SL no Section no BAY R0 Date

S1-45 17.12.16
1
S1-45 (DOOR) 21.12.16

S1-47 22.12.16
2
S1-47(Door) 24.12.16

S1-46 23.12.16
4
S1-46(DOOR) 25.12.16

S1-48 25.12.16
6
S1-48(DOOR) 28.12.16

S1-49 26.12.16
7
S1-49(DOOR) 28.12.16
27.12.16
S1-50 28.12.16
8
S1-50 (DOOR) 31.12.16

S1-51 (DOOR) 04.01.17


9
S1-51 05.01.17

S1-52 04.01.17

10
S1-52 (DOOR) 06.01.17

S1-53 05.01.17/06.01.17
11
S1-53 (DOOR) 07.01.17

S1-54 07.01.17,08.01.17
12
S1-54(DOOR) 10.01.17

S1-55 11.01.17
13
S1-55(DOOR) 13.01.17
S1-56 13.01.17
14
S1-56 (DOOR) 18.01.17

S1-57 16.01.17
15
S1-57 (DOOR) 20.01.17

S1-58 19.01.17
16
DOOR 24.01.17

S1-59 19.01.17&20.01.17
17
DOOR 26.01.17

S1-60 22.01.17
18
DOOR 29.01.17

S1-61 24.01.17
19
19
S1-61 DOOR 24.01.17

S1-62 DOOR 25.01.17


20
S1-62 25.01.17

S1-63 26.01.17
21
DOOR 27.01.17

S1-141 28.01.17
22
S1-DOOR 31.01.17

S1-65 30.01.17
23
S1-DOOR 01.02.17

S1-64 31.01.17
24
24
S1-DOOR 04.02.17

S1-142 31.01.17
25
s1-142 (DOOR) 04.02.17

S1-143 04.02.17
26
s1-143 door 06.02.17

S1-144 08.02.17
27
S1-144 DOOR 09.02.17

S1-145 08.02.17

28

S1-145 DOOR 12.02.17

S1-146 09.02.17&10.02.17

29
29

S1-146 DOOR 14.02.17

S1-148 11.02.17

30

S1-148 DOOR 14.02.17

S1-147 14.02.17

31

DOOR 17.02.17

S1-148

32

DOOR

S1-149 16.02.17

33

DOOR 18.02.17
S1-150 18.02.17

34

DOOR 18.02.17

S1-151 17.02.17

35

DOOR 21.02.17

S1-152 23.02.17

36

DOOR

S1-153 18.02.17

37

DOOR 22.02.17

S1-152 21.02.17

38
38

DOOR 23.02.17

S1-154 24.02.17

39

DOOR 25.02.17

S1-155 24.02.17

40

DOOR 01.03.17

S1-156 28.02.17

41

DOOR 02.03.17

S1-157 07.03.17

42

DOOR 07.03.17
S1-158 03.03.17

43

DOOR 06.03.17

S1-159 04.03.17

44

DOOR 07.03.17

S1-160 08.03.17

45

DOOR 11.03.17

S1-161 08.03.17
44
DOOR 09.03.17

S1-163 10.03.17
45
DOOR 13.03.17
S1-162 11.03.17
46
DOOR 14.03.17

S1-164 14.03.17
47
DOOR 16.03.17

S1-165 18.03.17
48
DOOR 22.03.17

S1-166 20.03.17
49
DOOR 24.03.17

S1-167 20.03.17
50
DOOR 24.03.17

S1-168 21.03.17
51
DOOR 23.03.17

S1-169 23.03.17
52
52
DOOR 27.03.17

S1-170 24.03.17
53
DOOR 25.03.17

S1-171 28.03.17
54
DOOR 30.03.17

S1-172 27.02.17
55
DOOR 30.03.17

S1-173 29.03.17
56
DOOR 31.03.17

S1-174 29.03.17
57
DOOR 01.04.17

S1-66 05.04.17
58
DOOR 06.04.17

S1-67 08.04.17
59
59
DOOR 10.04.17

S1-68 10.04.17
60
DOOR 11.04.17

S1-69 13.04.17
61
DOOR 14.04.17

S1-70 14.04.17
62
DOOR 15.04.17

S1-72 17.04.17
63
DOOR 21.04.17

S1-71 19.04.17
64
DOOR 19.04.17

S1-74 20.04.17
65
DOOR 24.04.17

S1-75 26.04.17
66
DOOR 28.04.17
S1-76 24.04.17
67
DOOR 28.04.17

S1-77 26.04.17
68

DOOR 03.05.17

S1-73 25.04.17
69
DOOR 25.04.17

S1-78 28.04.17
70

DOOR 02.05.17

S1-80 V 29.04.17
71

DOOR V 06.05.17

S1-79 IV 04.05.17
72

DOOR IV 06.05.17
S1-82 V 05.05.17
73
DOOR V 09.05.17

S1-81 IV 06.05.17
74
Door IV 08.05.17

S1-84 V 08.05.17
75
DOOR V 12.05.17

S1-85 IV 08.05.17
76

DOOR IV 16.05.17

S1-83 IV 09.05.17
77
DOOR IV 11.05.17

S1-86 IV 09.05.17
78
78
DOOR V 16.05.17

S1-87 (1ST HALF) IV 11.05.17

FVBBB S1-87 (2nd HALF) IV 17.05.17

DOOR IV 20.05.17

S1-88 V 12.05.17
80
DOOR V 20.05.17

S1-89- 2ND HALF IV 16.05.17

81 S1-89- 1ST HALF IV 21.05.17

DOOR IV 23.05.17

S1-90 V 17.05.17

82 s1-90 V 22.05.17

DOOR V 25.05.17
S1-91 IV 18.05.17

83 S1-91 1st HALF IV 26.05.17

DOOR IV 26.05.17

S1-92 1ST HALF V 19.05.17

84 S1-92 2ND HALF V 24.05.17

DOOR V 28.05.17

S1-93 (First Half) IV 26.05.17

85 S1-93 (Second Half) IV 22.05.17

DOOR IV 30.05.17

S1 95 V 03.06.17
95
door V 05.06.17

S1-97 IV 6.06.17
97
97
DOOR ` 10.06.17

S1-96 V 05.06.17
96
DOOR V 08.06.17

S1-94 IV 05.06.17
97
DOOR IV 06.06.17

S1-98(CS1-CS5) V 09.06.17

98 S1-98(CS6-CS9) V 06.06.17

DOOR V 13.06.17

S1-99 IV 08.06.17
99
DOOR IV 12.06.17

S1-100 V 09.06.17

100
100 S1-100(CS1-CS5) V 12.06.17

DOOR V 15.06.17

S1-101 IV 10.06.17
101

DOOR IV 14.06.17

S1-102(CS6-CS9) V 12.06.17

102 S1-102(CS1-CS5) V 16.06.17

DOOR V 19.06.17

S1 -103 ( DOOR ) IV 15.06.17


103
S1 -103 IV 16.06.17

S1-105 IV 17.06.17

104
104 S1-105(CS8) IV 20.06.17

S1-105(DOOR) IV 20.06.17

S1-104 V 20.06.17
104
S1-104 (DOOR) V 22.06.17

S1-106 V 22.06.17
105
DOOR V 26.06.17

S1-107 IV 23.06.17
106
S1-107 (DOOR) IV 23.06.17

S1-109 IV 27.06.17
107
door IV 27.06.17

S1-111 IV 29.06.17
108
108
DOOR IV 30.06.17

S1-108 V 27.06.17
109
DOOR V 29.06.17

110 S1-110 V 30.06.17

DOOR V 03.07.17

S1-115 iv 04.07.17
111
DOOR iv 04.07.17

S1-116(CS6-CS9) iv 05.07.17

111 S1-116(CS1-CS5) iv 11.07.17

S1-116(DOOR) iv 10.07.17

S1-113 V 06.07.17
112
DOOR V 06.07.17
S1-112 IV 06.07.17
112
DOOR iv 06.07.17

S1-114 V 06.07.17
113
DOOR V 08.07.17

S1-118(CS6-CS9) IV 07.07.17

114 S1-118(CS1-CS5) IV 10.07.17

s1-118(door) IV 12.07.17

S1-117 V 10.07.17
115
S1-117(DOOR) V 10.07.17

S1-119 v 14.07.17
116
S1 -119(DOOR) V 13.07.17

S1-120 IV 19.07.17

117 S1-120 IV 22.07.17&23.07.17


117

S1–120(DOOR) IV 24.07.17

S1-121 5 26.7.17
118
S1–121(DOOR) v 26.07.17

S1 -122(DOOR) v 01.08.17
119
S1-122 v 07.08.17

S1-123 IV 14.08.17
120
S1-123(DOOR) IV 31.10.17

108-S1-001 1 11.10.17
121
DOOR v 20.10.17

S1-126 v 05.12.17
122
S1-126(DOOR) v 16.11.17

S1-124 v 27.11.17
123
S1-124(DOOR) v 15.11.17
S1-125 IV 29.11.17
124
S1-125(DOOR) v 22.11.17

S1-127 v 23.11.17
120
S1-127(DOOR) v 23.11.17

S1-128 v 08.12.17

120 S1-128 v 14.12.17

DOOR v 23.02.18

S1-129 iv 07.03.18
129
DOOR iv 15.03.18

S1-130 IV 12.03.18
131
DOOR IV 14.03.18

S1-176 4 20.03.18
132
DOOR IV 23.03.18
S1-175 4 20.03.2018
133
DOOR IV 23.03.18

S1-131 V 22.03.18
134
DOOR V 28.03.18

S1-132 IV 28.03.2018
135
DOOR IV 30.03.18

S1-133 IV 11.06.18
136
DOOR IV 16.05.18

S1-134 IV 15.06.18
137
DOOR IV 19.06.18

S1-135 IV 20.06.18
137
DOOR IV 26.06.18

S1-136 4 25.06.18
138
138
DOOR 4 02.07.18

S1-137 4 29.06.18
139
DOOR

S1-138 4 03.07.18
140
R0

Noo of repair spots Length of the Repair(R0)

16 spots/2400mm

9spots/1060mm

15 SPOTS/2280MM 1 SPOT VT HOLD

3SPOTS/ 230MM

34spots/6880mm

2Spots/1940mm

23Spots/4010mm

2 SPOTS/1050MM AND 1 SPOT FLUSH WELD

9SPOTS/1100MM

2 SPOTS /3000MM
11SPOTS /1100MM & 2 BT SPOTS

5SPOTS/590MM

100% UT CLEAR

35SPOTS /6560MM & 5 VT HOLD SPOTS

UT COMPLETED 21 SPOTS/8670MM

FULL DOOR REPAIR

UT COMPLETED/5 SPOT(1100),1 BT

5 SPOTS /1400MM-2 SPOTS VT HOLD

17 SPOTS /3040+1250MM

6 SPOTS/3600MM,1 SPOTS 1VT HOLD

19 SPOTS/1700MM & 1SPOT VT HOLD

7 spots repair/1750mm
16 SPOTS/4360MM

04 SPOTS/1100MM

12 SPOTS/1990MM

FULL DOOR REPAIR

21SPOTS/3080mm

FULL DOOR REPAIR

36 SPOTS/7290MM

5 SPOTS REPAIR/2330MM

13 SPOTS/1380MM

All spots ut ok

17 SPOTS/1380MM
1 SPOT/50MM

6 SPOT/480MM

9 SPOTS& 1BT

8 SPOTS/450MM

5 SPOTS/570MM

12 SPOTS/800MM

1SPOTS/100MM

12 SPOTS/900MM

3 SPOTS REPAIRS/750MM& 3 SPOTS VT HOLD

37 SPOTS/11500MM
4 SPOTS/2700MM

4 SPOTS-650MM

NO REPAIR

8 SPOTS/1280MM

5 spotss/580mm

3 spotss/330mm

5 SPOTS UT REPAIR/600mm

12 SPOTS UT REPAIR/2230mm

9 SPOTS UT REPAIR/1810mm

7 CS UT OK&1 CS PENDING
FULL DOOR REPAIR

8 SPOTS UT REPAIR/550mm

1 SPOT UT REPAIR/30mm

2 SPOTS UT REPAIR/130mm

7 SPOTS UT REPAIR/1180mm

15 spots/3280mm

FULL DOOR REPAIR


7 SPOTS UT REPAIR/1180mm& 3SPOT VT HOLD

3 spots/1400mm

6 spots/640mm&3 SPOTS VT HOLD

3 SPOTS REPAIR/350MM- 7 SPOTS VT HOLD

8 SPOTS REPAIR/1700MM

4 spots/470mm

8 SPOTS REPAIR/540mm

4 SPOTS REPAIR/1260MM
8 SPOTS/1700MM

5 SPOTS REPAIR/210mm

6 SPOTS/1200mm

5 spots/1250mm

All spots ut ok

3 SPOTS REPAIR/210MM

3 SPOTS/140mm

10 SPOTS/2830mm

3 SPOTS/2450mm
12 spots /1920mm

1 spots repair 100mm + 1 spots vt hold

9 SPOTS / 1430mm

7 SPOTS / 1750mm

8 SPOTS/630MM

4 SPOTS/4150MM

11 SPOTS/ 2540MM

7 SPOTS/ 2000MM

18 SPOTS/2620MM& CS3 PENDING

3 SPOTS/ 4700MM
11 SPOTS/2880MM& 2 spots vt hold

5 SPOTS REPAIR/2850mm

18 SPOTS REPAIR/3260mm

9 SPOTS REPAIR/1830mm - 1 spots vt hold

25 spots repair/4410 mm- cs-8 full cs repair/ c

13 SPOTS REPAIR/1340mm

9 SPOTS REPAIR/2280mm

4 SPOTS/780MM

5 spots repair/ CS1 AND CS8 UT COMPLETED

ZERO REPAIR

11 spots repair/1140mm

3 SPOTS REPAIR/440mm

CS8 ONLY 2 SPOTS REPAIR/240mm


4 SPOTS REPAIR/360mm

8 SPOTS REPAIR/1190mm

2 SPOTS REPAIR/3750mm

18 SPOTS REPAIR/6000mm

3 SPOTS REPAIR/350mm

7 SPOTS REPAIR/630mm

FULL DOOR UT REPAIR/D=10-20mm(o/s)

4 SPOTS REPAIR/ 150 mm

3 SPOTS /110MM

4 SPOTS REPAIR/ 400 mm

FULL DOOR REPAIR / 6000mm

12 SPOTS REPAIR/ 710 mm

1 SPOTS /30MM

10 SPOTS UT REPAIR/840mm
4 SPOTS UT REPAIR/850mm, 3 spots vt hold

10 SPOTS UT REPAIR/ 2600mm

7 SPOTS REPAIR/ 870 mm

22 SPOTS REPAIR/ 4010 mm

5 SPOTS/2800M

10 SPOTS REPAIR/1090mm

3 SPOTS REPAIR/3000mm

20 SPOTS REPAIR/2400MM

4 SPOTS REPAIR/1170MM

26 SPOTS REPAIR/ 5530 mm

FULL REPAIR

5 SPOTS REPAIR/ 280 mm/1 SPOTS VT HOLD

12 spots repair / 1060mm

18 SPOTS REPAIR /2420 mm

9 SPOTS REPAIR /1800 mm


12 spots repair / 1200mm

5 spots repair / 1900 mm

21 SPOTS REPAIR/ 2540 mm

5 SPOTS 630mm

31 SPOTS REPAIR/ 4320 mm

6 SPOTS REPAIR/ 330 mm

540mm/8 spots

4 spots 350mm

9 SPOTS REPAIR-7630MM

4 spots 900MM

10 spots 1260mm

5 spots 1200mm
14 spots 2240MM

5 spots 950mm

25 spots 4580MM

FULL DOOR REPAIR

8 SPOTS 660MM

2 spots 230mm

11 SPOTS 3050MM

6 SPOTS 2250 MM

9 SPOTS 695MM

6 SPOTS 1330MM

1 spot 50mm (cs6-9)


5 spot 1000MM

6 SPOTS CS6 TO CS9 - 2480mm

22 SPOTS CS1 TO CS5 - 2990mm

4 spot 350MM/ 2SPOT FLUSH WELD

13 SPOTS 4350MM

2 SPOTS 190MM

24 SPOTS CS6 TO CS9 - 2890mm

4 SPOTS CS1 TO CS5 - 760mm

3 SPOTS 900 MM

13 SPOTS CS6 TO CS9 - 5010mm

8 SPOTS CS1 TO CS5-720mm

3 SPOTS 530 MM
4 SPOTS CS6 - CS9 - 280mm

5 SPOTS CS1 - CS5 - 860mm

2 SPOTS 800mm

9 SPOTS CS6 - CS9 - 2830mm

7 SPOTS CS (1-5) --760 MM

5+1 SPOTS 1560mm/1 spot vt hold

13SPOTS (CS1-CS5) 3170mm

6 SPOTS CS6 - CS9 - 620mm

2 SPOT 50mm/1 SPOT FLUSH WELD

11 SPOTS 1230mm/ 2 spot vt hold

NO REPAIR

19 SPOTS 3450MM
6 SPOTS 500MM/ 4 spots vt hold

12 SPOTS 1995mm+cs1 full repair

NO REPAIR 3 SPOT VT HILD

16 SPOTS 2530MM

3 SPOTS 250MM

8 SPOTS 870MM

6 SPOTS 1090 mm

NO REPAIR

14 SPOTS 1160mm

2 SPOT 100MM/ 1 SPOT VT HOLD

3 SPOTS 550mm
7 SPOTS 1170mm

NO REPAIR

14 SPOTS 1450MM

3 SPOTS 330MM / 2 SPOT O/S FLUSH &WELD

5 SPOTS 600mm

8 SPOTS 970mm

8 SPOTS+1 FLUSH
WELD 1500mm

NO REPAIR

13 SPOTS 6500mm

20 SPOTS 21 SPOTS
2 SPOTS 750MM

5 SPOTS 400MM

8 SPOTS 680MM

2 SPOTS 100mm/ 1 SPOT FLUSH & WELD NEED RE-UT

5 SPOTS 1090MM

3 SPOTS 500MM

4 SPOTS 390MM

1 SPOTS 300MM

6 SPOTS 420MM

8 SPOTS 2250mm

5 SPOTS 310MM
2 SPOTS 120MM

8 SPOTS 1850mm

3 SPOTS& 1 FLUSH 500MM


WELD

13 SPOTS 1040MM

6 SPOTS+3F/W 410MM

15 SPOTS 2000MM

3 SPOTS& 1 FLUSH 350mm


WELD

3 SPOTS 350mm

3 SPOTS 350mm

3 SPOTS 150mm/ 2 spots fiush weld

7 SPOTS 2020mm

2 SPOT 150mm/ 2 spots fiush weld


12 SPOTS 970mm

4 spot 450mm

11 spots 740mm

4 spot 550mm

6 spots 740mm

NO REPAIR

3 SPOTS 250MM

16 SPOTS 2040mm

1 spot 40mm

3 spot Cs6-9 ut completed/ 170mm

NO REPAIR

7 SPOTS CS-6 TO CS-9 UT CHECK COMPLETED/1340MM

14 SPOTS CS-1 to CS-5 UT CHECK COMPLETED/2130MM


1 spot 20mm

7 SPOTS CS-5 TO CS-9 UT CHECK COMPLETED/710MM

NO REPAIR

2 SPOT 330MM

8 SPOT 1380 MM

25 spots 3110MM

4 SPOTS 800MM

40 spots 10740

1 spot 70mm

13 SPOTS 4360MM

10 spot 1110mm

22 SPOTS 2205mm

7 spot 2400mm
28 spot 3975mm

3 spot 300MM

34 spot 24120 MM

1 spot 5000 MM

16 SPOTS 5350 MM/CS-6,7,8 UT CHECK COMPLETED

18 SPOTS 6300 MM/CS-1 to 5&9 UT CHECK COMPLETED

5 spot 1460 MM

30 61 SPOTS/17040MM

8 SPOTS 1100MM

27 spots 4370mm

2 SPOTS 250 mm

15 SPOTS 4500 mm

9 SPOTS 580 mm
20 SPOTS 9310 mm

7 SPOTS 450 mm

30 SPOTS 2850 mm

2 SPOTS 200 mm

13 SPOTS 1600 mm

4 spot 850 mm

10 spot 1770 mm

12 spotS 2040 mm

16 spots 3160 mm

8 spots 1290 mm

5 spots 1000 mm

14 SPOTS 1750 mm/4 SOPTS FLUSH WELD

15 SPOTS 5150 mm
4 SPOTS 1800 mm

11 spots 9200 mm

8 SPOTS CS 1,2,3,8,9 only UT completed/1060 mm


R1

R0 verification &sign (R1)Date

JNN 21.12.16

RRL 22.12.16

RRL(N) 24.12.16

NKK(D) 25.12.16

NKK 27.12.16

JNN(D) 27.12.16

JNN(D) 27.12.16

JNN(D) 29.12.16

NKK(D) 29.12.16

RRL(D) 29.12.16
NKK(N) RRL(D) 28.12.16

JNN(D) 02.01.17

RRL(D)

RRL(D) 06.01.17

RRL(D) &JNN(N) 10.01.17

NKK(D) 07.01.17

JNN(N),NKK(D) 07.01.17

RRL(D) 08.01.17

JNN(N),RRL(D) 11.01.17

RRL(N) 11.01.17

NKK(D) 16.01.17

RRL(N) 16.01.17
RRL(N)&JNN(D) 18.01.17

JNN(D) 19.01.17

JNN(D) 18.01.17

MVE 21.01.17

JNN(D) PMJ(D) 22.01.17

NKK 26.01.17

NKK&JNN 23.01.17

BSK 27.01.17

PMJ 23.01.17

NKK(D)

RRL(D) 26.01.17
JNN(D) 26.01.17

BSK 28.01.17

JNN 28.01.17

NKK(D)RRL(D) 28.01.17

JNN(N) 28.01.17

JNN 30.01.17

JNN(D) 31.01.17

JNN(D) 01.02.17

RRL(N) 02.02.17

RRL(N)
RRL(N) 06.02.17

RRL(N) JNN 02.02.17

NKK(D) 04.01.17

JNN(D) 06.02.17

JNN 08.02.17

JNN(D)

PMJ 10.02.17

NKK(N) 09.02.17

MNK 13.02.17

NKK(N)&JNN 16.02.17
NKK(D) 15.02.17

MVE&MNK 13.02.17

NKK(D) 14.02.17

NKK(D) 14.02.17

RRL(D 18.02.17

JNN RRL(D) 20.02.17

JNN 20.02.17
RRL(D 20.02.17

NKK(D) 20.02.17

RRL(D 20.02.17

RRL(N) 22.02.17

JNN

JNN 21.02.17

NKK(D) 22.02.17

NKK(D) & RRL(N) 24.02.17


JNN 24.02.17

JNN 25.02.17

NKK(D) 25.02.17

JNN(D) RRL(N) 27.02.17

JNN

RRL(D) 28.02.17

NKK(N) 03.03.17

RRL(D) 09.03.17

PMJ(N) 09.03.17
JNN 06.03.17

RRL(D) 06.03.17

NKK(N) 06.03.17

PMJ(N) 08.03.17

JNN RRL(D) 09.03.17

bsk 12.03.17

PMJ(N) RRL(D) 09.03.17

RRL(D) 10.03.17

JNN(D) 11.03.17

RRL(N) 14.03.17
RRL(D) 14.03.17

RRL(N) 16.03.17

NKK(D) 16.03.17

RRL(N) 18.03.17

RRL(N) PMJ 21.03.17

NKK(N) 24.03.17

NKK(N) 21.03.17

RRL(D) 24.03.17

PMJ 20.03.17

PMJ

RRL(D) 22.03.17

RRL(D) 23.03.17

PMJ 23.03.17
NKK(D) 27.03.17

RRL(D) 25.03.17

NKK(N) 27.03.17

RRL(D) 30.03.17

PMJ 31.03.17

RRL(D) 28.03.17

NKK(D) 31.03.17

NKK(D) 29.03.17

JNN 1.04.17

RRL(D) 30.03.17

NKK(D) 03.04.17

NKK(D) 06.04.17

NKK(D) 06.04.17

NKK(D) 10.04.17
RRL(D) 11.04.17

NKK(N) 12.04.17

NKK(N) 12.04.17

NKK(N) 17.04.17

JNN 15.04.17

NKK(N) 15.04.17

NKK(N) 17.04.17

RRL(D) 21.04.17

PMJ 24.04.17

NKK(N) 22.04.17

NKK(N) 24.04.17

RRL(D) 21.04.17

KSA(D) 25.04.17

NKK(D) 29.04.17

RRL(N) 02.05.17
RRL(D) 26.04.17

NKK(D) 29.04.17

RRL(N) 27.04.17

NKK(N) 04.05.17

NKK(D) 27.04.17

NKK(D) 27.04.17

NKK(D) 28.04.17

PMJ(D) 03.05.17

MNK(N) 02.05.17

RRL(D) 06.05.17

RRL(D) PMJ(D) 05.05.17

RRL(D) 07.05.17
NKK(N) 07.05.17

PMJ 10.05.17

PMJ(D) 08.05.17

PMJ 10.05.17

RRL(D) 09.05.17

NKK 12.05.17

JNN 11.05.17

RRL(N) 17.05.17

NKK(D) 11.05.17

PMJ 12.05.17

NKK(D) 10.05.17
RRL(N) 17.05.17

PMJ 13.05.17

NKK 20.05.17

RRL(N) 22.05.17

NKK 13.05.17

NKK 20.05.17

JNN 17.05.17

RGA 24.05.17

RRL 24.05.17

RRL(N) 19.05.17

NKK(N) 24.05.17

MNK&KSA 25.05.17
RRL(N) 19.05.17

MNK&KSA 26.05.17

RRL(D) 27.05.17

RRL(N) 20.05.17

RRL 25.05.17

RRL 29.05.17

RRL(D) 27.05.17

RRL 23.05.17

MVE 31.05.17

RRL 05.06.17

JNN&MNK

JNN 07.06.17
RRL 12.06.17

JNN&MNK 08.06.17

RRL 09.06.17

NKKNKK 07.06.17

RGA 07.06.17

RRL 10.06.17

RRL 07.06.17

JNN

RRL 12.06.17

PMJ 12.06.17

PMJ 09.06.17
MNK 15.06.17

NKK

RRL 12.06.17

MNK 15.06.17

MNK 16.06.17

MNK 20.06.17

MNK 20.06.17

NKK

RRL 19.06.17

MNK 22.06.17
RGA 22.06.17

RGA 22.06.17

RRL 21.06.17

MNK 23.06.17

RGA 24.06.17

NKK 26.06.17

MNK 23.06.17

NKK 23.06.17

JNN 28.06.17

RRL 28.06.17

JNN 30.06.17
JNN 01.07.17

NKK 29.06.17

JNN 30.06.17

RGA 03.07.17

NKK 03.07.17

MNK 05.07.17

pmj 05.07.17

RRL

MNK 11.07.17

MNK 11.07.17

RRL 07.07.17

RRL 07.07.17
RRL 08.07.17

RRL 07.07.17

NKK 08.07.17

NKK 10.07.17

MNK 12.07.17

RRL

JNN 12.07.17

RRL 13.07.17

JNN

nkk 14.07.17

NKK

RRL
25.07.17
RRL , KSA
RGA 25.07.17

MVE 26.07.17

nkk

nkk 02.08.17

nkk 09.08.17

RGA 07.11.17

MNK 07.11.17

RRL 16.10.17

jnn 23.10.17

RRL 08.12.17

RRL 21.11.17

mnk&ksa 30.11.17

MNK 17.11.17
mnk&ksa 05.12.17

RRL 24.11.17

RRL 11.12.17

MNK 11.12.17

MNK&KSA 11.12.17

RRL 18.12.17

KSA,BSK 27.02.17

KSA 12.03.18

ksa,rrl 16.03.2018

KSA,PMJ 14.03.18

RRL@KSA 15.03.18

PMJ,DSK,RRL,BSK 23.03.18

KSA,DSK 24.03.18
PMJ,DSK 23.03.18

RRL 24.03.18

BSK,KAS 26.03.18

RRL,DSK 29.03.18

KSA,PMJ 29.03.18

RRL 31.02.2018

rrl,ksa,pmj 12.06.18

RRL,DSK,MVH 16.06.18

KSA,MVH,DSK 16.06.18

KSA,BSR 20.06.18

RRL,MVH 21.06.18

RRL 28.06.18

RRL,PMJ 26.06.18
RRL 03.07.18

KSA,MVH 03.07.18

DSK,BSR
R1

Repair(R1) R1 verification &sign

6Spots

8SPOTS-UT OK 1SPOT REPAIR RRL(N)

