A Practical Summer Training Report

On

Construction of Reactor Building at RAPP-78


In

HINDUSTAN CONSTRUCTION COMPANY LTD.

Submitted as a Partial fulfillment of the B.Tech program

In CIVIL ENGINEERING

CIVIL ENGINEERING DEPARTMENT


Studynama.com - #1 destination for free notes, eBooks, papers & projects.
Choose your course below and start downloading!

CBSE/STATE BOARD SCHOOL STUDENTS – NOTES, EBOOK, PROJECTS, REPORTS

» CBSE/State Boards Class 9 & 10 - Notes, eBooks


» Class 9 & 10 Lecture/class notes, eBooks PDF
» Class 9 & 10 previous year/sample Papers PDF
» CBSE/State Boards Class 11 & 12 Notes, eBooks
» Class 11 & 12 Science & Medical Notes, eBooks
» Class 11/12 science & medical notes, eBooks PDF
» Class 11/12 science & medical board exam papers
» Class 11 & 12 Commerce Notes, eBooks
» Class 11/12 commerce notes, eBooks PDF
» Class 11 & 12 Arts Notes, eBooks PDF

ENTRANCE EXAMINATIONS – PAPERS, CUTOFFS, COUNSELLING, SEAT AVAILABILITY

» Engineering entrance exam papers, notes, cutoffs


» BE/BTECH Engineering colleges ranking
» IIT-JEE Mains (AIEEE) 2018 Papers, Notes
» IIT JEE Advanced 2018 Papers, Notes
» MBBS Pre-Medical Entrance Papers, Notes
» AIIMS 2018 Papers, Notes, Cutoffs
» BBA Entrance Papers, Notes, Cutoffs
» LLB LAW Entrance Papers, Notes, Cutoffs
» LSAT 2018 Papers, Notes, Cutoffs
» CLAT 2018 Papers, Notes, Cutoffs PDF
» GATE 2019 exam notes, eBooks, cutoffs
» MBA/PGDM Entrance Notes, eBooks, Cutoffs
» MCA Entrance Exam Notes, eBooks, Cutoffs

STUDY ABROAD & INTERNATIONAL EXAM PREPARATION STUDY MATERIAL

» Study Abroad & International Studies Exams


» IELTS Exam Question Papers & Solutions
» IELTS Listening Solutions, Strategy, Experiences
» IELTS Reading Solutions, Strategy, Experiences
» IELTS Writing Solutions, Strategy, Experiences
» IELTS Speaking Solutions, Strategy, Experiences
ENGINEERING – NOTES, EBOOKS, PROJECTS, REPORTS PDF DOWNLOAD

» Engineering Lecture Notes, eBooks, Projects


» First Year Engineering Lecture Notes, eBooks, Papers
» Computer (CSE/IT) Engineering Lecture Notes, eBooks
» Computer (CSE/IT) Project, Summer Training Report
» Electronics (ECE) Engg. Lecture Notes, eBooks
» Electronics (ECE) Engg. Projects, Summer Training Reports
» Electrical/EEE Engineering Lecture Notes, eBooks
» Electrical/EE Engineering Projects, Summer Training Reports
» Mechanical Engineering Lecture Notes, eBooks
» Mechanical Engg. Projects, Summer Training Reports
» Civil Engg. Lecture Notes, eBooks
» Civil Engg. Projects, Summer Training Reports

MEDICAL – NOTES, EBOOKS, CASES, PROJECTS, REPORTS PDF DOWNLOAD

» MBBS Lecture Notes, eBooks, Cases


» BDS Lecture Notes, eBooks, Cases
» BHMS Lecture Notes, eBooks, Cases

LAW – NOTES, EBOOKS, PROJECTS, CASES & REPORTS PDF DOWNLOAD

» LLB/LLM Lecture Notes, eBooks, Cases


» LLB/LLM Lecture Notes, eBooks, Cases

MBA - NOTES, EBOOKS, PROJECTS, CASES & REPORTS PDF DOWNLOAD

» MBA/PGDM Notes, eBooks, Papers


» MBA/PGDM Marketing Notes, eBooks, Projects, Cases & Reports FREE PDF Download
» MBA/PGDM Finance Notes, eBooks, Projects, Cases & Reports FREE PDF Download
» MBA/PGDM HR Notes, eBooks, Projects, Cases & Reports FREE PDF Download
» MBA/PGDM Operations Notes, eBooks, Projects, Cases & Reports FREE PDF Download

BBA/BBM, B.COM., MCA NOTES, EBOOKS, PROJECTS & REPORTS PDF DOWNLOAD

» BBA/BBM Lecture Notes, eBooks, Projects


» B.COM Lecture Notes, eBooks, Projects
» BCA Lecture Notes, eBooks, Projects
» MCA Lecture Notes, eBooks, Projects
Downloaded from https://www.studynama.com/.

