Académique Documents
Professionnel Documents
Culture Documents
REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED
A. TOWER
REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED
5 BEAM BC 7 AND B17 MODIFICATION DUE TO CLASH WITH PRESTRESS BEAM PC-1 AT LEVEL 9 ACI-STR-RFI-0599WF-004893
ACTUAL PRESTRESS ANCHOR FOR PC-3, PC-5 AND PC-6 AT L4 FLOOR TOWER ACI-STR-RFI-0602WF-004887
will be review by WAS WAS
7 06/09/2017 DT 12/9/2017
8 ACI-STR-RFI-0601WF-004886
BEAM B21 AT L5 FLOOR TOWER
9 ACI-STR-RFI-0596
WF-004859
L5 FLOOR TOWER QUERIES (PGW-SD-000211)
NO. 1 CORRECT AS SITE DIRECTIVE
NO. 2 WAS: D13-100 + D10-500 BECOME TO 1,5 D13-100 STIRRUPS AS A
REPLACE NO ADDITIONAL. IF ALREADY FABRICATE JUST INSTALL ALL OF
THEM (07/09/2017)
NO.3 SECTION CORRECT
WAS
NO. 4 TBC BY DT DT 8/9/2017
04/09/2017
NO.5OK RE
NO.6 OK
NO. 7 BEAM TO BE ADJUST EDGE OF COLUMN, ADD CANTILEVER SLAB.
NO. 8 ADDITIONAL BEAM MUST INLINE WITH MAIN BEAM. TO BE CONFIRM BY
DT
NO. 9 FOR INFO
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17
REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED
ACI-STR-RFI-0557. R1WF-004858
PRESTRESS BEAM FOR L9 TOWER BY VSL
WILL BE REVIEW BY RE
11 04/09/2017 RE 8/9/2017
12 REQUEST DATA FOR PRESTRESS BEAM PC-3 AND PC-4 AT L7 TOWER ACI-STR-RFI-0594WF-004849
WAS WILL REVIEW BY REQUEST
02/09/2017 WAS 12/9/2017
13 ACI-STR-RFI-0593WF-004848
TOWER SLAB L5 EDGE ADJUSTMENT (PGW-SD-000210)
DT WILL ISSUED FORCON 8/9/2017
02/09/2017 DT For Info
10 ACI-STR-RFI-0574WF-004774
ALTERNATIVE FOR PRESTRESS BEAM PC-4 AT L7 FLOOR TOWER TO AVOID LINK BEAM LB-9
DIAGONAL REBAR
25/08/2017: Need Calculation/analysis from VSL regarding shift position by 1500. Starter bar
for slab from corewall did not change; Slab rebar will be modified to support from beam to
beam. DT will give the parameter data to Acset and VSL tobe analysed (regarding PC4) 23/08/2017 WAS 12/9/2017
31/08/2017: VSL request balanced loading to perform analysis. WAS will provide 04/09/2017
Still Waiting for data from WAS
11 ACI-STR-RFI-0589WF-004838
BEAM ANCHORAGE TO COLUMN STANDARD DETAIL (TOWER)
31/082017: ACI-318chapter 7.22, ACI 315 Appendix anchorage to far face of column RE
30/08/2017 4/9/2017
DT
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17
REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED
14 ACI-STR-RFI-0541WF-004535
STARTER BAR FOR STAIR ST1-01 AND ST1-0202/08/2017: To be confirmed by DT today
02/08/2017.
10/08/2017:ST1-01 Done; ST1-02 TBC (11 Aug 2017)
25/08/2017: PMI already released. 31/07/2017 RE 4/9/2017
A3. OTHER
2
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17
DATE
No. ITEMS REFERENCE PIC TARGET
SUBMITTED
DATE
No. ITEMS REFERENCE PIC TARGET
SUBMITTED
4 ACI-STR-RFI-0591WF-004847
02/09/2017 DT , WAS 11/9/2017
EDGE OF SLAB PODIUM AREA
TBC BY DT AND WAS
5 ACI-STR-RFI-0590WF-004844
31/08/2017 DT, WAS
BASEMENT 4 PODIUM P6 SLAB INQUIRY
TBC BY DT AND WAS
11/9/2017
6 STRUTTING EAST SIDE TYPE A1,A2,AND B1 BALLROOM AREA 28/08/2017
ACI-STR-RFI-0581WF-004803 WAS 11/9/2017
31/08/2017: WAS will review RE
DT
DATE
No. ITEMS REFERENCE PIC TARGET
SUBMITTED
10 PODIUM B6 FIRETANK WALL DETAIL31/05/2017: Architecture Drawing are not available yet. 30/05/2017
ACI-STR-RFI-0482WF-004026 DT 4/9/2017
07/06/2017: - WAS
14/06/2017: -
21/06/2017: -
12/07/2017: -
19/07/2017: -
26/07/2017: DT to review.
02/08/2017: To be confirmed by DT.10/08/2017:To be confirmed by DT.
25/08/2017: TBC by DT on 31 Aug 2017.
31/08/2017: will confirm to arch
B3. OTHER
MEETING AGENDA
STRUCTURAL TECHNICAL MEETING
14-Sep-17
REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED
C. MANSION
C1. PROPOSALS (PCD)
1 8/29/2017
ACI-STR-PCD-0475WF-004850 RE 7/9/2017
CONVERSION D16 TO D22 AT SLAB S618
RE WILL RELEASE THE DOCUMENT TO ACSET
ACI-STR-RFI-0600WF-004885
06/09/2017
REFERENCE DATE
No. ITEMS PIC TARGET
SUBMITTED
PROVIDE DETAIL FOR CONSTRUCTION DRAWING AT GRID MA-4~MA-5 (MA-B~MA-C) LEVEL 8 ACI-STR-RFI-0419WF-003715
28/04/2017 ARCH
MANSION
26/07/2017: -
02/08/2017: To be confirmed by DT Arch.
10/08/2017:TBC by DT Arch
6 25/08/2017: TBC by RA on 30 Aug 2017.
31/08/2017: -
7/9/2017 : WILL BE CONFIRMED BY ARCH
C3. OTHER