PHASE I PROPOSAL
TABLE OF CONTENTS
A. INTRODUCTION STATEMENT 2
B. WORK PLAN 4
C. FEASIBILITY STUDY 8
D. ALTERNATIVE FINANCING MODELS 8
E. QUALIFICATIONS 14
1. ORGANIZATIONAL CHART 17
2. LIST OF COMPARABLE PROJECTS 18
3. PROJECT TEAM EXPERIENCE 24
4. REFERENCES 30
F. CAPABILITY AND CAPACITY 31
G. PUBLIC / PRIVATE PARTNERSHIPS 32
H. REQUIREMENTS OF GREENVILLE COUNTY 32
I. STAKEHOLDER COMMUNICATIONS PLAN 32
APPENDIX: ADDITIONAL MCC PROJECTS 41
April 5, 2017
Greenville County
University Ridge Development
301 University Ridge, Suite 2400
Greenville, SC 29601
Municipal Consolidation and Consolidation, LLC (MCC), a Franklin L. Haney Company subsidiary,
has formed a highly- experienced team of professionals to respond to the Request for Development
Proposal for the University Ridge Development Project (The Project) located in Greenville County,
South Carolina. The representations and commitments as set forth in the response are correct
and accurate.
UNDERSTANDING OF THE COUNTY’S GOALS: We fully understand the County’s vision to develop a world-class
mixed-use infill development project that serves to further strengthen the magnificent urban fiber of downtown
Greenville. As described in the RFDP, the primary objectives for the development of the County’s University
Ridge campus are as follows:
1. Intensive, High Density Urban Land-Usage
2. Aesthetically Striking and Appealing Urban Building, Hardscape, and Landscape Design
3. Thoughtful Consideration for the Replacement of a County Administrative Office Facility
4. Connectivity to Downtown Greenville, Adjacent Parks, Trails and Surrounding Properties
5. Distinct Sense of Place, Including Walkability, Greenspace and Public Gathering Spaces
6. Adequate Parking and Vehicular and Pedestrian Traffic Circulation
7. Significant Positive Community Impact
With these goals in mind, we have developed a thorough redevelopment plan approach based on our
simple yet highly effective public / private partnership approach with municipalities:
DEVELOPMENT PROPOSAL SUMMARY: Our approach is divided into two primary phases. In Phase I, MCC
proposes to acquire the existing property 301 University Ridge and lease back the existing facilities to the
County while we design and construct a new 250,000 sf facility to house the County offices plus an
additional 50,000 sf to house the Courts (total of 300,000 sf facility). This new facility will exemplify the
level of sophistication and dedication to sustainability and quality design exemplified in Greenville County.
Most importantly, as part of our proposal, MCC will absorb ALL liability for the project during the design and
construction phases. The County in turn, will only be liable for lease payments once the new building is
completed and the certificate of occupancy is obtained.
1. This approach puts ALL liability from design through construction of Phase I on us, freeing the County
to budget appropriately for the lease without worrying about unforeseen costs arising in Phase I.
2. The County is not responsible for any upfront capital costs associated with the development including
infrastructure, demolition or other project-related costs.
3. The newly built, state-of-the-art County facility serves as a value generator for the property and a
catalyst for the subsequent private development phases.
To provide the County with a turnkey project within budget and within an agreed upon schedule, we have
assembled a highly-experienced team of local, national and international professionals including:
• Project Executive: Frank Haney – Municipal Consolidation and Construction
• Design Principals: Chris Engel, AIA, LEED AP; Michael Keeshen, AIA, LEED AP – Goodwyn, Mills
& Cawood (Offices in Greenville and Columbia)
• Design Architect: Marc Warren, AIA, LEED AP –Goodwyn, Mills & Cawood (Offices in Greenville
and Columbia)
• Construction Project Manager: AJ Bargoti – Turner Construction
• Construction Site Manager: Terence Strong – Brownstone Group (SC DBE Firm)
• O & M Leader: Gregory Cichy, CPM®, LEED GA – Colliers (Offices in Columbia)
• Lead Counsel: R. Preston Bolt, Esq. – Hand Arendall, LLC
• Lead Financier: Lindsay Stroud – Savills-Studley
In addition to the above-mentioned team, we are prepared to hire Robert Charles Lester, Co
(RCLCO) should our team be selected as our economic and market analyst. As president of MCC, I
will be the point of contact for this contract and have full contractual authority for our team on all
matters related to this project. I look forward to working with Greenville County on this exciting
opportunity.