PREFACE

Project give an opportunity to implement the principles and knowledge practically. The
experience that one gets wonderful because what one studies in books is different from what
one fact in the field.

A Project helps a student in getting acquainted with the manner in which his knowledge is
being practically used and this is normally different from what one has learnt from books.
Hence, when one switches from the process of learning to that of implementation his
knowledge, he finds an abrupt change. This is exactly why project during the B.Tech.
Curriculum becomes all the more important.

Imagine large drives used in Site, they are really effective and helpful. Also imagine of we
could control different machine and equipment at site or industry by using another device.
My training included these basic and some important engineering needs in an industry.

This report is detail describe of OVERVIEW OF HINDUSTAN CONSTRUCTION CO. LTD.

CIVIL ENGINEERING DEPARTMENT


Studynama’s Engineering Community is one of India’s Largest Community of BE & BTECH Students. About 79,182
Indian Engineering students are members of this community and share FREE study material, notes, eBooks, major
and minor projects, exam papers etc. to enable each other to do well in their semester exams.

Links to Popular Study Material for Engineering (BE/BTech) students:


CSE & IT Engineering Electronics Engineering Electrical Engineering Mechanical Engineering Civil Engineering

Computer Science Electronics Engineering BTech Civil/Structural


Electrical/EE Engineering Mechanical/Automobile/IP
(CSE/IT Engineering) (ECE/ET/EC) Engineering Second
Second/2nd Year Notes Engineering second year notes
Second/2nd Year Notes Second/2nd Year Notes Year Lecture Notes

CSE/IT Computer Electronics Engineering BTech Civil/Structural


Electrical/EE Engineering Mechanical/Automobile/IP
Science Engg. Final/4th (ECE/EC/ET) Third/3rd Engineering Fourth
Third/3rd Year notes Engineering fourth year notes
Year Notes Year Notes Year Lecture Notes

Computer Science Electronics (ECE/ET/EC) BTech Civil/Structural


Electrical/EE Engineering Mechanical/Automobile/IP
Engineering (CSE/IT) Engineering Final/Fourth Engineering Third Year
Fourth/4th Year Notes Engineering third year notes
Third/3rd Year Notes Year Notes Lecture Notes

Advanced Java Antenna & wave Electrical Machine-1 pdf Automobile engineering lecture
Surveying 1 - eBook
Programming eBook propagation eBook download notes

Web Technology - Network analysis & Electrical machines-II Engineering materials & SOM - strength of
eBook synthesis notes eBook metallurgy lecture notes materials - eBook

E-Commerce lecture VLSI engineering pdf Manufacturing Technology-1 Engineering Geology


EMI eBook
notes lecture notes lecture notes eBook

And 12998 more free downloads for BE & BTech Students.

Other Popular Links for Engineering Study Material:


• Engineering First Semester (Sem 1) Notes
• Engineering Second Semester (Sem 2) Notes
• Engineering chemistry pdf eBook
• Engineering Mechanics PDF Lecture Notes
• Electrical/EE Engineering notes
• Mechanical/Automobile/IP Engineering notes
• Powerplant Engineering Lecture Notes
• Engineering Mechanics lecture notes
Downloaded from https://www.studynama.com/.

TABLE OF CONTENTS

S. No. PARTICULARS PAGE


No.
1. Introduction About the Company
2. Introduction About the Project
3. Safety Training
4. Geology of Site
5. Blasting Process
6. Excavation Process
7. Drilling Process
8. Grouting Process
9. Test in Laboratory
10. Water Proofing
11. Survey during work
12. Reinforcement Work
13. Batching Plant
14. Crushing Plant
15. Sand Washing Plant
16. Conclusion

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

INTRODUCTION ABOUT THE COMPANY

The HINDUSTAN CONSTRUCTION COMPANY INDIA LTD. is the dignified and indeligible
company of India. This company was established in 27th Jan,1926 near MUMBAI with the
golden hand of WALCHAND HIRACHAND, son of cloth merchant in Sholapur,Maharashtra.

