Académique Documents
Professionnel Documents
Culture Documents
Assignment
on Systematic Layout Planning
Contributors:
Eryka Gaye Adique
Alexander Alfabete
Jasper Jay Andrey
Ken Lester Bermudez
Isauro Bona III
Liezle Caroche
Jomel Mary Dimasaka
Cherith Furagganan
Zilin Willian Japay
Dexter Lee
Jelica Legaspi
Myrian Mendoza
Victor Martin Mendoza
Aerold Montalbo
Marianne Nicolas
Timothy John Orleans
1
2.10. Eight parts (A to H) are to be manufactured and assembled to produce two products (X
and Y). The processing sequences for the parts and assembly sequences for the products
given below. The daily production rate for product X is 400 and for product Y is 600.
Required:
(a) Determine the daily production rates for each part.
(b) Design a product layout for manufacturing and assembling each product.
(c) Design a process layout for manufacturing both products.
(d) Design a group layout for manufacturing the two products.
(e) Construct a from-to chart for the daily flow of parts between processes.
(f) Construct an activity relationship chart for each product and combined REL chart for two
products.
(g) Using the traditional SLP approach, design a REL diagram for each REL chart
constructed in part (f)
Parts
Machine A B C D E F G H
Bench mold 3 4.2
Tumble mill 1.1 0.7
Milling machine 2.4 3.4
Turret lathe 3.5 1.7
Automatic screw
machine 1.3 0.6 0.9
Drill press 1.5 2.2 1.1
Punch press 0.3 0.5 0.4
Press brake 0.8 1.2 1.1
II. Solution:
Assumption: All eight parts will be used to produce both products X and Y.
Solution:
Reference: 2.6. Flow Analysis and Activity Analysis; 2.6.2 Types of Layout, pages 54-60
2
Assumption: All eight parts will be used to produce both products X and Y.
Diagram:
Reference: 2.6. Flow Analysis and Activity Analysis; 2.6.2 Types of Layout, pages 54-60;
Diagram:
3
(d) Required: Group Layout
Reference: 2.6. Flow Analysis and Activity Analysis; 2.6.2 Types of Layout, pages 54-60;
Assumption: All eight parts will be used to produce both products X and Y.
Diagram
Assumptions: All eight parts will be used to produce both products X and Y.
After Assembly, all products will be delivered to the consumer.
Diagram:
4
To Automatic
Bench Tumble Milling Turret Screw Drill Punch Press Warehouse
From Store Mold Mill Machine Lathe Machine Press Press Brake Assembly Total
Store 2000 3000 3000 8000
Bench
Mold 2000 2000
Tumble Mill 2000 2000
Milling
Machine 2000 2000
Turret
Lathe 2000 2000
Automatic
Screw
Machine 3000 3000
Drill Press 3000 3000
Punch
Press 3000 3000
Press
Brake 3000 3000
Assembly 8000 8000
Warehouse
Total 2000 2000 2000 2000 3000 3000 3000 3000 8000 36000
The from-to chart is used in designing both groups and process layouts. Consequently, it is used to analyze the material flow for low-
volume products and product families. The numerical values are based from the daily production rates from each part (ex: 1000 units x 2 [see
given] = 2000 for bench mold and so on). The diagram above is designed according to the specific arrangement of the processing of parts in
order to assemble the final product. The process started from the stores up to the assembly, and finally to the warehouse.
Reference: 2.6. Flow Analysis and Activity Analysis; 2.6.3 Flow Analysis Approaches, pages 61-66; Figure 2.23
5
(f) Required: Activity Relationship chart; Combined REL Chart
Assumptions: All eight parts will be used to produce both products X and Y.
After Assembly, all products will be delivered to the consumer.
Diagram:
Assumptions: All eight parts will be used to produce both products X and Y.
After Assembly, all products will be delivered to the consumer.
Reference: 2.7 Relationship Diagram pages 69-87; Figures 2.24, 2.25, 2,27
Diagram:
A relationships are considered first, represented by four lines, followed by E which has three
lines, and I, with two lines.
2.17 Construct the graph for the block layout shown in Figure 2.17; construct the dual graph
and show that it is the same as the REL diagram for the layout.
A B
C D
E F G
Figure 2.17
Solution:
First, we will assume a dummy activity H. This dummy activity will function as an external
department. By doing so, we can have the corner points in the block layout and proceed with
the whole process.
H 1
A B
2 3 4
C D
5 7 8 9
6
E F G
10 11
The numbers are the corner points in the layout. These corner points are points were at
least 3 departments meet, including the exterior department. (Sec. 2.7, Relationship
Diagram, page 78). Now the corner points will be joined by lines, called “edges.”
1
2 3 4
5 6 7 8 9
10 11
This is the primal graph of the layout constructed by connecting the corner points of the
block layout.
A B
2 3 4
H C D
5 6 7 8 9
E G
F
10
0 11
This the dual graph or the REL diagram since we consider any shared point to satisfy the
requirements of adjacency. (Sec. 2.7, Relationship Diagram, page 78)
2.20. A job shop has received an order for high precision formed parts. The cost of
producing each part is estimated to be $20,000. The customer requires that either four or
five good parts be supplied. Each good part sold yield a revenue of $30,000. However, if
fewer than four good parts are produced, none will be purchased; if more than five good
parts are produced, the excess will not be purchased. The probability of an individual part
being acceptable to the customer is 0.80. Determine the optimum batch production quantity
given that job shop has agreed to supply the formed parts. Is the situation a profitable one
for the job shop? If not, how must the selling price be changed for expected profit to be
positive?
