MEETING AGENDA

STRUCTURAL TECHNICAL MEETING


14-Sep-17

REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED

A. TOWER

A1. PROPOSALS (PCD)

1 SLAB STARTER BAR AT COREWALL L9 TOWER ACI-STR-PCD-0477 9/9/2017


WF-004915
2 CONTRACTOR PROPOSAL TOWER GF~L4 PRESTRESSED BEAM BY PT VSL INDONESIA ACI-STR-PCD-216 9/8/2017
WF-004905

TC 2 TEMPORARY SUPPORT DETAILS


ACSET WILL SUBMITTED THE CALCULATION FOR EXISTING BEAM
3 WHICH LOADED BY TC 2 8/28/2017
ACI-STR-PCD-0474WF-004806 ACSET 7/9/2017

A2. REQUEST OF INFORMATIONS (RFI)

1 TOWER 1-L6 FLOOR BEAM QUERIES


ACI-STR-RFI-0613 9/13/2017
WF-004953
2 TOWER 1 - L5 CAST IN ITEMS AND ADDITIONAL REINFORCEMENT DUE TO FACADE
SUPPORT ACI-STR-RFI-0611 9/12/2017
WF-004928

3 CLARIFY BEAM BC10 AT LEVEL 13/14 TOWER ACI-STR-RFI-0608


WF-004910 9/8/2017
4 PACKING FORCE PRESTRESS BEAM AT L3 FLOOR TOWER ACI-STR-RFI-0607
WF-004908 9/8/2017
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17

REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED

5 BEAM BC 7 AND B17 MODIFICATION DUE TO CLASH WITH PRESTRESS BEAM PC-1 AT LEVEL 9 ACI-STR-RFI-0599WF-004893

WAS TECHNICALLY OKAY,


NEED REVIEW FROM DT -ARCH REGARDING ALTERING THE BEAM SHAPE 9/7/2017

6 CONVERSION BEAM BP7 AT L5 TOWER AREA ACI-STR-RFI-0603WF-004888


OKAY BY RE
06/09/2017 RE 7/9/2017

ACTUAL PRESTRESS ANCHOR FOR PC-3, PC-5 AND PC-6 AT L4 FLOOR TOWER ACI-STR-RFI-0602WF-004887
will be review by WAS WAS
7 06/09/2017 DT 12/9/2017

8 ACI-STR-RFI-0601WF-004886
BEAM B21 AT L5 FLOOR TOWER

OKAY BY RE 06/09/2017 RE 9-Jul

9 ACI-STR-RFI-0596
WF-004859
L5 FLOOR TOWER QUERIES (PGW-SD-000211)
NO. 1 CORRECT AS SITE DIRECTIVE
NO. 2 WAS: D13-100 + D10-500 BECOME TO 1,5 D13-100 STIRRUPS AS A
REPLACE NO ADDITIONAL. IF ALREADY FABRICATE JUST INSTALL ALL OF
THEM (07/09/2017)
NO.3 SECTION CORRECT
WAS
NO. 4 TBC BY DT DT 8/9/2017
04/09/2017
NO.5OK RE
NO.6 OK
NO. 7 BEAM TO BE ADJUST EDGE OF COLUMN, ADD CANTILEVER SLAB.
NO. 8 ADDITIONAL BEAM MUST INLINE WITH MAIN BEAM. TO BE CONFIRM BY
DT
NO. 9 FOR INFO
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17

REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED

ACI-STR-RFI-0557. R1WF-004858
PRESTRESS BEAM FOR L9 TOWER BY VSL
WILL BE REVIEW BY RE
11 04/09/2017 RE 8/9/2017

12 REQUEST DATA FOR PRESTRESS BEAM PC-3 AND PC-4 AT L7 TOWER ACI-STR-RFI-0594WF-004849
WAS WILL REVIEW BY REQUEST
02/09/2017 WAS 12/9/2017

13 ACI-STR-RFI-0593WF-004848
TOWER SLAB L5 EDGE ADJUSTMENT (PGW-SD-000210)
DT WILL ISSUED FORCON 8/9/2017
02/09/2017 DT For Info