It was the first company in India to be certified for ISO 9001, ISO 14001, OHSAH 18001 for its
quality, environmental and occupational health and safety management systems. The
company is headed by Mr. Ajit Gulabchand, Chairman and Managing Director.

The HCC Family- In the HCC family there is big part of engineers comes not only
Civil Engineers but also Mechanical Engineers, Electrical Engineers and many
more….

In HCC Family there is

More than 3000 Office, 2000 Engineers, 35000 Employees and also
More than 21000 workers and many more investors are executed in the company.

In the RAPP-78 site there is more than about 115 employees are working.

The HINDUSTAN CONSTRUCTION CO. INDIA LTD. Is the ultimate company in field of
construction. This company relates with the Engineering, Construction, Realestate,
Infrastructure.

Annual Turnover of company in year 2010-11 is about ₹ 7000 carore.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Some major projects undertaken by HCC include:


 Bandra-Worli Sea Link, Mumbai
 Ennore Breakwaters, Tamil Nadu
 Kudankulam Nuclear Power Plant, Tamilnadu
 Rajasthan Atomic Power Station, Rajasthan
 Mumbai Pune Expressway
 Godavari Rail Bridge, Andhra Pradesh
 Nathpa Jhakri Hydro-electric Project: Construction of head race tunnel and
surge shaft, with Impregilo SPA
 Naini - Allahabad Bridge: One of the first cable-stayed bridges across
the River Yamuna, India, with Hyundai Engineering and Construction
 Delhi Metro Project: Underground Metro Corridor with Kumagaigumi Co.
Limited, Japan, Skanska AB, Sweden, and Itochu Corporation, Japan,
 East-West Road Corridor Project in Rajasthan, with M/s. Continental
Engineering Corporation, Taiwan
 Lavasa hill city, Pune
 300MW hydroelectric project in Uttarakhand, india.

AND MANY MORE…

CIVIL ENGINEERING DEPARTMENT


Studynama’s MBA Community is one of India’s Largest Community of MBA & PGDM Students. About 29,882 Indian
Management students are members of this community and share FREE study material, notes, eBooks, projects, case
studies exam papers etc. to enable each other to do well in their semester exams.

Links to Popular Study Material for Management (MBA/PGDM) students:


MBA General MBA Marketing MBA Finance MBA HR MBA Operations

MBA/PGDM first Enterprise resource Security analysis & Business environment MBA Operations
year notes planning (ERP) pdf portfolio Mgmt. Notes Notes

MBA/PGDM second Marketing International Fin. Human resource MIS pdf


year notes management pdf management eBook management pdf

Principles of International Advanced financial Compensation Industrial safety


management pdf marketing eBook management eBook management Notes eBook

Managerial Retail marketing Corporate taxation International human Import export


economics eBook eBook pdf eBook resource management pdf mgmt. lecture notes

Organizational Sales management Financial Human resource TQM eBook


behavior pdf eBook management eBook development eBook

Operation research Brand management Management Organization & Management


lecture notes pdf accounting notes management process pdf control systems

And 12,998 more free downloads for MBA & PGDM Students.

Other Popular Links for MBA Study Material:


• MBA/PGDM Core (General) Notes, eBooks, Projects, Cases & Reports FREE PDF Download
• MBA/PGDM Marketing Notes, eBooks, Projects, Cases & Reports FREE PDF Download
• MBA/PGDM Finance Notes, eBooks, Projects, Cases & Reports FREE PDF Download
• MBA/PGDM HR Notes, eBooks, Projects, Cases & Reports FREE PDF Download
• MBA/PGDM Operations Notes, eBooks, Projects, Cases & Reports FREE PDF Download
Downloaded from https://www.studynama.com/.

ABOUT THE PROJECT-


 In RAPP-78, two units of 1400 megawatt, Unit-7&8 construction was started from
year 2010.
 ₹ 12000 carore has been invested in construction of unit-78.
 This is the 25th unit of country and 7th and 8th unit of RAJASTHAN.
 Till 2016, energy will be produced in the unit.
 The capacity of RAPP will increased till 2580 megawatt.
 700 megawatt power is for Rajasthan and 1400 megawatt power for north
power grid.