1 SPOT/100MM RRL(N)

All spots ut ok NKK(D)

R1 REPAIR 8 SPOTS & 8 SPOTS VISUAL RRL(D) BSK


HOLD

1 SPOT REPAIR/1800MM, 1SPOT REPAIR RRL(D),BSK


OK

3spots again repair NKK(N)

3 SPOPTS/450MM NKK(N)

3 SPOT JNN(D)

All spots ut ok NKK(N)


2 SPOTS REPAIR & 2 SPOTS UT BALANCE NKK(N)

1 SPOTS REPAIR NKK(D)

8 spots repair& 3spots pending JNN(D)

7 spots repair/1350MM RRL(N)

9 SPOTS / 2250MM JNN(N)

5 SPOTS UT OK- / 1 BT SPOTS NOT JNN(N)


ATTEND

2 SPOTS /600MM-1 SPOTS VT HOLD RRL(N)

2 SPOTS /200, 5 SPOTS VT HOLD RRL(N)

2 SPOTS/400MM RRL(N)

6 SPOTS/800 MM & 1 SPOT VT HOLD RRL(D)

5 SPOTS/800 MM & 1 SPOT O/S FLUSH & RRL(D)


WELD
5 SPOTS REPAIR JNN(D)

02 SPOTS MVE

8 SPOTS AGAIN REPAIR RRL(N)

3 SPOTS/300MM NKK(N)

5 SPOTS AGAIN REPAIR & 5 SPOTS PMJ(D)


PENDING

4 SPOTS/3900MM RRL(D)

8 SPOTS AGAIN REPAIR NKK(D)

2 SPOTS AGAIN REPAIR & 1 SPOT RRL(D)


PENDING

12 SPOTS JNN(N)

6 SPOTS AGAIN REPAIR RRL(D)


All spots ut ok RRL(D)

3 SPOTS AGAIN REPAIR NKK(D)

2 SPOTS REPAIR & 4 SPOTS UT BALANCE NKK(D)

1 SPOTS REPAIR & 3 SPOTS UT BALANCE NKK(D)

3 SPOTS AGAIN REPAIR NKK(D)

2 SPOTS AGAIN REPAIR RRL(D)

All spots ut ok NKK(D)

10 SPOTS AGAIN REPAIR RRL(N)

4 SPOTS AGAIN REPAIR RRL(N)

4 SPOTS REPAIRS& 29 spots pending RRL(N)


All spots ut ok NKK(N)

1 SPOTS AGAIN REPAIR RRL(N)

7 sopts/1950mm RRL(N)

2 SPOT REPAIR JNN

2 SPOTS AGAIN REPAIR/ 1 SPOTS FLUSH RRL(D)


WELD

2 SPOT AGAIN REPAIR NKK(N)

8 SPOTS UT OK/4 SPOTS UT BALANCE NKK(N)

3 SPOTS REPAIR JNN

All spots ut ok RRL(D


inside REPAIR 2100mm NKK(D)

2SPOTS AGAIN REPAIR/ 1 SPOT PENDING JNN

1SPOT AGAIN REPAIR NKK(D)

1SPOT AGAIN REPAIR JNN(D)

1SPOT AGAIN REPAIR RRL(D

3 SPOT AGAIN REPAIR RRL(N)

3 SPOTS REPAIR/350MM-1 SPOTS RRL(N)


PENDING
2 SPOT AGAIN REPAIR RRL(N)

3 SPOT AGAIN REPAIR/700MM RRL(N)

All spots ut ok RRL(N)

FLUSH AREA UT COMPLETED/RECHECK JNN(D)


NEEDED AFTER WELDING COMPLETED

1SPOT AGAIN REPAIR RRL(N)

2SPOT AGAIN REPAIR RRL(N)

All spots ut ok RRL(N)


8 SPOTS AGAIN REPAIR JNN

1 SPOTS AGAIN REPAIR NKK

All spots ut ok NKK

2 spots Repair/900mm JNN

9 SPOTS REPAIR/610MM NKK

All spots ut ok JNN

2 SPOTS AGAIN REPAIR/ 1 SPOT UT


BALANCE

3 SPOTS AGAIN REPAIR JNN


1 SPOTS AGAIN REPAIR + 1 spots vt hold RRL(D)

2 REPAIR /150MM PMJ(D)

1 SPOTS REPAIR & 3 SPOT BALANCE NKK(D)

6 SPOTS AGAIN REPAIR PMJ(N)

1 SPOT AGAIN REPAIR/2 SPOTS UT NKK(D)


BALANCE

1 SPOT/1000MM JNN

9 SPOTS PENDING JNN(D)

3 SPOTS AGAIN REPAIR RRL(D)

5 SPOTS AGAIN REPAIR RRL(D)

4 SPOTS AGAIN REPAIR RRL(N)


1 SPOTS VT HOLD RRL(N)

5 SPOTS REPAIR/1750mm MVE

7 SPOTS REPAIR/ 2 SPOTS VT HOLD RRL(N)

2 SPOTS REPAIR/150mm NKK

9 SPOTS REPAIR/1570mm & cs-2 RE-UT NKK(N)


NEED

5 SPOTS AGAIN REPAIR RRL(D)

2 SPOTS VT&UT HOLD NKK(N)

2 SPOTS AGAIN REPAIR NKK(N)

23 SPOTS REPAIR/3190mm NKK(N)

All spots ut ok RRL(D)

All spots ut ok NKK(N)

17 SPOTS REPAIR NKK(N)


1 SPOTS AGAIN REPAIR RRL(D)

All spots ut ok JNN

1 SPOTS AGAIN REPAIR NKK(D)

3 SPOTS AGAIN REPAIR PMJ

1 SPOTS AGAIN REPAIR 1 SPOT VT HOLD RRL(D)

1 SPOTS again reapir JNN

4 SPOTS again reapir & 1 FLUSH WELD RRL(D)

All spots ut ok RRL(D)

1 SPOTS PENDING NKK(D)

1 SPOTS again reapir NKK(D)

2 SPOTS REPAIR JNN

2 SPOTS again reapir RRL(N)

All spots ut ok RRL(N)

2 SPOTS again reapir / 50 mm JNN


2 SPOTS again reapir / 1 SPOT VT HOLD RRL(D)

3 SPOTS AGAIN REPAIR NKK(N)

All spots ut ok NKK(N)

3 SPOT AGAIN REPAIR/4 SPOTS PENDING RRL(D)

7 SPOTS/2960M RRL(D)

1 SPOT AGAIN REPAIR NKK(N)

3 SPOT AGAIN REPAIR/2200MM RRL(D)

7 SPOTS AGAIN REPAIR PMJ

All spots ut ok KSA(D)

4 SPOTS AGAIN REPAIR RRL(D)

FULL DOOR AGAIN REPAIR NKK(D)

2 SPOT AGAIN REPAIR/1 SPOTS VT HOLD RRL(D)

1 SPOTS AGAIN REPAIR RRL(N)

All spots ut ok NKK(N)

7 SPOTS AGAIN REPAIR RRL(D)


1 SPOTS AGAIN REPAIR/ 1 SPOT REPAIR RRL(N)
NOT ATTEN

1 SPOTS AGAIN REPAIR NKK

13 SPOTS UT CHECKED/AGAIN 6 SPOTS


REPAIR/ (8 SPOTS PENDING(VT NOT RRL(N)
CLEAR)

2 SPOTS REPAIR /100MM PMJ

6 SPOTS AGAIN REPAIR /1290MM NKK(D)

All spots ut ok RRL(N)

AGAIN 3 SPOTS REPAIR RRL(N)

1 SPOTS AGAIN REPAIR /200MM RRL(D)

1 SPOT REPAIR/1 SPOT VT HOLD NKK(N)

1 SPOTS AGAIN REPAIR NKK(N)

1 SPOT REPAIR/1 SPOT VT HOLD NKK(N)

4 SPOTS AGAIN REPAIR PMJ


1 SPOTS AGAIN REPAIR/ONE SPOT UT PMJ
PENDING

All spots ut ok PMJ

10 SPOTS AGAIN REPAIR/ 1 SPOTS VT RRL(D)


HOLD

7 SPOTS AGAIN REPAIR PMJ

1 SPOTS AGAIN REPAIR RRL(D)

All spots ut ok PMJ

5 SPOTS AGAIN REPAIR MNK,KSA

3 SPOTS AGAIN REPAIR RRL(N)

1 SPOTS AGAIN REPAIR/1 SPOT UT MNK(D)


PENDING

flushed area checked / 4 spot repair mve

All spots ut ok(cs6-9) MNK(D)


2 SPOTS AGAIN REPAIR RRL(N)

2 SPOTS/300MM MVE

2 SPOTS/1000MM MNK

All spots ut ok RRL

1 SPOT AGAIN REPAIR BSK

All spots ut ok RRL

4 SPOT AGAIN REPAIR NKK

1 SPOT AGAIN REPAIR MNK

All spots ut ok RRL

All spots ut ok BSK

4 SPOT AGAIN REPAIR RRL

All spots ut ok NKK


CS6 - CS9 REPAIR SPOTS CLEARED BSK

3 SPOT AGAIN REPAIR NKK

2 SPOT AGAIN REPAIR NKK

3 SPOT AGAIN REPAIR KSA

1 SPOT AGAIN REPAIR NKK

3 SPOT AGAIN REPAIR MNK

4 SPOT AGAIN REPAIR RRL

All spots ut ok RRL

All spots ut ok RRL

All spots ut ok RGA

7 SPOT AGAIN REPAIR&1 SPOT PENDING MNK


1 SPOT AGAIN REPAIR/1 SPOT VT HOLD RRL

CS1+ 7SPOT PENDING PMJ

All spots ut ok NKK

5 SPOT AGAIN REPAIR / AND 3 spots UT NKK


PENDING

1 SPOT AGAIN REPAIR NKK

3 SPOTS AGAIN REPAIR PMJ

2 SPOTS AGAIN REPAIR NKK

2 SPOTS AGAIN REPAIR PMJ

1 SPOTS AGAIN REPAIR MNK

2 SPOTS AGAIN REPAIR RRL


1 SPOTS AGAIN REPAIR NKK

4 SPOTS AGAIN REPAIR MNK

1 SPOTS AGAIN REPAIR NKK

2 SPOTS AGAIN REPAIR+1 SPOT FLUSH MNK


WELD RE-UT NEEDED

2 SPOTS AGAIN REPAIR MNK

9 SPOTS AGAIN REPAIR MNK

7 SPOTS AGAIN REPAIR RRL

8 SPOTS AGAIN REPAIR nkk


8 SPOTS AGAIN REPAIR nkk

All spots ut ok nkk

3 SPOTS REPAIR & 4 SPOT PENDING RGA

All spots ut ok RRL

2 SPOTS AGAIN REPAIR RRL

All spots ut ok RRL

1 SPOTS AGAIN REPAIR RGA(N)

All spots ut ok RGA(N)

All spots ut ok RRL

5 SPOTS AGAIN REPAIR/ 2 spots flush RRL


weld

All spots ut ok MNK


All spots ut ok NKK

2 SPOTS AGAIN REPAIR RRL

1 SPOT VT HOLD MNK

2 SPOTS AGAIN REPAIR nkk

1SPOT NKK

4SPOT pmj

1SPOT pmj

2 spots pending RRL

2 spots pending RRL

Again 1SPOT RRL

2 SPOTS UT PENDING MNK

1 SPOT VT HOLD PMJ


All spots ut ok NKK

1 SPOTS AGAIN REPAIR MNK

3 SPOTS AGAIN REPAIR MNK

All spots ut ok RRL

1 SPOTS AGAIN REPAIR RGA

4 SPOTS AGAIN REPAIR MNK

1 SPOTS AGAIN REPAIR MNK

Cs2-5 ut completed/ 470mm-5 spots RGA

4 SPOTS AGAIN REPAIR RGA,KSA


All spots ut ok RGA,KSA

Totally 24 spots / 3970mm length MNK

1 SPOTS AGAIN REPAIR nkk

2 SPOTS PENDING 1 SPOTS AGAIN REPAIR MNK

2 SPOTS AGAIN REPAIR KSA&MNK

1 SPOTS AGAIN REPAIR RRL

15 spots need to re UT MNK

All spots ut ok MNK

4 SPOTS Repair/3180mm RRL

4 SPOTS AGAIN REPAIR RRL

3 SPOTS AGAIN REPAIR/ 6 spots pending KSA

1 SPOTS AGAIN REPAIR MNK


5 SPOTS AGAIN REPAIR/4 SPOTS- RRL
WELDING UNDER PROCESS

1 SPOTS AGAIN REPAIR KSA

14 SPOTS AGAIN REPAIR/ 3spots weld


under process RRL

7 SPOTS AGAIN REPAIR/1750mm RRL

2 SPOTS AGAIN REPAIR/4 spots ut RRL


pending

3 SPOTS AGAIN REPAIR/4 spots ut KSA


pending

3 SPOTS AGAIN REPAIR/1 SPOT VT HOLD RRL

13 SPOTS AGAIN REPAIR RRL

3 SPOTS AGAIN REPAIR BSK,DSK

3 SPOTS AGAIN REPAIR RRL@KSA

1 SPOTS AGAIN REPAIR pmj,bsk

2 SPOTS AGAIN REPAIR/ 2 SPOTS UT KSA,DSK


PENDING

2 SPOTS AGAIN REPAIR RRL


1 SPOTS AGAIN REPAIR RRL

ALL SPOT OK RRL

6 SPOTS AGAIN REPAIR RRL

ALL SPOT OK BSK

2 SPOTS AGAIN REPAIR/ 4 spots under RRL


welding

1 SPOT AGAIN REPAIR KSA,PMJ

ALL SPOT OK KSA

3 SPOTS AGAIN REPAIR/ 130mm pmj,dsk,mvh

4 SPOTS AGAIN REPAIR/ 370mm KSA

4 SPOTS AGAIN REPAIR/ 500mm RRL

ALL SPOT OK KSA

2 SPOTS AGAIN REPAIR/ 200mm KSA, DSK

All spots ut ok KSA


2 SPOT AGAIN REPAIR/ 1200mm RRL

All spots ut ok KSA


R2

(R2) Date Repair(R2)

22.12.16 1 spot

23.12.16 All spots ut ok

25.12.16 All spots ut ok

8 spots ut comp/total 11 spots


27.12.16 again ut repair

28.12.16 1 SPOT REPAIR/1500MM

29.12.16 AGAIN 4 SPOTS /450MM

30.12.16 All spots ut ok

29.12.16 All spots ut ok


29.12.16 1 SPOT REPAIR/100MM

02.01.17 All spots ut ok

08.01.17 1 spots repair& 1spots pending

12.01.17 2 SPOTS UT REPAIR

11.01.17 4 spots repair 2500MM/ FULL


DOOR VT HOLD

08.01.17 All spots ut ok

09.01.17 All spots ut ok

11.01.17 2 SPOTS PENDING

12.01.17 1 SPOTS VT HOLD

17.01.17 4 SPOTS / 500MM

18.01.17 3 SPOTS/300MM
19.01.17 03 SPOTS

20.01.17 All spots ut ok

20.01.17 7 SPOTS REPAIR

1 SPOT AGAIN REPAIR & I SPOT I/S


23.01.17 MERGE

24.01.17 6 SPOTS AGAIN REPAIR

28.01.17 Outside VT Hold (ReCheck needed)

1 SPOTS PENDING
23.01.17 NOT ATTENED

28.01.17 CLEARED 28.01.17

25.01.17 3 SPOTS AGAIN REPAIR

27.01.17 1 SPOTS AGAIN REPAIR


28.01.17 2 SPOTS AGAIN REPAIR

28.01.17 2 SPOTS AGAIN REPAIR

29.01.17 2 SPOTS AGAIN REPAIR

28.01.17 All spots ut ok

31.01.17 All spots ut ok

03.01.17 1 SPOTS AGAIN REPAIR

03.01.17 1 SPOTS AGAIN REPAIR

03.01.17 7REPAIR/2 SPOT PENDING


04.02.17 All spots ut ok

08.02.17 All spots ut ok

08.02.17 1 SPOT UT REPAIR

11.02.17 1 SPOT AGAIN REPAIR

11.02.17 1 SPOT AGAIN REPAIR

14.02.17 All spots ut ok


15.02.17 All spots ut ok

14.02.17 All spots ut ok

14.02.17 1SPOT AGAIN REPAIR

16.02.17 All spots ut ok

18.02.17 All spots ut ok

21.02.17 All spots ut ok

21.02.17 All spots ut ok


21.02.17 All spots ut ok

21.02.17 1 SPOT AGAIN REPAIR

22.02.17 1 SPOT AGAIN REPAIR

22.02.17 All spots ut ok

23.02.17 2SPOT AGAIN REPAIR


7 SPOTS UT OK 1 SPOTS FLUSH
24.02.17 WELD

26.02.17 All spots ut ok

01.03.17 1 SPOT AGAIN REPAIR

02.03.17 3 REPAIR/ 4 UT pending

10.13.17 All spots ut ok

09.03.17 All spots ut ok


06.03.17 2 REPAIR /350MM

07.03.17 All spots ut ok

07.03.17 1 SPOT BALANCE

09.03.17 2 SPOTS REPAIR

09.03.17 1 SPOTS REPAIR

13.02.17 1 spot /& VT HOLD

10.03.17 3 SPOTS AGAIN REPAIR

11.03.17 All spots ut ok

13.03.17 3 SPOTS REPAIR

15.03.17 2 SPOTS REPAIR


17.03.17 1 SPOTS REPAIR

17.03.17 6 SPOTS AGAIN REPAIR

18.03.17 5 SPOTS REPAIR/ 1 SPOTS VT HOLD

4 SPOTS REPAIR/1570mm & cs-2


24.03.17 RE-UT NEED

24.03.17 4 SPOTS AGAIN REPAIR

22.03.17 2 spots again repair in cs9

25.03.17 All spots ut ok

23.03.17 10 SPOTS REPAIR/1090mm

25.03.17 3 SPOTS AGAIN REPAIR/ 3 PENDING


28.03.17 All spots ut ok

27.03.17 All spots ut ok

31.03.17 All spots ut ok

31.03.17 1 SPOT PENDING

27.03.17 All spots ut ok

2 SPOTS again reapir & 1 FLUSH


01.04.17 WELD

01.04.17 All spots ut ok

30.03.17 All spots ut ok

03.04.17 All spots ut ok

07.04.17 All spots ut ok

11.04.17 1 SPOTS again reapir


11.04.17 1 SPOTS again reapir

13.04.17 All spots ut ok

18.04.17 1 SPOTS again reapir

18.04.17 2 SPOTS AGAGIN REPAIR

17.04.17 All spots ut ok

18.04.17 2 SPOTS PENDING

24.04.17 All spots ut ok

24.04.17 3 SPOT AGAIN REPAIR

6 SPOT REPAIR 1600mm/ 2 spots vt


26.04.17 hold

27.04.17 All spots ut ok

26.04.17 2 SPOT REPAIR

03.05.17 6 SPOT REPAIR


28.04.17 All spots ut ok

29.04.17 All spots ut ok

28.04.17 AGAIN 9 SPOTS REPAIR

05.05.17 All spots ut ok

28.04.17 All spots ut ok

02.05.17 All spots ut ok

03.05.17 All spots ut ok

04.05.17 CS 7(2 SPOTS UT REPAIR)

07.05.17 All spots ut ok

06.05.17 1 SPOT REPAIR/1 SPOT VT HOLD

08.05.17 All spots ut ok


09.05.17 1 spot agagin repair

11.05.17 2 spots repair/1VT HOLD

11.05.17 3 SPOTS AGAIN REPAIR

10.05.17 1 SPOTS AGAIN REPAIR

CS1 TO CS5 COMPLETED (130mm /


12.05.17 3 SPOTS) + 1 VT HOLD

18.05.17 2 SPOTS AGAIN REPAIR

13.05.17 All spots ut ok

12.05.17 2 SPOTS AGAIN REPAIR

CS1 TO CS5 COMPLETED (8 SPOT /


13.05.17 1290 mm)
18.05.17 All spots ut ok

20.05.17 All spots ut ok

22.05.17 All spots ut ok

20.05.17 All spots ut ok

24.05.17 All spots ut ok

24.05.17 All spots ut ok

24.05.17 2 SPOT REPAIR BALANCE


27.05.17 2 SPOT REPAIR BALANCE

29.05.17 All spots ut ok

22.05.17 All spots ut ok

27.05.17 All spots ut ok

30.05.17 1 spot again repair

28.05.17 All spots ut ok

11.06.17 2 SPOT UT REPAIR


09.06.17 6 SPOT AGAIN REPAIR

08.06.17 4 SPOT AGAIN REPAIR

07.06.17 1 SPOT AGAIN REPAIR

14.06.17 All spots ut ok

09.06.17 All spots ut ok

12.06.17 All spots ut ok

13.06.17 All spots ut ok

10.06.17 All spots ut ok


16.06.17 1 SPOTS AGAIN REPAIR

14.06.17 2 SPOTS AGAIN REPAIR

16.06.17 All spots ut ok

21.02.17 All spots ut ok

21.02.17 All spots ut ok

21.02.17 8 SPOTS ut ok/ one spot RE UT

20.06.17 2 SPOTS AGAIN REPAIR

23.06.17 All spots ut ok


23.06.17 All spots ut ok

23.06.17 3 SPOTS AGAIN REPAIR

27.06.17 All spots ut ok

24.06.17 All spots ut ok

2 SPOTS AGAIN REPAIR/ 1 spots


29.06.17 flush weld
30.06.17 All spots ut ok

30.06.17 All spots ut ok

03.07.17 1SPOT

05.07.17 1 SPOTS AGAIN REPAIR

06.07.17 1 SPOTS AGAIN REPAIR

06.07.17 All spots ut ok

10.07.17 All spots ut ok

10.07.17 1 SPOTS AGAIN REPAIR

13.07.17 1 SPOTS AGAIN REPAIR

08.07.17 All spots ut ok

08.07.17 All spots ut ok


08.07.17 All spots ut ok

11.01.17 All spots ut ok

13.07.17 All spots ut ok

13.07.17 1 SPOTS AGAIN REPAIR

13.07.17 All spots ut ok

15.07.17 9 SPOTS / 700mm REPAIR TOTALLY

13.07.17 All spots ut ok


29.07.17 5 SPOTS AGAIN REPAIR

03.08.17 All spots ut ok

11.08.17 All spots ut ok

08.11.17 1 SPOTS AGAIN REPAIR

08.11.17 All spots ut ok

24.10.17 2 SPOTS AGAIN REPAIR

11.12.17 All spots ut ok

28.11.17 All spots ut ok

04.12.17 2 SPOTS AGAIN REPAIR

21.11.17 All spots ut ok


07.12.17 2 SPOTS AGAIN REPAIR

07.12.17 All spots ut ok

15.12.17 14 SPOTS AGAIN REPAIR

3 SPOTS AGAIN REPAIR/ 2 spots


13.12.17 welding under process

6 SPOTS AGAIN REPAIR/2 spots vt


15.12.17 hold

3 SPOTS AGAIN REPAIR/3 spots o/s


03.03.18 flush

13.03.18 4 SPOTS AGAIN REPAIR

16.03.18 ALL SPOT OK

15.03.18 1 SPOTS AGAIN REPAIR

15.03.18 ALL SPOT OK

24.03.18 ALL SPOT OK

24.03.18 1 SPOT AGAIN REPAIR


24.03.18 ALL SPOT OK

28.03.18 2 SPOT AGAIN REPAIR

30.03.18 4 SPOT AGAIN REPAIR

31.02.2018 ALL SPOT OK

20.06.18 CS-1 REWORK AREA 250MM REPAIR

18.06.18 1 SPOT AGAIN REPAIR

19.06.18 1 SPOT AGAIN REPAIR

21.06.18 ALL SPOT OK

03.07.18 ALL SPOT OK


R3

R2 verification &sign Date

22.12.16 23.12.16

nkk(d) 24.12.16

NKK(D)

NKK(N) 29.12.16

RRL(D) 30.12.16

NKK(N)
NKK(N) 31.12.16

RRL(D)

RRL(D)

NKK(D) 12.01.17

RRL(N) 13.01.17

RRL(D)

NKK(D)

JNN(D) 12.01.17

RRL(N) 12.01.17

JNN(D) 20.01.17

RRL(N) 20.01.17
JNN(D) 20.01.17

NKK(N)

JNN(D) 23.01.17

RRL(D) 23.01.17

RRL(D) 28.01.17

NKK(D)

JNN(N) 24.01.17

NKK(D)

RRL(D) 27.01.17

NKK(D) 27.01.17
JNN(N) 29.01.17

29.01.17

NKK(D)