Sincerely,
PHASING PLAN
Phase 1 Construction: County Admin Building and Structured Parking October 2018 – February 2020
Phase 2a Construction: Demolition existing buildings site work April 2020 – January 2021
Phase 2b Construction: Vertical Construction of Mixed Use Buildings February 2021 – October 2022
Working in concert, our firms have delivered over Construction: Turner Construction will provide a
$10 billion in public-private and turnkey real Guaranteed Maximum Price. Our construction
estate development across the country. We are team, Turner, completed more than $1.2 Billion in
experts in “Complex Delivery Methods”, including design/build projects in 2015 alone. Turner brings
design-build delivery. A few recent successes an unparalleled resource base that can provide
include: The Portals Office Building in Washington the County with the assurance of a complete staff
DC, The Dulles Greenway, a 14-mile private toll and proven track record on design-build delivery
road, The 600,000 sf Birmingham Municipal methods. Turner is ranked among the top 20
Building and the $ 13.4 billion Bellefonte Nuclear national design- build firms in the United States.
Plant. Their experience with design-build, as well as
their resources, allows them to fix a price to a
The MCC team recently completed a 600,000 SF
project early, and shift cost and schedule risk to
municipal complex in Birmingham, AL. This
our team from the County.
project incorporated a renovation design of an
existing facility, construction while occupied, Turner will be engaged from the beginning of the
private financing, and facility management. The project to ensure the project is designed in a
City is looking to consolidate the Fire, Police and manner that maximizes constructability while
Municipal Courts into the remaining 360,000 managing the site logistics. However, above
square feet. The Franklin Haney Company, MCC’s other concerns will be construction safety during
parent company, was shortlisted in a RFP process the project. Both construction teams have a
and in the final round of negotiations. proven record of safety excellence while
maintaining quality work delivered on time.
Design & Pre-Construction: Turner Construction,
Brownstone Construction and Goodwyn, Mills and Operation and Maintenance: Finally, our team
Cawood will lead the facility programming and provides the County the most experienced facility
design effort. However, we will utilize the management team in the world. Colliers
expertise of the County, Turner Construction, International manages over 1.46 billion square
Colliers Management and local designers and feet of buildings worldwide. Our team will not
contractors to ensure the design is developed in a only ensure the project is designed and
manner that promises building comfort, constructed for the preference of the County, but
functionality and aesthetic excellence. we will provide a long-term management partner
that will ensure the sustainability of the facility for
The pre-construction services will be led by
the County for the long term.
Turner Construction. This effort will work in
unison with the design process to provide a Risk Sharing: MCC strongly believes the largest
consistently coordinated project schedule, risk is completion of the project, and therefore,
budget, value engineering, site logistics plan and the most beneficial risk-reducing solution is for
evaluation of existing conditions. the County to do a long-term lease with MCC for
the property. With this type of transaction, MCC
Our approach to this project will be centered on is able to absorb ALL major risks and create the
our extensive experience with other similar following key benefits to the County:
mixed-use urban redevelopment projects as well Nationwide, governments are encountering
as government office and administrative projects. problems pertaining to the office spaces they own
Lead Council
Maintenance Leader
R. Preston Bolt Jr., Esq.
Gregory Cichy, CPM®, LEED GA Hand Arendall, LLC
Colliers International Inc. Lead Council
Maintenance Leader
R. Preston Bolt, Jr. serves as the chair of Hand
An experienced commercial real estate leader Arendall's public finance practice group. He
with a successful record of maximizing financial practices in the fields of public finance, securities,
returns and providing strategic asset advisory and commercial and lending transactions. He was
services to the industry’s premiere owners and born in Anniston, Alabama, practiced in Georgia
institutional investors. Mr. Cichy has from 1979 until 1982, and was admitted to the
established a successful record of innovating Alabama State Bar in 1983. He graduated from
solutions and leading teams to provide “best in The University of Alabama, B.A. 1976, and from
class” real estate services. Known for a strategic Vanderbilt University School of Law, J.D. 1979.
and focused approach to the business, he strives Preston was the recipient of the Algernon Sydney
to consistently add value to managed assets. Mr. Sullivan Award. At Vanderbilt Law School, he was
Cichy adheres daily to the Institute of Real a Patrick Wilson Scholar and was inducted into
Estate Management’s Code of Professional the Order of the Coif. He served on the staff of
Ethics. the Vanderbilt Law Review, 1977-1979.