Many more…

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Safety Training
In safety training safety instructor tell us of use of safety equipment at construction site.

CUSTOM HARD WORK


SAFETY VESTS
HATS GLOVES

FALL PROTECTION SAFETY GLASSES SAFETY SHOES

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Geology of Site
The rock is predominantly Quartzite sand stone generally hard and compact with
interbedded shale seams and clay strain. The site investigation of the foundation
rock carried out by drilling and coring has sand stone to a depth of over 6m and
drilling core in rock upto of 3m below ground surface.

NPCIL awarded the construction of nuclear plant 7&8 at RAPP, to HCC. As part of
this work, about 15lakh cubic meter of hard rock has to be excavated by drilling
and blasting method for site grading and foundation excavation. The excavation
site is located close to operating nuclear plant.

CIVIL ENGINEERING DEPARTMENT


Studynama’s Law Community is one of India’s Largest Community of Law Students. About
29,982 Indian Law students are members of this community and share FREE study material,
cases, projects, exam papers etc. to enable each other to do well in their semester exams.

Links to Popular Study Material for LAW (LLB & BA.LLB) students:
• Family law pdf lecture notes & eBook download for LLB students
• Jurisprudence Law lecture notes pdf & eBook download for LLB students
• Company Law lecture notes pdf & eBook download for LLB students
• Law of Evidence lecture notes pdf & eBook download for LLB students
• Contract Law lecture notes pdf & eBook download for LLB students
• Criminal law pdf lecture notes & eBook download for LLB students
• Taxation Law lecture notes pdf & eBook download for LLB students
• Law of torts pdf eBook & lecture notes for LLB students
• Constitutional law pdf lecture notes & eBook download
• Labour law lecture notes pdf & eBook download for LLB students
• Administrative law lecture notes pdf & eBook download for LLB students
• Constitutional Law - I q&a notes pdf & eBook download for LLB
And 1998 more free downloads for Law & LLB Students.

Other Popular Links for Law Study Material:


• LLB/LLM Lecture Notes, eBooks, Guides, Handouts FREE PDF Download
• LLB - Law third year notes, eBooks, handouts and study material - semester 5 & 6
• LLB - Law second year notes, eBooks, handouts and study material - semester 3 & 4
• LLB - Law first year notes, eBooks, handouts and study material - semester 1 & 2
Downloaded from https://www.studynama.com/.

Blasting

Blast Details-

 Size of Blast-115mm diameter.


 Drilling Machine- IR Crawler/ Tire mounted.
 Burden- About 2.0m to 3.0m. (... Burden<Spacing)
 Spacing-About 2.5m to 3.5 m.
 No. of Holes- 8 to 61.
 Depth-3m to 9m.
 Explosive-Raj blast (83mm dia, 2.78Kg Booster and 450mm long)
 Charge per hole-11Kg to 61Kg depending on depth of hole.

Peak particle velocity,

V=k (D/Q½)b

V= Peak particle velocity (mm/sec.)

D=radial distance from blast monitoring station (m)

Q=max. Charge per delay (Kg.)

K and b=site constant

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Explosion Used-

 Detonator and Fuse Wire

In under water excavation an electric detonator shall be used.

In dry weather and normal dry excavation, ordinary low explosive black powder
(Gun Powder) in granular form may be used. Granular black blasting powder in
small charges (as in hole 1500mm to 1650mm deep, and 30 to 40mm dia.). As
per use the size of hole increased about 150mm.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Excavation
Excavation- Excavation carried out in two stages-

1- Excavation comprising of area.


2- Excavation are completed and accepted by engineer.

Companies working in excavation at Reactor Building site-

1- SIBY
 1000cum/8hr.
2- MCC
 550 cum/8hr.
3- KCPL
 1000 cum/8hr.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Drilling

Scope of Drilling-

1. Erection of rotary drilling rigs at required location.


2. Collection of soil and rock samples.
3. Testing of rock and soil sample.
4. Storage of core in boxes.
5. Preparation of report.