10 ACI-STR-RFI-0574WF-004774

ALTERNATIVE FOR PRESTRESS BEAM PC-4 AT L7 FLOOR TOWER TO AVOID LINK BEAM LB-9
DIAGONAL REBAR
25/08/2017: Need Calculation/analysis from VSL regarding shift position by 1500. Starter bar
for slab from corewall did not change; Slab rebar will be modified to support from beam to
beam. DT will give the parameter data to Acset and VSL tobe analysed (regarding PC4) 23/08/2017 WAS 12/9/2017
31/08/2017: VSL request balanced loading to perform analysis. WAS will provide 04/09/2017
Still Waiting for data from WAS

11 ACI-STR-RFI-0589WF-004838
BEAM ANCHORAGE TO COLUMN STANDARD DETAIL (TOWER)
31/082017: ACI-318chapter 7.22, ACI 315 Appendix anchorage to far face of column RE
30/08/2017 4/9/2017
DT
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17

REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED

14 ACI-STR-RFI-0541WF-004535
STARTER BAR FOR STAIR ST1-01 AND ST1-0202/08/2017: To be confirmed by DT today
02/08/2017.
10/08/2017:ST1-01 Done; ST1-02 TBC (11 Aug 2017)
25/08/2017: PMI already released. 31/07/2017 RE 4/9/2017

A3. OTHER

1 VOID SIZE TO BE GROUTED RAFT FOUNDATION

2
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17

DATE
No. ITEMS REFERENCE PIC TARGET
SUBMITTED

B. PODIUM & BALLROOM

B1. PROPOSALS (PCD)


1 LAPPING COLUMN AT BASEMENT 4 PODIUM AREA NOT IN THE MIDDLE THIRD ACI-STR-PCD-0478 9/9/2017
WF-004918

2 PILECAP PC7A REDESIGN DUE TO BOREPILE ECCENTRICITY PODIUM AREA 27/07/2017


ACI-STR-PCD-0444WF-004506
02/08/2017: Need additional information regarding actual borepile diameter (larger than
design; from 1000 to 1200mm). PGW to review today 02/08/2017.
10/08/2017: RE need approval for con drawing for review. For con will be confirm with PGW-DT
for legal approval. From WAS will submit to PGW-DT (14 Aug 2017).
25/08/2017: PCD need to be send to DT and WAS for review and approval. Targer: 18 Aug
2017.
31/08/2017: -

B2. REQUEST OF INFORMATIONS (RFI)


1 SPLICE SLAB REBAR RIGHT AFTER CONSTRUCTION JOINT ALL AREA
ACI-STR-RFI-0610
WF-004922
1 ACI-STR-RFI-0592WF-004872
06/09/2017 DT, RE 11/9/2017
NEW DERMACATION LINE PODIUM LINE PODIUM AREA
WAS OKAY (1/3 1ST SPAN)
TBC BY DT

3 DETAIL ESCALATOR WITH PRESTRESS BEAM AT LEVEL 2 PODIUM AREA ACI-STR-RFI-0595WF-004855


04/09/2017 RE 7/9/2017
DT WILL CLARIFY TO RE
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17

DATE
No. ITEMS REFERENCE PIC TARGET
SUBMITTED

4 ACI-STR-RFI-0591WF-004847
02/09/2017 DT , WAS 11/9/2017
EDGE OF SLAB PODIUM AREA
TBC BY DT AND WAS

5 ACI-STR-RFI-0590WF-004844
31/08/2017 DT, WAS
BASEMENT 4 PODIUM P6 SLAB INQUIRY
TBC BY DT AND WAS

11/9/2017
6 STRUTTING EAST SIDE TYPE A1,A2,AND B1 BALLROOM AREA 28/08/2017
ACI-STR-RFI-0581WF-004803 WAS 11/9/2017
31/08/2017: WAS will review RE
DT

7 SUMPIT POSITION AND DETAIL GUTTER ON BALLROOM AREA 25/08/2017


ACI-STR-RFI-0580WF-004791 ACSET 6/9/2017
31/08/2017: ACSET need provide the save position of sumpit. DT
7/9/2017 : WAS Clarify, ACSET to follow ME shop drawing