NKK(D)

RRL(N) 04.02.17

RRL(N) 04.02.17

JNN 09.02.17
JNN

RRL(D 09.02.17

NKK(N)

RRL(D) 11.02.17

NKK(N) 13.02.17

JNN
JNN

MNK

MNK 14.02.17

RRL(D

JNN

NKK(D)

NKK(D)
RRL(N)

RRL(N) 22.02.17

RRL(N) 23.02.17

JNN(D)

JNN 23.02.17
RRL(N) 25.02.17

MVE

JNN 01.03.17

JNN 03.03.17

RRL

NKK
RRL(D) 07.03.17

RRL(D)

NKK(D) 07.03.17

RRL(D) 09.03.17

RRL(D) 11.03.17

JNN 13.03.17

RRL(D) 11.03.17

RRL(D)

RRL(D) 13.03.17

RRL(N) 15.03.17
RRL(N) 18.03.17

JNN 18.03.17

NKK 19.03.17

JNN 24.03.17

NKK(N) 25.03.17

JNN 23.03.17

RRL(D)

PMJ 24.03.17

RRL(D) 28.03.17
PMJ

RRL(D)

NKK(D)

JNN 01.04.17

RRL(D)

RRL(D) 02.04.17

RRL(D)

RRL(D)

RRL(N)

NKK

NKK(N) 12.04.17
NKK(N) 12.04.17

RRL(D) 19.04.17

NKK 18.04.17

RRL(D)

PMJ

KSA(D)

KSA(D) 24.04.17

RRL(N) 27.04.17

RRL(N)

RRL(N)

PMJ(D) 05.05.17
NKK(D)

NKK(D)

RRL(N) 03.05.17

RRL(D)

NKK(D)

RRL(D)

PMJ(D)

NKK(N) 06.05.17

PMJ

KSA(D) 08.05.17

RRL(D)
NKK(D) 10.05.17

NKK 12.05.17

PMJ 12.05.17

MNK(D) 12.5.17

PMJ 13.05.17

RGA 19.05.17

PMJ

PMJ 13.05.17

PMJ 15.05.17
NKK

RRL

RRL

NKK

MNK

RRL

NKK 25.05.17
nkk 29.05.17

MVE

RRL

RRL

NKK 30.05.17

RRL

PMJ 12.06.17
12.06.17

NKK 09.06.17

NKK 08.06.17

RRL 08.06.17

MNK

RRL

MNK

RRL

PMJ
MNK 17.06.17

MNK 16.06.17

RRL

MNK 22.06.17

RRL 20.06.17

JNN
JNN

KSA(D) 24.06.17

NKK

RRL

RRL 30.06.17
MNK

RRL

NKK 04.07.17

nkk 06.07.17

nkk 07.07.17

NKK

RRL

RRL 13.07.17

mnk 13.07.17

RRL

RRL
NKK

MNK

MNK

mnk 13.07.17

RGA

NKK 15.07.17

RGA
rrl 01.08.17

nkk

mnk

mnk 09.11.17

mnk

rrl 24.10.17

rrl

bsk

KSA 05.12.17

mnk
rrl 08.12.17

rrl

rrl 22.02.18

rrl 26.02.2018

rrl 22.02.18

PMJ 08.03.18

RRL 14.03.2018

RRL

pmj,bsk 15.03.18

RRL

KSA

KSA 24.03.18
RRL

RRL,DSK 29.03.18

RRL 31.02.2018

RRL

KSA 21.06.18

KSA, PMJ 25.06.18

KSA 21.06.18

KSA

RRL
R3
RESULT

Repair(R3) R3 verification &sign

1 SPOT REPAIR ANOTHER 1 SPOT VT NKK(D) CLEARED


HOLD

FLUSH WELD UT OK RRL(N) CLEARED

5 SPOT JNN(D) CLEARED

All spots ut ok CLEARED

CLEARED

CLEARED
All spots ut ok CLEARED

All spots ut ok JNN(D)

13.01.17
1 SPOTS REPAIR JNN(D) CLEARED

O/S FULL DOOR VT HOLD RRL(N) 13.01.17


CLEARED

1 SPOTS PENDING RRL(N) CLEARED

All spots ut ok JNN(D)

1 SPOT REPAIR NKK(N) CLEARED

1 SPOT REPAIR NKK(N) 21.01.17 CLEARED


1 SPOT REPAIR NKK(N) 21.01.17 CLEARED

2 SPOT AGAIN REPAIR 23.01.17 CLEARED

1 SPOT AGAIN REPAIR JNN(D) CLEARED 24.01.17

All spots ut ok RRL(D)

All spots ut ok NKK(D)

All spots ut ok RRL(D)

All spots ut ok RRL(D)


All spots ut ok NKK(D)

All spots ut ok NKK(D)

All spots ut ok RRL(N)

All spots ut ok JNN

2 SPOT UT REPAIR/3000MM RRL(D) All spots ut ok


All spots ut ok RRL(D

1 SPOT AGAIN REPAIR MVE All spots ut ok

All spots ut ok
All spots ut ok jnn
All spots ut ok JNN(D)

All spots ut ok NKK(D)

All spots ut ok NKK(D)


All spots ut ok

All spots ut ok NKK(N)

All spots ut ok NKK(N)


All spots ut ok RRL(D)

All spots ut ok PMJ

1 SPOT AGAIN REPAIR PMJ CLEARED

All spots ut ok RRL(D)

All spots ut ok RRL(N)

1 SPOT REPAIR RRL(D) All spots ut ok

All spots ut ok RRL(N)

All spots ut ok RRL(N)


All spots ut ok RRL(N)

All spots ut ok RRL(N)

All spots ut ok PMJ

In CS2- 2 Repair & (After Flush Re- NKK(N)


UT) Pending

5 SPOTS AGAIN REPAIR NKK(N) 26.03.17

All spots ut ok RRL(D)

3 SPOTS AGAIN REPAIR NKK(N) 25.03.17

2 SPOTS AGAGIN REPAIR NKK(N) 28.03.17


All spots ut ok RRL(D)

2 SPOTS AGAGIN REPAIR RRL(D) 03.04.17

All spots ut ok RRL(D)


1 SPOTS again reapir RRL(D) 12.04.17

All spots ut ok RRL(D)

1 SPOTS again reapir PMJ 19.04.17

1 SPOT AGAIN REPAIR RRL(N) 26.04.17

4 SPOT AGAIN REPAIR RRL(N) 28.04.17

All spots ut ok RRL(D)


All spots ut ok PMJ(D)

All spots ut ok NKK(N)

All spots ut ok MNK


All spots ut ok PMJ(N)

All spots ut ok PMJ

2 SPOTS AGAGIN REPAIR& 1 spot bsk 13.05.17


flush welding

1 spots again repair NKK 13.05.17

2 spots again repair MNK 15.05.17

1 spots again repair NKK 20.05.17

All spots ut ok PMJ

All spots ut ok RRL(N)


All spots ut ok NKK
All spots ut ok NKK

All spots ut ok RRL

1 SPOT AGAIN REPAIR RRL 12.06.17


All spots ut ok

2 SPOT AGAIN REPAIR/ 1 spot pending RRL 10.06.17

1 SPOT AGAIN REPAIR RRL

All spots ut ok NKK


All spots ut ok NKK

All spots ut ok KSA

All spots ut ok MNK

1 spots again repair RGA 21.06.17


All spots ut ok pmj

All spots ut ok MNK


All spots ut ok MNK

All spots ut ok MNK

All spots ut ok RRL

All spots ut ok MNK

All spots ut ok NKK


1 SPOTS AGAIN REPAIR NKK 14.07.17

All spots ut ok MNK


2 spots again repair RRL 02.08.17

All spots ut ok RRL

All spots ut ok jnn

All spots ut ok KSA


All spots ut ok KSA

All spots ut ok mnk

1 SPOTS AGAIN REPAIR KSA,BSK 02.03.18

1 sPOT vt hold mnk 08.03.18

ALL SPOT OK pmj

ALL SPOT OK pmj

ALL SPOT OK RRL

ALL SPOT OK KSA


ALL SPOT OK BSK

1 SPOT AGAIN REPAIR KSA 31.02.2018

ALL SPOT OK KSA

ALL SPOT OK PMJ

ALL SPOT OK KSA


TOTAL Repair & Spot PLANER
(LS & CS)

1SPOT/700MM
11SPOTS/1100MM

30SPOTS/5990MM

4SPOTS/1300MM

18SPOTS/1500MM
21SPOTS/3080MM
RRL(D) 36 SPOT/11420MM
NKK(N)
6 SPOT/880MM

1 SPOT/50MM
5 SPOT/1750MM

2 SPOT/400MM

1 SPOT/100MM
3 SPOT/1050MM

8 SPOT/2230MM
NKK(N)

PMJ 8 SPOT/1950MM

2 SPOT/1500MM

2 SPOT/4500MM
3 SPOT/630MM

15 SPOT/3000MM

1 SPOT AGAIN REPAIR JNN

All spots ut ok PMJ

8 SPOT/730MM

All spots ut ok RRL(D)


14 SPOT/5690MM

2 SPOT/150MM

All spots ut ok

2 SPOT/200MM
All spots ut ok 3 SPOTS/700MM

All spots ut ok RRL(D)

14 SPOTS/1150MM

All spots ut ok RRL(N)

All spots ut ok JNN

8 SPOTS/1600MM
13 SPOTS/700MM

10 SPOTS/1260MM
All spots ut ok mnk

All spots ut ok BSK

All spots ut ok NKK

All spots ut ok NKK

6 SPOTS/455MM
4 SPOTS/700MM

3 SPOTS/250MM

2 SPOTS/700MM

13 SPOTS/5010MM

3 SPOTS/530MM
7 SPOTS/2530MM

All spots ut ok 12 SPOTS/1895MM


All spots ut ok 11 SPOTS/1895MM

12 SPOTS/1895MM

6 SPOTS/1090 mm

14 SPOTS/1160 mm
5 SPOTS/600 mm

All spots ut ok RRL(D)


All spots ut ok nkk
All spots ut ok nkk
All spots ut ok RRL(D)

All spots ut ok RRL(D)


ALL SPOT OK RRL(D)
VOLUMETRIC Remarks

1 SPOT/350MM
HEATING AREA UT CHECK
COMLETED

5 SPOTS/570MM

HEATING AREA UT CHECK


COMLETED on 13.01.17

DOOR & T JOINTS UT CHECKED


FROM CUSTOMER SIDE

1 SPOT/100MM

HEATING AREA UT CHECK


COMLETED

HEATING AREA UT CHECK


1 SPOT/200MM COMLETED
HEATING AREA UT CHECK
COMLETED

HEATING AREA UT CHECK


COMLETED

HEATING AREA UT CHECK


COMLETED

HEATING AREA UT CHECK


COMLETED
5 SPOT/450MM

EASY LASER CUT AND WELD


1 SPOT/80MM 3000MM REPAIR
after flush weld we found 7 spots
repair

heating area ut check


completed(16.02.17)
1 SPOT/300MM

2 SPOT/300MM
2 SPOT/140MM

4 SPOT/240MM

2 SPOT/250MM
2 SPOT/200MM

heating area ut check


2 SPOT/600MM completed(11.03.17)
CS-3 FULL CS FLUSH WELD UT
CHECK COMPLETED ON (07.03.17)

BF/TF HEATING AREA UT CHECK


COMPLETED,BF 30 MM LENGTH
ACCEPTED REPAIR FOUNDED

3 SPOT/590MM

5 SPOT/500MM

1 SPOT/200MM
HAUT COMPLETED ON 19.03.17

6 SPOT/1200MM

4 SPOT/880MM

HEATING AREA UT CHECKED 1


SPOT REPAIR FOUNDED.1 SPOT
RECORDED (25.03.17)

3 SPOT/410MM
4 SPOT/310MM HAUT COMPLETED ON 01.04.17

5 SPOT/550MM HAUT OK(30.03.17)

2 SPOT/200MM

HAUT OK
1 SPOT/150MM

HAUT COMPLETED ON 14.04.17

HAUT COMPLETED ON 19.04.17

HAUT COMPLETED ON 19.04.17

6 SPOT/1250MM

HAUT COMPLETED ON 26.04.17

HAUT COMPLETED ON 26.04.17

HAUT COMPLETED ON 05.05.17

1 SPOT/200MM
HAUT COMPLETED ON 29.04.17

8 SPOT/1840MM HAUT COMPLETED ON 05.05.17

HAUT COMPLETED ON 28.04.17

HAUT COMPLETED ON 07.05.17

HAUT COMPLETED ON 09.05.17


HAUT COMPLETED ON 11.05.17

HAUT COMPLETED ON 12.05.17

3 SPOTS/240MM
1 SPOTS/300MM

1 SPOTS/100MM

1 SPOTS/200MM
5 SPOTS/860MM

2 SPOTS/300MM

HAUT COMPLETED ON 07.06.17


HAUT COMPLETED ON 09.06.17

HAUT COMPLETED ON 14.06.17


HAUT COMPLETED ON 16.06.17

HAUT CHECKED ON 21.06.17

HAUT CHECKED ON 24.06.17


HAUT CHECKED ON 24.06.17

HAUT CHECKED ON 28.06.17

HAUT CHECKED ON 01.07.17


HAUT CHECKED ON 30.06.17

HAUT CHECKED ON 06.07.17

HAUT CHECKED ON 07.07.17

HAUT CHECKED ON 14.07.17

HAUT CHECKED ON 09.07.17


HAUT CHECKED ON 09.07.17

HAUT CHECKED ON 12.07.17

HAUT CHECKED ON 16.07.17

HAUT CHECKED ON 27.07.17


HAUT CHECKED ON 05.08.17
SL no Section no BAY R0 Date

1 S2-47 20.12.16

2 S2-48 23.12.16

3 S2-49 24.12.16

4 S2-51 27.12.16

5 S2-50 29.12.16

6 S2-52 30.12.16

7 S2-53 31.12.16

8 S2-54 02.01.17

9 S2-55 03.01.17

10 S2-56 06.01.17

11 S2-57 10.01.17
12 S2-58 11.01.17

13 S2-59 12.01.17

14 S2-60 17.01.17

15 S2-61 19.01.17

16 S2-62 21.01.17

17 S2-63 23.01.17

18 S2-64 24.01.17

19 S2-65 27.01.17

20 S2-141 30.01.17

21 S2-142 01.02.17

22 S2-143 02.02.17

23 S2-144 03.02.17

23 S2-145 06.02.17
24 S2-146 11.02.17

25 S2-147 14.02.17

26 S2-148 16.02.17

27 s2-149 18.02.17

28 s2-151 21.02.17

29 S2-152 23.02.17

30 S2-150 25.02.17

31 S2-154 27.02.17

32 S2-153 27.02.17

33 S2-155 28.02.17

34 S2-156 02.03.17
35 S2-157 03.03.17

36 S2-158 05.03.17

37 S2-159 08.03.17

38 S2-160 10.03.17

39 s2-161 13.03.17

40 s2--162 14.03.17

41 S2-163 15.03.17

42 S2-164 16.03.17

43 S2-165 19.03.17

44 S2-166 22.03.17
45 S2-167 23.03.17

46 S2-168 25.03.17

47 S2-169 27.03.17

48 S2-170 27.03.17

49 S2-171 30.03.17

50 S2-172 04.04.17

51 s2-173 05.04.17

52 s2-174 06.04.17

53 s2-66 08.04.17

54 s2-67 11.04.17
55 S2-68 12.04.17

56 S2-69 14.04.17

57 S2-70 15.04.17

58 S2-71 18.04.17

59 S2-72 19.04.17

60 S2-73 21.04.17

61 S2-74 22.04.17

62 S2-75 23.04.17

63 S2-76 25.04.17

64 S2-77 27.04.17

65 S2-78 27.04.17
66 S2-79 II 28.04.17

67 S2-80 II 30.04.17

68 S2-81 II 03.05.17

69 S2-82 II 05.05.17

70 S2-83 II 05.05.17

71 S2-84 II 08.05.17

72 S2-85 II 09.05.17

73 S2-86 II 10.05.17

74 S2-87 II 12.05.17

75 S2-88 II 12.05.17

76 S2-89 II 14.05.17
77 S2-90 II 16.05.17

78 S2-91 II 17.05.17

79 S2-92 II 18.05.17

80 S2-93 II 23.05.17

81 S2-94 II 26.05.17

82 S2-96 II 27.05.17

83 S2-95 III 28.05.17

84 S2-97 II 29.05.17

85 S2-98 II 31.05.17

86 S2-99 II 01.06.17 & 02.06.17

87 S2-100 II 03.06.17

88 S2-101 II 05.06.17&06.06.17
89 S2-102 II 07.06.17

90 S2-103 II 08.06.17

91 S2-104 II 13.06.17

92 S2-105 II 14.06.17

93 S2-106 II 16.06.17

94 S2-107 II 17.06.17

95 S2-108 II 19.06.17

96 S2-109 II 20.06.17

97 S2-110 II 22.06.17

98 S2-111 II 24.06.17

99 S2-112 II 25.06.17

100 S2-113 II 27.06.17

101 S2-114 II 28.06.17


102 S2-115 II 29.06.17

103 S2-116 II 01.07.17

104 S2-117 II 03.07.17

105 S2-118 II 13.07.17

106 S2-119 II 14.07.17

107 S2-120 II 20.06.17

108 S2-121 II 22.06.17

109 S2-122 II 24.06.17

110 S2-123 II 27.07.17

111 S2-124 II 11.08.18

112 108-S2-001 III 09.10.17

113 S2-125 II 08.11.17

114 S2-126 II 11.11.17


115 S2-127 III 17.11.17

116 S2-128 III 25.11.17

117 S2-128 III 07.12.17

118 S2-129 III 06.03.18

119 S2-130(CS-2,3) III 07.03.18

120 S2-130(CS1, CS4-CS10) III 09.03.18

121 T-104 S2-175 III 21.03.2018

122 T-104 S2-176 III 22.03.18

123 S2-132 III 28.03.18

124 S2-131 IV 29.03.18

125 S2-133 III 05.06.18

126 S2-134 III 07.06.18


127 S2-135 III 14.06.18

128 S2-136 III 20.06.18

129 S2-137 III 21.06.18

130 S2-138 3 27.06.18

131 S2-139 IV 29.06.18

132 S2-140 3 02.07.18

133

134

135

136

137

138

139
140

141

142

143

144

145

146

147

148

149

150

151

152
153

154

155

156

157

158

159

160

161

162

163

164

165
166

167

168

169

170

171

172

173

174

175

176

177

178
179

180

181

182

183

184

185

186

187

188

189

190

191
192

193

194

195

196

197

198

199

200

201

202

203

204
205

206

207

208

209

210

211

212

213

214

215

216

217
218

219

220

221

222

223

224

225

226

227

228

229

230
231

232

233

234

235

236

237

238

239

240

241

242

243
244

245

246

247

248

249

250

251

252

253

254

255

256
257

258

259

260

261

262

263

264

265

266

267

268

269
270

271

272

273

274

275

276

277

278

279

280

281

282
283

284

285

286

287

288

289

290

291

292

293

294

295
296

297

298

299

300

301

302

303

304

305

306

307

308
309

310

311

312

313

314

315

316

317

318

319

320

321
322

323

324

325

326

327

328

329

330

331

332

333

334
335

336

337

338

339

340

341

342

343

344

345

346

347
348

349

350

351

352

353

354

355

356

357

358

359

360
361

362

363

364

365

366

367

368

369

370

371

372

373
374

375

376

377

378

379

380

381

382

383

384

385

386
387

388

389

390

391

392

393

394

395

396

397

398

399
400

401

402

403

404

405

406

407

408

409

410

411

412
413

414

415

416

417

418

419

420

421

422

423

424

425
426

427

428

429

430

431

432

433

434

435

436

437

438
439

440

441

442

443

444

445

446

447

448

449

450

451
452

453

454

455

456

457

458

459

460

461

462

463

464
465

466

467

468

469

470

471

472

473

474

475

476

477
478

479

480

481

482

483

484

485

486

487

488

489

490
491

492

493

494

495

496

497

498

499

500

501

502

503
504

505

506

507

508

509

510

511

512

513

514

515

516
517

518

519

520

521

522

523

524

525

526

527

528

529
530

531

532

533

534

535

536

537

538

539

540

541

542
543

544

545

546

547

548

549

550

551

552

553

554

555
556

557

558

559

560

561

562

563

564

565

566

567

568
569

570

571

572

573

574

575

576

577

578

579

580

581
582

583

584

585

586

587

588

589

590

591

592

593

594
595

596

597

598

599

600

601

602

603

604

605

606

607
608

609

610

611

612

613

614

615

616

617

618

619

620
621

622

623

624

625

626

627

628

629

630

631

632

633
634

635

636

637

638

639

640

641

642

643

644

645

646
647

648

649

650

651

652

653

654

655

656

657

658

659
660

661
R0

Noo of repair spots Length of the Repair(R0)

11 spots/740mm

8SPOTS/ 1460MM

18 SPOTS/3400MM

13 SPOTS/7880 & 1 SPOTS FLUSH WELD

21 SPOTS 9960MM

5 SPOTS REPAIR/430MM

3SPOTS/450MM

3SPOTS/290MM

8SPOTS/790MM

5 SPOTS REPAIR/620MM

4 SPOTS -360MM
10 SPOTS/870MM

11 SPOTS/2480MM

17 SPOTS/1840MM

17 SPOTS/4910MM

21 SPOTS/1950MM

14 SPOTS/1600MM

5 SPOTS/550MM

TOTAL 13 SPOTS /3110MM

3 SPOTS UT REPAIR/430mm

7 SPOTS UT REPAIR/780mm

2 SPOTS UT REPAIR/110mm

8 SPOTS UT REPAIR/3880mm

7 SPOTS UT REPAIR/760mm
6 SPOTS UT REPAIR/830mm

7 SPOTS UT REPAIR/480mm

2 SPOTS UT REPAIR/200mm

4 spots/290mm

6spots/650mm and 2 VT HOLD

2050mm/7 SPOTS

1 SPOTS/50MM

5 spots/800mm

9 spots/1760mm

15 SPOTS/1670MM

8 SPOTS/430MM
13 SPOTS/1720MM

5 spots/730mm

14 SPOTS/1460MM

9 SPOTS/950MM

2 cs pending&2 spot repair/160mm

18 spots/1170mm

9 SPOTS/750MM

13 spots/1680mm

1 SPOTS/ 50MM

15 SPOTS/2480MM
10 SPOTS/1090MM

6 SPOTS/470MM

8 SPOTS/620mm

16 spots/1350

9 spots/1375 mm ; PENDING : CS2

5 SPOTS/330MM

3 spots/220mm

17 spots/5230mm

2 spots ut repair/140MM

3 spots ut repair/140MM
2 SPOTS UT REPAIR/130mm

8 SPOTS UT REPAIR/1080mm

2 SPOTS UT REPAIR/250mm

8 SPOTS/760MM

9 SPOTS/830MM

7 SPOTS/350MM

7 SPOTS/510MM

4 SPOTS -380MM

5 SPOTS -520MM

6 SPOTS -960MM

13 SPOTS REPAIR /1220MM


6 SPOTS REPAIR /830MM

2 SPOTS REPAIR /50MM

8 spots 585mm

NO REPAIR

8 spots + 1 VT HOLD 2015mm

1 spots 80mm

3 SPOTS 200mm

9 SPOTS 1100mm

8 SPOTS 880mm

1 SPOT 20mm

11 spots 780mm
9 SPOTS 550MM

5 SPOTS 690MM

1 SPOT CS7 - CS10 UT COMPLETED (100mm)

7 SPOTS 560MM

12 SPOTS 1260MM

11 SPOTS 1120MM

23 SPOTS 6700 MM

11 SPOTS 1170 MM

3 SPOTS 270 MM

9 SPOTS 850MM

1 SPOTS 30 MM/1 SPOT VT HOLD

19 SPOTS=1 VT HOLD 2590MM


13 SPOTS 1450 MM

12 SPOTS 1680 MM

6 SPOTS 480 MM

3 SPOTS 130MM

NO REPAIR

7 SPOTS 830 MM

16 SPOTS 1700 MM

15 SPOTS 2780MM&CS-6 FULL REPAIR

5 SPOTS 660mm

8 SPOTS 700mm& 2 spots vt hold

4 SPOTS 660mm

5 SPOTS 610MM

5 SPOTS 1430MM
9 SPOTS 780mm

NO REPAIR

2 SPOTS 100mm

9 SPOTS 1050mm

1 SPOT CS5 – CS6 UT COMPLETED (100mm)

13 SPOTS 1100mm

16 SPOTS 1610 MM

5 SPOTS 1080mm

7 SPOTS 830mm

4 SPOTS 280mm

7 SPOTS 450 mm

52 SPOTS 20485 mm/ 1 SPOT VT HOLD

35 SPOTS 6990 mm
6 SPOTS+10TH CS FULL 11730 mm
REPAIR

2450 mm/CS-1 TO CS-5 UT CHECK


15 SPOTS COMPLETED

300 mm/CS-6 TO CS-10 UT CHECK


3 SPOTS COMPLETED

16 SPOTS/1330 1330mm

6 SPOTS 1150mm

9 SPOTS 390mm

10 SPOTS 1150mm

10 SPOTS 1380mm

30 SPOTS 12180 mm

10 SPOTS 2250 mm

5 SPOTS 790 mm

14 SPOTS 6610 mm
4 SPOTS 320 mm

13 SPOTS 1270MM

14 SPOTS 1980MM

4 SPOTS 500mm

6 SPOTS 380mm

12 SPOTS 560MM
R1

R0 verification &sign (R1)Date

NKK 21.12.16

RRL(N) &JNN 24.12.16

RRL(N) 26.12.16

RRL(D) 28.12.16

RRL(D) & JNN(D) 30.12.16

NKK(N) 30.12.16

RRL(D)&JNN(D) 02.01.17

RRL(D) 02.01.17

JNN(D) 04.01.17

RRL(D)&JNN(D) 06.01.17

RRL(N),JNN(D) 10.01.17
RRL(N)&JNN(D) 11.01.17

NKK(D) 13.01.17

NKK(N) 18.01.17

JNN(D) 19.01.17

NKK(N) 23.01.17

RRL(D) 24.01.17

JNN(D) 25.01.17

NKK(D) 28.01.17

NKK(D) 30.01.17

JNN(D) 01.02.17

NKK(D) 02.02.17

NKK(D) 04.02.17

JNN(D) 06.02.17
NKK(N) 13.02.17

NKK(D) 14.02.17

JNN(N) 17.02.17

JNN 20.02.17

RRL(N) JNN (D) 22.02.17

RRL(N) 24.02.17

NKK(D) 25.02.18

JNN 28.02.17

NKK(N) 28.02.17

JNN 28.02.17

RRL(D) 02.03.17
NKK(N) 04.03.17

RRL(D) 06.03.17

JNN 08.03.17

MNK(N) 11.03.17

JNN 13.03.17

JNN 14.03.17

JNN 15.03.17

NKK(D) 17.03.17

NKK(D) 20.03.17

JNN 23.03.17
NKK(N) RRL(D) 24.03.17

RRL(D) 25.03.17

NKK(D) 28.03.17

NKK 28.03.17

RRL(D) 31.03.17

JNN 04.04.17

JNN 06.04.17

RRL(N) 07.04.17

RRL(N) 09.04.17

JNN 12.04.17
NKK(N) 13.04.17

RRL(D) 14.04.17

NKK(N) 17.04.17

NKK 18.04.17

RRL(D) 19.04.17

RRL(D) 21.04.17

RRL(D)