Purpose of Drilling-

1. To find geological information.


2. Description of extent and nature of sub-surface material.
3. Soil/Rock characteristics.
4. Depth of ground water table.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Equipment Required-

1. Total Station
2. Auto Level
3. Rotary Drilling Rigs (Vol. 90, Long layer, KLR tractor, Mounted Hydraulic
drilling rig).
4. Tripod set with pulley.
5. Drilling rod.
6. ͞Double Barrel Core Tube͟ of 1.5m and 3.0m length.
7. Starting barrel of 200mm-500mm length.
8. Triplex/Water Pump.
9. Measuring Tape (3m and 30m).
10.Pressure gauge.

Procedure-

1. Survey of area. Survey for Borehole drilling.


2. Drilling in overburden soil-
a) Machine set up at borehole location.
b) Borehole drilling by hydraulic rotary drilling rig of 100mm
dia.
c) Temporary casing will be provided to support of the
borehole, when drilled through loose, very soft soil to avoid
collapse of borehole.
3. Rotary drilling in rock-
a) Method.
b) Drill rod and core barrels
c) Drilling Fluid-Clean potable water
d) Type of Bit-Diamond tipped core bit
e) Drilling Run-Not exceed 3m in length.
f) Observation during drilling-The speed at different
depth will be carefully recorded during drilling.
4. Plugging of bore hole-Using Cement and Sand grout ratio (1:2).
CIVIL ENGINEERING DEPARTMENT
Downloaded from https://www.studynama.com/.

Precautions-

1) To prevent surface water into pit.


2) Warning signboard and safety barricade provided.
3) Powder connection will be protected.
4) Grouting.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Grouting
Consalidation Grouting is the process of filling the cracks.

Holes in Grouting- There are two types of holes

i. Primary Hole
ii. Secondary Hole
iii. Tertiary Hole

Pattern of Primary Hole at 6m distance from one hole to another hole.

Small holes are Secondary Hole at 3m distance from big hole to small hole.

Cold Drilling- 100m depth.

Instruments Used in Grouting-

i. Grouting Pump
ii. Pressure Gauge
iii. Water Meter
iv. Rubber Packer (Diameter of rubber=110mm.)
v. Agitator
vi. Mixing Drum.

Applied Pressure- At 0m to 3m height=1Kg/m3

At 3m to 9m height=2.5Kg/m3

Plugging-It is the process to fill the hole with sand and cement in ratio of (1:2).

Grout Mix- Grout Mix is the mix of sand and cement in ratio of
(1:2,1:15,1:10,1:5,1:.05,etc.).

NOTE- Before Grouting, it is mondatry to find out the Lussion Value by conducting the Perculation Test, based
on L.V. the Grout Mix can be decided.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Q. Why Grouting is done?

Ans. To consolidate underground rock surface. In underground rock surface there


may be different type of cracks and faults. Which causes sub surface flow of
water. To fill up these cracks ͞Grouting͟ is carried out.

Purpose of Grouting-

To fill up the sub surface voids in between rock layers. If it is not done
seepage of water continue which will cause the damage of water proofing surface
as well as planter reinforcement.

Procedure of Grouting-

1. Primary Holes-
a) Spacing of holes- 6m c/c.
b) Depth of holes- 9m(from existing ground level)
c) 1st Stage- 1] Perculation from 3 to 9m depth.

2] Perculation from 0 to 3m depth.

d) 2nd Stage- 1] If there cracks or voids or faults is there a certain


loosen value will be find.

2] Grout the hole from 3 to 9m depth as required corresponding to loosen value.

3] When computed plug the hole from 3 to 9m.

4] Now process the perculation from 0 to 3m depth.

5] Grout and plug the hole as loosen value obtain.

e) Grout and plug all the primary holes.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

2. Then go for Secondary Holes- The secondary hole will be in between


primary holes. The grouting and pluging will be same as primary holes.
3. If loosen value is there in secondary holes we have to proceed for
tertiary holes.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

TESTS IN LABORATORY
Introduction of Concrete testing lab-

1. Compression Testing Machine(CTM)


2. Flexural Test of Concrete for Beam
3. Soundness Test of Cement(Expansion of Cement, ͟Le Chatteres
Principal͟)
4. Aggregate Abrasion Test
5. Workability or Slump test on Concrete
6. Air Content Test on Concrete
7. Flakielongation Test
8. Sieve analysis of coarse aggregate
9. Sieve analysis of fine aggregate
10. Sand present in aggregate

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CONCRETE TESTING LAB

Experiment-1

Compression Testing Machine

USE- Compressive strength test on concrete remove before 24hrs. Whenever


cube is coated.