Given:
Cost of each part = $20,000
Each good part sold (revenue) = $30,000
Probability of an individual part being acceptable to the customer = 0.80
Required:
Reference:
Solution:
The following are the notations that will be used based on the process stated on the
handouts.
x=random variable denoting the number of good parts produced
p(x)=probability of producing exactly good parts
Q=production lot size
R (Q,x)=revenue resulting from producing Q parts of which exactly x are good
C (Q,x)=cost of producing a lot size Q, of which exactly x are good
P(Q,x)= R (Q,x)- C (Q,x)=profit resulting from producing Q parts, of which exactly x
are good
E[R(Q)]=expected revenue resulting from producing Q parts
E[C(Q)]= expected cost resulting from producing Q parts
E[P(Q)]= expected profit resulting from producing Q parts
The expected profit model is formulated based on the conditions in the problem.
E[P(Q)]= C (Q,x)}p(x)
C (Q,x) = $20,000Q
R (Q,x) = $0 x<4
$30,000 x=4,5
$30,000(5) x>5
Based on the computations done, the project will only incur losses, without any profit
whatsoever. Therefore, in order to minimize the expected loss, the company should produce
5 units of the high precision parts. By doing so, there would be an expected loss of $
1,696.00
The project will be profitable at the evaluated optimum quantity in the first part of the
problem. For Q=5, the project will be first profitable. Hence, the evaluation for the selling
price of the high precision parts should be made when Q=5. The following are the
computations for the selling price.
5
C ( Q, x ) = P∑ xp ( x )
x=4
Answer:
The optimum batch quantity is 5 with Expected Profit = ($1,696.00). Moreover, the
selling price to breakeven is $30,517.57813. In able to have profit the selling price should
greater than the breakeven value.
2.22. A firm has received a production order of 10 injection-molded parts. The parts will sell
for $4000 each; it will cost $2500 to produce an individual part. The probability of a part
meeting the final inspection standards is .80. Any good parts in excess of 10 can be
salvaged for $2000; any bad parts produced can be salvaged for $1000. If an insufficient
number of good parts are produced, each shortage must be overcome at a cost of $3000 in
excess of the cost of production. Determine the number of parts to be scheduled for
production to maximize expected profit.
Required:
The number of parts to be scheduled for production that would maximize the
expected profit.
Given:
Production Order: 10 injection-molded parts
Selling Price: $4000/part
Cost: $2500/part
Probability of meeting standard: 0.80
Salvage value of excess (good) $2000
Salvage value of bad part: $1000
Reference:
Solution:
The first thing that should be done is express the revenue and cost functions based
on the given above.
To express the revenue function we divide the conditions set by the problem into
cases, and . If the number of good parts produced is from 0 to 10,
the selling price would be $4000 for the 10 good parts made and the salvage value of each
bad part would be $1000. On the other hand if the number of good parts produced is from 11
to , there would be an additional of $2000 for every good part produced in excess. Thus,
the revenue function will be as follows:
Where:
Q =production lot size
x=random variable denoting the number of good parts produced
To express the cost function, we do the same, as we did to obtain the revenue
function we divide the conditions set by the problem into cases, and
. If the number of good parts produced is from 0 to 10, it will cost $2500 to produce each part
of the order quantity and if an insufficient number of good parts are produced, each shortage
must be overcome at a cost of $3000 in excess of the cost of production. On the other hand
if the number of good parts produced is from 11 to , only the cost of $2500 to produce each
part of the order quantity is considered. Thus the cost function will be as follows:
Where:
After simplifying the two cases of the revenue function, and two cases of cost
functions above (by combining like elements), we can express the expected revenue and
cost functions to be as follows:
Based on the expected profit equation above we create a table that will us help find
the number of parts to be scheduled for production that would maximize the expected profit.
The table below summarizes the expected profit from the lot size of 0 to 17:
To determine the optimum production lot size the following table is filled out:
Lot Expected
Size Profit
0 0 0 0 0 0
1 -1200 1600 -24000 32000 8400
2 -3000 4160 -30000 40000 11160
3 -4500 7232 -30000 40000 12732
4 -6000 10508.8 -30000 40000 14508.8
5 -7500 13785.6 -30000 40000 16285.6
6 -9000 16931.33 -30000 40000 17931.328
7 -10500 19867.34 -30000 40000 19367.3408
8 -12000 22551.7 -30000 40000 20551.69536
9 -13500 24967.61 -30000 40000 21467.61446
10 -15000 27115.1 -30000 40000 22115.09811
11 -16500 944.8928 -18897856.1 40000 -18873411.21
12 -18000 1769.527 -35390530.52 40000 -35366760.99
13 -19500 2484.209 -49684181.68 40000 -49661197.47
14 -21000 3099.936 -61998711.91 40000 -61976611.98
15 -22500 3627.701 -72554023.54 40000 -72532895.84
16 -24000 4078.061 -81561222.79 40000 -81541144.73
17 -25500 4460.867 -89217342.16 40000 -89198381.29
From the table it can be deduced that the optimum lot size to produce that would
maximize the expected profit would be 10. This lot size will incur an expected profit of
$22,115.09811.
2.23. A customer places an order for 50 units of a product, which your company can
manufacture on a single machine. The product is custom-made and you doubt that the order
will be repeated. The customer will pay you $1000 per unit of product produced within stated
quality specifications, subjected to the following conditions: no more than 55 units would be
purchased and the entire shipment will be refused if it contains less than 45 good units.
