UNIVERSITY OF PETROLEUM AND ENERGY STUDIES,

DEHRADUN

REPORT ON INDUSTRIAL TRAINING AT DAHANU


THERMAL POWER STATION

(21th Dec2017 to 30th Dec 2017)


B.TECH (ELECTRICAL ENGINEERING)
BATCH-2015-19

Name: -VISHAL SHARMA


SAP ID:-500046607
ENROLLMENT. NUMBER:-R132215073
Training Batch Number :- B2
CERTIFICATE

This is to certified to be the bonafide work of Vishal Sharma


(R132215073) (500046607) in the “Campus to Power 2*250 MW”
Training done at Dahanu Thermal Power Plant located at Dahanu,
Maharashtra during the academic year 2017-2018.

Faculty Signature

……………………………

ACKNOWLEDGEMENT
I would like to express my deepest gratitude to the electrical department of
University of Petroleum and Energy Studies, Dehradun. I want to give my
sincere thanks to Mr. Narendra Soni, Mr. Sami Rehman, Miss. Monika Yadav
for their efforts to organize the industrial training at Dahanu thermal Power
Station Maharashtra

I would also like to express my sincere thanks to the Trainers


DTPS, for providing me with a conducive environment and necessary facilities
during our stay in Dahanu.

I thank the managing director of DTPS, Maharashtra for giving me this


opportunity to gain knowledge as a trainee at Dahanu thermal power station.

DAHANU THERMAL POWER STATION


Dahanu Thermal Power Station (DTPS), Reliance Energy's hostage control age
plant is one of the first power age plants in India. It initiated its business
operations in January 1996.It is a coal based plant situated at seaside Dahanu
town in the territory of Maharashtra. The power plant is worked by Reliance
Infrastructure. It has an introduced limit of 500 MW (2x250 MW) and supply
energy to rural Mumbai.

As fuel the plant utilize blend of Indian washed coal from Chhattisgarh and
imported coal from South Africa and Indonesia by means of ocean course. The
general mixing proportion is 80:20. It supplies vitality at the tax of Rs 2.45 for
each unit.

The plant has many honors for its unmistakable highlights as far as execution,
mechanical advancement and maintainability. The plant is the primary Power
Company to be affirmed ISO 14001 for its ecological administration framework
and ISO 9001 for its quality administration.

TABLE OF CONTENTS:-
1. COVER
PAGE…………………………………………………………………….....

2.
CERTIFICATE……………………………………………………………………

3.
ACKNOWLEDGEMENT………………………………………………………

4.ABOUT DAHANU THERMAL POWER


PLANT…………………………………..

5.TABLE OF
CONTENT……………………………………………………………….

6.ABSTRACT……………………………………………………………………
……..

7. DETAILED DAY WISE INFORMATION AT DTPS

7.1 DAY
1……………………………………………………………………………………………….……
7.2 DAY
2…………………………………………………………………………………………………….
7.3 DAY 3……………………………………………………………………………………..
…………….
7.4DAY
4……………………………………………………………………………………………………
7.5 DAY
5…………………………………………………………………………………………………..
7.6DAY 6
…………………………………………………………………………………………………..
7.7DAY7
……………………………………………………………………………………………………
7.8 DAY 8
…………………………………………………………………………………………………..
7.9 DAY 9
…………………………………………………………………………………………………
8.
CONCLUSION……………………………………………………………………………………………………
…….

ABSTRACT

Dahanu Thermal Power Station (DTPS), Reliance Energy's prisoner control age
plant is one of the principal control age plants in India. It started its business
operations in January 1996.It is a coal based plant arranged at ocean side
Dahanu town in the domain of Maharashtra. The power plant is worked by
Reliance Infrastructure. It has a presented point of confinement of 500 MW
(2x250 MW) and supply vitality to provincial Mumbai.

As fuel the plant use mix of Indian washed coal from Chhattisgarh and imported
coal from South Africa and Indonesia by methods for sea course. The general
blending extent is 80:20. It supplies imperativeness at the assessment of Rs 2.45
for every unit.

The plant has many respects for its unmistakable features similar to execution,
mechanical headway and viability. The plant is the essential Power Company to
be insisted ISO 14001 for its environmental organization system and ISO 9001
for its quality organization.
DETAILED DAY WISE INFORMATION
AT DTPS TRAINING :-

DAY 1

• Initially, a composed test was directed which had inquiries regarding nuts
and bolts of warm power plant designing and gear's and plant points of interest
at DAHANU THERMAL POWER STATION.

• First day was significantly presentation class where we were brief data
about the plant .

• Also we were given some data about wellbeing.

• Learned about Quality Management Principles -

Client center

Authority

Inclusion of individuals
Process approach

Change

Confirmation based basic leadership

Relationship administration

What's more, after the addresses we went by the plant and found out about the
fundamental structure of plant.

Day 2

The primary preparing began on day 2 of our training.The following gives a


short record of the work done on the second day of the preparation:-

• DC battery set up in plant-220 V DC, 1200 Ah for each unit,its


intention is to control and ensure hardware and in addition crisis supply.

• Station transformer-220/6.6 KV hydrogen filled

• Bus course of action

• Switch yard types of gear-

SF6 Circuit Breakers-for operation and upkeep Current transformer-venture


down current to 1 A for security, observing and estimation
reason

Potential transformer-advance down voltage to 110V

Lightning arrestor-releases lightning and exchanging over voltage

securely to ground.