JNN(D) 24.04.17

RRL(N) 27.04.17

JNN(D) 27.04.17

RRL(N)
MNK(N) 29.04.17

SVK 02.05.17

PMJ(D)&NKK(N) 04.05.17

RRL(D)

jnn 06.05.17

RRL(D) 08.05.17

PMJ 10.05.17

MNK(D) 11.05.17

MNK,BSK,KSA 12.05.17

JNN 13.05.17

NKK 15.05.17
NKK 17.05.17

NKK 18.05.17

SVK 18.05.17

NKK 24.05.17

MNK(D) 26.05.17

RRL 28.05.17

JNN 30.05.17

MNK & NKK 30.05.17

MNK 01.06.17

MNK nkk 02.06.17

RRL 03.06.17

RGA&JNN 06.06.17
MNK 08.06.17

PMJ 09.06.17

RRL 13.06.17

NKK 15.06.17

NKK

NKK 18.06.17

RGA 20.06.17

NKK 21.06.17

rrl 22.06.17

mnk 24.06.17

rrl 26.06.17

JNN 27.06.17

JNN 28.06.17
rrl 30.06.17

nkk

NKK 04.07.17

NKK 14.07.17

RGA 15.04.17

RRL 21.07.17

RRL

RRL 25.07.17

RRL 28.07.17

RRL 11.08.18

RRL 09.10.17

RRL 20.11.17

RRL 21.11.17
RRL 22.11.17

KSA/MNK 29.11.17

mnk 08.12.17

rrl,ksa,bsk,pmj 07.03.18

RRL 09.03.18

ksa,bsk 10.03.18

KSA,RRL 22.03.18

BSK,PMJ,KSA,DSK 23.03.18

RRL,DSK,PMJ 30.03.18

Rrl,ksa 30.03.18

RRL,DSK,PMJ 06.06.18

RRL,DSK,PMJ 07.06.18
RRL,KSA 14.06.18

RRL,PMJ 21.06.18

KSA,PMJ,MVH 22.06.18

KSA,PMJ,MVH 27.06.18

RRL,KSA 30.06.18

KSA,DSK 03.06.18
R1

Repair(R1) R1 verification &sign

3spots

4SPOTS/ NKK(D)

4 spots and 1spot pending JNN(D)

2 SPOTS REPAIR JNN(D)

19spots JNN(D)

All spots ut ok RRL(D)

All spots ut ok RRL(D)

All spots ut ok JNN(D)

All spots ut ok JNN(D)

1 SPOT REPAIR NKK(D)

All spots ut ok NKK(D)


5 SPOTS Again Repair NKK(D)

4 SPOTS Again Repair RRL(N)

2 SPOTS AGAIN REPAIR& 1 SPOT VT NKK(N)


HOLD

4 SPOTS Again Repair NKK(N)

9 SPOTS Again Repair NKK(D)

4 SPOTS Again Repair RRL(D)

3 SPOTS AGAIN REPAIR NKK(D)

4 SPOTS AGAIN REPAIR NKK(D)

All spots ut ok RRL(D)

All spots ut ok RRL(N)

1 SPOT REPAIR RRL(N)

2 SPOTS AGAIN REPAIR RRL(N)

1 SPOTS AGAIN REPAIR NKK(N)


2 SPOTS AGAIN REPAIR NKK(D)

All spots ut ok MNK

All spots ut ok NKK(N)

1 spot again repair JNN(D)

All spots ut ok NKK(D)

All spots ut ok NKK(D)

All spots ut ok RRL(N)

1 spot again repair RRL(D)

3 SPOTS AGAIN REPAIR JNN(D)

2 SPOTS AGAIN REPAIR NKK(N)

All spots ut ok NKK(N)


2 SPOTS AGAIN REPAIR NKK(N)

2 SPOTS AGAIN REPAIR NKK(D)

1 SPOTS AGAIN REPAIR PMJ(N)

All spots ut ok RRL(D)

3 spot repair/160mm JNN RRL(N)

1 SPOTS AGAIN REPAIR RRL(N)

1 SPOTS AGAIN REPAIR NKK(D)

3 spot again repair JNN

All spots ut ok

All spots ut ok NKK(N)


All spots ut ok PMJ(D)

All spots ut ok JNN

2 SPOTS again repair JNN

2 SPOTS again repair PMJ

FRESH CS2 COMPLETED/2 SPOTS


REPAIR ; 2 SPOTS AGAIN REPAIR & NKK(D)
PENDING : 3 SPOTS

2 SPOTS again repair RRL(N)

All spots ut ok NKK(D)

15 SPOTS UT OK 2 SPOTS PENDING RRL(N)

All spots ut ok RGA(D)

All spots ut ok RRL(D)


All spots ut ok RRL(D)

3 SPOTS again repair JNN

All spots ut ok NKK(D)

7 SPOTS PMJ

6 SPOTS PENDING PMJ

All spots ut ok PMJ

All spots ut ok KSA(D)

All spots ut ok RRL(N)

1 SPOTS again repair RGA(D)


1 SPOTS again repair NKK

All spots ut ok RRL(D)

1 SPOTS again repair RRL(D)

1 SPOTS again repair+3 SPOT UT NKK(N)


PENDING

1 SPOTS again repair PMJ

All spots ut ok nkk

All spots ut ok BSK,MNK

All spots ut ok PMJ

All spots ut ok JNN

5 SPOTS again repair NKK


1 SPOTS again repair BSK

All spots ut ok NKK

TOTALLY 14 SPOTS (2180mm) RRL

All spots ut ok RRL

All spots ut ok RRL

2 SPOTS again repair JNN

6 SPOTS again repair RRL & KSA

3 SPOTS again repair RRL & KSA

2 SPOTS again repair NKK

6 SPOTS again repair KSA(D)

All spots ut ok MNK(N)

1 SPOT again repair MVE


All spots ut ok NKK

All spots ut ok PMJ

1 SPOT AGAIN REPAIR / 30 mm JNN

All spots ut ok NKK

1 SPOT AGAIN REPAIR/ 1 SPOT UT KSA(D)


PENDING

3 SPOT again repair + 1 BT MNK


PENDING

2SPOTS AGAIN REPAIR + 2SPOTS UT RRL


PENDING + CS 6 PENDING

All spots ut ok + ( CS7 DECISION RGA(D)


PENDING )

2 SPOT AGAIN REPAIR RRL

2 SPOT AGAIN REPAIR NKK

All spots ut ok MNK

4 spots ut ok/1 spots vt hold MNK


All spots ut ok MNK

All spots ut ok RRL

1 SPOT AGAIN REPAIR/ 1 SPOT UT MNK


PENDING

TOTALLY 6 SPOTS / 510mm LENGTH NKK


REPAIR

4 SPOT AGAIN REPAIR NKK

2 SPOT AGAIN REPAIR svk

2 SPOT AGAIN REPAIR RRL

1 SPOT AGAIN REPAIR jnn

All spots ut ok KSA(D)

cs1-cs5 ut check (16spots)3vt MNK


hold+4 spot repair/36 spot pending

4 SPOTS AGAIN REPAIR/ 1 SPOT VT MNK


HOLD
3 SPOTS again repair RRL

2 SPOT AGAIN REPAIR RRL

All spots ut ok KSA(D)

2 SPOT AGAIN REPAIR RRL

5 SPOTS UT OK/ 1 SPOT PENDING KSA

All spots ut ok jnn

All spots ut ok RRL

All spots ut ok JNN

4 SPOT AGAIN REPAIR RRL

4 SPOT AGAIN REPAIR DSK

All spots ut ok PMJ

11 SPOT ONLY UT CHECKED AND


AGAIN 1 SPOT REPAIR,3SPOTS DSK
PENDING
3 SPOT AGAIN REPAIR MVH

ALL SPOT OK KSA

ALL SPOT OK MVH,PMJ

1 SPOT AGAIN REPAIR / 250 mm KSA

All spots ut ok KSA

4 SPOT AGAIN REPAIR / 500 mm RRL


R2

(R2) Date Repair(R2)

21.12.16 CLEARED

24.12.16 All spots ut ok

26.12.16 1 spot again repair

29.12.16 All spots ut ok

31.12.16 13 spots again repair

07.01.17 All spots ut ok


13.01.17 1 spot again repair

19.01.17 All spots ut ok

20.01.17 All spots ut ok

23.01.17 1 SPOT Again Repair

24.01.17 3 SPOT REPAIR

25.01.17 All spots ut ok

28.01.17 All spots ut ok

03.01.17 All spots ut ok

08.02.17 1 SPOTS AGAIN REPAIR


13.02.17 All spots ut ok

20.02.17 All spots ut ok

28.02.17 All spots ut ok

28.02.17 All spots ut ok

01.03.17 All spots ut ok


05.03.17 All spots ut ok

06.03.17 All spots ut ok

09.03.17 All spots ut ok

13.03.17 All spots ut ok

14.03.17 All spots ut ok

15.03.17 All spots ut ok

17.03.17 All spots ut ok


28.03.17 1 SPOTS again repair

29.03.17 2 SPOTS again repair

31.03.17 1 SPOTS again repair

05.04.17 All spots ut ok

08.04.17 All spots ut ok


15.04.17 1 SPOTS again repair

19.04.17 All spots ut ok

27.04.17 1 SPOTS again repair


29.04.17 All spots ut ok

04.05.17 All spots ut ok

07.05.17 All spots ut ok

09.05.17 All spots ut ok

16.05.17 4 SPOTS again repair


17.05.17 All spots ut ok

19.05.17 All spots ut ok

29.05.17 All spots ut ok

31.05.17 All spots ut ok

30.05.17 1 SPOTS again repair

01.06.17 2 SPOTS again repair

03.06.17 All spots ut ok

07.06.17 All spots ut ok


13.06.17 All spots ut ok

20.06.17 1 SPOT AGAIN REPAIR

CS-6 ( UT OK) AND 1 SPOT AGAIN


22.06.17 REPAIR+1 SPOT PENDING

25.06.17 All spots ut ok

26.06.17 1 SPOTS again repair

29.06.17 All spots ut ok


15.07.17 3 SPOT AGAIN REPAIR

15.07.17 1 SPOT AGAIN REPAIR

22.07.17 All spots ut ok

27.07.17 1 SPOT AGAIN REPAIR

28.07.17 All spots ut ok

14.08.17 All spots ut ok

8 SPOTS AGAIN REPAIR/ 3 SPOT VT


21.11.17 HOLD

24.11.17 1 SPOT AGAIN REPAIR


23.11.17 All spots ut ok

01.12.17 1 SPOT AGAIN REPAIR

07.03.18 All spots ut ok

10.03.18 All spots ut ok

31.02.2018 All spots ut ok

02.04.18 All spots ut ok

08.06.18 All spots ut ok


15.06.18 All spots ut ok

28.06.18 All spots ut ok


R3

R2 verification &sign Date

RRL(N)

NKK(N)

RRL(D) 03.01.17

RRL(D)
MVE(D) 14.01.17

JNN(D)

MVE(D)

RRL(D) 24.01.17

JNN(D) 25.01.17

JNN(D)

RRL(D)

RRL(D) 08.02.17
JNN(D)

RRL(N)

JNN(D)

NKK(N)

RRL(D)
RRL(D)

RRL(D)

NKK(D)

RRL(N)

RRL(N)

RRL(N)

NKK(D)
RRL(D) 28.03.17

NKK(D) 29.03.17

JNN(D) 01.04.17

JNN(D)

JNN(D)
RRL(D)

RRL(D)

RRL(N) All spots ut ok


NKK(D)

PMJ

PMJ

jnn

JNN 17.05.17
NKK

RRL

MNK

nkk

RGA 31.05.17

RGA 02.06.17

NKK

NKK
MNK

RGA 21.06.17

RGA 23.06.17

RRL

PMJ 26.06.17

RGA
NKK 16.07.17

MNK 15.07.17

JNN

RRL 27.07.17

MNK

MNK

MNK 24.11.17

KSA,RRL 25.11.17
RRL

mnk 08.12.17

JNN

KSA

PMJ

PMJ
KSA

KSA
R3

Repair(R3) R3 verification &sign

All spots ut ok

All spots ut ok JNN(D)


All spots ut ok RRL(N)

All spots ut ok NKK

All spots ut ok RRL(D)

1 SPOTS AGAIN REPAIR JNN(D)


All spots ut ok

2 SPOTS again repair RRL(D)

All spots ut ok RRL(D)


All spots ut ok BSK
All spots ut ok nkk

All spots ut ok RRL


All spots ut ok MNK

All spots ut ok MNK

All spots ut ok RRL


All spots ut ok MNK

All spots ut ok RRL

All spots ut ok MVE

All spots ut ok KSA,RRL

All spots ut ok RRL


All spots ut ok KSA(D)
R4

Date Repair(R4)
29.03.17 2 SPOTS again repair
TOTAL Repair & Spot
RESULT (LS & CS)
R4 verification &sign
08.02.17 All spots ut ok
PMJ 30.03.17 All spots ut ok
PLANAR VOLUMETRIC

16 SPOTS/ 9430MM 5 SPOTS/430M


10 SPOTS/2440MM 1 SPOT/40MM

13 SPOTS/1580MM 4 SPOTS/260MM

14 SPOTS/46100MM 3 SPOTS/300MM

14 SPOTS/1600MM

2 SPOTS/110mm

7 SPOTS/1380mm 1 spot/2500MM

NKK(N)
5 SPOTS/1700mm 2 SPOTS/350mm
7 SPOTS/750mm 2 SPOTS/200mm
6 SPOTS/ 350 mm 2 SPOTS/ 270mm

NKK(D)

6 SPOTS/ 1185 mm 3 SPOTS/ 190 mm

10 SPOTS/ 3850 mm 7 SPOTS/ 1380 mm


6 SPOTS/ 480 mm 2 SPOTS/ 600 mm

4 SPOTS/ 370 mm 1 SPOTS/ 150 mm

4 SPOTS/780 mm 9 SPOTS/ 470 mm


5 SPOTS/800 mm 1 SPOTS/ 30 mm

1 SPOT/80 mm

5 SPOTS/470 mm 4 SPOTS/ 630 mm


8 SPOTS/560 mm 4 SPOTS/ 700 mm

3 SPOTS/270 mm
4 SPOTS/480 mm
13 SPOTS/ 1100MM
Remarks

Heating Area ut
completed on 04.01.17

Heating Area ut
completed on 02.01.17

Heating Area ut
completed on 03.01.17

Heating Area ut
completed on 05.01.17

Heating Area ut
completed on 10.01.17
Heating Area ut
completed on 13.01.17

Heating Area ut
completed on 20.01.17

Heating Area ut
completed on 26.01.17

Heating Area ut
completed on 26.01.17
HEATING AREA UT
CHECK COMPLETED

HEATING AREA UT
CHECK COMPLETED

Heating Area ut
completed on 26.01.17

Heating Area ut
completed on 02.03.17

Heating Area ut
completed on 04.03.17
Heating Area ut
completed on 05.03.17

Heating Area ut
completed on 06.03.17

Heating Area ut
completed on 15.03.17

Heating Area ut
completed on 17.03.17
Heating Area ut
completed on 25.03.17

Heating Area ut
completed on 28.03.17

Heating Area ut
completed on 30.03.17

Heating Area ut
completed on 01.04.17

Heating Area ut
completed on 06.04.17

Heating Area ut
completed on 12.04.17
Heating Area ut
completed on 17.04.17

Heating Area ut
completed on 19.04.17

Heating Area ut
completed on 20.04.17

HAUT COMPLETED ON
29.04.17
HAUT COMPLETED ON
04.05.17

HAUT COMPLETED ON
07.05.17

HAUT COMPLETED ON
09.05.17

HAUT COMPLETED ON
10.05.17

HAUT COMPLETED ON
11.05.17
HAUT COMPLETED ON
27.05.17

HAUT COMPLETED ON
31.05.17

HAUT COMPLETED ON
31.05.17

HAUT COMPLETED ON
02.06.17
Heating Area ut
completed on 14.06.17

Heating Area ut
completed on 15.06.17

Heating Area ut
completed on 23.06.17

Heating Area ut
completed on 26.06.17

HAUT COMPLETED ON
29.06.17
HAUT COMPLETED ON
01.07.17

HAUT COMPLETED ON
16.07.17

HAUT COMPLETED ON
22.07.17

HAUT COMPLETED ON
02.08.17

HAUT COMPLETED ON
05.08.17
HAUT COMPLETED ON
02.03.18
SL no Section no BAY R0 Date

1 S3-44 20.12.16

2 S3-45 21.12.16

3 S3-46 21.12.16

4 S3-47 23.12.16

5 S3-48 24.12.16

6 S3-49 25.12.16

27.12.16
7 S3-50 28.12.16

8 S3-52 29.12.16

9 S3-51 29.12.16

10 S3-53 03.01.17
11 S3-54 02.01.17

12 S3-55 04.01.17

13 S3-57 05.01.17

14 S3-56 06.01.17

15 S3-58 07.01.17

16 S3-59 10.01.17

17 S3-60 11.01.17

18 S3-61 12.01.17

19 S3-62 14.01.17

20 S3-63 17.01.17

21 S3-64 21.01.17

22 S3-65 26.01.17

23 S3-141 01.02.17
24 S3-142 01.02.17

25 S3-143 04.02.17

26 S3-144 09.02.17

27 S3-145 10.02.17

28 S3-146 15.02.17

29 S3-147 19.02.17

30 S3-148 21.02.17

31 S3-149 22.02.17

32 S3-150 23.02.17

33 S3-151 24.02.17

34 S3-152 24.02.17

35 S3-153 25.02.17

36 S3-154 25.02.17

37 S3-155 01.03.17

38 S3-156 02.03.17
39 S3-157 04.03.17

40 S3-158 06.03.17

41 S3-159 11.03.17

42 S3-160 13.03.17

43 S3-161 14.03.17

44 S3-162 16.03.17

45 S3-163 17.03.17

46 S3-164 21.03.17

47 S3-165 23.03.17

48 S3-166 24.03.17

49 S3-167 26.03.17

50 S3-168 28.03.17

51 S3-169 28.03.17

52 S3-170 30.03.17

53 S3-171 30.03.17

54 S3-172 01.04.17
55 S3-173 05.04.17

56 S3-174 07.04.17

57 S3-66 13.04.17

58 S3-67 14.04.17

59 S3-68 15.04.17

60 S3-69 18.04.17

61 S3-70 19.04.17

62 S3-71 20.04.17

63 S3-72 22.04.17

64 S3-73 24.04.17

65 S3-74 25.04.17

66 S3-75 26.04.17

67 S3-76 27.04.17

68 S3-77 28.04.17
69 S3-78 29.04.17

70 S3-79 III 02.05.17

71 S3-80 III 03.05.17

72 S3-81 III 04.05.17

73 S3-82 III 05.05.17

74 S3-83 III 06.05.17

75 S3-84 III 09.05.17

76 S3-85 III 13.05.17

77 S3-86 III 18.05.17

78 S3-87 III 19.05.17

79 S3-88 III 20.05.17

80 S3-89 II 20.05.17
81 S3-90 III 23.05.17

82 S3-91 24.05.17

83 S3-92 i 27.05.17

84 S3-93 III 29.05.17

85 S3-94 III 31.05.17

86 S3-95 III 01.06.17

87 S3-96 III 03.06.17

88 S3-97 III 06.06.17

89 S3-98 III 07.06.17

90 S3-99 I 07.06.17

91 S3-100 III 08.06.17

92 S3-101 III 09.06.17


93 S3-102 III 10.06.17

94 S3-103 II 11.06.17

95 S3-104 II 13.06.18

96 S3-105 III 14.06.17

97 S3-106 III 17.06.17

98 S3-107 III 20.06.17

99 S3-108 III 20.06.17

100 S3-109 III 21.06.17

101 S3-110 III 23.06.17

102 S3-111 III 23.06.17

103 S3-112 III 26.06.17

104 S3-113 III 26.06.17


105 S3-114 III 27.06.17

106 S3-115 III 28.06.17

107 S3-116 III 30.06.17

108 S3-117 III 01.07.17

109 S3-118 III 03.07.17

110 S3-119 I 10.07.17

111 S3-120 III 20.07.17

21.07.2017 &
112 S3-121 III 22.07.17

113 S3-122 III 25.07.17

114 S3-608786 III 26.7.2017

115 S3-123 III 27.7.17

116 S3-124 III 12.08.17

117 S3-001 (T108) III 12.10.17

118 S3-125 iii 16.10.17

119 S3-126 III 28.10.17

120
121 S3-127 III 23.02.18

122 S3-128 III 24.02.18

123 S3-129 III 10.03.18

124 S3-130 III 19.03.18

125 S3-175,T-104 III 21.03.18

126 S3-176,T-104 III 23.03.18

127 S3-131 III 27.03.18

128 S3-132 III 28.03.18

129 S3-133 III 05.04.18

130 S3-134 I 06.06.18

131 S3-135 III 07.06.18

132 S3-136 III 09.06.18

133 S3-137 III 09.06.18

134 S3-138 III 19.06.18

135 S3-139 III 19.06.18


136 S3-140 III 23.06.18

137 S3-141 I 26.06.18

138
R0

No of repair spots Length of the Repair(R0)

8 spots/3300mm

No repair

6 SPOTS/540mm

2 Spots/180mm

No repair

2SPOTS/BT&3SPOTS/110MM

3 spots /2860mm

5 SPOTS/1010MM

2SPOTS REPAIR/350MM

10SPOTS REPAIR/1730MM
4SPOTS/500MM&5SPOTS VT HOLD

4 SPOTS /900MM

6 SPOTS /1010MM

NO REPAIR

3 SPOTS REPAIR/190MM- 2 SPOTS VT


HOLD

4 SPOTS /580MM

6 SPOTS /500MM

1 SPOT/50MM

3 SPOTS 300MM

NO REPAIR

2 SPOTS 100MM

NO REPAIR

6 SPOT/340MM
16SPOT/9010MM/2VTHOLD/1BT

12 SPOTS/970MM

3 SPOTS REPAIR/1100mm

14 SPOTS/1950MM /1 SPOTS VT HOLD

5 SPOTS REPAIR/500mm

2 Spots VT HOLD - 0 Repair / Pending


CS- 2,9,10

5 SPOTS REPAIR/660mm

3 SPOTS REPAIR/140mm &


INDICATIONS FOUND IN PLATE (CS3)

1 SPOT REPAIR/300MM

1 SPOT/50MM

13 SPOTS/1060MM

1 SPOTS/50MM

3 SPOTS/350MM

3 SPOTS/240MM

3 SPOTS/450MM
4 SPOTS/400MM- 1 SPOT VT HOLD

4 SPOTS/440MM

4 SPOTS/630MM

1 SPOTS/100MM

6 SPOTS/280MM + 1 VT HOLD

CS-1 TO CS2 &CS-10 TO CS-11 UT


COMPLETED, 2 SPOTS REPAIR

6 SPOTS/660MM- 1 SPOT VT HOLD

3 SPOTS/370mm

6 SPOTS/820mm

5 SPOTS/80m740

NO REPAIR

7 SPOTS/1290MM

4 SPOTS/250MM

4 SPOTS/230mm

NO REPAIR

2 SPOTS/240mm
1 SPOT/50MM

1 SPOT/50MM

6 SPOTS/2480MM

4 SPOTS/240MM

6 SPOTS/760MM

2 SPOTS/200MM

4 SPOTS/140MM

4 SPOTS/180MM

10 SPOTS/980MM

3 SPOTS/430MM

1 SPOT/30MM

1 SPOT/40MM

4 SPOTS/180MM

6 SPOTS/560MM
4 SPOTS/320 MM

5 spots 730 MM

3 spots 150 MM

5 spots 360 MM

3 spots 1040 MM

14 spots 1130 MM

10 SPOTS+CS4 3430MM+CS4(full)

9 SPOTS 1550 MM

15 SPOTS 5200 MM

8 SPOTS 2140 MM

1 SPOT 200 MM

13 SPOTS 3170 MM
6 SPOTS 2640 MM

8 SPOTS 8570 MM

6 SPOTS 600 MM

2 SPOTS 1600MM

4 SPOTS 660MM Repair / 3 spot vt hold

10 SPOTS 1440MM

6 SPOTS 270 MM

7 SPOTS 1020 MM/1 spot vt hold

8 SPOTS 1150 MM

90MM/CS-1 TO CS-7 UT CHECK


2 SPOTS COMPLETED

5 SPOTS 350mm

4 SPOTS 300mm
4 SPOTS 250mm

7 SPOTS 470mm

4 SPOTS 240 mm

14 spots 1290 mm

3 spots 250MM

32 SPOTS 6750MM

12 spots 2500mm

5 SPOTS 410mm

17 SPOTS 4390mm

14 SPOTS+2 BT 1950 mm

17 SPOTS 2990 mm

19 SPOTS 6820mm
4 SPOTS/650mm cs-3,4 & 6,7 ut check completed

1600MM/ CS1 TO CS5 ONLY


10 SPOTS COMPLETED

20 SPOTS 4010mm

4 SPOTS 450mm

13 SPOTS 1390mm

7 SPOTS 1200mm

4 SPOTS 600MM

3 SPOTS + 5 BT 260 MM

13 SPOTS 1070mm

NO REPAIR REWORK SECTION CS-1 AND CS-2

10 SPOTS 1170 mm

NO REPAIR

10 SPOTS 620 mm

9 SPOTS 4310

4+1 SPOTS 400 + BF FULL CS


5&1I/S MERGE 880
SPOTS

18 SPOTS 1960mm

7 SPOTS 250MM

5 SPOTS 500MM

10 SPOTS 450MM

8 SPOTS 1260MM

6 SPOTS 920MM

7 SPOTS 5600MM

3 SPOTS 150 MM

16 SPOTS 10300 MM

5 SPOTS 2000 mm

3 SPOTS 1630 mm

5 SPOTS 230MM

3 SPOTS 140 mm

7 SPOTS 4350 mm
5 SPOTS 5210

2 SPOTS 100MM
R1

R0 verification &sign (R1)Date

NKK 21.12.16

JNN

RRL 22.12.16

JNN (D) 23.12.16

NKK(D)