The cost of manufacturing and delivering the order is estimated to be $800 per unit.
The manufacturing process is such that the probability of any unit of product being “out of
specification” is 0.15. Because of a lack of instrumentation, you cannot inspect the product;
inspection will be done by the customer after the shipment is delivered. It is desired to
determine the number of units of product to manufacture to maximize expected profits.
Develop a formulation of expected profit as a function of Q, the production lot size.
Given:
Order= 50 units
Selling price= $1000 per unit
For customer to purchase the product
where x is the random variable denoting the number of good products
produced
Manufacturing and delivering cost= $800 per unit
Probability of out of specification= 0.15
Required:
Reference:
Solution:
Definition of notation:
X = random variable denoting the number of good products produced
P(x) = probability of producing exactly x good castings
Q = production lot size
R(Q,X) = revenue resulting from producing Q products of which exactly X are good
C(Q,X) = cost of producing a lot size of Q of which exactly X are good
P(Q,X) = profit resulting from producing Q products of which exactly X are good
=
E[R(Q)]= expected revenue resulting from producing Q castings
E[C(Q)]= expected cost resulting from producing Q castings
E[P(Q)]= expected profit resulting from producing Q castings
Since the probability of out of specification is given, to get the probability of producing
good units (p(x)) we would subtract the given probability from one
We then formulate our revenue and cost functions based on the conditions given in the
problem.
$0 x < 45
R ( Q, x ) = $1000 x 45 ≤ x ≤ 55
$1000(55) x > 55
C ( Q, x ) = $800Q
We then make the expected profit function since all needed data are solved. The formula of
expected profit is given as:
Q
E P ( Q ) = ∑ { R ( Q , x ) − C ( Q , x ) } p ( x ) Equation 2.1 page 90
x =0
For the problem since is not a function of good units produced, the expected profit
can be computed as follow:
Q
E P ( Q ) = ∑ R ( Q, x ) p ( x ) − C ( Q)
x =0
55 Q
E R ( Q ) = 1000 ∑ xp ( x ) + 1000 ( 55 ) ∑ p ( x)
x = 45 x =56
E C ( Q ) = 800Q
55 Q
E P ( Q ) = 1000 ∑ xp ( x ) + 1000 ( 55 ) ∑ p ( x ) − 800Q
x = 45 x =55
Conclusion:
To solve or the production rate we must first identify and distinguish all given values
and data to us. We then analyze each data and properly denote them in their proper
notation. We must also check and formulate the given constraints.
2.27. Consider a toaster that toasts one side of each two pieces of bread at the same time. It
takes two hands to insert or remove each slice. To turn the slice over, it is necessary to push
the toaster door all the way down and allow the spring to bring it back. Thus both slices can
be turned at the same time, but only one slice can be inserted or removed at one time. The
time required to toast one side of a slice of bread is 0.50 minute. The time required to turn a
slice over is 0.02 minute. It takes 0.05 minute to remove a toasted slice and place it on a
plate. The time required to secure a piece of bread and place it in the toaster is 0.05 minute.
Determine the minimum amount of time required to toast three slices of bread on both sides.
Begin with three untoasted slices of bread on a plate and end with all three slices of bread
toasted and placed on a plate. Illustrate your solution with a multiple activity chart.
Given:
Operation Time
Toast one side of a slice of bread 0.05 min.
Turn a slice over 0.02 min.
Remove a toasted slice and place it on a plate 0.05 min.
Secure a piece of bread and place it in the toaster 0.05 min.
Required:
Minimum amount of time required to toast three slice of bread on both sides
Reference:
2.6. Flow Analysis and Activity Analysis; 2.6.3. Flow Analysis Approaches;
Multiproduct Process Charts.
