft.


Materials
2 - 6" dia. eaves gutter lengths @ 514.80 = 514.80
1 joiner @ 120.00 = 120.00
17 gutter brackets @ 18.00 = 306.00
34 - 3/4" brass screws @ 4.00 = 136.00
20 grams solvent cement @ 1.45 = 29.00

Labour
1/2 day plumber @ 750.00 = 375.00
1/2 day U/Sk labourer @ 750.00 = 375.00

Scaffolding - Add 5% 750.00 37.50


Rate per L.ft. Rs. 1893.30
Rate with Mark-up Rs.

165 4" dia. PVC gutter head

Consider 1 No. gutter head


Materials
1 PVC gutter head @ 85.00 = 85.00
2 gutter joiners @ 120.00 = 240.00
2 gutter brackets @ 18.00 = 36.00
12 grams solvent cement @ 1.45 = 17.40
4 - 3/4" brass screws @ 1.50 = 6.00

Labour
1/8 day plumber @ 750.00 = 93.75
1/8 day U/Sk labourer @ 750.00 = 93.75

Scaffolding - Add 5% 187.50 9.38


Rate per 1 No. Rs.
Rate with Mark-up Rs.

166 4" dia. PVC mitres

Consider 1 No. mitre


Materials
1 mitre bend @ 120.00 = 120.00
2 gutter joiners @ 120.00 = 240.00
2 brackets @ 18.00 = 36.00
12 grams solvent cement @ 1.45 = 17.40
4 - 3/4" brass screws @ 1.50 = 6.00

Labour
1/8 day plumber @ 750.00 = 93.75
1/8 day U/Sk labourer @ 750.00 = 93.75

Scaffolding - Add 5% 187.50 9.38


Rate per 1 No. Rs.
Rate with Mark-up Rs.

167 4" dia. PVC end caps

Consider 1 No. end cap


Materials
1 No. end cap @ 28.50 = 28.50
12 grams solvent cement @ 1.45 = 17.40

Labour
1/16 day plumber @ 750.00 = 46.88
1/16 day U/Sk labourer @ 750.00 = 46.88

Scaffolding - Add 5% 93.75 4.69


Rate per 1 No. Rs.
Rate with Mark-up Rs.

168 3 1/2" dia. PVC rain water down pipes fixed to brick wall with
wooden plugs buried in wall

Consider 24 L.ft. pipe length


Materials
2 - 3 1/2" dia. pipe lengths @ 2478.00 = 4956.00
1 - 3 1/2" joiner @ 60.00 = 60.00
4 PVC straps @ 13.50 = 54.00
8 brass screws 1" long @ 5.00 = 40.00
30 grams solvent cement @ 1.45 = 43.50

Labour
1/3 day plumber @ 750.00 = 250.00
1/3 day U/Sk labourer @ 750.00 = 250.00

Scaffolding - Add 5% 500.00 25.00


Rate per L.ft. Rs. 5678.50
Rate with Mark-up Rs.
Rate per m length with out profit 776.06
169 3 1/2" dia. PVC elbow

Materials
1 - 60° / 80° elbow @ 60.00 = 60.00
32 grams solvent cement @ 1.45 = 46.40

Labour
1/16 day plumber @ 750.00 = 46.88
1/16 day U/Sk labourer @ 750.00 = 46.88

Scaffolding - Add 5% 93.75 4.69


Rate per 1 No. Rs.
Rate with Mark-up Rs.

170 3 1/2" dia. PVC shoe

Materials
1 - 60° / 80° shoe @ 60.00 = 60.00
15 grams solvent cement @ 1.45 = 21.75

Labour
1/16 day plumber @ 750.00 = 46.88
1/16 day U/Sk labourer @ 750.00 = 46.88
Rate per 1 No. Rs.
Rate with Mark-up Rs.
750.00
952.50