NKK(D) 26.12.16

NKK(N) RRL(D) 28.12.16

RRL(D) 29.12.16

NKK(N) 30.12.16

NKK(D) 05.01.17
RRL(D)&JNN(D) 04.01.17

JNN(D) 05.01.17

JNN(D) 06.01.17

NKK(D)

RRL(D) 08.01.17

RRL(N) 10.01.17

JNN(D) 11.01.17

JNN(D) 13.01.17

RRL(N) 16.01.12

RRL(D)

JNN(D) 22.01.17

NKK(D)

NKK(D) 02.02.17
RRL(N) 3.01.17

JNN 06.02.17

NKK(N) 10.02.17

RRL(D) 11.02.17

RRL(D) 16.02.17

NKK(D) 20.02.17

JNN 21.02.17

JNN (D) 22.02.17

JNN 23.02.17

JNN 24.02.17

NKK(D) RRL(N) 24.02.17

NKK(D) 25.02.17

RRL(N) 26.02.17

JNN 01.03.17

JNN 03.03.17
RRL(D) 05.03.17

PMJ (N) 07.03.17

PMJ (N) 12.03.17

RRL(N) 14.03.17

RRL(N)&JNN 15.03.17

RRL(N) 17.03.17

RRL(N) 18.03.17

RRL(N) 21.03.17

PMJ (D) 23.03.17

PMJ (D) 25.03.17

JNN

NKK 28.03.17

PMJ 29.03.17

NKK(D) 30.03.17

PMJ

JNN(N) 01.04.17
JNN 05.04.17

JNN 07.04.17

RRL(D) 13.04.17

JNN 14.04.17

NKK(N) 17.04.17

RRL(D) 18.04.17

RRL(D) 19.04.17

PMJ RRL(D) 21.04.17

RRL(D) 2.04.17

RRL(N) 25.04.17

mnk(d) 25.04.17

NKK(D) 26.04.17

RGA(D) 27.04.17

NKK(D) 28.04.17
NKK(D) 29.04.17

PMJ(D) 03.05.17

RRL(D) 03.05.17

PMJ 05.05.17

PMJ(D) 05.05.17

NKK(N) 07.05.17

JNN 09.05.17

MNK 13.05.17

SVK 19.05.17

NKK 20.05.17

RGA, RRL 21.05.17

RRL 22.05.17
RRL 24.05.17

NKK 25.05.17

NKK 28.05.17

JNN 30.05.17

RRL 31.05.17

MNK 02.06.17

NKK 03.06.17

MNK 06.06.17

MNK 07.06.17

RRL 08.06.17

RRL 09.06.17

PMJ 09.06.17
MNK 10.06.17

PMJ&MNK 12.06.17

JNN 13.06.17

RRL 14.06.17

RRL 17.06.17

MNK 20.06.17

MNK 20.06.17

MNK 21.06.17

MNK 23.06.17

RGA(N)

RGA(N) 21.06.17

RRL 28.06.17
RRL 28.06.17

NKK 29.06.17

MNK 01.07.17

NKK 01.07.17

MNK 04.07.17

NKK(N) 11.07.17

RGA, RRL 21.07.17

RGA NKK 22.07.17

RRL 25.07.17

MVE

MVE & mnk 28.07.17

NKK

JNN 14.10.17

NKK 23.10.17

RRL 31.10.17
MNK,PMJ 24.02.18

RRL,PMJ 27.02.18

bsk,ksa,gsr 12.02.18

RRL,pmj,KSA 20.03.18

RRL,BSK,PMJ,DSK 22.03.18

RRL,DSK,KSA 24.03.18

KSA,PMJ,DSK 27.03.18

RRL,KSA,PMJ 28.03.18

RRL,PMJ,BSK 05.04.18

RRL,PMJ 07.06.18

RRL,DSK,PMJ,MVH 08.06.18

RRL,KSA,PMJ 09.06.18

MVH,DSK 11.06.18

MVH,DSK,KSA,RRL 20.06.18

mvh pmj 21.03.18


RRL,KSA 23.06.18

RRL,KSA 26.06.18
R1

Repair(R1) R1 verification &sign

CLEARED

CLEARED

All spots ut ok NKK(D)

All spots ut ok NKK(D)

CLEARED

All spots ut ok NKK(N)

1 SPOT JNN(D)

All spots ut ok NKK(N)

All spots ut ok

All spots ut ok NKK(D)


4 VT SPOTS UTOK/ 5 SPOTS UT REPAIR NKK(D)
BALANCE

All spots ut ok RRL(D)

4 SPOTS UT OK/ 2 SPOTS BALANCE NKK(D)

CLEARED

All spots ut ok RRL(D)

2 Spots/500mm NKK(D)

2 SPOTS UT BALANCE NKK(D)

All spots ut ok RRL(N)

All spots ut ok JNN(D)

All spots ut ok PMJ

NO REPAIR

2 SPOTS AGAGIN REPAIR JNN(D)


3REPAIR/6 SPOT PENDING JNN(D)

2REPAIR JNN(D)

All spots ut ok RRL(D)

8 spots pending /1 SPOTS VT HOLD RRL(D)

All spots ut ok RRL(D)

All spots ut ok RRL(D)

1 SPOT REPAIR RRL(N)

All spots ut ok RRL(N)

All spots ut ok `

All spots ut ok RRL(N)

All spots ut ok NKK

All spots ut ok NKK

All spots ut ok PMJ

All spots ut ok NKK(N)

All spots ut ok RRL(D)


1 SPOT/30MM RRL(D)

All spots ut ok RRL(D)

All spots ut ok JNN(D)

All spots ut ok

All spots ut ok NKK(D)

All spots UT cleared / CS3 need RE-UT NKK(D)

All spots ut ok NKK(D)

All spots ut ok PMJ

1 SPOT AGAIN REPAIR NKK(N)

3 SPOT AGAIN REPAIR RRL(D)

All spots ut ok PMJ

All spots ut ok RRL(D)

1 SPOT UT BALANCE NKK(D)

All spots ut ok NKK(D)


All spots ut ok NKK(D)

All spots ut ok NKK(D)

1 SPOT REPAIR /50MM NKK(N)

1 SPOT REPAIR /150MM NKK(N)

1 SPOT REPAIR RRL(D)

All spots ut ok PMJ

All spots ut ok NKK(N)

1 SPOT/30MM PMJ

4 SPOT REPAIR PMJ

All spots ut ok JNN(D)

All spots ut ok RRL(N)

All spots ut ok RRL(N)

All spots ut ok RRL(N)

All spots ut ok RRL(N)


All spots ut ok MNK(N)

All spots ut ok RRL(D)

2 SPOTS AGAIN REPAIR NKK(N)

All spots ut ok RRL(D)

All spots ut ok NKK(N)

1 SPOTS AGAIN REPAIR PMJ

7 SPOTS UT CHECKED + 4th CS UT PMJ


OK..PENDING : 12th CS (4 SPOTS)

All spots ut ok PMJ

1 SPOT AGAIN REPAIR BSK

All spots ut ok NKK

All spots ut ok RGA

All spots ut ok MNK


All spots ut ok MNK

1 SPOT AGAIN REPAIR BSK

1 SPOT VT HOLD NKK

1 SPOT AGAIN REPAIR NKK

All spots ut ok MNK

All spots ut ok RRL

All spots ut ok RGA

3 SPOTS AGAIN REPAIR KSA

1 SPOT VT HOLD MVE

TOTAL 4 SPOTS /390MM NKK

All spots ut ok NKK

All spots ut ok MNK


All spots ut ok mve

All spots ut ok RRL

1 SPOT/20MM JNN(D)

1 SPOT AGAIN REPAIR MNK

All spots ut ok NKK

4 SPOT AGAIN REPAIR RRL

10 SPOTS UT OK/ 2 SPOTS UT PENDING

1 SPOT AGAIN REPAIR RGA

10 SPOTS UT OK /7 SPOTS PENDING KSA

All spots ut ok RGA

7 SPOT AGAIN REPAIR RGA

4 SPOT AGAIN REPAIR NKK


23spots+3BT / 3720mm Nkk & RRL

(1 SPOT +1BT)60MM/ CS6 TO CS12 ONLY RGA


COMPLETED

2 SPOT AGAIN REPAIR NKK

All spots ut ok RRL

1 SPOTS NKK

All spots ut ok ksa

All spots ut ok SRL

All spots ut ok DSK

All spots ut ok mnk

1 SPOT AGAIN REPAIR & 1 spot VT HOLD MNK

All spots ut ok mnk

1 SPOT AGAIN REPAIR & 1 spot VT HOLD RRL

BF FULL CS UT HAS TO BE CHECKED AFTER KSA


HEATING
All spots ut ok PMJ

All spots ut ok RRL&BSK

2 SPOT AGAIN REPAIR BSK

1 SPOT AGAIN REPAIR KSA

All spots ut ok RRL

All spots ut ok JNN(D)

All spots ut ok RRL

5 SPOTS UT OK /3 SPOTS VT HOLD/300MM RRL,DSK

All spots ut ok KSA

4 SPOT AGAIN REPAIR PMJ,DSK,MVH

All spots ut ok PMJ

All spots ut ok mvh

All spots ut ok ksa

All spots ut ok PMJ

1 SPOT AGAIN REPAIR KSA


1 SPOT AGAIN REPAIR /3800 mm MVH,PMJ

All spots ut ok KSA


R2

(R2) Date Repair(R2)

28.12.16 1SPOT/250mm
04.01.17 2SPOT/200mm

06.01.17 All spots ut ok

11.01.17 All spots ut ok

12.01.17 All spots ut ok

02.02.17 All spots ut ok


04.02.17 3 SPOTS AGAIN REPAIR

06.02.17 1 SPOTS AGAGIN REPAIR

11.02.17 All spots ut ok

22.02.17 VT & UT HOLD 1 SPOT

2 SPOTS REPAIR/ 60mm


26.02.17 AFTER CUT & WELD AREA
06.03.17 All spots ut ok

18.03.17 All spots ut ok

24.03.17 All spots ut ok

25.03.17 All spots ut ok

30.03.17 All spots ut ok


14.04.17 All spots ut ok

15.04.17 All spots ut ok

17.04.17 All spots ut ok


04.05.17 All spots ut ok

08.05.17 All spots ut ok

10.05.17 CS-12 SEG INSIDE(1-9.5) REPAIR

19.05.17 All spots ut ok


26.05.17 All spots ut ok

30.05.17 All spots ut ok

07.06.17 All spots ut ok

08.06.17 All spots ut ok

08.06.18 All spots ut ok


13.06.17 All spots ut ok

15.06.17 All spots ut ok

21.06.17 All spots ut ok

22.06.17 All spots ut ok

23.06.17 All spots ut ok

26.06.17 All spots ut ok

28.06.17 All spots ut ok


28.06.17 20 spots ut ok/ 6 spots pending

30.06.17 1 SPOT AGAIN REPAIR

01.07.17 1 SPOT AGAIN REPAIR

04.07.17 All spots ut ok

01.08.17 All spots ut ok

25.10.17 All spots ut ok

02.11.17 All spots ut ok


12.03.18 All spots ut ok

21.03.18 All spots ut ok

28.03.18 All spots ut ok

07.06.18 All spots ut ok

21.06.18 All spots ut ok


25.06.18 All spots ut ok
R3

R2 verification &sign Date

NKK(N) 29.12.16
RRL(D) 04.01.17

RRL(D)

JNN(D)

NKK(D)

NKK(D)
NKK(D) 06.02.17

NKK(N) 08.02.17

MNK

JNN(D)

PMJ 26.02.17
RRL(D)

PMJ (D)

RRL(D)

JNN(D)

NKK(D)
RRL(D)

JNN(D)

PMJ
RRL(D)

JNN(D)

PMJ 11.05.17

RRL(N)
JNN(D)

KSA

PMJ

NKK

KSA
MNK

NKK

MNK

MNK

RGA(N)

RRL

PMJ
RRL 29.06.17

RGA 30.06.17

RRL 02.07.17

MNK

pmj

ksa

RRL
ksa

ksa

pmj

DSK

pmj
KSA
R3
RESULT

Repair(R3) R3 verification &sign

All spots ut ok JNN(D) CLEARED


All spots ut ok JNN(D)
All spots ut ok

All spots ut ok RRL(D)

1 SPOTS REPAIR/ 30mm PMJ


AFTER CUT & WELD AREA
CS-12 SEG INSIDE(1-9.5) REPAIR KSA,MNK 12.05.17
All spots ut ok RGA

All spots ut ok RRL

All spots ut ok PMJ


TOTAL Repair & Spot PLANER
(LS & CS)

3 SPOTS/710MM

2 SPOTS/350MM

10SPOTS REPAIR/1730MM
2SPOTS/90MM

3SPOTS/300MM
9 SPOTS/610MM

3 SPOTS/350MM
1 SPOTS/100MM

5 SPOTS/510MM

1 SPOTS/200MM
5 SPOTS/2380MM

4 SPOTS/140MM

1 SPOTS/30MM
3 SPOTS/150MM

4 spots again repair jnn

1 SPOT/200MM

9 SPOTS/1920MM
4 SPOTS/850MM

4 SPOTS/250MM
4 SPOTS/250MM
VOLUMETRIC Remarks

2 SPOTS/300MM Heating area ut check completed

Ovality Heating area ut check


completed & bottom and top flange to
be checked
Heating area ut check completed

Heating area ut check completed

Heating area ut check completed

Heating area ut check completed

1SPOTS/100MM Heating area ut check completed

CS-8 DENT PROBLEM UT RECHECK


COMPLETED

Heating area ut check completed on


13.01.17

Heating area ut check completed on


18.01.17

Heating area ut check completed on


02.02.17
Heating area ut check completed on
16.02.17
Heating area ut check completed on
21.02.17

Heating area ut check completed on


24.02.17
Heating area ut check completed on
4 SPOTS/450MM 27.02.17
3 SPOTS/300MM

1 SPOTS/100MM

Heating area ut check completed on


15.03.17

1 SPOTS/150MM HAUT COMPLETED ON 19.03.17

2 SPOTS/170MM

HAUT COMPLETED ON 27.03.17

HAUT COMPLETED ON 29.03.17

HAUT COMPLETED ON 30.03.17

HAUT COMPLETED ON 31.03.17

HAUT COMPLETED ON 02.04.17


HAUT COMPLETED ON 07.04.17

1 SPOTS/100MM HAUT COMPLETED ON 14.04.17

2 SPOTS/200MM

HAUT COMPLETED ON 29.04.17


HAUT COMPLETED ON 03.05.17

HAUT COMPLETED ON 05.05.17

HAUT COMPLETED ON 08.05.17

HAUT COMPLETED ON 24.05.17

4 SPOTS/1250MM HAUT COMPLETED ON 23.05.17


HAUT COMPLETED ON 30.05.17

HAUT COMPLETED ON 30.05.17

HAUT COMPLETED ON 02.06.17

HAUT COMPLETED ON 03.06.17

3 SPOTS/170MM HAUT COMPLETED ON 07.06.17

HAUT COMPLETED ON 09.06.17

1 SPOTS/100MM

HAUT COMPLETED ON 10.06.17


HAUT COMPLETED ON 18.06.17

HAUT COMPLETED ON 21.06.17

HAUT COMPLETED ON 21.06.17

HAUT COMPLETED ON 22.06.17

HAUT COMPLETED ON 25.06.17

HAUT COMPLETED ON 27.06.17


HAUT COMPLETED ON 28.06.17

HAUT COMPLETED ON 30.06.17

HAUT COMPLETED ON 02.07.17

HAUT COMPLETED ON 02.07.17

HAUT COMPLETED ON 04.07.17

HAUT COMPLETED ON 11.07.17

HAUT COMPLETED ON 27.07.17

HAUT COMPLETED ON 02.11.17

HAUT COMPLETED ON 02.11.17


40

50
150

100

300

100

150

400
SL no Section no BAY R0 Date

1 S4-46 20.12.16

2 S4-47 22.12.16

3 S4-48 23.12.16

4 S4-49 26.12.16

5 S4-50 27.12.16

6 S4-51 28.12.16

7 S4-52 29.12.16

8 S4-53 30.12.16

9 S4-54 02.01.17

10 S4-55 04.01.17

11 S4-56 05.01.17
12 S4-57 06.01.17

13 S4-58 10.01.17

14 S4-59 11.01.17/12.01.17

15 S4-60 13.01.17

16 S4-61 18.01.17

17 S4-62 20.01.17

17 S4-63 22.01.17

18 S4-64 25.01.17

19 S4-65 26.01.17

20 S4-141 01.02.17

21 S4-142 02.02.17

21 S4-143 06.02.17

22 S4-144 10.02.17
22 S4-145 13.02.17

23 S4-146 14.02.17

24 S4-147 16.02.17

25 S4-149 17.02.17

26 S4-148 18.02.17

27 S4-150 20.02.17

28 S4-151 23.02.17

29 S4-152 23.02.17

30 S4-153 25.02.17

31 S4-154 25.02.17

32 S4-155 28.02.17
33 S4-156 03.03.17

34 S4-157 04.03.17 & 05.03.17

35 S4-158 07.03.17

36 S4-159 08.03.17

37 S4-160 10.03.17

38 S4-161 13.02.17

39 S4-162 15.03.17

40 S4-163 16.03.17

41 S4-164 18.03.17

42 S4-165 20.03.17

43 S4-166 22.03.17
44 S4-167 24.03.17

45 S4-168 27.03.17

46 S4-169 29.03.17

47 S4-170 30.03.17

48 S4-171 31.03.17

49 S4-172 02.04.17

50 S4-173 04.04.17

51 S4-174 08.04.17

52 S4-66 13.04.17

53 S4-67 15.04.17

54 S4-68 17.04.17
55 S4-69 18.04.17

57 S4-70 22.04.17

56 S4-71 23.04.17

57 S4-72 25.04.17

58 s4-74 27.04.17

59 S4-75 I 29.04.17

60 S4-76 I 03.05.17

61 S4-77 I 04.05.17

62 S4-78 I 05.05.17&06.05.17

63 S4-79 I 08.05.17

64 s4-80 1 10.05.17
65 s4-81 3 10.05.17&11.05.17

66 S4-82 1 11.05.17

67 s4-84 3 12.05.17

68 S4-83 1 13.05.17

69 S4-86 3 15.05.17

70 S4-85 1 15.05.17

71 S4-87 1 16.05.17

72 S4-88 1 17.05.17

73 S4-89 1 20.05.17

74 S4-90 1 22.05.17

75 S4-91 I 24.05.17

76 S4-92 I 25.05.17
77 S4-93 I 30.05.17

78 S4-94 I 31.05.17

79 S4-95 I 02.06.17

80 s4-96 i 04.06.17

81 S4-97 1 05.06.17

82 S4-98 1 09.06.17

83 S4-99 1 09.06.17&10.06.17

84 S4-100 1 12.06.17

85 S4-101 I 13.06.17

86 S4-102 I 15.06.17

87 S4-104 III 16.06.17

88 S4-103 I 16.06.17
89 S4-106 I 19.06.17

90 S4-107 1 21.06.17

91 S4-108 I 22.06.17

92 S4-109 I 24.06.17

93 S4-110 1 26.06.17

94 S4-111 I 27.06.17

95 S4-112 I 28.06.17

96 S4-113 I 30.06.17

97 S4-114 I 01.07.17

98 S4-115 I 03.07.17

99 S4-116 I 04.07.17
100 S4-117 I 06.07.17

101 S4-118 I 12.07.17

102 S4-119 I 14.07.17

103 S4-120 I 01.08.17

104 S4-121 I 07.08.17

105 S4-122 1 18.08.17

106 108-S4-001 I 09.10.17

107 S4-123 1 20.10.17

108 S4-124 1 27.10.17

109 S4-125 1 03.11.17

110 S4-126 I 09.11.17

111 S4-127 I 16.11.17

112 S4-128 I 28.02.2018


114 S4-129 1 21.03.2018

115 S4-175,T-104 I 21.03.18

116 S4-176,T-104 I 22.03.18

117 S4-130 1 26.03.2018

118 S4-131 I 28.03.18

119 S4-132 I 30.03.18

120 S4-133 1 09.06.18

121 S4-134 1 11.06.18

122 S4-135 1 14.06.18

122 S4-136 1 19.06.18

123 S4-137 I 23.06.18

124 S4-138 I 29.06.18

125 S4-139 1 03.07.18


R0

Noo of repair spots Length of the Repair(R0)

5spots/810mm

4 spots/320mm

5 SPOTS/800MM &2 BT

NO REPAIR

4spots/330mm

13SPOTS/2390MM & 5 BT SPOTS

4 SPOTS REPAIR/390MM

2 SPOTS REPAIR/150 MM & 3 BT SPOTS

5 SPOTS REPAIR/560MM

3 SPOTS REPAIR/320 MM

1 Spot Repair/100mm
11 SPOTS REPAIR/1500mm

3 SPOTS/220MM

6 SPOTS REPAIR/3670MM

6 SPOTS REPAIR/660MM &1 spot


inside merge

13 SPOTS/3860MM

23 SPOTS/8900MM

2 SPOTS/350MM

2 SPOTS/1100MM

3 SPOTS/580MM

8 SPOTS/880MM

8 SPOTS/860MM

11 SPOTS REPAIR/1710mm+ 3BT

3 SPOTS/ 300mm
6 SPOTS/ 300mm/CS11 FULL REPAIR

14SPOT/1780MM

14SPOT/1440MM

3 SPOTS/400MM

5 SPOTS/1010MM

8 SPOTS+VT HOLD/2930MM

NO REPAIR

5 SPOTS/1400MM

8 SPOTS/1910MM

8 SPOT/ 800M

7 SPOT/940MM
10 spots repair/2740mm

5 SPOTS REPAIR /750mm

1 SPOT/ 200mm

4 SPOT/ 1040mm

NO REPAIR

1 SPOT/50MM

8 spots -1290mm- 1 spot vt hold

6 spots -1120mm

6 spots+1 Spot VT/RW /1260mm

12 spots -550mm

6 spots/2720mm
CS1-CS8 ONLY COMPLETED 2
spots/200mm

7spot/780mm

3spot/150mm

7spots/400mm

7 SPOTS/1320MM

4 SPOTS REPAIR

3 SPOTS REPAIR/220mm

4 SPOTS REPAIR/250mm

5 SPOTS REPAIR/800mm & 1 VT HOLD

no repair

7 SPOTS REPAIR/2110mm
1 SPOTS REPAIR/30mm (CS6 SEG 14 TO
23 NEED RE UT)

3 SPOTS REPAIR+CS12 FULL REPAIR

No repair

CS-1 TO CS-6 UT CHECK COMPLETED, 1


SPOTS REPAIR

no repair

7 SPOTS REPAIR/1270mm

3 spots 140mm

9 SPOTS 7300MM

2 spots 700mm

6 spots 1390mm

0 no repair
4 SPOTS 200MM

4 SPOTS+2BT 190MM+400MM

3 spots 1050mm

6 spots 1770MM+VT HOLD

14 spots 5530MM

4 spots 420MM

1 SPOT REPAIR + 4 BT 100MM

3 spots 3500MM

8 spots 1240MM

0 1240MM

2 spots 1030mm

1 spot 35mm
1 SPOT 100mm

2 spots +1 VT HOLD 250MM

2 spots +1 VT HOLD 200 mm

1 spots +1 VT HOLD 100mm

1 SPOT 100mm

4 SPOT 380mm

1 SPOT 30mm

Total 10 SPOT 2790mm

6 SPOT 13000mm

2 SPOT 150mm

1 SPOT 100mm

3 SPOTS 200 mm
1 SPOT 40MM

1 SPOT 100mm

3 SPOT cs-1 to cs-6 ut completed/400mm

7 SPOT 460mm

9 SPOTS 770mm

4 SPOT 580mm

cs-2 to cs-9 ut check


2 SPOT completed/120mm

1 SPOT 30MM & 1 VT HOLD

1 SPOT 40mm

no repair All spots ut ok

4 SPOT& 2BT 250MM


4 SPOT 330mm

15 SPOT 2100MM

7 SPOT 2900MM

3 SPOT 230mm/2 spots vt hold

1 SPOT 2 spots vt hold only

2 SPOT 280MM

3 SPOTS+1 vt hold 140mm

8 spots 3530mm

2 SPOT 300MM

6 SPOT 5050MM

4 SPOT 550 MM

4 SPOT 380 MM

6 SPOT 2000 MM
6 SPOTS 530mm

8 SPOTS 580 mm

11 SPOTS 1750 mm

5 SPOTS 1400 mm

3 SPOT 350 mm

1 SPOT 200 mm

1 SPOT 50 mm

8 SPOT 1600 mm

9 SPOTS 1640 mm

4 spots 260 mm

1 spots 30 mm

All spots ut ok

4 spots 630 mm
R1

R0 verification &sign (R1)Date

JNN 20.12.16

JNN 22.12.16

RRL(N) 25.12..16

JNN(D)

JNN(D) 28.12.16

NKK(N) 30.12.16

JNN(D)& NKK(N)

JNN(D)& NKK(N) 30.12.16

NKK(D) 02.01.17

NKK(D)(RRL(D) 05.01.17

RRL (D)JNN(D) 06.01.17


NKK(D) 07.01.17

JNN(D) 11.01.17

NKK(D),RRL(N) 13.01.17

RRL(N) 13.01.17

JNN(D)& NKK(N) 20.01.17

RRL(D) 21.01.17

PMJ(D) 22.01.17

RRL(D) JNN(N) 26.01.17

JNN 27.01.17

NKK(D) 02.02.17

RRL(N) 03.02.17

NKK(N) 08.02.17

NKK(N) 11.02.17
NKK(N) 14.02.17

JNN 15.02.17

JNN(N) 17.02.17

JNN 18.02.17

NKK(D) 18.02.17

RRL(D) 21.02.17

NKK 25.02.17

RRL(D) 25.02.17

RRL(N) PMJ 27.02.17

JNN 01.03.17
NKK(N) RRL(D) 03.03.17

NKK(N) RRL(D) 06.03.17

NKK(D) 07.03.17

PMJ(D) 09.03.17

RRL(D)

JNN 13.03.17

NKK(D) RRL(N) 16.03.17

RRL(N) 17.03.17

JNN 18.03.17

PMJ(D) 21.03.17

NKK(N)RRL(D) 23.03.17
PMJ(D) 24.03.17

PMJ(D) 28.03.17

RRL(D) 29.03.17

RRL(D) 31.03.17

RRL(D)&JNN 01.04.17

RRL(D)&JNN 03.04.17

RRL(N) 05.04.17

RRL(N) 10.04.17

RRL(D) 13.04.17

NKK(N) RRL(D)

PMJ 18.04.17
RRL(D) PMJ 19.04.17

NKK(D) 24.04.17

JNN(D)

RRL(N) 26.04.17

jnn

MNK(N) 02.05.17

PMJ(D) 04.05.17

NKK (N) 06.05.17

PMJ(D)&KSA 06.05.17

PMJ 09.05.17

JNN
PMJ&NKK 11.05.17

MNK 12.05.17

jnn 13.05.17

PMJ 15.05.17

NKK 16.05.17

RRL(N) 16.05.17

BSK 17.05.17

RRL(N) 18.05.17

NKK&RRL 21.05.17

JNN&MNK

JNN&MNK 24.05.17

JNN&MNK 25.05.17
RRL 30.05.17

MNK 01.06.17

RRL 03.06.17

nkk 05.06.17

RGA 06.06.17

NKK 09.06.17

RRL&nkk 10.06.17

NKK 13.06.17

MNK 14.06.17

NKK 15.06.17

RRL 16.06.17

MNK,RRL
KSA 20.06.17

RRL 21.06.17

RRL 22.06.17

RRL 25.06.17

jnn 26.06.17

RRL 28.06.17

RRL 28.06.17

MNK 30.06.17

RRL 03.07.17

MNK

NKK 05.07.17
RRL 07.07.17

NKK 13.07.17

NKK 15.07.17

RRL 02.08.17

RGA 08.08.17

NKK 19.08.17.