Solution:
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
Toast one side of 2 slices of
Idle Time
bread
0.40 0.40
0.45 0.45
0.50 0.50
0.55 0.55
0.60 0.60
0.62 Turn 2 slices of bread over Turn 2 slices of bread over 0.62
0.67 0.67
0.72 0.72
0.77 0.77
0.82 0.82
0.87 0.87
Toast one side of 2 slices of
Idle Time
bread
0.92 0.92
0.97 0.97
1.02 1.02
1.07 1.07
1.12 1.12
1.17 1.17
Remove 2 toasted slices of
bread and place it on a plate
1.22 Idle Time 1.22
Secure a piece of bread and
1.27 1.27
place it in the toaster
1.32 1.32
1.37 1.37
1.42 1.42
1.47 1.47
1.52 1.52
Toast one side of a slice of
Idle Time
bread
1.57 1.57
1.62 1.62
1.67 1.67
1.72 1.72
1.77 1.77
1.79 Turn a slice of bread over Turn a slice of bread over 1.79
1.84 1.84
1.89 1.89
1.94 1.94
1.99 1.99
2.04 2.04
Toast one side of a slice of
Idle Time
bread
2.09 2.09
2.14 2.14
2.19 2.19
2.24 2.24
2.29 2.29
Remove toasted slice of bread
2.34 Idle Time 2.34
and place it on a plate
Multiple Activity Chart (Proposed)
Product: Present Proposed Saving
Bread Cycle
(min)
Time
Worker 2.34 1.94 0.40
Process: Machine 2.34 1.94 0.40
Toasting Working
Worker 0.34 0.44 -0.10
Machine 2.04 1.54 0.50
Machine: Idle
Toaster Worker 2.00 1.50 0.50
Machine 0.30 0.40 -0.10
Utilization
Worker 14.53% 22.68% -8.15%
Machine 87.18% 79.38% 7.80%
Time Time
Worker Machine
(min) (min)
0.05 0.05
Secure 2 pieces of bread and
Idle Time
place it in the toaster
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
Toast one side of 2 slices of
Idle Time
bread
0.40 0.40
0.45 0.45
0.50 0.50
0.55 0.55
0.60 0.60
0.62 Turn a slice of bread over Turn a slice of bread over
Remove other slice of bread and
0.67
temporarily place it on a plate
Secure another piece of bread
0.72
and place it in the toaster
0.77
0.82
0.87
0.92
0.97
Toast one side of 2 slices of
Idle Time
bread
1.02
1.07
1.12
1.17
1.22
Remove toasted slice of bread
1.27 Idle Time
and place it on a plate
1.29 Turn other slice of bread over Turn other slice of bread over
Put back half toasted slice of
1.34 Idle Time
bread in the toaster
1.39 1.39
1.44 1.44
1.49 1.49
1.54 1.54
1.59 1.59
Toast one side of 2 slices of
Idle Time
bread
1.64 1.64
1.69 1.69
1.74 1.74
1.79 1.79
1.84 1.84
1.89 1.89
Remove 2 toasted slices of
Idle Time
1.94 bread and place it on a plate 1.94
1.99 1.99
2.04 2.04
2.09 2.09
2.14 2.14
2.19 2.19
2.24 2.24
2.29 2.29
2.34 2.34
Conclusion:
The minimum amount of time required to toast three slices of bread is 1.94 minutes.
2.28 Presently, on operator is tending five identical machines. Each machine is used to
produce similar products. With five machines it has been observed that during a cycle
a total of 20 machine-minutes is consumed waiting for a service to begin. In the past, it
was observed that the operator was idle for 10 minutes each cycle when assigned to
tend three machines. If machining time is 25 minutes and independent operator time is
1 minute per machine cycle, what is the value for concurrent activity? If C 1 equals $8
per hour and C2 equals $25 per hour, what is the economic assignment? What is the
value of the minimum cost per unit produced?
Given:
Current: 5 machines
• One operator <---> 5 identical machines
• Total idle time of machines: 20 minutes per cycle = Im
• Machining time: 25 minutes = t
• Individual operator time: 1 minute per machine cycle = b
• C1 = $8 per hour
• C2 = $25 per hour
Previous: 3 machines
• Idle time of operator: 10 minutes per cycle = Io
Required:
(a) Value of concurrent activity, a
(b) Economic assignment, m
(c) Value of the minimum cost per unit produced, TC(m)
Solution:
Assumption:
The data for three-machine assignment were past data and they were not considered
in the computations.
Im = 20/5 = 4 mins The total idle time of machines per cycle is 20 minutes
so
we divide it first by the total number of machines.
n’ = 4.4286
If m = 4; m ≤ n’
TC(m) = (C1 + mC2)(a + t) Equation 2.8 (p.96)
m We use this equation to calculate the cost per unit
TC(4) = (8 + 4[25])(6 + 25) produced, based on an assignment of m machines
4 per operator; in this case, m=4
TC(4) = $837
If m = 5; m>n’
TC(m) = (C1 + mC2)(a + b) Equation 2.8 (p.96)
TC(5) = (8 + 2[25])(6 + 1) We use this equation to calculate the cost per unit
TC(5) = $931 produced, based on an assignment of m machines
per operator; in this case, m=5
Since Φ < 1, we assign n = 4 machines per operator which will give the minimum cost per
unit produced of TC(4)=$837.
2.30. With a multiple activity chart show how one operator can handle two machines of type
A and one machine of type B during a repeating cycle using the following data.
Given:
Machine A Machine B
Activity Time(min) Activity Time(min)
Load 1 Load 1½
Inspect ½ Inspect 0
Travel ½ Travel ½
Machining 7 Machining 6½
Unload 1 Unload 1
Req’d:
Reference:
2.6. Flow Analysis and Activity Analysis; 2.6.3. Flow Analysis Approaches;
Multiproduct Process Charts.
Solution:
First step is to analyze the whole process first before developing the multiple process
activity chart.
Multiple Activity Chart
Product: Process: Machine(s):
N/A Machining 2 Machine A and 1 Machine B
2.34. The Acme Chemical Company has a drug-line conveyor system that operates between
two manufacturing buildings. Large hoppers are attached to the conveyor to transport
chemical mixes from building A to building B for further batch processing. Empty hoppers
are returned to building A on the same loop conveyor. Empty hoppers are cleaned
automatically on the return trip to A. Activities and times for this process are:
To ensure that chemical mixes are always available at building B, what is the
minimum number of hoppers required? If the chemical mix cannot stay in the hopper
longer than 20 minutes from the time loading is completed and unloading begins, what is
the maximum number of hoppers that could be used? Demonstrate graphically that your
solution is feasible.
Given:
Activities Average Time (min)
Required:
a.) To ensure that chemical mixes are always available at building B, what is the
minimum number of hoppers required?
b.) If the chemical mix cannot stay in the hopper longer than 20 minutes from the
time loading is completed and unloading begins, what is the maximum number of
hoppers that could be used?