NOTE:- Load in UTM=140 Kg/cm2.

Size of Cube Mould=15x15x15 cm.

PROCEDURE-

1. Remove the specimen from curing tank.


2. Place the specimen in Compression Testing Machine (CTM), Capacity-
3000KN.
3. Place the cube so that caste face shall not be at top or bottom.
4. In case so that cast face shall not be capped using Sulphur Capping.
͞Sulphur Capping is for the finishing of cube layer.͟
5. Align the axis of specimen with center of thrust of spherically seated platen
6. Apply the load till specimen break or crack.
7. Record the max load applied.
8. Calculate compressive strength.

Compressive Strength = Load/Area.

Unit-N/mm2

Note- Taping bar is used for cube is 25 times and 35 times.

TAPING BAR- 16mm Diameter & 700mm Long

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CONCRETE TESTING LAB

Experiment-2

Flexural Test of Concrete for Beam

1. Specimen shall be 700x150x150mm concrete beam.


2. Specimen shall be cured by submerging in clean water upto time of
testing.
3. Bearing surface of the supporting and loading rollers shall be wiped clean,
any loose sand or other material removed from surface of specimen.
4. The specimen shall be wiped clean, any loose sand or other material
removed from the surface of specimen.
5. The specimen shall then be placed in the machine in such a manner that
the load shall be applied to uppermost surface as caste in mould, along
two lines spaced 200mm apart. The axis of specimen shall be carefully
aligned with axis of loading device.
6. The fiber stresses increases at application 7Kg/sq./min that is at the rate of
loading 4KN/min for the 150 mm specimen.
7. The load shall be increased until the specimen fails, and the maximum load
applied during the test.

The flexural strength of specimen shall be expressed as modulus of rupture fb.

fb = Pl/bd2

P=Load (N), l=Length of specimen (mm), b=width of specimen (mm), d=depth of


specimen (mm).

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CONCRETE TESTING LAB

Experiment-3

Soundness test of Cement (Expansion of cement)

Initial reading Final reading

(Specific Gravity of Cement)-

Le-Chatelier flask-Standard Le-Chatelier flask conforming to IS 4301, shall be used.

Analytical balance-Electronic balance of accuracy (± 0.1g) shall be used.

Procedure-

1. Kerosene, free of water having a specific gravity not less than 0.731 shall be
used in specific gravity determination.
2. The flask shall be filled with kerosene to a point on the stem between the 0
and 1-ml mark.
3. Inside the flask above the level of the liquid shall be dried.
4. First reading shall be recorded.
5. A weighted quantity of cement (about 65g for Portland cement) shall then
be introduced in small amount at the same temp. as the liquid.
6. Care shall be taken to avoid splashing and has been introduced, the stopper
has been introduced.
7. The stopper shall be placed in the flask and the flask rolled in inclined
position or gently whirled in the horizontal circle, so as to free the cement
from air until no further air bubbles rise to surface of the liquid.
8. If proper amount of cement has been added the level of liquid will be in its
final position at some point of upper series of graduations.
9. The final reading shall be taken.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

10.The flask shall be kept in constant temperature room for sufficient interval
before making either of the reading so as to avoid variation greater than
0.2°C in temperature of the liquid in the flask.
11.The difference between the first and final reading represent the volume of
liquid displace by the mass of cement used in test.

The Specific Gravity shall be calculated as-

Mass of cement in (gms)


= --------------------------------
Displaced volume in cm3

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CONCRETE TESTING LAB

Experiment-4

Workability/Slump test on cement

1. Collect the sample on non absorbent metal plate or tray and mix it
thoroughly.
2. Clean the internal surface of cone slump.
3. Fix the cone firmly to its base plate with help of clamping screw and place it
at horizontal surface.
4. Fill the mould with concrete sample in four layers each layer approximately
¼ cone height.
5. Compact each layer with 25 strokes by tamping rod.
6. Release the clamping screw and lift the cone slowly and carefully in vertical
direction from the concrete.
7. Place the cone inverted at the side of concrete.
8. Measure the difference of height between top of cone top of plastic
concrete.
9. Record the value as slump of concrete in mm.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CONCRETE TESTING LAB