JNN 10.10.17

JNN 24.10.17

MNK 28.10.17

RRL 07.11.17

RRL 10.11.17

MNK 17.11.17

KSA,MNK,RRL 01.03.2018
BSK,JNN 23.03.18

BSK,PMJ,KSA 22.03.18

BSK,PMJ 23.03.2018

KSA,BSK 28.03.18

RRL,DSK,DSK 29.03.18

RRL,DSK,KSA,PMJ 31.02.2018

RRL,KSA,PMJ 11.06.18

MVH DSK PMJ 12.06.18

MVH DSK KSA 15.06.18

KSA,RRL 19.06.18

RRL,KSA 23.06.18

RRL,KSA

RRL,KSA,DSK 03.07.18
R1

Repair(R1) R1 verification &sign

2 spots

All spots ut ok RRL(N)

All spots ut ok JNN(D)

1 SPOT UT OK/3 SPOTS PENDING RRL(D)

10 SPOTS UT OK/ 8 SPOT UT NKK(N)


BALANCE

1SPOT&1 PENDING JNN(D)

1 spot repair JNN(D)

All spots ut ok NKK(D)

All spots ut ok RRL(N)


2 SPOTS REPAIR JNN(N)

All spots ut ok JNN(D)

4 SPOTS REPAIR/750MM RRL(N)

All spots ut ok MVE(D)

1 Spot Repair & 2 Spot VT Hold NKK(N)

20 SPOTS/8600MM RRL(D)

1 SPOTS PMJ

All spots ut ok NKK(D)

All spots ut ok RRL(D)

6 SPOTS AGAIN REPAIR JNN

1 SPOT UT REPAIR NKK(D)

3 SPOT UT REPAIR JNN(D)

2 SPOT UT REPAIR MNK


CS11 FULL REPAIR PENDING MNK

1 SPOTS AGAIN REPAIR RRL(N)

1 SPOTS AGAIN REPAIR RRL(D)

All spots ut ok RRL(D)

2 SPOT UT PENDING RRL(D)

All spots ut ok NKK(D)

2 spots again repair JNN(D)

3 spots again repair RRL(N)

7 spots ut ok,1 Spot VT/RW JNN

1 SPOTS AGAIN REPAIR RRL(D)


5 SPOTS UT BALANCE NKK(N)

1 SPOTS UT BALANCE RRL(D)

All spots ut ok RRL(D)

All spots ut ok RRL(D)

All spots ut ok RRL(N)

3 spots & 1 spot vt hold NKK(D)

1 SPOTS AGAIN REPAIR NKK(D)

All spots ut ok RRL(N)

2 SPOTS AGAIN REPAIR RRL(N)

2 SPOTS AGAIN REPAIR NKK(N)


3 spots -250mm NKK(N)

3 SPOTS AGAIN REPAIR RRL(D)

1 SPOTS AGAIN REPAIR PMJ

All spots ut ok NKK(D)

2 SPOTS AGAIN REPAIR RRL(D)

All spots ut ok NKK(D)

All spots ut ok NKK(D)

All spots ut ok RRL(D)

1 SPOTS REPAIR / 80mm NKK (N)

3 SPOTS REPAIR/1000mm PMJ


All spots ut ok RRL(D) NKK (N)

1 SPOTS REPAIR IN CS12 / 200mm NKK(D)

4 SPOTS REPAIR / 440mm PMJ

3 SPOTS AGAIN REPAIR RRL(D)

All spots ut ok RRL(D)

All spots ut ok RRL(D)

1 SPOT AGAIN REPAIR JNN

1 SPOT AGAIN REPAIR PMJ


All spots ut ok KSA

1 SPOT AGAIN REPAIR MNK

All spots ut ok jnn

1 SPOT AGAIN REPAIR RRL(N)

1 SPOT AGAIN REPAIR RRL(N)

1 SPOT AGAIN REPAIR JNN(D)

2 SPOT AGAIN REPAIR RRL(N)

All spots ut ok SVK

3 SPOTS PENDING / 5 SPOT UT OK RGA

2 SPOT AGAIN REPAIR NKK

All spots ut ok NKK


All spots ut ok SVK

All spots ut ok MVE(D)

1 spot AGAIN REPAIR +1 VT HOLD NKK


BALANCE

All spots ut ok MNK

All spots ut ok MNK

All spots ut ok MVE

All spots ut ok RRL

1 SPOT AGAIN REPAIR / 30 mm JNN

All spots ut ok NKK

1 SPOT AGAIN REPAIR pmj

1 SPOT AGAIN REPAIR MNK


All spots ut ok KSA

All spots ut ok RGA

5 SPOTS /460MM+ 3 BT RGA

1 SPOT AGAIN REPAIR rrl

All spots ut ok rrl

All spots ut ok MNK

TOTAL 6 SPOTS+2BT/1470MM RGA

All spots ut ok rrl

All spots ut ok rrl

All spots ut ok RGA


All spots ut ok rrl

9 SPOT AGAIN REPAIR RGA

2 SPOT AGAIN REPAIR RGA

All spots ut ok RRL

All spots ut ok RRL

1 SPOT AGAIN REPAIR RGA

1 SPOT VT HOLD PENDING ksa

1 SPOT AGAIN REPAIR RRL

All spots ut ok MNK

1 SPOT AGAIN REPAIR KSA&MNK

1 SPOT AGAIN REPAIR RRL

1 SPOT AGAIN REPAIR RRL

2 SPOTS AGAIN REPAIR BSK


All spots ut ok PMJ

All spots ut ok RRL

1 SPOT AGAIN REPAIR KSA

1 SPOT AGAIN REPAIR PMJ

1 SPOT AGAIN REPAIR KSA

1 SPOT AGAIN REPAIR KSA

All spots ut ok KSA

1 SPOT AGAIN REPAIR/ 2 SPOTS UT KSA


PENDING

All spots ut ok KSA

All spots ut ok pmj

All spots ut ok MVH

All spots ut ok DSK


R2

(R2) Date Repair(R2)

20.12.16 CLEARED

28.12.16 All spots ut ok

31.12.16 1 SPOT

31.12.16 2 Spots ut ok

03.01.17 All spots ut ok


08.01.17 All spots ut ok

14.01.17 All spots ut ok

CLEARED

21.01.17 All spots ut ok

23.01.17 All spots ut ok

23.01.17 All spots ut ok

03.02.17 4 SPOTS AGAIN REPAIR

04.02.17 All spots ut ok

08.02.17 3 SPOT UT REPAIR


14.02.17 All spots ut ok

16.02.17 All spots ut ok

18.02.17 1 SPOTS AGAIN REPAIR

18.02.17 All spots ut ok

24.02.17 1 spot again repair

26.02.17 All spots ut ok

27.02.17 All spots ut ok


04.03.17 All spots ut ok

17.03.17 1 SPOTS AGAIN REPAIR

17.03.17 1 SPOT AGAIN REPAIR

21.03.17 All spots ut ok

24.03.17 2 SPOT AGAIN REPAIR


25.03.17 All spots ut ok

28.03.17 All spots ut ok

30.03.17 1 SPOTS AGAIN REPAIR

01.04.17 All spots ut ok

14.04.17 All spots ut ok

19.04.17 2 SPOTS REPAIR/200mm


24.04.17 1 SPOTS REPAIR IN CS12 / 100mm

26.04.17 All spots ut ok

02.05.17 2 SPOTS REPAIR / 300 mm

06.05.17 All spots ut ok

10.05.17 All spots ut ok


12.05.17 All spots ut ok

17.05.17 All spots ut ok

16.05.17 All spots ut ok

18.05.17 All spots ut ok

22.05.17 1 SPOT AGAIN REPAIR

25.05.17 All spots ut ok


03.06.17 All spots ut ok

13.06.17 All spots ut ok

16.06.17 All spots ut ok

17.06.17 All spots ut ok


24.06.17 1 SPOT AGAIN REPAIR

26.06.17 All spots ut ok

29.06.17 2 SPOT AGAIN REPAIR


14.07.17 2 SPOT AGAIN REPAIR

17.07.17 All spots ut ok

22.08.17 1 spot agagin repair

14.10.17 All spots ut ok

26.10.17 All spots ut ok

07.11.17 All spots ut ok

13.11.17 All spots ut ok

20.11.17 All spots ut ok

02.03.18 All spots ut ok


24.03.18 All spots ut ok

29.03.18 All spots ut ok

30.03.18 All spots ut ok

02.04.18 All spots ut ok

12.06.18 All spots ut ok


R3

R2 verification &sign Date

NKK(N) 02.01.17

NKK(N)

RRL(D)
RRL(D)

RRL(N)

RRL(D)

RRL(D)

RRL(D)

NKK(D) 03.02.17

JNN

NKK(N) 10.02.17
RRL(D)

NKK(D) 18.02.17

JNN

RRL(N)

PMJ

NKK(N)
JNN

NKK(D)

RRL(N) 18.03.17

PMJ

RRL(D) 24.03.17
JNN

PMJ

NKK(D)

RRL(D)

JNN

RRL(D) 19.04.17
RRL(N) 27.04.17

RRL(N) 26.04.17

NKK(N) 03.05.17

MNK(D)
PMJ

BSK

NKK

NKK

MNK(D) 22.05.17

BSK
RRL

MNK(D)

KSA

NKK
RRL 24.06.17

PMJ

nkk 30.06.17
RGA 14.07.17

nkk

rga 22.08.17

RRL

MNK(D)

RRL

MNK(D)

MNK(D)

RRL
RRL

DSK

rrl

KSA

DSK
R3
RESULT

Repair(R3) R3 verification &sign

1 SPOT UT OK NKK(D)
All spots ut ok RRL(N)

2 SPOT UT REPAIR JNN 10.02.17


1 SPOTS AGAIN REPAIR RRL(D)
All spots ut ok

All spots ut ok NKK(N)


1 SPOT NKK 20.04.17
All spots ut ok RRL(N)

All spots ut ok RRL(N)

1 SPOT AGAIN REPAIR/100mm NKK(N) 04.05.17


All spots ut ok RRL
All spots ut ok RGA

All spots ut ok
All spots ut ok RGA

All spots ut ok NKK


TOTAL Repair & Spot PLANER
(LS & CS)

12 SPOTS/1890MM

4 SPOTS/390MM
5 SPOTS/3400MM

7 SPOTS/660MM

13 SPOTS/3860MM

22 SPOTS/8550MM

5 SPOTS/670MM

All spots ut ok
3 SPOTS /750 mm

5 SPOTS /9500 mm

4 SPOTS /720 mm

3 SPOTS /2540 mm
All spots ut ok
All spots ut ok 7 SPOTS REPAIR/1270mm
4 SPOTS REPAIR/420mm
1 SPOT/100MM

2 SPOT/250MM
VOLUMETRIC Remarks

HEATING AREA UT COMPLTED


1 SPOT/500MM ON 02.01.17

HEATING AREA UT COMPLTED


ON 03.01.17
2 SPOTS/270MM

HEATING AREA UT COMPLTED


ON 13.01.17

HEATING AREA UT COMPLTED


1 SPOTS/350MM ON 24.01.17

HEATING AREA UT COMPLTED


ON 23.01.17

3 SPOTS/190MM

HEATING AREA UT COMPLTED


ON 11.02.17
HEATING AREA UT COMPLTED
ON 17.02.17
HEATING AREA UT COMPLTED
ON 05.03.17

HEATING AREA UT COMPLTED


ON 10.03.17

3 SPOTS /350 mm

2 SPOTS /400 mm

HAUT OK ON 21.03.17

3 SPOTS /180 mm
3 SPOTS /150 mm

7 SPOTS /400 mm

HAUT OK ON 02.04.17

HAUT OK ON 20.04.17
HAUT OK ON 20.04.17

HAUT OK ON 25.04.17

HAUT OK ON 05.05.17

HAUT OK ON 06.05.17
3 SPOTS REPAIR/3500mm

HAUT OK ON 22.05.17

HAUT OK ON 24.05.17

2 spots/1030MM

1 spots/35MM
HAUT OK ON 07.06.17

HEATING AREA UT COMPLTED


ON 14.06.17

HEATING AREA UT COMPLTED


ON 14.06.17

HAUT OK ON 18.06.17
HAUT OK ON 21.06.17

HAUT OK ON 23.06.17

HAUT OK ON 25.06.17

HAUT OK ON 28.06.17

HAUT OK ON 02.07.17

HAUT OK ON 03.07.17

HAUT OK ON 04.07.17
HAUT OK ON 15.07.17

HAUT OK ON 01.11.17

HAUT OK ON 01.11.17

HAUT OK ON 13.11.17
HAUT OK ON 14.11.17
SL no Section no PIEACE R0 Date

1 07.03.18

2 07.03.18
1 S4- 129
3 07.03.18

4 07.03.18

1 07.03.18

2 07.03.18
2 S4 -130
3 07.03.18

4 07.03.18

1 13.03.18

2 13.03.18
3 S4 -124
3 13.03.18
3 S4 -124

4 13.03.18

1 13.03.18

2 13.03.18
3 S4 -125
3 13.03.18

4 13.03.18

1 17.03.18

2 17.03.18
4 S4 -126
3 17.03.18

4 17.03.18

1 17.03.18

2 17.03.18
5 S4 -127
3 17.03.18

4 17.03.18
1 17.03.18

2 17.03.18
6 S4 -128
3 17.03.18

4 17.03.18

1 17.03.18

2 17.03.18
7 S4 -129
3 17.03.18

4 17.03.18

1 17.03.18

2 17.03.18
8 S4 -130
3 17.03.18

4 17.03.18

1 17.03.18

2 17.03.18
9 S4 -131
9 S4 -131
3 17.03.18

4 17.03.18

1 17.03.18

2 17.03.18
10 S4 -132
3 17.03.18

4 17.03.18

1 08.06.18

2 08.06.18
11 S4 -133
3 08.06.18

4 08.06.18
R0

Repair(R0) R0 verification &sign

UT OK PMJ

UT OK PMJ

UT OK PMJ

UT OK PMJ

Repair PMJ

Repair PMJ

UT OK PMJ

UT OK PMJ

UT OK jnn

UT OK jnn

UT OK jnn
UT OK jnn

UT OK RRL

UT OK RRL

UT OK RRL

UT OK RRL

UT OK RRL

UT OK RRL

UT OK RRL

UT OK RRL

UT OK RRL

UT OK RRL

UT OK PMJ

UT OK PMJ
UT OK PMJ

UT OK PMJ

UT OK PMJ

UT OK PMJ

UT OK PMJ

UT OK PMJ

UT OK PMJ

UT OK PMJ

UT OK PMJ

UT OK KSA

UT OK KSA

UT OK KSA

UT OK KSA

UT OK KSA
UT OK KSA

UT OK KSA

UT OK KSA

UT OK KSA

UT OK KSA

UT OK KSA

UT OK RRL

UT OK RRL

UT OK RRL

UT OK RRL
R1

(R1)Date Repair(R1)

09.03.18 Repair

09.03.18 UT OK
R2

R1 verification &sign (R2) Date

bsk 10.03.18

bsk
R2

Repair(R2) R2 verification &sign

UT OK bsk
SL no Section no BAY R0 Date

1 BS-009 01.02.17

2 BS-010 10.02.17

3 BS-011 16.02.17

4 BS-12 22.02.17

5 BS-14 01.03.17

6 BS-13 02.03.17

7 BS-15 14.03.17

8 BS-16 03.04.17

9 BS-17 06.04.17

10 BS-18 11.04.17

11 V100 -BS-001 II 05.07.17


12 V100 -BS-002 II 08.07.17

13 V100-BS-003 IV 12.07.17

14 V100-BS-004 v 15.07.17

15 V100-BS-005 IV 17.07.17

16 V100-BS-006 v 17.07.17

17 V100-BS-007 v 19.07.17

18 V100-BS-008 v 21.07.17

19 V100-BS-009 v 02.08.17

20 V100-BS-011 III 10.08.17

21 V100-BS-010 V 11.08.18

22 V100 -BS-012 V 18.08.17

23 V110 -BS-020 II 25.08.17


24 V110 -BS-019 IV 29.08.17

25 V110 -BS-021 II 31.08.17

26 V110 -BS-022 II 06.09.17

27 V110 -BS-023 III 07.09.17

28 V110 -BS-024 III 08.09.17

29 V110 -BS-025 III 14.09.17

30 V110 -BS-026 III 19.09.17

31 V110 -BS-027 III 25.09.17

32 V110 -BS-028 III 27.09.17

33 V110 -BS-029 III 03.10.17

34 V110 -BS-030 III 07.10.17

1 V110 -BS-031 IV 26.12.17

2 V110 -BS-032 IV 28.12.17

3 V110 -BS-033 IV 03.01.18


4 V110 -BS-034 IV 05.01.18

5 V110 -BS-035 IV 08.01.18

6 V110 -BS-036 IV 10.01.18

7 V110 -BS-037 IV 12.01.18

8 V110 -BS-038 IV 17.01.18

9 V110 -BS-039 III 17.01.18

10 V110 -BS-041 IV 22.01.18

11 V110 -BS-040 IV 23.01.18

12 V110 -BS-042 IV 27.01.18

13 V110 -BS-043 IV 30.01.18

14 V110 -BS-044 IV 01.02.18

15 V110 -BS-045 IV 01.02.18

16 V110 -BS-046 IV 05.02.18

17 V110 -BS-047 IV 07.02.18

18 V110 -BS-048 IV 08.02.18

19 V110 -BS-049 IV 10.02.18

20 V110 -BS-050 IV 13.02.18


21 V110 -BS-051 IV 17.02.18

22 V110 -BS-052 IV 19.02.18

23 V110 -BS-052 IV 20.02.18

24 V110 -BS-053 IV 20.02.18

25 V110 -BS-054. IV 22.02.18

26 V110 -BS-055 IV 24.02.18

27 V110 -BS-056 IV 01.03.2018

28 V110 -BS-057 IV 02.03.18

29 V110 -BS-058 IV 13.03.18

30 V110 -BS-059 IV 15.03.18

31 V110 -BS-060 IV 17.03.18

31 V110 -BS-061 IV 23.01.18

31 V110 -BS-062 IV 22.01.18

1 V110 -BS-001 IV 11.04.18

2 V110 -BS002 IV 11.04.18


3 V110 -BS003 IV 14.04.18

4 V110 -BS004 IV 16.04.18

5 V110 -BS005 IV 17.04.18

6 V110 -BS006 IV 19.04.18

7 V110 -BS007 IV 21.04.18

8 V110 -BS008 IV 23.04.18

1 V100 -BS013 IV 24.04.18

2 V100 -BS014 IV 25.04.18

3 V100 -BS015 IV 26.04.18

4 V100 -BS016 4 29.04.18

5 V100 -BS017 4 30.04.18

6 V100 -BS018 4 03.05.18

7 V100 -BS019 4 05.05.18

8 V100 -BS020 4 05.05.18

9 V100 -BS021 IV 10.05.18

10 V100 -BS022 4 11.05.18


11 V100 -BS023 4 16.05.18

12 V100 -BS024 4 17.05.18

13 V100 -BS025 4 19.05.18

14 V100 -BS026 5 22.05.18

15 V100 -BS027 5 23.05.18

16 V100 -BS028 5 25.05.18

17 V100 -BS029 5 26.05.18

18 V100 -BS030 IV 28.05.18

19 V100 -BS031 IV 30.05.18

20 V100 -BS032 IV 31.05.18

21 V100 -BS033 IV 08.06.18

22
R0

Repair(R0) R0 verification &sign

17 spots/9490mm JNN(D)

22 spots/mm RRL(D)

17 spots/1570mmmm RRL(D)

20 SPOTS REPAIR/4 SPOTS VT HOLD RRL(N)

13 spots/1240mm NKK(N)

11 spots/950mm NKK(N)

22 SPOTS/6430MM&2 SPOTS VT HOLD NKK(D) RRL(N)

8 spots/1200mmmm RRL(N)

9 spots/1840mmmm NKK(D)

17 spots / 5400mm + 2 VT HOLD NKK(N)

2 spots/110mmmm PMJ
24 spots/5970mmmm NKK

CS2 PENDING & 7spot/415mm MNK

CS1&CS7 UT COMPLETED NO REPAIR ,CS2-


CS5 UT PENDING,CS6 VISUAL CLEAREANCE MNK
NOT GIVEN

25 spots/5920mmmm RRL

29 SPOTS/15940MM RRL

10 SPOTS/1340MM JNN(D)

42 SPOTS/6080MM + 2 vt hold NKK

22 SPOTS/2600MM mnk

9 SPOTS/1030MM ksa

16 SPOTS/2950MM KSA

7 SPOTS/2020MM NKK

2 SPOTS/90MM JNN(D)
28 SPOTS/5855MM NKK

9 SPOTS/1880MM NKK

19 SPOTS/2970MM NKK

9 SPOTS/1830MM NKK

19 SPOTS/2510MM NKK

13 SPOTS/780MM NKK

23 SPOTS/6390MM NKK, KSA

4 SPOTS/410MM jnn,ksa

21 SPOTS/2315MM nkk

NO REPAIR RRL,KSA

4 SPOTS/500MM RRL

19 SPOTS/13900 MM RRL&BSK

8 SPOTS/2240 MM RRL&BSK,KSA,DSK

14 SPOTS/1860 MM RRL&MNK
11 SPOTS/1320 MM BSK&DSK

14 SPOTS/5600 MM BSK,RRL&MNK

13 SPOTS/4600 MM/1 SPOT VT HOLD RRL&BSK

6 SPOTS/580MM rrl&bsk

5 SPOTS/1070MM KSA,MNK

5 SPOTS/310MM KSA,MNK,BSK
BSK,RRL&MNK,KSA,
11 SPOTS/1750MM PMJ
14 SPOTS/1280MM BSK,MNK

19 SPOTS/7760MM KSA,PMJ,MNK

14 SPOTS/9490MM BSK,MNK,KSA,PMJ

15 SPOTS/1570MM BSK,MNK,RRL

4 SPOTS/250MM BSK,MNK,RRL

7 SPOTS/730MM BSK,KSA,RRL

4 SPOTS/220MM RRL,MNK,KSA,PMJ

12 SPOTS/8470MM RRL,BSK,KSA

31 SPOTS/4200MM RRL PMJ MNK KSA

37 SPOTS/7350MM RRL PMJ MNK KSA


3 SPOTS/300MM BSK ,PMJ

CS-1 TO CS4 UT CHECK COMPLETED/4 RRL


SPOTS REPAIR-550MM

CS-5 TO CS9 UT CHECK COMPLETED/6 BSK,KSA


SPOTS REPAIR-570MM

7 SPOTS/680MM MNK,PMJ

22 SPOTS/3800MM MNK,PMJ
RRL PMJ MNK
11 SPOTS/2520MM KSA,BSK

17 SPOTS/4890MM RRL, KSA

15 SPOTS/970MM RRL, KSA

14 SPOTS/ 3880 MM pmj,bsk,santhosh

13 SPOTS/ 1010 MM RRL PMJ, KSA,DSK

26 SPOTS/ 1100 MM BSK,JNN,DSK

4 SPOTS/ 5300 MM BSK,PMJ,DSK

7 SPOTS/ 500 MM BSK,RRL,PMJ,KSA

14 SPOTS/ 13900 MM BSK,PMJ,KSA

11 SPOTS/ 1220 MM RRL,DSK


5 SPOTS/ 650 MM RRL,DSK, KSA

7 SPOTS/ 750 MM RRL,KSA,PMJ

13 SPOTS/ 1370 MM RRL, KSA,PMJ

13 SPOTS/ 1980 MM RRL,KSA,PMJ

8 SPOTS/ 1950 MM RRL,KSA

7 SPOTS/ 3750 MM KSA

7 SPOTS/ 590 MM RRL

4 SPOTS/ 550 MM RRL,DSK,MANI

12 SPOTS/ 1160 MM RRL,DSK,MANI

18 SPOTS/ 4940 MM PMJ,KSA

1 SPOT/ 100 MM PMJ,RRL,KSA,DSK

9 SPOTS/ 960 MM KSA

2 SPOTS/ 220MM PMJ

8 SPOTS/ 700 MM KSA

5 SPOTS/ 2250 MM DSK,MVE

4 SPOTS/ 350 MM KSA,MVH


14 SPOTS/ 1930 MM PMJ RRL DSK

9 SPOTS/ 14010 MM KSA MVH

9 SPOTS/ 1290 MM PMJ

10 SPOTS/ 1170 MM MVH,PMJ

10 SPOTS/ 1710 MM MVH,BSR

9 SPOTS/ 1490 mm MVH,pmj,ksa,dsk

24 SPOTS/ 4740 mm KSA,DSK,PMJ

7 SPOTS/ 9400 mm RRL,MVE

1 SPOTS/ 40 mm DSK,MVE

10 SPOTS/ 2280 mm dsk pmj bsr

4 SPOTS/ 230 MM DSK,MVI,ksa,pmj


R1

(R1)Date Repair(R1)

