Vous êtes sur la page 1sur 16

consulting engineers

Hubbard’s rail
embankment was
suffering from
continuous degradation
with soil material
ravelling away. BLP
provided embankment
stabilisation measures
to ensure the continued
safety and viability of
this section of rail line.
Byrne Looby Partners (UK)
MANAGEMENT TEAM

John Byrne David Beadman Danny Glynn


BEng, CEng, MICE, MIEI, Eur Ing MA, CEng, FICE, MIStructE BSc, Cert Law, CEng, CEnv, MICE
Managing Director Director Director

John is a Chartered Civil Engineer with David has over 25 years’ experience Danny has over 25 years’ experience
over 20 years’ experience in civil and in civil and geotechnical design, in the design, procurement and
geotechnical design. Having previously specialising in developing economic, execution of infrastructure and other
worked for Arup, he jointly established buildable solutions for deep basement civil and geotechnical projects.
Byrne Looby Partners in 1998. John excavations, combining knowledge of Danny is a Director of Byrne Looby
is the Managing Director of Byrne geotechnical design, structural design Partners (UK) and is based in their
Looby Partners (UK) and is based in and construction techniques. David Belfast office and has responsibility
their Guildford office. He has been is a Director of Byrne Looby Partners for the Northern Ireland region. Prior
responsible for the design of numerous (UK) and is based in their Guildford to joining BLP, he was Principal
large scale projects in the UK and office and has responsibility for the Geotechnical Engineer for the
overseas, mainly in the transport, London and UK-South regions. Prior Northern Ireland Central Procurement
marine and commercial sectors. to this David held senior positions Directorate where his responsibilities
John’s technical background is in with Tony Gee and Partners, Arup included advising on the design and
developing solutions that optimise and Bachy Soletanche. David has execution of major infrastructure
temporary works, permanent works been responsible for the design of projects under the Capital Works
and construction sequence. John has many underground space projects in Programme. Danny has led specialist
a deep interest in developing customer the UK and overseas, including the teams on a wide range of projects
focused solutions that deliver overall Shard triple-level top-down basement and was also Project Manager for
business value through the application and station boxes on Crossrail, the remediation of the 400-acre site
of technical expertise. the Jubilee Line Extension and the at the Maze Long Kesh scheme. A
Copenhagen Metro. Chartered Environmentalist, he is a
part-time lecturer in Geotechnics at
Queen’s University, Belfast.
Byrne Looby Partners
Civil & Geotechnical Design consulting engineers

We specialise in developing economic, buildable to solve challenging problems where first principles
solutions from concept stage through to complex engineering is combined with creative thinking
contractor design elements, combining knowledge along with a focus on safety and the regulatory
of structural and geotechnical design with framework. We operate mainly in the transport,
construction methodologies. We deliver added value commercial property and utility sectors.
through the application of technical excellence
and an awareness of our client’s priorities. We are constantly exploring more efficient designs
in order to achieve better solutions. Extensive
We provide a specialist civil and geotechnical investment in the latest computer design software
design service, predominantly for a contractor allows us to provide clients with the most advanced
client base. Our core expertise rests in our ability and effective design technology available.

Typical projects we assist our clients with are:

• Deep Excavations and Support Systems • Ground and Structural Movement Assessment
• Tunnels, Shafts and Cross-Passages • Near-shore Marine Structures
• Rail and Highway - Structures and Earthworks • Temporary Works Designs
• Historic Structures • Heavy Lifting Solutions
• Building Substructures and Complex Foundations • Asset Management and Value Engineering
Connaught Tunnel, London

Promoter
Crossrail

Client
Vinci Construction

Completion
2013

Services
• Structural Design
• Geotechnical design
• Damage Assessment
• Independent Checking

Involved at a number of
stages throughout this
project, BLP provided
progressive practical
Temporary Works
designs to ensure this
historic disused tunnel
in East London could be
successfully incorporated
into the new modern
Crossrail line.
Stepney Green Shaft, London

Promoter
Crossrail

Client
Carillion-Spie Joint Venture
Dragados-Sisk Joint Venture

Completion
2013

Services
• Soil-structure Interaction
• Structural Engineering
• Basement Design
• Temporary Works
• Construction Sequencing

BLP provided the


reinforcement design for
the 48m deep, 1.2m thick
diaphragm wall for the
Crossrail Stepney Green
shaft. Subsequently, BLP
were engaged by DSJV
to provide the detailed
design for the internal
temporary support system.
The Shard, London Bridge

Promoter
SELLAR GROUP

Client
Balfour Beatty Ground
Engineering

Completion
2012

Services
• Soil-structure Interaction
• Structural Engineering
• Sub-structure Design
• Construction Sequencing

