Vous êtes sur la page 1sur 6

OWNER CONTRACTOR

KANDHKOT FIELD GAS COMPRESSION STATION (KFGCS) PROJECT

Document Title: 240V AC UPS SIZING CALCULATION

Date: 16/09/2008 Document No: CAL-00-E-0002 Rev: 1 Class: II Sheet 1 of 3

240V AC UPS SIZING CALCULATION

1 Issued for Construction 16/09/2008 ARS MHS ShS

0 Issued for Construction 28/04/2008 SB ARS ShS

A Issued for Approval 28/08/2007 ARS SN ShS LiuXG

Rev Description Date Prepared Checked Approved CPECC Owner


CONTRACTOR

Sheet 1 of 3

Owner
OWNER CONTRACTOR
KANDHKOT FIELD GAS COMPRESSION STATION (KFGCS) PROJECT

Document Title: 240V AC UPS SIZING CALCULATION

Date: 16/09/2008 Document No: CAL-00-E-0002 Rev: 1 Class: II Sheet 2 of 3

1 AIM
The objective of this calculation is to document the design of the Kandhkot Field Gas Compression Station Project 240 V AC
UPS Electrical System.

2 REFERENCES
1 240V AC UPS Single Line Diagram - DWG-00-E-0008

3 ASSUMPTIONS
1 Power factor is assumed as 0.8 lagging for all connected loads.
CONTRACTOR

Sheet 2 of 3
OWNER CONTRA
KANDHKOT FIELD GAS COMPRESSION STATION (KFGCS) PROJECT

Document Title: 240V AC UPS SIZING CALCULATION

Date: 16/09/2008 Document No: CAL-00-E-0002 Rev: 1 Class: II Sheet 3

EU-5401/ EU-5402 UPS (240 VAC UPS & ED) BUDGET NAMEPLATE
Remarks
Tag Name Description Breaker Rating Duty Volts Amps Watts
1 PCS Cabinet 20 A 2P 1.0 240 14.06 2.7 kW
2 PCS Engg & Operator Stations 16 A 2P 1.0 240 11.98 2.3 kW
3 CSS Engineering & SOE Station 10 A 2P 1.0 240 6.77 1.3 kW
4 CSS Cabinet 50 A 2P 1.0 240 30.21 5.8 kW
5 PAGA System 20 A 2P 1.0 240 15.10 2.9 kW
6 PABX System 6 A 2P 1.0 240 1.50 0.288 kW
7 Weather Monitoring System 6 A 2P 1.0 240 1.04 0.2 kW
8 CCTV system 6 A 2P 1.0 240 2.19 0.42 kW
9 F&G System 6 A 2P 1.0 240 4.69 0.9 kW
10 Bulding fire & smoke system 6 A 2P 1.0 240 4.69 0.9 kW
11 Diesel Generator Panel Controls 6 A 2P 1.0 240 2.60 0.5 kW
12 Flare Ignition System 6 A 2P 1.0 240 2.08 0.4 kW
13 UCP workstation 6 A 2P 1.0 240 2.08 0.4 kW
14 Train A Control Cabinet 16 A 2P 1.0 240 10.42 2 kW
15 Train A Control Cabinet 6 A 2P 1.0 240 0.52 0.1 kW
16 Train B Control Cabinet 16 A 2P 1.0 240 10.42 2 kW
17 Train C Control Cabinet 16 A 2P 1.0 240 10.42 2 kW
Total Current from Single Phase Loads for each UPS 130.77 Amps

Max Current on 240 VAC side of each UPS is 130.77 Amps.


Based on this calculations, each UPS should be sized as 35 kVA.
Busbar rating for distribution board BD-5400 should be 145 Amps
Miniature Circuit breakers (Terasaki or equivalent ) to be used for distribution panel ED-5400.
CONTRACTOR

Sheet 3 of 3

Remarks

Vous aimerez peut-être aussi