468.75
595.31

750.00
952.50

1,687.50
2,143.13

2,625.00
3,333.75
2,250.00
2,857.50

1875.00
2381.25

2500.00
3175.00

750.00
952.50

2,777.50
3,527.43
4846.35
6154.87

8927.08
11337.40

10215.28
12973.40
19,692.07
25,008.92

20,354.67
25,850.43

24,212.67
30,750.09

27,176.27
34,513.86
33,777.87
42,897.89

4,110.21
5,219.97

7,345.98
9,329.40
19,170.88
24,347.02

48,889.49
62,089.65

50,356.17
63,952.34

51,333.96
65,194.13

52,311.75
66,435.93
49,956.16
63,444.32

51,454.84
65,347.65

52,453.96
66,616.53

53,453.09
67,885.42
48,222.82
61,242.98

49,669.51
63,080.27

50,633.96
64,305.13

51,598.42
65,529.99
46,293.30
58,792.49

47,682.10
60,556.27

48,607.97
61,732.12

49,533.83
62,907.97

45,898.79
58,291.46

47,275.75
60,040.21
48,193.73
61,206.04

49,111.71
62,371.87

51,656.16
65,603.32
51,606.16
65,539.82

51,556.16
65,476.32
48,973.93
62,196.90

43,986.27
55,862.57

87.03
110.53
95.50
121.29

262.03
332.78
349.25
443.55

581.46
738.45
10,449.17
13,270.45
10,242.92
13,008.51
12,588.76
15,987.72
12,588.76
15,987.72

5,484.75
6,965.63

7,245.90
9,202.30

19,890.00
25,260.30

15,270.83
19,393.96
8,610.00
10,934.70

16,960.38
21,539.68
23,530.50
29,883.74

19,377.67
24,609.64

11,344.40
14,407.39
21,460.78
27,255.18

34,054.50
43,249.22

15,265.00
19,386.55
6,494.80
8,248.40

232.40
295.15

397.85
505.27
340.27
432.14

9,568.05
12,151.42
7,273.40
9,237.22

17,929.00
22,769.83

19,179.00
24,357.33
15,346.98
19,490.66

17,979.80
22,834.35

18,656.35
23,693.56
12,457.09
15,820.50

2,750.00
3,492.50

4,861.98
6,174.71
3,817.78
4,848.58

4,425.00
5,619.75

55.03
69.88
102.27
129.89

115.08
146.15

114.28
145.14
7,784.11
9,885.82

9,871.79
12,537.18
11,711.74
14,873.91

ersideof roof

4,550.00
1,750.00
6,300.00
7,434.00

409.15
519.62
398.93
506.64

212.63
270.04
286.73
364.15

334.49
424.81
2,608.93
3,313.35

368.67
468.21

518.63
658.65

1,187.50
1,508.13
2,225.00
2,825.75

159.38
202.41

2,949.50
3,745.87

211.88
269.08
199.38
253.21

190.83
242.36

190.83
242.36

73.96
93.93
6,617.30
8,403.97

3,028.23
3,845.85

3,708.05
4,709.22
5,526.25
7,018.34

2,730.40
3,467.61
3,260.23
4,140.49

3,959.60
5,028.69

3,275.80
4,160.27
3,781.50
4,802.51

4,816.90
6,117.46
658.24

5,176.90
6,574.66
5,239.40
6,654.04

70.80
89.92

2,013.50
2,557.15

3,519.85
4,470.21
4,406.45
5,596.19

4,313.25
5,477.83

1,822.67
2,314.79
1,246.50
1,583.06

3,895.00
4,946.65

520.96
661.62
611.08
776.08

2,958.90
3,757.80

410.75
521.65
966.92
1,227.98

4,193.20
5,325.36

#VALUE!
#VALUE!
522.88
664.05

183.77
233.39

365.79
464.55

435.82
553.49
629.63
799.63

904.48
1,148.69

3,080.88
3,912.72
175.68
223.11

16.88
21.43

53.96
68.53
64.88
82.40

31.75
40.32

32.35
41.08

42.61
54.11
59.05
74.99

122.10
155.07

173.80
220.73

187.50
238.13
552.30
701.42

27.80
35.31

34.75
44.13

47.95
60.90
72.35
91.88

135.80
172.47

230.90
293.24

#VALUE!
#VALUE!
566.60
719.58

54.75
69.53

65.73
83.47

83.00
105.41

85.75
108.90

147.40
187.20

253.25
321.63
321.00
407.67

534.30
678.56

32.35
41.08

31.45
39.94
46.45
58.99

48.45
61.53

90.35
114.74

135.30
171.83
143.50
182.25

185.15
235.14

78.89
100.19
581.28
738.22

616.28
782.67

144.34
183.31

110mm
236.60
300.49

204.84
260.14

175.50
222.89