03.02.17 all spots ut ok

10.02.17 30 spots/ 3015mm + VT HOLD

17.02.17 2 SPOTS AGAIN REPAIR

24.02.17 6 SPOTS AGAIN REPAIR

3 SPOTS AGAIN REPAIR/ 1 SPOT


02.03.17 PENDING

03.03.17 2 SPOTS AGAIN REPAIR

10 SPOTS AGAIN REPAIR & 5 SPOTS


16.03.17 VT HOLD

04.04.17 2 spots

07.05.17 4 SPOTS AGAIN REPAIR

13.04.17 5 spots / 750mm + 2 VT HOLD

06.07.17 1 SPOTS AGAIN REPAIR


10.07.17 3 SPOTS AGAIN REPAIR

CS2 UT COMPLETED /1 SPOT


12.07.17 REPAIR / 120MM

CS2,3,4,5 UT COMPLETED
15.07.17 (1200mm)-7spots

19.07.17 8 SPOTS Repair, 3 Spots Pending

7 SPOTS AGAIN REPAIR/ 1 spots vt


20.07.17 hold

20.07.17 3 SPOTS AGAIN REPAIR

2 spots again repair / 22 spots ut


23.07.17 pending

05.08.17 9 SPOTS AGAIN REPAIR

11.08.17 all spots ut ok

17.08.17 all spots ut ok

19.08.17 3 repair weld under process

25.08.17 all spots ut ok


01.09.17 4 spots again repair & 1 spot vt hold

31.08.17 all spots ut ok

07.09.17 1 spots again repair & 1 spot vt hold

09.09.17 2 SPOTS AGAIN REPAIR

12.09.17 3 SPOTS UT PENDING

15.09.17 2 SPOTS AGAIN REPAIR

21.09.17 4 SPOTS AGAIN REPAIR

25.09.17 1 SPOTS AGAIN REPAIR

03.10.17 1SPOTS AGAIN REPAIR

09.10.17 all spots ut ok

29.12.17 5 SPOTS AGAIN REPAIR

29.12.17 2 SPOTS AGAIN REPAIR

04.01.18 3 spot repair/ 2 VT HOLD


06.01.18 all spots ut ok

09.01.18 7SPOTS AGAIN REPAIR

11.01.18 2 SPOTS AGAIN REPAIR

12.01.18 3 SPOTS AGAIN REPAIR

18.01.18 1SPOT UT PENDING

18.01.18 all spots ut ok

23.01.18 all spots ut ok

24.01.18 all spots ut ok

30.01.18 all spots ut ok

30.01.18 11 SPOTS UT OK & 4 SPOTS UT PENDING

02.02.18 11 SPOTS AGAIN REPAIR

02.02.18 all spots ut ok


4 SPOTS AGAIN REPAIR,1SPOT VT
05.02.18 HOLD&I UT PENDING

08.02.18 all spots ut ok

09.02.18 4 SPOTS AGAIN REPAIR

15 SPOTS AGAIN REPAIR/ 1 SPOT UT


09.02.18 PENDING

15.02.18 9 SPOTS AGAIN REPAIR


17.02.18 1 SPOT AGAIN REPAIR

20.02.18 all spots ut ok

20.02.18 all spots ut ok

21.02.18 all spots ut ok

23.02.18 7 SPOTS AGAIN REPAIR


2 SPOTS AGAIN REPAIR/1 SPOT VT
26.02.18 HOLD

03.03.18 3 SPOTS AGAIN REPAIR

03.03.18 3 SPOTS AGAIN REPAIR

15.03.18 8 SPOTS AGAIN REPAIR

16.03.18 6 SPOTs AGAIN REPAIR

11 SPOTS UT CHECKED-AGAIN 1
19.03.18 SPOTS REPAIR/15 REPAIR WELDING
UNDER PROCESS

24.03.18 all spots ut ok

23.03.18 2 SPOTS AGAIN REPAIR

12.04.18 12 SPOTs AGAIN REPAIR

12.04.18 6 SPOTs AGAIN REPAIR


15.04.18 all spots ut ok

17.04.18 4 SPOTS AGAIN REPAIR

18.04.18 10 SPOTS AGAIN REPAIR/1000mm

20.04.18 2 SPOTS AGAIN REPAIR

23.04.18 all spots ut ok

24.04.18 7 SPOTS AGAIN REPAIR

25.04.18 all spots ut ok

26.04.18 all spots ut ok

27.04.18 1 SPOT AGAIN REPAIR

3 spots again repair / 8 spots ut


30.04.18 pending
30.04.18 all spots ut ok

04.05.18 all spots ut ok

05.05.18 all spots ut ok

07.05.18 all spots ut ok

11.05.18 2 SPOTS AGAIN REPAIR

12.05.18 ALL SPOT OK


17.05.18 7 SPOTS AGAIN REPAIR

18.05.18 4SPOTS/ 13300

21.05.18 1 SPOTS AGAIN REPAIR

23.05.18 ALL SPOT OK

24.05.18 ALL SPOT OK

26.05.18 ALL SPOT OK

28.05.18 2 SPOTS AGAIN REPAIR

29.05.18 4 SPOTS AGAIN REPAIR/4400

31.05.18 ALL SPOT OK

06.06.18 1 SPOTS AGAIN REPAIR

09.06.18 all spots ut ok


R2

R1 verification &sign (R2) Date

RRL(N)

NKK(N) 13.02.17

RRL(D) 18.02.17

RRL(N) 25.02.17

JNN 03.03.17

NKK(N) 04.03.17

NKK(D) 17.03.17

NKK 04.04.17

JNN 07.05.17

NKK(N) 14.04.17

MNK 07.07.17
RRL(D) 11.07.17

RGA 13.02.17

RGA 17.07.17

JNN(D) 20.07.17

RRL 21.07.17

PMJ 21.07.17

KSA , MVE 24.07.2017

RRL 08.08.17

KSA

NKK

rrl 21.08.17

mnk
NKK 01.09.17

JNN

NKK 08.09.17

rrl 09.09.17

MNK 12.09.17

RGA 15.09.17

mnk 21.09.17

rrl 26.09.17

mnk 03.10.17

RRL

V110
RRL 30.12.17

RRL 29.12.17

MNK 05.01.18
BSK

dsk 11.01.18

mnk 12.01.18

ksa 13.01.18

ksa 19.01.18

ksa

BSK,MNK,PMJ

bsk/pmj

bsk/pmj/KSA

PMJ 01.02.18

BSK,MNK 03/02/18

BSK

PMJ 06.02.18

ksa

PMJ 10.02.18

KSA,RRL 14.02.18

PMJ,MNK 16.02.18
mnk 19.02.18

ksa

PMJ

ksa

RRL,BSK,PMJ 24.02.18

RRL&BSK 27.02.18

BSK 05.03.18

RRL,KSA 05.03.18

BSK 16.03.18

ksa 17.03.18

RRL 21.03.18

BSK

KSA 24.03.18

V110 HH95
RRL,DSK 15.03.18

BSK 13.04.18
KSA

KSA 17.04.18

RRL 19.04.18

PMJ 2004.18

KSA

KSA 24.04.18

V-100 NEW BATCH


KSA

KSA

pmj,rrl 27.04.18

PMJ,KSA 02.05.18

PMJ

KSA

BSR

KSA

RRL 11.05.18

PMJ
RRL 18.05.18

PMJ DSK 19.05.18

RRL 21.05.18

PMJ MVE

PMJ

KSA

KSA 28.05.18

DSK 29.05.18

MVE

PMJ 07.06.18

KSA
R2

Repair(R2) R2 verification &sign

7 SPOTS AGAIN REPAIR& 2 SPOTS JNN


PENDING

all spots ut ok NKK(D)

3 SPOTS REPAIR NKK(D)

2 SPOTS AGAIN REPAIR RRL(D)

all spots ut ok RRL(D)

9 SPOTS REPAIR& 1 SPOT VT HOLD JNN

1 SPOT AGAIN REPAIR RRL(N)

all spots ut ok NKK(D)

all spots ut ok JNN

all spots ut ok RRL(D)


all spots ut ok MNK

3 SPOTS REPAIR NKK(D)

CS4&6 UT COMPLETED MNK


(500mm)/4spots

9 SPOTS AGAIN REPAIR JNN

1 SPOTS AGAIN REPAIR NKK(D)

2 SPOTS AGAIN REPAIR RGA

2 SPOTS AGAIN REPAIR RRL(D)

4 SPOTS AGAIN REPAIR RRL(D)

all spots ut ok NKK


2 SPOTS AGAIN REPAIR & 1 SPOT VT JNN
HOLD PENDING

all spots ut ok KSA

all spots ut ok mnk

2 SPOTS AGAIN REPAIR KSA

1 spot repair/ 1spot ut pending ksa

all spots ut ok RRL(D)

ALL SPOTS UT OK ksa

ALL SPOTS UT OK ksa

V110
2 SPOTS AGAIN REPAIR mnk

all spots ut ok RRL, BSK

all spots ut ok RRL


3 SPOTS AGAIN REPAIR RRL

all spots ut ok bsk

all spots ut ok bsk

all spots ut ok JNN

7 SPOTS AGAIN REPAIR MNK,BSK

all spots ut ok KSA,PMJ

3 SPOTS AGAIN REPAIR RRL

1 SPOT AGAIN REPAIR ksa

4 SPOT AGAIN REPAIR PMJ

7 SPOT AGAIN REPAIR BSK


all spots ut ok KSA

3 SPOTS AGAIN REPAIR PMJ

all spots ut ok PMJ

2 SPOTS AGAIN REPAIR/100MM RRL

all spots ut ok RRL

1 SPOT AGAIN REPAIR ksa

all spots ut ok RRL

2 SPOTS AGAIN REPAIR ksa

all spots ut ok BSK

V110 HH95
7 SPOTS AGAIN REPAIR KSA

all spots ut ok RRL


1 SPOT AGAIN REPAIR PMJ

2 SPOT AGAIN REPAIR KSA

all spots ut ok PMJ

5 SPOTS AGAIN REPAIR RRL

V-100 NEW BATCH

all spots ut ok RRL

8 SPOTS AGAIN REPAIR ksa

1 SPOT AGAIN REPAIR KSA


all spots ut ok RRL
8 SPOTS/ 780MM- 1 spot ut KSA
pending
all spots ut ok RRL

all spots ut ok RRL

all spots ut ok PMJ

all spots ut ok PMJ


R3

Date Repair(R3)

15.02.17 all spots ut ok

26.02.17 all spots ut ok

03.03.17 all spots ut ok

19.03.17 all spots ut ok

05.04.17 all spots ut ok


14.02.17 1 SPOTS REPAIR

Again 7 spots repair&cs-4 full cs ut


17.07.17 check pending

21.07.17 2 SPOTS AGAIN REPAIR

21.07.17 all spots ut ok

21.07.17 all spots ut ok

24.07.2017 1 SPOTS AGAIN REPAIR

09.08.17 all spots ut ok


04.09.17 1 SPOTS AGAIN REPAIR

13.09.17 ALL SPOTS UT OK

18.09.17 ALL SPOTS UT OK

02.01.17 ALL SPOTS UT OK


12.01.18 all spots ut ok

1.02.18 all spots ut ok

06.02.18 2 SPOTS AGAIN REPAIR

10.02.18 all spots ut ok

16.02.18 all spots ut ok

16.02.18 6 SPOT AGAIN REPAIR


26.02.18 all spots ut ok

05.03.18 all spots ut ok

16.03.18 ALL SPOT OK

22.03.18 ALL SPOT OK

17.04.18 4 SPOTS AGAIN REPAIR


18.04.18 ALL SPOT OK

19.04.18 ALL SPOT OK

25.04.18 ALL SPOT OK

02.05.18 ALL SPOT OK

12.05.18 ALL SPOT OK


21.05.18 ALL SPOT OK
TOTAL Repair & Spot
RESULT (LS & CS)
R3 verification &sign

NKK(D)

PMJ

JNN

MNK

PMJ
NKK(D) 15.07.17 all spots ut ok

rrl 20.07.17 all spots ut ok

KSA, MVE 24.07.17 all spots ut ok

ksa

dsk

RGA 24.07.17 all spots ut ok

rrl
RRL

NKK

ksa

BSK
bsk

pmj

pmj 07.02.18 all spots ut ok

RRL

BSK

ksa 17.02.18 all spots ut ok


RRL

pmj

pmj

RRL

ksa 18.04.18 ALL SPOT OK


ksa

RRL

KSA

PMJ

PMJ
RRL
PLANER VOLUMETRIC

3 SPOTS/410MM

16 SPOTS 2700 3 SPOTS/350MM

7 SPOTS /1150 1 SPOTS/50MM


mnk

RRL

RRL

MNK
KSA

PMJ,.BSK
ksa
Remarks

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
SL no Section no BAY R0 Date

37 V110-M1-034 III 01.01.18

38 V110-M1-035 III 03.01.18

39 V110-M1-036 III 06.01.18

40 V110-M1-037 III 10.01.18

42 V110-M1-039 3 12.01.18

43 V110-M1-040 3 19.01.18

44 V110-M1-041 3 20.01.18

45 V110-M1-042 III 22.01.18

46 V110-M1-043 III 24.01.18

47 V110-M1-044 III 24.01.18

48 V110-M1-045 III 29.01.18


50 V110-M1-047 III 01.02.18

51 V110-M1-048 III 05.02.18

52 V110-M1-049 III 07.02.18

53 V110-M1-050 III 12-02-2018

54 V110-M1-051 III 14.02.18

55 V110-M1-052 III 16.02.18

56 V110-M1-053 III 17.02.18

57 V110-M1-054 III 21.02.18

58 V110-M1-055 III 22.02.18

59 V110-M1-056 III 28.02.18

60 V110-M1-057 III 01.03.2018

61 V110-M1-058 3 04.03.2018

65 V110-M1-62 3 14.03.2018
1 V110-M1-001 III 03.04.18

2 V110-M1 002 III 04.04.18

3 V110-M1 003 III 07.04.18

4 V110-M1 004 III 09.04.18

5 V110-M1 005 III 13.04.18

6 V110-M1 007 III 14.04.18

7 V110-M1 008 V 18.04.18

8 V110-M1 006 III 19.04.18

1 V100-M1-13 3 20.04.18

2 V100-M1-14 3 21.04.18

3 V100-M1-15 III 23.04.18

4 V100-M1-16 III 26.04.18

5 V100-M1-17 III 27.04.18

6 V100-M1-18 III 27.04.18

7 V100-M1-19 3 30.04.18

8 V100-M1-020 III 04.05.18


9 V100-M1-021 III 05.05.18

10 V100-M1-022 4 07.05.18

11 V100-M1-023 4 09.05.18

12 V100-M1-024 5 09.05.18

13 V100-M1-026 III 11.05.18

14 V100-M1-025 4 12.05.18

15 V100-M1-027 IV 15.05.18

16 V100-M1-028 III 16.05.18

17 V100-M1-029 III 17.05.18

18 V100-M1-030 III 19.05.18

19 V100-M1-031 III 21.05.18

20 V100-M1-032 III 22.05.18

21 V100-M1-033 III 23.05.18


R0

Repair(R0) R0 verification &sign

1 SPOT/50MM RRL,MNK,DSK

1 SPOT/700MM bsk&dsk

1 SPOT/20MM RRL&MNK

8 SPOTS/605MM RRL,MNK,DSK,BSK

7 SPOTS/590MM RRL,,DSK,BSK

1 SPOTS/50MM MNK,BSK,KSA

7 SPOTS/860MM MNK,BSK,PMJ,RRL

3 SPOTS/400mm RRL&PMJ

1 SPOT/50MM BSK,MNK

3 SPOTS/150MM KSA, PMJ

3 SPOTS/300MM KSA, PMJ


3 SPOTS/700MM ,RRL,MNK,BSK

3 SPOTS/290MM MNK,KSA,PMJ

3 SPOTS/230MM MNK,PMJ

no repair MNK,PMJ,BSK

4 SPOTS/180MM KSA,RRL,MNK,PMJ

2 SPOTS/200MM ,RRL,PMJ,BSK

8 SPOTS/1370MM KSA,MNK,RRL

12 SPOTS/680MM ,RRL,KSA,BSK

6 SPOTS/390MM ,RRL,KSA,BSK

4 SPOTS/550MM BSK, PMJ

10SPOTS/1950MM BSK, PMJ

9 SPOTS/600mm RRL, KSA

6 SPOTS/1180mm PMJ,SANTHOSH,BSK
3 SPOTS/130mm PMJ,DSK,KSA

5 SPOTS/750mm RRL,PMJ,KSA

6 SPOTS/630mm PMJ,DSK

5 SPOTS/300mm PMJ,KSA,RRL,DSK

2 SPOTS/180 mm RRL,DSK

11 SPOTS/1790 mm RRL,DSK

9 SPOTS/500 mm RRL,KSA,PMJ

2 SPOTS/200 mm RRL,KSA,PMJ

9 SPOTS/870 mm RRL,BSK,KSA

5 SPOTS/300 mm BSK,PMJ

6 SPOTS/400 mm RRL

4 SPOTS/300 mm KSA,PMJ

4 SPOTS/190 mm KSA,PMJ

2 SPOTS/150 mm RRL,DSK,MANI

4 SPOTS/220 mm PMJ,KSA

1 SPOT/100 mm KSA
3SPOTS/210 mm PMJ

4 SPOTS/220 mm & 1 VT HOLD RRL, KSA

9 SPOTS/3080 mm RRL,MVE

12 SPOTS/2820 mm & 2 VT HOLD RRL,PMJ

4 SPOTS/220 mm PMJ,DSK

13 SPOTS/7300 mm KSA,DSK,MVH

6 SPOTS/500 mm RRL, KSA

7 SPOTS/810 mm PMJ DSK

3 SPOTS/1200 mm RRL,PJN,DSK

8 SPOTS/1060 mm RRL,PMJ,DSK,MVE

2 SPOTS/200 mm mve pmj

2 SPOTS/150 mm mve pmj

7 SPOTS/1210 mm mve pmj


R1

(R1)Date Repair(R1)

02.01.18 ALL SPOT OK

03.01.18 ALL SPOT OK

06.01.18 ALL SPOT OK

11.01..18 ALL SPOT OK

13.01.18 ALL SPOT OK

19.01.18 ALL SPOT OK

22.01.18 ALL SPOT OK

22.01.18 ALL SPOT OK

24.01.18 ALL SPOT OK

25.01.18 ALL SPOT OK

30.01.18 ALL SPOT OK


01.02.18 ALL SPOT OK

05.02.18 ALL SPOT OK

08.02.18 all spots ut ok

14.02.18 all spots ut ok

16.02.19 all spots ut ok

19.02.18 ALL SPOT OK

21.02.18 ALL SPOT OK

23.02.18 ALL SPOT OK

28.02.18 1 SPOT AGAIN REPAIR

03.02.18 1 SPOT AGAIN REPAIR

05.03.18 1 SPOT FIUSH WELD

15.03.18 2 spots again repair


04.04.18 1 spots again repair

05.04.18 1 spots again repair

09.04.18 ALL SPOT OK

10.04.18 ALL SPOT OK

14.04.18 ALL SPOT OK

16.04.18 1 spots again repair

19.04.18 ALL SPOT OK

19.04.18 2 spots again repair

20.04.18 3 SPOT AGAIN REPAIR

23.04.18 2 SPOT AGAIN REPAIR

24.04.18 ALL SPOT OK

26.04.18 1 SPOT AGAIN REPAIR

27.04.18 ALL SPOT OK

28.04.18 ALL SPOT OK

02.05.18 1 SPOT AGAIN REPAIR

04.05.18 ALL SPOT OK


05.05.18 ALL SPOT OK

08.05.18 ALL SPOT OK

10.05.18 1 SPOT AGAIN REPAIR

10.05.18 1 SPOT AGAIN REPAIR

11.05.18 ALL SPOT OK

12.05.18 7 SPOT AGAIN REPAIR

15.05.18 3 SPOT AGAIN REPAIR

17.05.18 ALL SPOT OK

18.05.18 ALL SPOT OK

21.05.18 2 SPOT AGAIN REPAIR

22.05.18 ALL SPOT OK

22.05.18 ALL SPOT OK

23.05.18 ALL SPOT OK


R2

R1 verification &sign (R2) Date

JNN

RRL

RRL

RRL

ksa

JNN

PMJ

MNK

PMJ

BSK

BSK
pmj,ksa

MNK

ksa

rrl

ksa

BSK

MNK

KSA

KSA 01.03.2018

PMJ 03.03.18

RRL 06.03.18

dsk 16.03.18

V110 HH95
RRL 04.04.18

RRL 05.04.18

PMJ

PMJ

KSA

RRL 16.04.18

KSA

KSA 19.04.18

V100 NEW BATCH


PMJ 21.04.18

KSA 23.04.18

BSR

dsk 27.04.18

RRL

PMJ

KSA 2.05318

KSA
KSA

PMJ

RRL 10.05.18

RRL 10.05.18

RRL

DSK,MVH 15.05.18

MVH 16.05.18

RRL

MVE

PMJ 21.05.18

dsk

PMJ

PMJ
R2

Repair(R2) R2 verification &sign


ALL SPOT OK BSK

1 SPOT AGAIN REPAIR KSA

ALL SPOT OK BSK

ALL SPOT OK KSA

V110 HH95
ALL SPOT OK RRL

ALL SPOT OK KSA

ALL SPOT OK pmj

ALL SPOT OK pmj

V100 NEW BATCH


ALL SPOT OK BSK

ALL SPOT OK KSA

ALL SPOT OK KSA

ALL SPOT OK DSK


ALL SPOT OK PMJ

ALL SPOT OK KSA

ALL SPOT OK DSK

ALL SPOT OK RRL

all spots ut ok RRL


R3

Date Repair(R3)
03.03.18 ALL SPOT OK
TOTAL Repair & Spot
RESULT (LS & CS)
R3 verification &sign
BSK
PLANER VOLUMETRIC
Remarks

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
SL no Section no BAY R0 Date

1 M2-009 27.01.17

2 M2-011 09.02.17

3 M2-010 09.02.17

4 M2-12 17.02.17

5 M2-13 04.03.17

6 M2-14 09.03.17

7 M2-15 01.04.17

8 M2-16 05.04.17

9 M2-17 09.04.17

10 M2-18 11.04.17
11 V100 -M2-001 IV 04.03.17

12 V100 -M2-002 III 05.07.17

13 V100 -M2-003 I 07.07.17

14 V100 -M2-004 III 08.07.17

V100 -M2-005(CS1-
15 III 13.07.17
CS3&CS7-CS10)

15 V100-M2-006 III 13.07.17

16 V100-M2-007 III 14.07.17

17 V100 -M2-008 III 18.07.17

18 V100 -M2-009 III 18.07.17

19 V100 -M2-010 III 29.07.17

20 V100 -M2-011 III 02.08.17

21 V100 -M2-012 III 05.08.17


22 v110-M2-20 II 17.08.17

23 v110-M2-21 II 21.08.17

24 v110-M2-22 II 26.08.17

25 v110-M2-23 II 28.08.17

26 v110-M2-24 III 01.09.17

27 v110-M2-25 III 07.09.17

28 v110-M2-26 III 07.09.17

29 v110-M2-27 III 12.09.17

30 v110-M2-28 III 15.09.17

31 v110-M2-29 III 20.09.17

32 v110-M2-30 III 20.09.17

33 v110-M2-031 III 20.12.17

34 v110-M2-032 III 21.12.17

35 v110-M2-033 III 23.12.17


36 v110-M2-034 III 27.12.17

37 v110-M2-035 III 28.012.17

38 v110-M2-036 III 31.12.17

39 v110-M2-037 III 04.01.18

40 v110-M2-038 III 06.01.18

41 v110-M2-039 I 09.01.18

42 v110-M2-040 III 10.01.18

43 v110-M2-041 I 18.01.18

44 v110-M2-042 I 20.01.18

45 v110-M2-044 3 25.01.18

46 v110-M2-043 I 27.01.18

47 v110-M2-045 3 30.01.18

48 v110-M2-046 3 01/02/18

49 v110-M2-047 3 02/02/18
50 v110-M2-048 1 05.02.18

51 v110-M2-049 1 06.02.18

52 v110-M2-050 3 08.02.18

53 v110-M2-051 3 09.02.18

54 v110-M2-052 1 14.02.18

55 v110-M2-053 3 15.02.18

56 v110-M2-054 3 19.02.18

57 v110-M2-055 1 20.02.18

58 V110-M2-56 3 26.02.2018

59 V110-M2-57 III 27.02.18

60 V110-M2-58 I 13.03.18

61 V110-M2-59 III 15.03.18

62 V110-M2-60 III 16.03.18

63 V110-M2-61 III 17.03.18


64 V110-M2-62 III 18.03.18

1 V110-M2-001 1 03.04.18

2 V110-M2-002 1 04.04.18

3 V110-M2-003 1 09.04.18

4 V110-M2-004 3 10.04.18

5 V110-M2-005 1 12.04.18

6 V110-M2-006 1 13.04.2018

7 V110-M2-007 1 16.04.2018

8 V110-M2-008 I 17.04.18

1 M2-13 1 21.04.18

2 M2-14 3 21.04.18

3 M2-15 III 25.04.18


4 M2-16 I 25.04.18

5 M2-17 1 28.04.18

6 M2-18 3 28.04.18

7 M2-19 3 03.05.18

8 M2-20 1 03.05.18

9 M2-21 3 05.05.18

10 M2-22 3 07.05.18

11 M2-24 1 09.05.18

12 M2-23 5 10.05.18

13 M2-25 IV 12.05.18

14 M2-26 3 12.05.18

15 M2-27 3 12.05.19

16 M2-28 III 15.05.18

17 M2-29 III 18.05.18


18 M2-30 III 19.05.18

19 M2-31 III 23.05.18

20 M2-32 III 24.05.18

21 M2-33 III 25.05.18


R0

Repair(R0) R0 verification &sign

4 SPOTS/570MM RRL(D)

8 SPOTS/1810MM RRL(D)

NO REPAIR JNN

18 SPOTS/4090MM JNN

1 SPOT/100MM JNN

11 SPOT/3700MM RRL(D) PMJ

10 SPOTS/13510MM RRL(D)&JNN

12 SPOTS/6740MM MNK(N)

28 SPOTS/9500MM NKK(D)

4 SPOTS/1280MM RRL(D)
5 SPOT REPAIR/ 290MM NKK(D)

5 SPOT REPAIR/ 290MM RRL(D)

2 SPOT REPAIR/ 80MM RRL(D)

9 SPOT REPAIR/ 1920MM RRL(D)

1 SPOT REPAIR/ 200MM(CS4,5,6UT mnk


PENDING)

