Data Sheet Wöhr Parklift 411/6

dependent parking
For permanent user only!*

* Lower level also for short time user (e.g. at office-, hotel-, commercial building). Both levels are possible for short time
user if parking attendant or valet is available.
Parklift 411/6-2,0: Load per platform max. 2000 kg (load per wheel max. 500 kg).
Parklift 411/6-2,6: Load per platform max. 2600 kg (load per wheel max. 650 kg).
Dimensions in cm

Parklift 411/6

Platform length 448 cm


Load per platform
2000 kg or 2600 kg
Platform width up to 270 cm
For Outdoor installation
(in snowfall areas with
roofing provided by the
h1
customer)
w
e al l
hy lect op
dr ric en
au al i ng
lic an fo
se d r
rv
ice
s
15
min.18
min. 300 cm 15
horizontal
max. -10% 520
slope

Standard type Parklift Parklift Parklift Comfort type Parklift Parklift Parklift
411/6-155 411/6-165 411/6-175 411/6-185 411/6-195 411/6-205
Height h1* single unit 320 330 340 Height h1* single unit 350 360 370
Car height lower level 150 160 170 Car height lower level 180 190 200
Car height upper level* 150 150 150 Car height upper level* 150 150 150
* With greater h1 height, higher cars can be parked on the * With greater h1 height, higher cars can be parked on the
upper platform upper platform

Width dimensions

Single unit Units in a row

Space
required gives clear
B platform width
265 230
275 240
285 250
295 260
305 270

* Special platform widths


are available (e.g. 210,
220 cm), please check if
they correspond with
local regulations.
clear clear
Parklift 411/6 | 06.2015 | C027-4319 | © Otto Wöhr GmbH

platform width platform width


B B B B B

Notes
1. Clear platform width of 250 cm for car widths of 190 cm. For large touring sedans we recommend a clear platform width of 250 cm
2. According to ISO 3864 the floor has to be marked with 10 cm wide yellow-black stripes at a distance of 50 cm from the platform edge by the
purchaser (see “statics and construction requirements“ on page 2).
3. The platform has a length of 448 cm.
4. It is not possible to have channels or undercuts and/or concrete haunches along the floor-to-wall joints. In the event that channels
or undercuts are necessary, the system width needs to be reduced or the installation width needs to be wider.
5. The manufacturer reserves the right to construction or model modifications and/or alterations. Furthermore, the right to any subsequent part
modification and/or variations and amendments in procedures and standards due to technical and engineering progresses in the art or due to
environmental regulation changes, are also hereby reserved.

