SARIKEI & KEMANTAN TRANSFORMER UPGRADING AND

SUBSTATION EXTENSION PROJECT


PLS-130116
Client : Sarawak Energy Berhad

Project Title : Sarikei & Kemantan transformer upgrading and substation

Contract No : PLS-130116

Site Registration No : SW/13/03/4919

Document No : PLS-130116-C-HSP-MPR-0009

MONTHLY HSE REPORT


FEB 2015

Prepared By: Signature: Date:

Ambok Anwar Bin Ambok


Maek

Checked By: Signature: Date:

Approved By: Signature: Date:

Ir. Baharuddin Abdul Kudus


Project Director
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 1 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

1.0 INTRODUCTION

The preparation and submission of this report is a compliance of statutory


requirement of Occupational Safety and Health Act 1994. (Occupational Safety
and Health (Safety and Health Officer) Regulations 1997.

2.0 SCOPE

This report will cover the Safety & Health Officers report content as stipulated
under sub-regulation (2) of REGULATION 19 of Occupational Safety and Health
(Safety and Health Officer) Regulations 1997.

3.0 PURPOSE

This report is prepared for the purpose to acknowledge the employer pertaining
of HSE activities along the month.

4.0 HSE EXECUTIVE SUMMARY

❖ There is no accident or incident at site.


❖ Total Manhours MAR 2015 = 1536
❖ Total Manhours to date = 1728
❖ Contractor already registered with CIDB, registration No. 0320131128-
CH153755
❖ CIDB levi is paid on 24/01/14
❖ Toolbox meeting is conducted on weekly basis,
❖ The activity for the month of MAR 2015 are:

- Wooden barricade work


- Nylon barricade work
- Goal post
- Barricade and goal post painting work
- Site office

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 2 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

5.0 PROJECT SAFETY STATISTICS

5.1 Accident / Incident Report


• There are NO accident or incident occurrences at site for the month
of MAR 2015

5.2 HSE Promotion and Improvement


• Toolbox meeting

6.0 ACCIDENT INVESTIGATION AND REPORTING

• The HSE shall conduct an investigation within 24 hours where accident/incident


occurs at the site.
• The accident/incident shall be immediately reported to the Project Manager and HSE
Committee. The HSE Chairman shall convene an emergency meeting to discuss the
accident/incident and the immediate measures taken to correct and prevent a similar
accident/incident from further recurrence.
• The HSE Officer shall prepare and submit a monthly HSE report to CLIENT. The
report shall include but not limited to the following:

o Statistics
o Training
o Minutes of Meeting
o Safety Promotions

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 3 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

7.0 MONTHLY HEALTH, SAFETY AND ENVIRONMENTAL PROGRAMME

a) OSH Training / Course / Seminar / Exhibition

• Not recorded during this month

b) OSH Promotion and Improvement

• Safety Committee Chart already in placed but need to amend from


time to time& Safety meeting will be conducted once in every three
month.
• Toolbox Meeting is to be conducted on Weekly basis (Day and time
will be confirm)
• Job Safety Analysis (JSA) for every activity will be in place.
• Identification of Environmental aspect/impact and Safety & Health
hazard/risk assessment (HIRAC) will be in place.
• HSE penalty system to be proposed with an agreement with all
committee members.

c) Workplace HSE Inspection

• Inspection of the work area.


• Inspection of the machinery and tools.
• Inspection of proper PPE

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 4 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

8.0 CORRECTIVE-PREVENTIVE ACTION STATUS


8.1 Un-Safe Act andCondition :

U-SEE U-ACT
No. Location U-SEE U-ACT Status
1 Kemantan General worker not using safety .Ask to wear safety helmet while Closed
Substation helmet working inside the substation
2 Kemantan General worker climbing the fence Ask to use bench to paint high part Closed
Substation while painting barricade
3 Kemantan Debris/Rubbish didn’t collect at the All rubbish and debris to collect at Closed
Substation reserved area the reserved area
4 Kemantan No housekeeping work Todo Housekeeping work before Closed
Substation leaving the site

8.3 Environmental Issue :


• Not recorded during this month

9.0 MANPOWER AND MAN-HOURS RECORD/ MACHINERY & PLANT RECORD


- The manpower and man-hours record as attached.

10.0 Site Activity for the month of MAR 2015


- The activity on site for this month is:

a) Wooden barricade work


b) Nylon barricade work
c) Goal post work
d) Barricade and goal post painting work
e) Site office

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 5 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

11.0 SITE PHOTOGRAPH AND ACTIVITY

Toolbox Briefing at Sarikei Substation

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 6 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

Goalpost for Sarikei Substation

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 7 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

Barricade Painting in sarikei substation

Toolbox Briefing before start working at Kemantan Substation

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 8 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

Barricade work at Sarikei Substation

Nylon barricade work at Sarikei Substation

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 9 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

Goal post work at kemantan Substation

Site visit from SEB Corp. HSE (Kemantan Substation)

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 10 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

Barricade painting work at kemantan Substation

Housekeeping work at Kemantan substation

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 11 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

Site office for Sarikei substation

Site office for Kemantan substation

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 12 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

Project Signboard for Sarikei substation

Project Signboard for Kemantan substation

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project
Doc. Ref. : PLS130116-C-HSP-MPR-0009
MONTH : March 15
Original Issue Date : 25 March 2015
Revised Issue Date :
Page : Page 13 of 14

HEALTH, SAFETY AND ENVIRONMENT (HSE) REPORT FOR


MONTH OF MARCH2015

HSE Performance Statistic


-Attached

Manpower & Machinery Record


-Attached

Monthly HSE Report for PLS-130116 – Sarikei & Kemantan Transformer Upgrading and Substation Extension Project