EDUCATION Preston has extensive experience in representing
• Johns Hopkins University, Baltimore, MD – cities, counties, utilities and other public bodies
Masters of Science, Real Estate Concentration: issuing bonds and other tax exempt debt. He also
Institutional Real Estate Investment Analysis, has acted as bond counsel for bonds issued to
Graduated May 2001 finance projects for 501(c)(3) organizations and
• University of Maryland, College Park, MD – manufacturing and other facilities eligible for
Bachelors of Arts, Urban Studies industrial development and financing.
Concentration: Urban Planning, Graduated
With the increased use of incentives and
May 1992
public/private partnerships to encourage
• Real Estate Salesperson License – State of
investment, Preston has also had extensive
Maryland
experience in advising both public and private
• Real Estate Appraiser License – State of
participants in public/private transactions. He
Colliers International
Saban Capital Group, Inc Juliana Priest
Director, Real Estate 310-557-5158
Urban America Advisors Thomas Kennedy, CFO &
COO 212-612-9100
NGP V Management, LLC James P. Griffin
Director of Property Management
703-760-9269
For the County building, we propose to follow the submission that includes a detailed description of
General Service Administration’s (“GSA”) lease the project, market, financials and superior
model. This model follows a trend where the GSA sponsorship. Savills Studley will utilize a
has begun moving away from self-ownership of disciplined and competitive transaction process,
the facilities that they occupy and are leasing new stressing the unique and fleeting nature of the
facilities built to their specifications. In addition opportunity. This debt will be rated and sold
to direct benefits to the County such as lower based on the creditworthiness of the County.
operating costs and higher employee morale and Turner Construction’s guaranteed maximum
productivity this model also completely eliminates construction contract and Colliers International’s
all liability by passing the ownership operation and maintenance experience. Proceeds
responsibilities to a third party. from the sale of this high-quality debt will fund
construction. We bring to the table our extensive
MCC, an affiliate of the Franklin Haney Company
capital markets network developed over our
has over 40 years of experience successfully
extensive history in the marketplace. The
constructing and financing similar projects across
strength of our team will enable financing to
the country following this model. We are
occur at extremely attractive rates that will be bid
confident that this method will provide the
out internationally by Savills-Studley
highest quality facility with the lowest cost to the
County while eliminating all risk. The proposed financing structure is a long term
fixed County lease. The operation and
As such, a newly formed special purpose entity
maintenance expenses can include, if elected by
(“SPE”) will assume ALL LIABILITY for the project
the County: janitorial, repairs and maintenance,
as soon as the Lease is executed. The County will
utilities, roads and grounds, security and all
have no other liability associated with this project
administration expenses. MCC nor any of our
beyond the lease payments. Our team will work
partnering firms have defaulted on any project we
closely with the County to efficiently design a
have undertaken. We will be an extremely
state-of-the-art facility based on specific design
financially sound partner to the County.
criteria that delivers on the departmental values
of economic viability, convenience and security,
and environmental stewardship.
These commonly held events are a great way to Another effective method we like to employ is a
engage the public and get them involved in the graphic rendering technique called “before and
design components. Participants are encouraged after” imagery. This visualization tool allows
to speak their opinion and put pen to paper as people to clearly see what the project may look
they take part in incorporating their vision into like by showing a side-by-side comparison of the
the project. current condition with a virtual built condition.
ON-LINE SURVEYS
OPEN SPACES
Facilitate productivity and collaboration. We will Sustainability. Provide a building that works to better
work closely with County officials to create spaces that the environment and in turn, save the County millions
are appropriately sized, structured, and of dollars on energy bills throughout the life of the
equipped for the job functions performed by County building. We will work with Greenville County to
staff and provide ample opportunity for staff to develop a facility that exemplifies the County’s
interact and collaborate with each other and the commitment to sustainability and quality of life.
public