Reference:
2.8. Space Requirements and Availability; 2.8.3. Employee Requirements; Identical
activities p. 93-97.
Concepts Used:
Employee Requirement
Solution:
a.) To be able to ensure that chemical mixes are always available at building B we
must equate the idle time of the operator in building B to zero, thus implying that
chemical mixes are always available.
, thus
Where:
=idle operator time during a repeating cycle
=production lot size
=random variable denoting the number of good parts produced
Where:
=concurrent activity time
=independent machine activity
=independent operator activity time
Using the given: =90 (40+50: unload and fill hopper at A + unload and empty
hopper at B), =25 (10+15: travel from A to B + travel from B to A.), = 0 (there is no
independent operator activity time given) we come up with the following equation:
equation 2.4.
Where:
=number of machines assigned to an operator.
Thus, substituting =50 (only considering the activity time at B) and m=2 we
get:
Legend:
O-B: Operator at building B
M: Machine (followed by number)
U: Unloading
L: Loading (done at building A)
R: automatic run (conveyor)
b.)To compute for the maximum number of hoppers to be used we equate the
(idle time per machine) to 10 minutes. This is because the maximum allowable time
for the chemical to be transported from building A to B is said to be 20 minutes, but
since the average time for transporting the chemical from building A to B is 10
minutes, we subtract 10 minutes from the maximum 20, giving us 10 minutes of idle
time.
, thus
And since:
equation2.6.
equation 2.4.
Legend:
L-A: Loading done at building A
U-B: Unloading done at building B
M: Machine (followed by number)
R: automatic run (conveyor)
: Idle time
2.37. Automatic palletizers are used to palletize cases of finished goods at production plant.
The palletizer places a a given number of layers of cartons on each pallet, which each layer
having a specified number of cartons. The time required for the palletizer to perform a
palletizing cycle is 2 minutes per pallet.
An operator is responsible for programming and setting up the palletizer for each
“palletizing run” based on the dimensions of the case. A palletizing run consists of a batch of
100 pallets. Hence, the palletizer can operate without interruption for 200 minutes before
programming and setup are required. It takes the operator 5 minutes to program and set up
the palletizer.
Additionally, the operator must supply empty pallets to the palletizer. The empty
pallets are placed in a magazine with a capacity to hold 25 pallets. It requires 6 minutes for
operator to travel to the empty pallet storage area, return with 25 pallets, and places the 25
empty pallets in the magazine.
Given:
Required:
Reference:
Solution:
Given that the palletizer can operate without interruption, thus, t = 200 minutes having
100 pallets in a batch. Such the case, the total concurrent activity time can be computed
through:
Where:
2.39. An operator is currently operating three identical machines. The operator utilized 78%
of the repeating cycle. Concurrent activity equals 8 minutes and independent operator
activity equals 5 minutes. Each operator costs $10 per hour and each machine costs $12
per hour.
(a) What is the cost per unit produced based on the minimum-cost assignment?
(b) For what range of values for concurrent activity will the economic assignment
equal three machines?
Given:
m (number of machines assigned an operator)= 3 machines
T (repeating cycle- operator)= 78%
a (concurrent activity time)= 8 minutes
b (independent operator activity time)= 5 minutes
C1 (cost per operator-hour)= $10
C2 (cost per machine-hour)= $12
Required:
Reference:
Solution:
Solve for (a)
Required: TC
and
C1, C2, m, a, b and percentage repeating cycle of operator are given. To solve for n’
and TC, we need to find t.
Solve for t
Io= T(repeating cycle-machine) (for m ≤ n’)
Io= (1-0.78)Tc
Io= (0.22) Tc
Since,
Tc= a + t (for m ≤ n’)
Io= (a + t) – m (a + t) (for m ≤ n’)
Then,
(a + t) – m (a + b) = 0.22 (a + t)
(8 + t) – 3 (8 + 5) = 0.22 (8 + t)
t = 42 minutes
To know the formula we should use in getting the TC, we should solve for n.
Solve for n
Equation 2.3.
= 3.846 machines
Since,
)
and
= 3.846
then,
Solving for ,
Equation 2.10.
Since
And
Equation 2.3.
minutes < a
Conclusion:
The values for the concurrent activity time should start at 8.29686 minutes so that the
economic assignment equal three machines.
2.40. The KLM Job Shop has requested that a new layout be designed for their operation in
Alpharetta, Georgia. There are 12 departments involved. The department areas (in square
feet) and activity relationships for the job shop are summarized in Figure 2. 40. Design a
block layout using the SLP approach.
Given:
• Values assigned to each relationship are as follows:
A = 10000, E = 1000, I = 100, O = 10, U = 0, AND X = -10000
1 2 3 4 5 6 7 8 9 10 11 12 A E I O U X
1 - I U X U U U U U U U U 0 0 1 0 8 2 -19900
2 I - U U U U I U U U U U 0 0 2 0 9 0 200
3 U U - A I E E U E U I I 1 3 3 0 4 0 13, 300
4 X Y A - U I X U E I I I 1 1 4 0 3 2 -8600
5 X U I U - I X U U I E I 0 1 4 0 4 2 -18600
6 U U E I I - E I E I I I 0 3 6 0 2 0 3600
7 U I E X X E - E U A U U 1 3 1 0 4 2 -6900
8 U U U U U I E - U E I U 0 2 2 0 7 0 2200
9 U U E E U E U U - U U U 0 3 0 0 8 0 3000
10 U U U I I I A E I - I I 1 1 3 0 6 0 11300
11 U U I I E I U I U U - U 0 0 4 0 7 0 1400
12 U U I I I I U U U U U - 0 0 4 0 7 0 400
Required:
• Block Layout
Solution:
• Based on the procedure of assigning the order of placement given discussed in
Section 2 .7. 4, the order of departments in their corresponding numbers are as
follows in:
1st. 3 because it has the highest TCR
2nd. 4 because of its A relationship with 3
3rd. 6 because it has E relationship with 3 and a TCR value of 3600
4th. 9 because of its E relationship with 3, 4,and 6 and a TCR value of 3000
5th. 7 because of its E relationship with 3 and 6
6th. 10 because of its A relationship with 7
7th .8 because of E relationship with 7 and 10 and TCR value of 2,200
8th. 11 because of its I relationship with 6 and 4 and TCR value of 1400.