8 FFL L1 MEZZANINE PODIUM AREA 18/08/2017


ACI-STR-RFI-0553WF-004704 DT 4/9/2017
25/08/2017: TBC by DT on 29 Aug 2017. RA/RE
31/08/2017: Follow FFL Arch
7/9/2017 : ACSET HASN’T RECEIVED THE DOCUMENT YET

9 STP WALL BALLROOM AREA AT BASEMENT 6 11/07/2017


ACI-STR-RFI-0520WF-004320 DT 4/9/2017
12/07/2017: -
19/07/2017: DT to review.
26/07/2017: DT will review and reply before 28/07/2017.
02/08/2017: To be confirmed by DT (MEP) today 02/08/2017.
10/08/2017:TBC by DT
25/08/2017: TBC by DT on 30 Aug 2017.
31/08/2017: Forcon MEP tto Arch and then structre provide detail
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17

DATE
No. ITEMS REFERENCE PIC TARGET
SUBMITTED

10 PODIUM B6 FIRETANK WALL DETAIL31/05/2017: Architecture Drawing are not available yet. 30/05/2017
ACI-STR-RFI-0482WF-004026 DT 4/9/2017
07/06/2017: - WAS
14/06/2017: -
21/06/2017: -
12/07/2017: -
19/07/2017: -
26/07/2017: DT to review.
02/08/2017: To be confirmed by DT.10/08/2017:To be confirmed by DT.
25/08/2017: TBC by DT on 31 Aug 2017.
31/08/2017: will confirm to arch

11 RETAINING WALL PODIUM AREA 27/03/2017


ACI-STR-RFI-0376WF-003408 4/9/2017
26/07/2017: -
02/08/2017: To be confirmed by DT.10/08/2017: To be confirmed by DT.
25/08/2017: TBC by DT due to landscape and MEP requirment on 31 Aug 2017.
31/08/2017: Waiting architecture landscape

12 FORCON RAMP 08 PODIUM AREA ACI-STR-RFI-0604WF-0048907/9/2017 DT 11/9/2017

B3. OTHER
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17

REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED

C. MANSION
C1. PROPOSALS (PCD)
1 8/29/2017
ACI-STR-PCD-0475WF-004850 RE 7/9/2017
CONVERSION D16 TO D22 AT SLAB S618
RE WILL RELEASE THE DOCUMENT TO ACSET

C2. REQUEST OF INFORMATIONS (RFI)


1 WATER TANK FOUNDATION DETAIL AT L9 MANSION 9/13/2017
ACI-STR-RFI-0612
WF-004948
HOISTING HOOK DETAIL (MS-03) MANSION 9/9/2017
2 ACI-STR-RFI-0609
WF-004917
KERB WALL HEIGHT AT LEVEL 9 MANSION ACI-STR-RFI-0605 9/7/2017
3 WF-004895

ACI-STR-RFI-0600WF-004885
06/09/2017

PLN ROOM COLUMN CLARIFICATION MANSION GROUND FLOOR


ACSET TO CLARIFY REGARDING SURVEY DATA FOR BEAM POSITION (TO CHECK
4 WITH RETAINING WALL FCD AND SHOP DRAWING)

ROAD ACCESS WIDTH AT WEST SIDE 23/08/2017


ACI-STR-RFI-0573WF-004769 DT - RA ASAP
31/08/2017: Beam stair to be modified following cantilever slab
5 7/9/2017 : STILL REVIEW BY RA
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17

REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED

PROVIDE DETAIL FOR CONSTRUCTION DRAWING AT GRID MA-4~MA-5 (MA-B~MA-C) LEVEL 8 ACI-STR-RFI-0419WF-003715
28/04/2017 ARCH
MANSION
26/07/2017: -
02/08/2017: To be confirmed by DT Arch.
10/08/2017:TBC by DT Arch
6 25/08/2017: TBC by RA on 30 Aug 2017.
31/08/2017: -
7/9/2017 : WILL BE CONFIRMED BY ARCH

RELEASE HOLD AREA AT LEVEL 2 IN THE MANSION AREA 12/01/2017


ACI-STR-RFI-0278WF-002526 ARCH
26/07/2017: -
02/08/2017: To be confirmed by DT Arch.10/08/2017: TBC by DT Arch
25/08/2017: TBC by RA.
7 31/08/2017: -
7/9/2017 : WILL BE CONFIRMED BY ARCH