Otto Wöhr GmbH Ölgrabenstrasse 14 Fon +49 [0] 7044 46 -0 www.woehr.de


01 Auto-Parksysteme 71292 Friolzheim | Germany Fax +49 [0] 7044 46 -149 info@woehr.de We compact parking space
Electrical datas Installation diagram
Item Performance Quantity Designation Position Frequency 1 Electric meter
1 by customer 1 unit electric meter in the feed cable 2 Fuse or automatic circuit breaker
3 x16 A slow blow according to
2 by customer 1 unit fuse or automatic circuit in the feed cable 1 per DIN VDE 0100 part 430
breaker 3x16A slow blow power pack 3 Feed line to the main switch
acc. to DIN VDE 0100 p. 430 7 PVC control cable 5 x 1,52
6 Lockable main switch from main switch to
3 by customer as locally acc. to local power supply feed cable to 1 per assembly
required regulations main switch power pack 8 Hydraulic unit with three-phase
3 Ph + N + PE* motor, 230/400V, 50Hz,
14 Unlock magnet 1,5/3,0 kW. Switching cabinet
4 by customer each equipotential bonding sa- corner pit floor/
10 m fety lead-out connection rear wall with motor, protection, wired
already for installation
5 by customer 1 unit equipotential bonding sa- from the lead-out 1 per
10 Branch connector 11 PVC control cable 3 x1,5 2
fety compliant to the connection to the Parklift from branch connector
DIN EN 60204 standard system to unlock magnet
6 by customer 1 unit marked main switch, above operating 1 per 4 Equipotential bonding safety
lockable to prevent device power pack lead-out connection
unauthorized switching on
12 PVC control cable 5 Equipotential bonding safety
7 by customer 10 m PVC control cable with from main switch 1 per 5 x1,5 2 from branch from the lead-out connection
marked strands and pro- to hydraulic power power pack connector to operating to the system
tective conductor 5 x 1,5 2 pack element
9 PVC control cable 5 x1,5 2 from
Items 8–16 are included in WÖHR’s scope of delivery unless otherwise specified in the 13 Operating device for UP/DOWN assembly to branch connector
with EMERGENCY-STOP. If
offer/order.
possible on the left, but always 16 PVC control cable 3 x1,5 2 from
outside the platform’s movement branch connector to valve
* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE 15 Cylinder valve
(three-phase current) Note: Where a door is used to close the garage, the range. Cables always feed in
from below. (2 keys per parking place.)
manufacturer of the door must be consulted before the electric cable is laid.
The electrical components enable our fitters to complete
suppliedbythemanufacturer their work satisfactorily and to Maintenance
must be connected in accord- check the correct functioning WÖHR and its foreign partners have an assembly and customer
ance with the appropriate wiring of the units. network. Annual maintenance is performed at conclusion of a
diagram and local regulations. In compliance with the DIN EN maintenance contract.
German VDE electrical require- 60204 standard provisions, all
ments must be adhered to, in systems must be connected Protection against corrosion
order to validate the TÜV tested directly on site with an earthed
circuit. Independent of a maintenance workings has to be carried out acc. to
equipotential bonding. The lead- WÖHR Cleaning and Maintenance Instruction regularly.
The electrical supply to the out connection must be at a
power pack(s) must be provided 10 m distance! Clean up galvanized parts and platforms of dirt and road salt as well
prior to or during installation to as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.
Noise protection
Statics and construction requirements
Basis is the German DIN 4109 At differing constructional
“Noise protection in buildings”. Aconditions additional sound 411/6-2,0
absorbing measures are P3 P1 = +20 kN *
With the following conditions
necessary.
required 30 dB (A) in rooms P2 = +14 kN
can be provided: The best results are reached – 3 kN
by separated sole plates from 300 P3 = +13 kN (with roofing)
– noise protection package
the construction. P3 = + 3 kN (indoor)
from our accessory
– insulation figure of the Increased noise protection: 411/6-2,6
construction of min. R’w = 57dB If increased noise protection P1 P2 P1 = +14 kN *
– walls which are bordering must be provided planning has P2 = +22 kN
the parking systems must be to be confirmed on a project 139 (205) 130 P3 = +13 kN (with roofing)
done as single wall and base by WÖHR (bigger building P3 = + 3 kN (indoor)
measurements are required). Marking according to ISO 3864
deflection resistant with min.
m’= 300 kg/m2 P1 P2 * all static loadings
P3 include the
– solid ceiling above the weight of the car
parking systems with min. clear clear
platform platform
m’= 400 kg/m2 width width+ 20 ( ) Dimension in
brackets for
Temperature P3 Parklift 411/6-2,6
P1 P2
The installation is designed to operate between +5°and +40°C. 50
Atmospheric Humidity: 50% at +40°C. If the local circumstances
differ from the above please contact WÖHR. The units will be fixed on the anchor points with heavy duty anchor bolts
to a depth of approx. 10–12 cm.
Hydraulic power pack Base plate thickness minimum 18 cm! Concrete quality according to
the static requirements of the building, but for the dowel fastening
1) A wind and weather-proof 3) Each power pack can manage we require a concrete quality of min. C20/25.
hydraulic power pack must a maximum of two systems.
be accessible via the entrance Special foundations are required with asphalt floors or paving-stones.
4) When temperatures are low,
level (not in residential it is possible for the systems
buildings). Space requirements: to require longer lowering Fire safety
length 100, height 140 cm, times. In some circumstances, Each and every fire safety requirement and all possible mandatory item(s)
depth 35 cm freezing temperatures may and equipment(s) (fire extinguishing systems and fire alarm systems, etc.)
Parklift 411/6 | 06.2015 | C027-4319 | © Otto Wöhr GmbH

2) For protection from rain and cause the system to come to are to be provided by the customer.
for the reduction of airborne a standstill.
sound transmission, a noise Notes
insulation covering is on offer
for the power pack. Lowered cars or cars with front spoiler can be parked only limited on
the upper platform (see clearance profile).
Dimensions Clearance profile (standard car)
All dimensions shown are minimum. Construction tolerances must
be taken into consideration. All dimensions in cm. 40 170
50 50
Conformity test 150
...

All our systems are checked according to EC machinery directive 200*


2006/42/EC and EN 14010. 275 22
60 14 38
Railings 120 max. 290 90
If walkways are arranged directly to the side or behind the systems, railings 500
have to be provided acc. EN ISO 13857 by client acc. to local requirements, * The total car height includes roof rail and antenna fixture must not
height min. 200 cm. exceed the mentioned max. height dimension.
4 02