Vous êtes sur la page 1sur 3

Stealth Arms

80% lower kit - MILLING DIRECTIONS


DISCLAIMER: These instructions are intended for use by someone who has knowledge of machining and
machine tooling is necessary to complete an 80% lower receiver. It is the end user’s responsibility to
determine if finishing an 80% lower receiver is permitted by law in their state and/or municipality. These
instructions are offered for educational purposes. The author and jig manufacturer assumes no liability for
misuse or damage; bodily, machinery, receiver or otherwise. The purchase of this product and its
instructions are acceptance of these terms.

Part’s included: Underlined items are required for the milling process

1 - 80% lower AR 15 receiver

1 - Left plate 4 - 10-24x ½ bolts


1 - Right plate 1 - ¼ - 20 x 1 ¾ bolt
1 - Milling Plate 1 1 - ¼ - 20 x 1 ½ bolt
1 - Milling Plate 2 1 - 3/8” Drill Bit
1 - Drill press plate 1 - 7/16” Drill Bit
1 - 5/32 Drill Bit
1 - 1/8” Drill Bit

The enclosed jig and instructions are instructions are intended for use with 80% receivers and had been
tested on most popular forged and billet 80% receivers. This jig is specifically intended for use to finish
80% receivers only and is in no way designed to finish receivers any less than 80%

Please be safe in completing your project. Always use eye protection and keep first aid supplies nearby
if needed. Take your time! Measure twice and cut once. Safety and patience will help you produce a
quality product.

Stealth Arms 80% lower kit – MILLING DIRECTIONS 1.


Stealth Arms 80% lower kit
MILLING DIRECTIONS

Milling Directions:

1. Assemble left and right side plate as shown using the ¼ - 20 x 1 ¾ bolt through the rear
take down hole and the ¼ - 20 x 1 ½ bolt through the recessed hole.
Milling Plate 1

(4) - 10-24 bolts

Left Side Plate 1 - ¼ - 20 x 1 ½ bolt


1 - ¼ - 20 x 1 ¾ bolt

2. Drill the selector hole using the 3/8” drill bit. Drill slow while only taking a ¼ “at a time to
avoid drill walk. It is ok to drill into the right side plate.

3. Use the 5/32” drill bit to drill the 2 trigger group pin holes. Drill slow while only taking a ¼
“at a time to avoid drill walk. It is ok to drill into the right side plate.

4. Bolt on Milling Plate 1 using the 4 10-24x ½ bolts.

Milling Plate 1

3/8 Drill Guide

5/32 Drill Guide

Stealth Arms 80% lower kit - MILLING DIRECTIONS 2.


Stealth Arms 80% lower kit
MILLING DIRECTIONS

5. Mill out the trigger pocket following the milling plate 1 trigger pocket guide. Continue milling until
a depth of 1.367” is achieved measuring from the top of milling plate 1.

Drill out to depth of


1.367”

6. Remove milling plate 1 and bolt on milling plate 2.


Milling plate 2

7. Mill the trigger hole.

8. Machine the remaining material to a depth of .748” from the top of top plate 2. Continue to
machine past the top plate guides until you reach the pre-machined portion at the back of the lower.
(NOTE: only remove 3/8” depth of material at a time.)

Mill through the part

Stealth Arms 80% lower kit


For support please call: Tim @ 419-300-0097

Stealth Arms 80% lower kit - MILLING DIRECTIONS 3.

Vous aimerez peut-être aussi