Experiment-5

Air Content test on Concrete

1. Collect the sample on nonabsorbent metal plate and mix it thoroughly.


2. Fill the container in three equal layers and compact each layer with 25
strokes by tamping rod.
3. Close main air valve of air receive of top LID open both the pet clocks of top
LID.
4. Place LID on container and close the four toggle clamp.
5. Pour water into funnel until water comes out of petcock.
6. Close both the petcock and air bleeder valve.
7. Gently pump air into receiver until gauge needle comes in line marked on
gauge.
8. Top gauge gently and open main air valve.
9. Allow the needle to come to rest and take the reading.
10.Report this reading is present of air entered in concrete.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CONCRETE TESTING LAB

Experiment-6

Aggregate Abrasion Test

The test sample shall consist of clean aggregate which has been dried in an oven
at 105°C to 110°C to substantially constant weight and shall confirm to one of the
grading shown.

Table: 1- Grading of test sample

Sieve Size (Square Hole) Weight in gm. Of Test Sample for


Grade

Passing Retained A B C D E F G
on
80 63 - - - - 2500* - -
63 50 - - - - 2500* - -
50 40 - - - - 5000* 5000* -
40 25 1250 - - - - 5000 5000
25 20 1250 - - - - - 5000*
20 12.5 1250 2500 - - - - -
12.5 10 1250 2500 - - - - -
10 6.3 - - 2500 - - - -
6.3 4.75 - - 2500 - - - -
4.75 2.36 - - - 5000 - - -

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Table: 2- No. of Abrasive Charges

Grading No. of Spheres Wt. of Charges gms.


A 12 5000±25
B 11 4584±25
C 8 3330±20
D 6 2500±15
E 12 5000±25
F 12 5000±25
G 12 5000±25

For grading A,B,C,D the machine shall be rotated for 500 revolution.

For grading E,F,G it revolve 100 revolutions. After completion test the machine
shall be discharge and sample passes through 1.10 mm sieve. The finger portion
shall than be sieved on a 1.70mm IS sieve sample.

The ratio of the weight of fine formed the total sample weight is expressed in %
for each test.

Aggregate Abrasion Value = (B/A)*100

B = Weight fraction 1.7mm IS Sieve.

A = Weight of oven dried sample.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CONCRETE TESTING LAB

Experiment-7

Flakieness of Aggregate Test

1. Take aggregate sample, so that minimum no. of 200 pieces of each fraction
is available.
2.
40 mm down aggregate-50Kg.
20 mm down aggregate-20Kg.
3. Sieve the sample on IS sieve 40, 31.5, 25, 20, 16, 12.5, 10, 6.3 mm.
4. Calculate % retain on each sieve.
5. Count aggregate retain on each sieve as (Ni).
6. Gauge each fraction for thickness on the standard metal thickness gauge.
7. Aggregate passing the gauge for each fraction shall be separately counted
(N1i).

Calculate Flakiness index (F.I.) = (Σ N1i / Σ Ni)*C3i (%)

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CONCRETE TESTING LAB

Experiment-8

Sieve Analysis of Coarse Aggregate

1. Prepare sample using sample divider for different of aggregate as per table
below-

Max. Size of Min. Wt. of Sample(Kg.) Min. Wt. of Sieve


Aggregate(mm) Analysis(Kg.)
40 50 20
20 25 12
10 6 3

2. Make the sample dry by heating at 100 to 110°C.


3. Take the weight of sample and sieve it successfully on following sieve-
50mm, 40mm, 20mm, 10mm, and 4.75mm.
4. Shake each sieve separately until not more than a trace passes but not less
than 2 min.
5. Take weight of material retained on each sieve.
6. Calculate % retained, and cumulative % retained on each sieve.
7. Calculate corresponding % passing.

%retained = (Wt. of retained on sieve/Total Wt. of sample)*100

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CONCRETE TESTING LAB

Experiment-9

Sieve Analysis of Fine Aggregate

1. Sieve Analysis of Fine Aggregate

Max. Size of Min. Wt. of Sample(Kg) Min. Wt. of Sieve


aggregate(mm) Analysis(Kg)
10 6 3
4.75 3 1

Following using Sieve-

4.75mm, 2.36mm, 1.18mm, 600micron, 300micron, 150micron.