9th. 12 because its TCR value is 400
10th. 2 because of TCR value of 200
11th. 5 because of X relationship with 7
12th. 1 because of its X relationship with 4rd
• Next is the computation for the relative locations for each department where positions
1,7, 3 are directly adjacent and will have a value equal to the TCR of the next
department and 2,4,6,8 are partially adjacent and will be computed as TCR/2 of the
next department.
WPV
1. 10,000 -- position one is chosen because of the western edge rule
2. (10,000/2) = 5,000
3. 10,000
8 7 6
4. (10,000/2) = 5,000
5. 10,000
6. (10,000/2) = 5,000
7. 10,000 1 3 5
8. (10,000/2) = 5,000
2 3 4
On the other positions, same steps will apply.
1. 100
2. (100/2) = 50
3. 100 + (1,000/2) = 600
4. 1,000 + (100/2) = 1,050
5. (1,000/2) = 500
6. 1,000
7. (1,000/2) = 500
8. 1,000 + (100/2) = 1,050
9. 100 + (1000/2) = 600
10. (100/2) = 50
1. 1,000
2. (1,000/2) = 500
3. 1,000 + 1,000 + (1,000/2) = 2,500
4. (1,000/2) = 500
5. 1,000
6. (1,000/2) = 500
7. 1,000 + (1,000/2) = 1,500
8. 1,000 + (1,000/2) = 1,500
9. (1,000/2) = 500
10. (1,000 + (1,000/2) = 1,500
11. 1,000 + (1,000/2) = 1,500
12. (1,100/2) = 500
1. -10,000 + 0 = -10,000
2. (-10,000/2) + 0 = -5,000
3. 0
4. 0 + (1,000/2) = 500
5. 0 + 1,000 = 1,000
6. (1,000/2) = 500
7. 1,000 + (1,000/2) = 1,500
8. (1,000/2) + 1,000= 1,500
9. (1,000/2) = 500
10. (-10,000/2) + 1,000 = -4,000
11. -10,000 + (1,000/2) = -9,500
12. (-10,000/2) = -5,000
1. 100 + 0 = 100
2. (100/2) = 50
3. 0
4. 0 + (100/2) =50
5. 0 + 100 = 100
6. (100/2) + 10,000 = 10,050
7. (10,000/2) = 5,000
8. 10,000
9. (10,000/2) = 5,000
10. (100/2) + 10,000 + 0 = 10,050
11. 0
12. 0 + (100/2) = 50
13. 100 + 0 = 100
14. (100/2) = 50
1. 0
2. 0
3. 0
4. 0 + (100/2) = 50
5. 100 + (1,000/2) + 1,000 = 1,600
6. (100/2) = 50
7. 1,000
8. (1,000/2) = 500
9. 1,000 + 1,000 = 2,000
10. ,000 + 1,000 = 2,000
11. (1,000/2) = 500
12. 1,000 + (100/2) = 1,050
13. 0
14. 0
15. 0
16. 0
1. 100 + 0 =100
2. (100/2) + 0 = 50
3. 0
4. 0 + (100/2) = 50
5. 100 + 0 + 0 = 100
6. 0
7. 0 + (100/2) = 50
8. 100 + 0 = 100
9. (100/2) = 50
10. 100
11. (100/2) = 50
12. 100 + 0 + 0 = 100
13. 0
14. 0 + (100/2) + 100 = 150
15. (100/2) = 50
16. 100 + (100/2) 150
17. 100
18. (100/2) = 50
1. 100 + 0 = 100
2. (100/2) + 0 = 50
3. 0
4. 0 + (100/2) = 50
5. 100 + 0 + 0 =100
6. 0
7. 0
8. 0
9. 0
10. 0
11. 0
12. 0
13. 0
14. 0
15. 0 + (100/2) = 50
16. 100 + (100/2) = 150
17. 100 + (100/2) = 150
18. (100/2) = 50
1. 0
2. 0
3. 0
4. 0
5. 0 + (100/2) + 0 = 50
6. 0
7. 0
8. 0
9. 0
10. 0
11. 0
12. 0 + 0 + 100 + 0 + 100
13. 0 + (100/2)
14. 0
15. 0
16. 0
17. 0
18. 0
19. 0
20. 0
1. 0
2. 0 18 17 16
3. 0
4. (100/2) + 0 = 50
5. 100 + (-10,000/2) + 100 = 4,800 20 19 12 15 14
6. (100/2) = 50
7. 100
8. (100/2) = 50 1 4 3 11 13 12
9. 0
10. 0
11. 0 2 9 6 7 2 11
12. 0
13. 0 + (-10,000/2) + 1,000 = -4,000
14. (1,000/2) = 500 3 4 5 10 8 10
15. 1,000 + (100/2) + 100 = 1,150
16. (100/2) =50
17. 100 6 7 8 9
18. (100/2) =50
19. 100 +0 + (100/2) =150
20. 0
1. 10,000 + 0 = -10,000
2. (-10,000/2) = -5,000
3. 0
4. 0
5. 0
6. 0
7. 100
8. 0
9. 0
10. (100/2) = 50
11. 100
12. (100/2) = 50
13. 100 + (-10,000/2) = -4,900
14. -10,000
15. (-10,000/2) = -5,000
16. -10,000
17. (-10,000/2) = -5,000
18. 0
19. 0
20. 0
Press
900 sq. ft. 12 5
Office
Welding Other Storage 600 sq. ft.