As the detailed designer for the sub-structure of the renowned Shard,


BLP facilitated a reduced programme with a practical and buildable
top-down design and construction sequence for this triple level
basement. BLP successfully satisfied Network Rail and their technical
advisers in relation to the adjacent sensitive London Bridge station,
considered to be a significant constraint for the project.
Finsbury Circus, London

Promoter
Crossrail

Client
Balfour Beatty
major projects

Completion
2012

Services
• Foundation Design
• Numerical Modelling
• Structural Detailing

BLP provided the design


for the challenging
foundations of the concrete
batcher plant, located
in close proximity to
an LUL exclusion zone.
The challenge was to
design shallow but stable
foundations that could
accommodate Crossrail
tunnelling works beneath,
to which the batcher plant
supplied concrete.
Umm Qasr Port, Iraq

Promoter
United States Navy

Client
CCI, Alaska
PND Engineers, Seattle

Completion
2011

Services
• Marine Dredging
• Hydraulic Filling
• Soft Ground Engineering
• Staged Construction
• Slope Stability Analysis

This challenging site


was underlain by deep
deposits of marine mud.
BLP designed the marine
dredging, hydraulic filling
and construction sequencing
for this 14m high sea-wall
project . BLP’s solution of a
seaward to landward filling
operation was devised to
prevent large scale mud
slides which had previously
been experienced on the site.
Deephams Shaft, London

Promoter
Thames Water Utilities Ltd

Client
J. Murphy and Sons

Completion
2011

Services
• Geotechnical and
Structural Design

BLP’s geotechnical and


structural design for Deephams
Shaft challenged traditional
techniques incorporating
what are reputedly the UK’s
longest ever secant piles.
The implementation of
BLP’s design reduced costs
by more than 20% and
saved approximately one
month on the programme.
Broadgate, City of London

Promoter
British Land, Blackstone

Client
O’Keefe Construction Ltd

Completion
2013

Services
• Structural Engineering
• Temporary Works Design
• Value Engineering

BLP provided an
innovative value added
propping scheme,
pushing the limits of
a berm and raking
prop solution for this
three storey basement
for the new and
distinctive home of UBS
Investment Bank.
M25, London

Promoter
Highways Agency

Client
Skanska-Balfour Beatty
Joint Venture

Completion
2011

Services
• Geotechnical Engineering
• Value Engineering
• ASSEt Management

In a value engineering
exercise, BLP identified
considerable material
and programme savings
based on a design and
construction review of the
retention solutions along
the M25 upgrade sections.
Shadwell Station, London

Promoter
Transport for London

Client
Tony Gee & Partners

Completion
2010

Services
• Tunnel Design
• Historical Engineering
• Independent Checking

BLP’s analysis of this


historic brick lined
tunnel assisted in
achieving the objective
of incorporating
Shadwell Station into
the London Overground
system without
adversely impacting the
existing tunnel asset.
Crossrail – DLR Viaduct Bearing Surveys

Promoter
Crossrail

Client
Dragados-Sisk Joint Venture

Completion
2013

Services
• Bridge Engineering
• Non Intrusive Structural
Surveys

In areas where the existing


DLR overground line and
Crossrail tunnels came
in close proximity, BLP’s
bridge bearings survey
inspections formed an
important component
towards ensuring the
tunnelling works did not
adversely impact on the
existing assets of the DLR.
Kennacraig Ferry Terminal, Scotland

Promoter
Caledonian Maritime Assets Ltd

Client
Graham Construction Ltd

Completion
2011

Services
• Marine Engineering
• Foundation/Pile Design
• Temporary Works Design
• Construction Support

When challenging conditions were


found during the expansion of the
ferry terminal, BLP provided a
buildable re-engineered solution
which allowed for the extension
of the existing pier while still
keeping the link between the Isle
of Islay and the Scottish Mainland
operational during construction.
Derry-Londonderry Peace Bridge

Promoter
Ilex Urban Regeneration
Company

Client
Graham Construction Ltd

Completion
2011

Services
• Bridge Engineering
• Temporary Works Design
• Slope Stability Analysis
• Foundation Design

BLP provided our client with


construction stage support
and designed a robust
temporary works scheme to
allow the safe and expedient
construction of the renowned
Peace Bridge in Derry-
Londonderry, physically and
symbolically uniting both
sides of the River Foyle.
consulting engineers

Address: Priory House, Pilgrims Court, Sydenham Road, Guildford, GU1 3RX
Phone: +44 (0) 1483 511247 | Fax: +44 (0) 1483 569416 | email: london@blpge.com | web: www.blpge.com

London | Belfast | Dublin | Abu Dhabi | Doha | Jeddah