Wave trap-squares higher recurrence.

Transport and covers

In the second half we were taken to switchyard and were acquainted with
the switchyard types of gear which were instructed in before address i.e.
Circuit breakers,CT,PT,Lightning arrestors and so forth.

DAY 3

DAY 3 was a continuation of energy plant operations began on DAY 2

The operations performed on day 3 are given beneath:

220KV Switchyard assurance


Course stumbling loads gets moved to other line causing over-burdening

Zone setting-3 zones as indicated by the length.

Auto reclosure transfer to extinguish the curve in electrical switch

Power swing hindering because of uneven load

Wire come up short supervision

Line differential assurance


S
Reinforcement overcurrent and earth blame transfer trips entire 3 stages.

End blame assurance This will work if blame is outside electrical switch.

Breaker disappointment assurance if breaker isn't working then this transfer


will

trip the various transfer on that line.

HT(> 1KV) and LT(<415V) engines

2 shaft motor,DOL starter at DTPS

Testing-
IR test-for 1 min

Polarization test-for 10 min

After the address we went to switchyard to see the defensive gadgets, DC


framework and engines.

DAY 4:-

On DAY 4 control plant operations were further proceeded with a specific


end goal to produce an electric energy of 500 MW.

Switch adapt segments

Transport bar

Electrical switch

Transfers

Metering gadgets

Present and Potential transformer

Bolster protector
Control transformer

Switches and breakers

Sorts of feeders-Incoming,Outgoing and generator

Feeder security

Limited Earth blame insurance

Over fluxing and Overcurrent security

Unbalance security

Slowing down security

Rehashed begin security

Soon thereafter we went by where they kept LT and HT switchgear.

DAY 5:-

On DAY 4 control plant operations were additionally continued with a


particular true objective to deliver an electric vitality of 500 MW.
Switch adjust fragments

Transport bar

Electrical switch

Exchanges

Metering contraptions

Present and Potential transformer

Reinforce defender

Control transformer

Switches and breakers

Sorts of feeders-Incoming,Outgoing and generator

Feeder security

Constrained Earth accuse protection

Over fluxing and Overcurrent security


Unbalance security

Backing off security

Reiterated start security

Before long we passed by where they kept LT and HT switchgear.

DAY 6:-

On DAY 6 there was address on DTPS generator and Exciter framework

Generator

Rule – Faraday law

At DTPS generator is turbogenerator with H2 cooling to packaging,


outspread

cooling to rotor and backhanded cooling for rotor.

Generator support movement


Decoupling

Deassembling of exciter

Threading

Review of stator and rotor

Stator varnishing

Protection of exciter

Center repairing

Excitation Purpose-assurance from fault,controlling of yield voltge and dc

current to rotor

Capacity of AVR-to enhance control framework stability,improve transient

Stability,improve dynamic stability,to smother over

Voltage on stack dismissal


Limiter-field current limiter, inductive stator limiter,capacitive stator
current

limiter

In the second half we went to plant to see generators assistant types of


gear .

DAY 7-

There is one uncommon address of Phule sir with respect to 6-sigma strategy
which is separated from our syllabus. This procedure is being utilized by
numerous enterprises to enhance the plant to work with better proficiency.

Aside from visitor address we learned about transformer as takes after:-

Parts-

Radiator

HT and LT bushing

Attractive oil measure

Primary and Conservator tank


Bucholz hand-off

Breather

Weight hand-off valve

GENERTOR PROTECTION against electrical blame, mechanical blame and


blame past generator framework

Stator winding earth blame security

Rotor earth blame insurance

Generator differential insurance

Generator unbalance insurance

Generator overvoltage insurance

Under recurrence insurance

Generator invert control security

Breakure disappointment insurance

We went to plant and saw power and dispersion transformer.


DAY 8-

There was one special session by guest faculty who taught us the energy
conservation techniques of India according to Bureau of Energy Efficieny.
After guest lecture there was session on condition monitoring of electrical
system-
CVT secondary voltage monitoring
Thermovision monitoring
LA third harmonics resistive leakage current measurement-
Capacitive and tan delta measurement
Circuit breaker contact resistance measurement
Dissolved gases analysis
Sweep frequency response analysis
Condition monitoring
There was plant visit in the second half regarding the lecture in the first half.

DAY 9-

There was an interactive session with Mantri sir regarding the whole trip and
some case studies were discussed by him.
And remaining topics were discussed like battery charger at DTPS and best
O&M practices at DTPS.
And later that day there was a session of certificate distribution and speeches
were given by our faculties DrVamsi Krishna sir and MrVineetMediratta sir.

CONCLUSION
Industrial training is very essential for engineering students. It is also a great
opportunity to acquire practical knowledge . During the training period I
acquired lots of experience in Energy production and Production management.
This will surely help in theoretical classes as well as in future profession. We
also enhanced competencies and competitiveness in our area of study. We tried
to relate the experience in the workplace with knowledge learned in our
university and applied the knowledge to understand the working of plant with
the help of faculty members and workers of DTPS.

Here we gained the experience and knowledge that can be used for suitable job
without delay after studies.

We learned to hone soft skills appropriate to the working environment. Also


get improvised in communication skills. We assessed knowledge and confidence
as well as enhanced our marketability more competitive.

With experience and knowledge and skills acquired during industrial training
we will be better prepared to face working world.