800 sq. ft. 800 sq. ft.
4 1
3 11
Personal Services
1000 sq. ft.
Steel Storage Machining Assembly
500 sq. ft. 800 sq. ft. 700 sq. ft.
7 2
9 6
Painting
600 sq. ft.
Finished Storage 8
1000 sq. ft.
10
2.44. An auto-parts warehouse in Flyspeck, Texas, has required that a new layout be
designed for their main warehouse located in metropolitan Flyspeck. The warehouse has 10
major activity “centers”. The current building has the dimensions of 150x225 ft. Other
pertinent data are summarized in Figure P2.44. Using SLP, design a layout to be contained
in the current building.
Figure P2.44
Solution
Given:
Solution:
1. Using graph based process from the activity relationship chart given, form an
Activity Relationship Graph/Diagram. (2.7.3, pp. 71).
# Activity
1 Office
2 Counter
3 Part Bins
4 Muffler Bins
5 Tailpipe racks
6 Paint room
7 Storage
8 Receiving
9 Lounge
10 Restroom
The given graph shows a graphical activity relationship diagram. The graph is non
planar since it has many overlapping lines. Also, according Sec. 2.7.3, no more than 3N-
6 pairs of activities can be adjacent. Thus, applying the equation:
Since: N=10
A = 2 ; E = 3; I = 8 ; O=20; TOTAL = 32 adjacent activities
3N-6 = 3(10) – 6 = 24
Since 32>24, hence, the graph is non-planar.
Since this is a non-planar graph, we can use the relationship diagramming process in
order to develop a block diagram, for the given figure P2.44. (2.7.4, pp. 83). Total closeness
rating can be derived using the activity chart given above.
TCR or total closeness ratio computations are shown below. Given that the assigned
closeness ratings are: A=10000, E=1000, I=100, O=10, U=0, and X=-10000, the
following computations were solved.
Following the steps given in 2.7.4 pp 83-87, we can determine the placement
sequence. The first department is the one having the greatest TCR. Dept 3 = 11230. The
second department placed is Dept 2, since Dept 2 is the only department that has an A
relationship with Dept 3. An X relationship exist in Dept 2 between Dept 8 and Dept 7. since
Dept 8 has a lower TCR compared to Dept 7, Dept 8 will be taken as the last department to
be placed. For the third department, since there is no A relationship exist with the arranged
department, then E relationship will now be considered. Taking the highest TCR among the
E relationship that exist we take Dept 4. Following the procedure given, we would arrive in
this arrangement of departments:
3, 2, 4, 5, 1, 9, 6, 10, 7, 8
Having generated the placement sequence, we now determine the relative locations
of the departments. Its placement will be determined by the weighted placement value. The
steps in page 85 sec 2.7.4 show the procedure in obtaining the relative locations of each
department. Applying these steps will arrive in these computations:
1.
1,3,7,5 = 10,000
2,4,6,8 = 5,000
1, 11 = 1000 + 0/2 = 1000
2, 10 = 1000/2 + 0 = 500
Dept 2 = loc1 3, 6, 9 = 0 = 0
4,5,7,8 = 0 + 0/2 = 0
2. 12 = 1000/2 = 500
Dept 1 = loc 1
5.
1 = 100
2, 10 = 100/2 = 50
3, 9 = 100 + 1000/2 = 600
4, 8 = 100/2 + 1000 = 1050
5, 7 = 1000/2 = 500
6 = 1000
Dept 5 = loc 3
6.
4.
8.
1=0
2,16 = 0/2
3 = 0 + 10/5 + 100 = 100
4 = 100/2 = 50
5,6 = 100 + 100/2 = 150
7 = 100/2 = 50
1 = 0 + 10/2 = 5
8 = 100 + 10/2 = 105
2 = 10 + 0/2 = 10
9 = 10 + 100/2 = 60
3 = 10/2 = 5
10,12,14 = 10/2 = 5
4,8 = 10 + 10/2 + 10 = 25
11 = 10 + 10/2 + 10 = 25
5,7,9,12,14,16 = 10/2 = 5
13 = 10
6,15 = 10
15 = 10 + 0 + 10/2 = 15
10,11 = 10 + 10/2 = 15
13 = 10 +10 + (-10000/2) = -4980
Dept 6 = loc 5 17 = 0 + 10 + (-10000/2) = -4990
18 = 0/2
7.
Dept 7 = loc 4
9.
1,6,15 = 10
2,5,7,9,12,14,16,18 = 10/2 = 5
3,8,13,17 = 10 +10/2 +10 = 25
4,10,11 = 10 + 10/2 = 15
Dept 8 = loc
Relative Location of Departments
Now, that the 10 departments are placed relatively with each other, (as we consider
the different relationships that exist among them) we could now consider the space
requirements to formulate the block diagram of the required layout.