1 SPOT REPAIR + 3 BT / 700MM MVE

3 SPOT REPAIR – 500MM MVE

6 SPOTS/410MM MVE

7 SPOTS/460MM RRL

4 SPOTS/390MM + 1 BT MNK

5 SPOTS/370MM RRL

12 SPOTS/2240MM RGA
2 SPOTS/900MM RRL

2 SPOTS/400MM RGA

9 SPOTS/800MM mnk

3 SPOTS/140MM RRL

3 SPOTS/250MM mnk

2 SPOT/100mm RRL

2 BT RRL

3 SPOTS/ 210MM RGA

1 SPOT/ 30MM nkk

3 SPOTS/ 430MM RGA

12 SPOTS/6440MM KSA

1SPOTS/40MM RRL

2 SPOTS/150 MM rrl&bsk

2 SPOTS/60 MM rrl&bsk
2 SPOTS/650 MM RRL

NO REPAIR RRL&DSK

3 SPOTS/ 430MM ksa/mnk

NO REPAIR rrl&bsk,mnk

NO REPAIR RRL&MNK

3 SPOTS/ 550MM rrl&bsk,mnk

3 SPOTS/ 330MM MNK,RRL&DSK

NO REPAIR MNK, BSK

14 SPOTS/ 1670MM MNK,BSK,PMJ

1 SPOTS/ 300MM rrl&KSA,PMJ

2 SPOTS/ 100MM KSA,PMJ

1 SPOT/ 50MM KSA,PMJ

NO REPAIR BSK,ksa,pmj

3 SPOTS/ 500MM PMJ,RRL,MNK,KSA


8 SPOTS/ 420MM PMJ,RRL,MNK,BSK

2 SPOTS/ 200MM RRL,ksa,BSK

1 SPOTS/ 2000MM PMJ & MNK

5 SPOTS/ 390MM KSA,PMJ & MNK

3 SPOTS/ 140MM BSK,PMJ & MNK

1 SPOTS/ 100MM BSK,PMJ & MNK

3 SPOTS/ 90MM KSA, GSR, BSK

2 SPOTS/ 80 MM KSA,BSK,RRL

4 SPOTS/ 140 MM BSK,KSA

4 SPOTS/ 150 MM 27.02.18

NO REPAIR RRL,KSA

2 SPOTS/ 160 MM pmj,dsk

NO REPAIR RRL,pmj,dsk

NO REPAIR BSK,JNN,DSK
3 SPOTS/ 95 MM RRL,pmj,BSK

22 SPOTS/ 3460 MM PMJ,DSK,RRL

4 SPOTS/220 MM KSA,PMJ

2 spots repair-300mm RRL,KSA,PMJ,DSK

NO REPAIR RRL,KSA,PMJ,DSK

2 spots repair-90mm RRL,KSA,PMJ,DSK

2 spots repair-70mm PMJ, KSA

2 spots repair-550 PMJ, DSK

12 spots repair-9110 mm RRL,KSA

4 spots repair-860MM JNN,BSK,PMJ

1 spot repair-50MM/ 3 SPOTS VT KSA


HOLD

NO REPAIR RRL,PMJ,GUNA
2 spots repair-280MM BSR,MMN

NO REPAIR RRL,KSA

4 spots repair-120MM PMJ,DSK

4 spots repair-330MM KSA

3 spots repair-110MM PMJ,DSK,MVH

NO REPAIR KSA

1 spots repair-50MM RRL

1 spots repair-50MM KSA,MVH

7 spots repair-2120MM RRL,KSA,PMJ

1 spots repair-50MM PMJ,BSR

NO REPAIR MVH,DSK

6 spots repair-500MM MVH,DSK

3 spots repair-150MM MVE,DSK

1 spots repair-50MM RRL,KSA,MVE


2 spots repair-100MM RRL,KSA,DSK

1 spots repair-50MM PMJ MVE

NO REPAIR PMJ BSR

6 spots repair- 360mm PMJ, KSA

#VALUE!
R1

(R1)Date Repair(R1)

27.01.17 all spots ut ok

09.02.17 all spots ut ok

18.02.17 2 SPOT AGAIN REPAIR + 2 LS REPAIR

04.03.17 all spots ut ok

10.03.17 1 SPOT REPAIR&3 SPOT PENDING

03.04.17 9 SPOT AGAIN REPAIR

06.04.17 5 SPOT AGAIN REPAIR

10.04.17 11 SPOT AGAIN REPAIR

12.04.17 all spots ut ok


04.07.17 all spots ut ok

07.07.17 all spots ut ok

07.07.17 2 SPOT AGAIN REPAIR

08.07.17 1 SPOT AGAIN REPAIR

CS4,5,6 UT CHECKED/ TOTAL 6


13.07.17 REPAIRS

14.07.17 2 SPOT AGAIN REPAIR

15.07.17 1 SPOT AGAIN REPAIR

18.07.17 3 SPOTS AGAIN REPAIR

19.07.17 1 SPOT AGAIN REPAIR

01.08.17 all spots ut ok

03.08.17 1 SPOT AGAIN REPAIR

06.08.17 1 SPOT AGAIN REPAIR


18.08.17 ALL SPOTS UT OK

21.08.17 ALL SPOTS UT OK

28.08.17 ALL SPOTS UT OK

01.09.17 1 SPOT AGAIN REPAIR

05.09.17 ALL SPOTS UT OK

07.09.17 2 SPOT AGAIN REPAIR

13.09.17 ALL SPOTS UT OK

15.09.17 ALL SPOTS UT OK

20.09.17 ALL SPOTS UT OK

22.09.17 ALL SPOTS UT OK

20.12.17 ALL SPOTS UT OK

22.12.17 ALL SPOTS UT OK

23.12.17 ALL SPOTS UT OK


27.12.17 1 SPOT AGAIN REPAIR

01.01.17 ALL SPOTS UT OK

09.01.18 ALL SPOTS UT OK

11.01..18 ALL SPOT OK

20.01..18 ALL SPOT OK

25.01.18 ALL SPOT OK

27.01.18 ALL SPOT OK

30.01.18 ALL SPOT OK

150

03/02/18 ALL SPOT OK


06.02.18 1 SPOT AGAIN REPAIR

06.02.18 ALL SPOT OK

08.02.18 ALL SPOT OK

10.02.18 1 SPOT AGAIN REPAIR

14.02.18 1 SPOT AGAIN REPAIR

15.02.18 ALL SPOT OK

19.02.18 ALL SPOT OK

20.02.18 ALL SPOT OK

27.02.17 ALL SPOT OK

27.02.18 1 SPOT AGAIN REPAIR

15.03.18 ALL SPOT OK


19.03.18 ALL SPOT OK

04.04.18 ALL SPOT OK

05.04.18 ALL SPOT OK

10.04.18 ALL SPOT OK

13.04.18 ALL SPOT OK

13.04.18 ALL SPOT OK

17.04.17 ALL SPOT OK

18.04.18 ALL SPOT OK

23.04.18 ALL SPOT OK

21.04.18 ALL SPOT OK

+
25.04.18 ALL SPOT OK

28.04.18 ALL SPOT OK

03.05.18 ALL SPOT OK

03.05.18 ALL SPOT OK

07.05.18 ALL SPOT OK

10.05.18 ALL SPOT OK

11.05.18 5 spots repair

12.05.18 ALL SPOT OK

15.05.18 ALL SPOT OK

15.05.19 ALL SPOT OK

18.05.18 ALL SPOT OK


19.05.18 ALL SPOT OK

24.05.18 ALL SPOT OK

25.05.18 ALL SPOT OK

+
R2

R1 verification &sign (R2) Date

JNN(N)

NKK(D) 20.02.17

RRL(D)

JNN(D) 10.03.17

RRL(N) 04.04.17

RRL(N) 07.05.17

NKK(N) 11.04.17

JNN
mnk

jnn

RGA 07.07.17

mnk 09.07.17

NKK(D) 13.07.17

NKK(D) 14.07.17

NKK(D) 15.07.2017

mnk 18.07.17

RGA 19.07.17

pmj

dsk

vvj 07.08.17
NKK

mnk

mnk

KSA 1.9.17

KSA

NKK 08.09.17

NKK

ksa

nkk

nkk

V110
bsk

JNN

RRL
bsk 28.12.17

mnk

mnk

RRL

RRL

ksa

ksa

pmj

ksa
bsk 06.02.18

bsk

ksa

rrl 10.02.18

KSA 15.02.18

mnk

RRL

mnk

bsk

KSA 28.02.18

pmj
DSK

V110 HH95
RRL

RRL

KSA

KSA

DSK

RRL

KSA

V100 NEW BATCH


BSR

BSR
DSK

KSA

DSK

pmj

RRL

RRL

RRL 11.05.18

KSA

KSA

MVH

DSK
DSK

pmj

DSK
R2

Repair(R2) R2 verification &sign

all spots ut ok JNN(N)

all spots ut ok RRL(D)

2 SPOT AGAIN REPAIR &5 SPOTS RRL(N)


FLUSH WELD RE UT NEEDED

all spots ut ok NKK

2 SPOT REPAIR &1 SPOT PENDING JNN


all spots ut ok MNK

1 SPOT AGAIN REPAIR RGA

all spots ut ok MVE

all spots ut ok MVE

all spots ut ok MNK

all spots ut ok RRL

ALL SPOTS UT OK JNN

all spots ut ok RRL


all spots ut ok JNN

all spots ut ok JNN

V110
ALL SPOTS UT OK bsk
ALL SPOTS UT OK MNK

ALL SPOT OK RRL

ALL SPOT OK PMJ

ALL SPOT OK BSK


V110 HH95

V100 NEW BATCH


ALL SPOT OK MVE
R3

Date Repair(R3)

05.04.17 all spots ut ok

12.04.17 all spots ut ok


10.07.17 all spots ut ok
TOTAL Repair & Spot
RESULT (LS & CS)
R3 verification &sign

NKK(D)

RRL(D)
mnk
PLANER VOLUMETRIC

3 SPOTS/410MM

9 SPOTS/6490MM 3 SPOTS/250MM

3 SPOTS/880MM 1 SPOTS/400MM
Remarks

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
2
HEATING AREA UT 22 v110-M2-20 II 17.08.17SPOTS/
COMPLETED 900M RRL
M
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
2
22 v110-M2-20 II 17.08.17SPOTS/
900M RRL
M
18.08.17
ALL SPOTS UT OK
NKK
22 v110-M2-20 II 17.08.17
SL no Section no BAY R0 Date

1 TS-009 28.01.17

2 TS-010 09.02.17

3 TS-011 13.02.17

4 TS-012 20.02.17

5 TS-13 03.03.17&04.03.17

6 TS-14 11.03.17

7 TS-15 22.03.17

8 TS-16 25.03.17

9 TS-17 07.04.17

10 TS-18 11.04.18

11 V100-TS-001 I 10.07.17
12 V100-TS-002 I 15.07.17

13 V100-TS-003 I 17.07.17

14 V100-TS-004 I 18.07.17

15 V100-TS-005 I 20.07.17

16 V100-TS-006 1 22.07.2017

17 V100-TS-007 1 24.07.2017

18 V100-TS-008 1 27.07.17

19 V100-TS-009 I 04.08.17

20 V100-TS-010 1 08.08.17

21 V100-TS-011 I 09.08.17

22 V100-TS-012 1 12.08.17

23 V110-TS-019 1 18.08.17

24 V110-TS-020 1 22.08.17
25 V110-TS-021 1 28.08.17

26 V110-TS-022 1 31.08.17

27 V110-TS-023 1 02.09.17

28 v110-TS-024 1 06.09.17

29 v110-TS-025 1 12.09.17

30 v110-TS-026 1 13.09.17

31 v110-TS-027 1 15.09.17

32 v110-TS-028 I 23.09.17

33 v110-TS-029 1 28.09.17

34 v110-TS-30 1 03.10.17

35 v110-TS-031 I 20.12.17

36 v110-TS-032 I 22.12.17

37 v110-TS-033 I 25.12.17
38 v110-TS-034 I 28.12.17

38 v110-TS-035 I 29.12.17

38 v110-TS-036 I 02.01.18

39 v110-TS-037 I 04.01.18

40 v110-TS-038 I 06.01.18

41 v110-TS-039 I 09.01.18

42 v110-TS-40 I 12.01.18

43 v110-TS-41 I 16.01.18

44 v110-TS-42 I 22.01.18

45 v110-TS-43 I 23.01.18

46 v110-TS-43 I 24.01.18

47 v110-TS-44 I 29.01.18

48 v110-TS-45 I 30.01.18

49 v110-TS-46 I 1/2.18

50 v110-TS-47 I 03/02/18
51 v110-TS-48 I 06.02.18

52 v110-TS-49 I 08.02.18

53 v110-TS-50 I 10.02.18

54 v110-TS-51 I 12.02.18

55 v110-TS-52 I 15.02.18

56 v110-TS-53 I 19.02.18

57 v110-TS-54 I 22.02.18

58 v110-TS-55 I 24.02.18

59 v110-TS-56 I 01.03.2018

60 v110-TS-57 I 05.03.18

61 v110-TS-58 I 12.03.2018

62 v110-TS-59 I 14.03.18

63 v110-TS-60 I 16.03.18

64 v110-TS-61 I 17.03.18

65 v110-TS-62 I 19.03.18
1 TS-01 1 05.04.18

2 TS-02 1 07.04.18

3 TS-03 I 10.04.18

4 TS-04 I 12.04.18

5 TS-05 I 14.04.18

6 TS-06 I 17.04.18

7 TS-07 I 18.04.18

7 TS-08 I 20.04.18

1 TS-013 1 23.04.18

2 TS-014 1 24.04.18

3 TS-015 1 26.04.18

4 TS-16 1 27.04.18
5 TS-17 1 30.04.18

6 TS-18 1 02.05.18

7 TS-19 1 04.05.18

8 TS-20 1 05.05.18

9 TS-21 1 07.05.18

10 TS-22 1 09.05.18

11 TS-23 I 11.05.18

12 TS-24 I 12.05.18

13 TS-25 1 14.05.18

14 TS-26 I 15.05.18

15 TS-27 I 17.05.18

16 TS-28 I 18.05.18

17 TS-29 I 19.05.18

18 TS-30 I 21.05.18
19 TS-31 I 23.05.18

20 TS-32 I 24.05.18

21 TS-33 I 26.05.18
R0

Repair(R0) R0 verification &sign

UT COMPLETED.12 SPOTS/2450MM RRL(D) &JNN(D)

bf-5000mm repair&5 spots repar/1000mm RRL(D)

5sopts/530mm and 1 VT hold JNN

4sopts/1300mm and 1 BT RRL(N)

3 SPPOTS /180MM NKK(N)&JNN

4 REPAIR/300&4 BT JNN

4 REPAIR/450mm RRL(D)

3 REPAIR/840mm & 5 BT PMJ(D)

3 REPAIR/260mm RRL(N)

1 REPAIR/50mm JNN

7 SPOTS/2600mm NKK(N)
4 SPOTS/390mm MNK

7 SPOTS/1060mm MNK

2 SPOTS/100mm MNK

1 SPOT/30mm PMJ

5 SPOT/580mm JNN

2 SPOT/180mm MNK

1 SPOT/100mm NKK

3 B:T ONLY RRL(D)

4 REPAIR/900mm & 1 BT ksa

7 SPOT/800mm RRL(D)

7 SPOT/1490mm KSA

NO REPAIR RGA

2 SPOT/180mm JNN
6 SPOTS/1110mm RRL(D)

cs-5 to cs-12 ut completed(1 spot repair-1 spot


vt hold) RRL(D)

4 SPOTS/3000mm mnk

6 SPOTS/1450mm JNN

5 SPOTS/1680mm RGA

3 SPOTS/260mm NKK

4 SPOTS/890mm RRL

19 SPOTS/133800mm RRL

10 spots JNN

5 SPOTS/1170mm JNN

10 SPOTS/1805mm RRL/BSK

2 SPOTS/1050mm RRL/BSK

3 SPOTS/930mm KSA
2 SPOTS/350mm KSA,BSK, DSK

2 SPOTS/300mm KSA,BSK, MNK

11SPOTS/1765MM BSK

4 SPOTS/175mm RRL&DSK

3 SPOTS/150mm BSK&DSK

1 SPOT/ 50mm RRL,DSK&MNK

1 SPOT/ 50mm ksa, dsk

7 SPOT/ 1160mm ksa, bsk

5 SPOT/ 560mm MNK,ksa,bsk

CS-7 TO CS-12 UT COMPLETED/ NO REPAIR KSA, PMJ

CS-1 TO CS-6 UT COMPLETED/ NO REPAIR BSK,MNK

1 SPOT/ 80mm BSK,RRL

2 SPOT/ 80mm BSK,mnk,KSA,PMJ

6 SPOT/ 480mm KSA,PMJ

4 SPOTS/ 300mm KSA,BSK,RRL


NO REPAIR PMJ,MNK

2 SPOTS/ 240mm KSA,BSK,RRL

3 SPOTS/190mm MNK

5 SPOTS/270mm KSA,RRL

NO REPAIR KSA,RRL

3 SPOTS/300mm BSK, GSR, KSA

PMJ MNK
5 SPOTS/290mm KSA,BSK,RRL

1 SPOTS/100mm RRL,MNK,BSK

2 SPOTS/150mm BSK, PMJ

2 spot repair/60MM KSA, bsk,PMJ

6 spot repair/700 MM bsk,PMJ

1 SPOTS/50mm RRL,KSA,PMJ,DSK

5SPOTS/710mm RRL&PMJ

NO REPAIR RRL,PMJ,DSK

1 SPOTS/50mm RRL,PMJ,DSK
2 SPOTS/70mm bsk,PMJ

4 SPOTS/680mm KSA,PMJ

6 SPOTS/400mm RRL&DSK

3 SPOTS/270mm RRL,KSA,PMJ,DSK

4 SPOTS/590mm KSA,PMJ

1 SPOTS/400mm PMJ,DSK,ksa

4 SPOTS/800mm PMJ,DSK,

2 SPOTS/150mm DSK,KSA

NO REPAIR RRL,ksa

2 SPOTS/60mm KSA

2 SPOTS/100mm KSA,PMJ

1 SPOT/50mm KSA,PMJ
5 SPOTS/290mm KSA,DSK,PMJ

4 SPOTS/240mm PMJ DSK BSR

1 SPOT/70mm KSA,DSK,PMJ

NO REPAIR KSA,DSK,MVH

NO REPAIR KSA,PMJ

4 SPOT/190mm PMJ,DSK,

NO REPAIR RRL,PMJ,DSK

4 SPOT/190mm PMJ,BSR

1 SPOT/100mm KSA,BSR

1 SPOT/100mm DSK,BSR

6 SPOT/1700mm RRL,DSK,BSR

NO REPAIR PMJ RRL MVE DSK

1 SPOT/350mm PMJ BSR MVE

NO REPAIR RRL,PMJ,DSK,MVE
1 SPOT/30mm PMJ JNN

4 SPOTs/1150mm KSA,MVH,DSK

NO REPAIR KSA,MVH,DSK,PMJ
R1

(R1)Date Repair(R1)

30.01.17 12 REPAIR SPOTS UT BALANCE

bf-5000mm repair&1 spots


11.02.17 repar/1000mm

14.02.17 1 SPOTS REPAIR

21.02.17 1 SPOTS REPAIR

04.03.17 1 SPOT AGAIN REPAIR

12.03.17 All spots ut ok

22.03.17 3 SPOT AGAIN REPAIR

27.03.17 2 SPOT AGAIN REPAIR

08.04.17 1 spot again repair

12.04.17 1 spot again repair

11.07.17 8 spot again repair


16.07.17 3 SPOTS AGAIN REPAIR

18.07.17 1 spot again repair/ 1 spot vt hold

18.07.17 1 spot again repair

20.03.17 All spots ut ok

22.03.17 All spots ut ok

25.07.17 1 spot again repair

05.08.17 All spots ut ok

09.08.17 2 spot pending& 1 spot again repair

11.08.17 All spots ut ok

14.08.17 2 SPOT AGAIN REPAIR

22.08.17 All spots ut ok


29.08.17 2 SPOT AGAIN REPAIR

31.08.17 1 spot again repair

05.09.17 All spots ut ok

07.09.17 3 SPOTS AGAIN REPAIR

13.09.17 All spots ut ok

13.09.17 All spots ut ok

2 SPOTS AGAIN REPAIR & 1 SPOT UT


PENDING

25.09.17 1 spot vt hold

03.10.17 All spots ut ok

09.10.17 All spots ut ok

22.12.17 All spots ut ok

23.12.17 All spots ut ok

26.12.17 2 SPOT AGAIN REPAIR


29.12.17 ALL SPOTS UT OK

30.12.17 ALL SPOTS UT OK

1 SPOT AGAIN REPAIR/1 SPOT UT


02.01.18 PENDING

05.01.18 ALL SPOTS UT OK

06.01.18 1 SPOTS/20mm

10.01.18 ALL SPOTS UT OK

13.01.18 ALL SPOTS UT OK

18.01.18 ALL SPOTS UT OK

23.01.18 ALL SPOTS UT OK

29.01.18 ALL SPOTS UT OK

31.01.18 ALL SPOTS UT OK

02.02.18 2 SPOTS AGAIN REPAIR/200mm

03.02.18 ALL SPOTS UT OK


09.02.18 1 spot again repair

09.02.18 2 spot ut ok / 1 spot ut pending

13.02.18 1 spot again repair

19.02.18 ALL SPOT OK

23.02.18 1 spot again repair

24.02.18 ALL SPOT OK

01.03.2018 ALL SPOT OK

06.03.18 ALL SPOT OK

12.03.18 1 spot again repair

15.03.18 1 spot again repair

17.03.18 ALL SPOT OK

20.03.18 ALL SPOTS UT OK


06.04.18 ALL SPOTS UT OK

09.04.18 1 spot again repair

11.04.18 ALL SPOTS UT OK

13.04.18 ALL SPOTS UT OK

14.04.18 1 spot again repair

18.04.18 ALL SPOTS UT OK

20.04.18 1 spot again repair

20.04.18 ALL SPOTS UT OK

24.04.18 ALL SPOTS UT OK

26.04.18 ALL SPOTS UT OK

27.04.18 ALL SPOTS UT OK


02.05.18 1 SPOT AGAIN REPAIR

03.05.18 ALL SPOTS UT OK

04.05.18 ALL SPOTS UT OK

09.05.18 ALL SPOTS UT OK

12.05.18 ALL SPOTS UT OK

14.05.18 ALL SPOTS UT OK

15.05.18 ALL SPOTS UT OK

17.05.18 2 SPOTS UT OK/ 5 SPOTS PENDING

19.05.18 1 SPOT AGAIN REPAIR


24.05.18 ALL SPOTS UT OK

25.05.18 4 SPOTs/1150mm
R2

R1 verification &sign (R2) Date

NKK(D) 31.01.17

RRL(D) 11.02.17

NKK(D) 15.02.17

NKK(D) 21.02.17

NKK(N) 05.03.17

JNN

PMJ

NKK(D) 27.03.17

NKK(D) 09.04.17

RRL(D) 12.04.17

RRL(D) 12.07.17
MNK 17.07.17

dsk 19.07.17

dsk 19.07.17

RRL

NKK(D)

KSA 25.07.17

RRL

KSA 10.08.17

RRL

KSA 16.08.17

NKK
RRL

JNN 01.09.17

KSA

NKK 09.09.17

NKK

NKK

18.09.17 All spots ut ok

nkk 26.09.17

JNN

KSA(D)

V110
KSA

RRL

KSA 29.12.17
RRL(D)

mnk

RRL 03.01.18

RRL

MNK 05.01.18

RRL

RRL

ksa

BSK

KSA

BSK

BSK 03/02/18

PMJ
MNK 03.02.18

ksa 10.02.18

ksa 14.02.18

RRL

KSA 23.02.18

BSK

RRL

pmj,ksa

KSA 13.03.18

pmj 15.03.18

BSK

KSA
V110 HH95
ksa

DSK 10.04.18

DSK

PMJ

DSK 16.04.18

RRL

RRL 20.04.18

pmj

V100 NEW BATCH

BSR

DSK

DSK
KSA 02.05.18

DSK

pmj

KSA

DSK

MVH

DSK

KSA 18.05.18

BSR 21.05.18
BSR

MVH 25.05.18
R2

Repair(R2) R2 verification &sign

AGAIN 1 SPOTS REPAIR RRL(N)

2 SPOTS REPAIR MNK

All spots ut ok NKK(D)

All spots ut ok NKK(D)

All spots ut ok RRL(D)

All spots ut ok JNN

1 SPOT AGAIN REPAIR PMJ

All spots ut ok RGA(D)

All spots ut ok JNN

1 SPOT AGAIN REPAIR MNK


2 SPOTS AGAIN REPAIR MNK

1 spot vt hold RGA(D)

All spots ut ok RGA(D)

All spots ut ok mnk

All spots ut ok RRL(D)

All spots ut ok mnk


All spots ut ok NKK(D)

All spots ut ok RRL(D)

RGA

ALL SPOTS UT OK ksa

V110

ALL SPOTS UT OK RRL(D)


ALL SPOTS UT OK RRL(D)

ALL SPOTS UT OK RRL(D)

ALL SPOTS UT OK BSK


ALL SPOTS UT OK RRL(D)

ALL SPOTS UT OK MNK

ALL SPOTS UT OK MNK

ALL SPOTS UT OK MNK

ALL SPOTS UT OK KSA

ALL SPOTS UT OK KSA


V110 HH95

ALL SPOTS UT OK pmj

ALL SPOTS UT OK pmj

ALL SPOTS UT OK pmj

V100 NEW BATCH


ALL SPOTS UT OK PMJ

ALL SPOTS UT OK MVH

ALL SPOTS UT OK PMJ


ALL SPOT OK KSA
R3

Date Repair(R3)

01.02.17 CLEARED

12.02.17 AGAIN 1 SPOTS REPAIR

28.03.17 CLEARED

12.07.17 CLEARED
18.07.17 CLEARED

19.07.17 1 SPOT REPAIR


TOTAL Repair & Spot
RESULT (LS & CS)
R3 verification &sign

NKK(D)

MNK

JNN

DSK
MVE

PMJ 19.07.17 CLEARED


PLANER VOLUMETRIC

12 SPOTS/2450MM

4 SPOTS/1200MM 1 SPOTS/100MM

4 SPOTS/450MM

3 SPOTS/260MM
rrl
Remarks

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED

HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED
HEATING AREA UT
COMPLETED