Space Requirement
Template dimension was used to estimate the block diagram shown in the figure
below. (Sec 2.9 in pg. 101)
Many alternative layout can be formed using the space requirements and the relative
locations of each department. One of the alternative layout that can be deduced using the
given in the problem is shown in the figure below. It is estimated that the total land area to
be used is 33,750 sq.ft.
225'-0"
Lounge
Office 500 sq. ft.
1250 sq. ft. 1 9
Part Bins
10000 sq. ft.
Counter
2500 sq. ft.
2
150'-0"
RestRoom 5 5
250 sq.
10ft.
8 7 6
Following the SLP approach, we can arrive to different alternative block layout. Choosing
the alternative layout to be used depends on the objective of designing the new layout.
2.47. An activity relationship chart is shown in Figure P2.47 for the Rickety Furniture
Company. Construct a REL diagram for the plant using the graph-based process. Based on
the space requirements given, design a block layout.
Activity Area
I
U
O U
E U
U E U
U A U
A A I
A
U A I X
U U U E A
U U U I
I O U X
U O U
U U U
U U
I X
U
E
Figure P2.47
Required:
a) REL diagram
b) Block layout given the space requirements
Reference:
Solution:
In making the REL diagram of the plant of Rickety Furniture Company given the said
relationships, the activities with A relationship were the first one to be considered because
an A relationship means that the pairs of activities are absolutely necessary to be placed
side by side with each other. Shown below is the REL diagram of activities with A
relationship namely: (1,10), (7,3), (7,2), (6,3), (6,2), (5,4).
1 7 2 5
10
3 6 4
The block layout of the pair of activities with A relationship is not applicable since
there are independent pairs of activities.
After plotting the pairs of activities with A relationship, the pairs with X relationship
will be analyzed next. Since pairs (10,7), (10,3), (9,1) have X relationships, these pairs
should not be connected in the REL diagram because X relationship indicates that the pair
of activities are undesirable to be placed next with each other.
1 7 2 5
b
a
10
3 6 4
The block layout for the above REL diagram is shown below.
11 10 9
7 2 5
7
3 6 4
Incorporating the activities with I relationship to the currently presented REL diagram
resulted with the REL diagram shown below.
f
1 7 2 5
b
a
c
d 10
3 6 4
The block layout of the REL diagram which includes the activities that have A, E, and
I is shown below.
3
7
8 9
2
1 10
And lastly, to complete the REL diagram of the given activity and their relationship
with one another, the pairs of activities with O relationship are plotted to the precious REL
diagram. The REL diagram below shows the final REL diagram which considers the different
relationships that exist between the activities, from A relationship to O relationship.
f
1 7 2 5
b
a
c
g
d 10
3 6 4
j
i
9
The final block layout that follows the space requirement is shown below.
Offices 2
1000 sq. ft.
1
Maintenance
400 sq. ft. 5
Employee Parking
4000 sq. ft.
Conclusion:
The ideal plant layout of Rickety Furniture Company is clearly illustrated by the block
layout derived from the REL diagram of activities that have A,X, E, I and O relationships.
2.48. An Electronic company has acquired 5000ft-2 of space in a shopping center for its
regional service facility. The space is configured 50 ft x 100 ft, with common carrier access
along one of its long walls. Customers enter the facility along one of the short walls. Based
on the activity relationship chart shown in Figure P2.48, use the graph-based process to
construct a REL diagram for the service facility. Using the space requirements given, design
a block layout.
Activity Area
Total 5,000ft2
Figure P2.48
Given:
Required:
REL diagram for the service facility using the graph-based approach.
Reference:
First, we summarize the REL chart, taking into account the relationships of activities.
Then, we take into account the A relationships and obtain a primal and dual graph for this
and develop the block layout. The red dash lines represent the dual graph for the primal
graph. In making the dual graph, the edges of the dual graph should be drawn wherein faces
share the same edge of the primal graph. The block layout for this graph could not be made
since there are two groups of activities. It cannot be combined into one only because of the
considerations on their closeness ratings.
5 4 9 3 1
7 8
Second, are the A and E relationships. In making the dual graph, assuming that
all the activities should be located inside the layout, there should not be any
external activity unless specified. Therefore we should adjust the dual graph
edges so as to meet this requirement. The graph shown below does not have
sufficient number of corner points needed to construct the block layout. The red
nodes with letters are the corner points that are drawn for the block layout. By
intuition, the number of red nodes wouldn’t be enough to materialize a block
layout.
7 5 4
a
c
8 6 b 9 10
d
e
2 3 1
Third, we consider the A, E and I relationships. Same as in the last situation, the
graph should be made that there won’t exist an external activity or department.
5 4
g
a
f
6 b 1 9 10
c i
j
d
8 7 3 2
e
Next is taking into account the A, E, I and O relationships. This would be the final
graph that should be considered for the block layout. This is because the fourth
closeness rating (U) will not have an effect on the graph of the dual and primal.
m
5 4
f
a
e
c
l b
6 1 9 10
d g
7 3 2
h
j
8
i
The block layout of the activities described is as follows. Though this layout does
not represent the required area for each activity, it clearly shows the use of the
dual graph and the extracted corner points.
Lastly would be making the design layout with the considerations of the total
area of the facility.