2. Make the sample dry by heating at 100 to 110°C.


3. Take the weight of sample and sieve it successfully on following sieve-
50mm, 40mm, 20mm, 10mm, and 4.75mm.
4. Shake each sieve separately until not more than a trace passes but not less
than 2 min.
5. Take weight of material retained on each sieve.
6. Calculate % retained, and cumulative % retained on each sieve.
7. Calculate corresponding % passing.

%retained = (Wt. of retained on sieve/Total Wt. of sample)*100

NOTE: - Sieve shaker with 20 & 45 cm. frame.

CONCRETE TESTING LAB

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Experiment-10

Sand Present in Aggregate

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Water Proofing
Water Proofing in Horizontal Surface-

a. 20 mm. thick leveling coarse(Screed) of 1 part of cement,4 part of sand


by volume with SIKA Latex , Water/Cement ratio should be 0.5.
b. 1st coat of͟ Acrylic Polymer͟.
c. 1st layer of fiber glass cloth reinforcement o.2mm thick.
d. Repeat process for 5 layer of Acrylic Polymer͟ material sandwich with 4
layer of fiber glass.
e. Total thickness of water proofing shall be 3 to 4 mm.
f. Completion of final layer of water proofing and a gap of manufacturer
before application of 20mm thick protective layer of 1:4 cement and
sand ratio by volume with chicken mesh wire.
g. 7 days curing after plaster.

Water Proofing in Vertical Surface-

a. Concrete surface will be clear with wire brush to remove laitance of


cement mortar, fungi, algae, oil substance.
b. 1st coat of acrylic polymer.
c. 1st layer of fiber glass coat reinforcement 0.2 mm thickness.
d. Repeat five layer of acrylic cementious material sandwich with four
layer of fiber glass.
e. Total thickness of waterproofing membrane shall be 3 to 4 mm.
f. Before 115mm brick wall sufficient curing shall be done.
g. 115mm protective brick wall with cement mortar 1:6 will be build
outside the RC wall/raft.
h. Curing shall be 7 days minimum.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

SURVEYING DURING
WORK

1-Auto Level
2-Total Station

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

1-AUTO LEVEL

Apparatus Used- Tripod, Auto-level, Prism, Shaft, Measuring Tap etc.

Procedure- for Temporary arrangement

1) Set the tripod in level (3legs are level and equal).


2) Set auto level on tripod.
3) Set bubble in center.
4) Read the reading in cross hair level.

Observation Table for Calculation-

Synod. B.S. I.S. F.S. H.I. R.L.

B.S.-Back Sight

I.S.-Intermediate Sight

F.S.-Fore Sight

H.I.-Height of Instrument

R.L.-Reduced Level

Formulae- H.I. = R.L. + B.S. R.L = I.S. – H.I.

F.S. = H.I. – R.L. of staff in fore direction

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

2-TOTAL STATION

APPLICATION OF TOTAL STATION-

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Reinforcement Work

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

 Material- HYSD bar and TMT bar Fe 500 to IS 1786.

In Fe 500 steel elongation not more than 14.5% ultimate tensile strength of
bar 15% more than actual 0.2% proof stress/yield stress.

 Storage-Reinforcement steel shall not keep direct contact with ground; it is


kept on timber sleepers or concrete pedestal.
 Bending of Reinforcement-The reinforcement bar shall be cold bent at
appropriate radius of minimum 6D using ͞Bar Bending Machine͟ with
proper mandrill. Load shall be applied gradually on bar.
 Lying of Reinforcement- The bars are placed as according to reinforcement
diagram. Chair/ Spacer made up of reinforcement steel bar shall be
provided to keep the bars in position.
The radius of bent is less than 6 times the diameter for HYSD TMT bars.
Reinforcement shall be tied with each other 16 gauge
where the spacing of re-bars is greater than 300mm both ways. If spacing
of the bars is less than 300mm, only alternate joint shall be tied both ways.
 Spacing- R*Ø
 36 mm Ø bar is used for reinforcement of grade Fe 500 in construction of
Reactor Building.

Q. Why we use Fe 500 bar, not use Fe 415 bar in construction of Reactor Building?
Ans. Because the strength of Fe500 is more than Fe 415 bar.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Types of Bars used in construction of Reactor Building:-

S.No. Name of Bar Diameter of Shape of Bar Type of Bar


Bar
1. Straight Bar 8mm TMT
Fe 500

2. Straight Bar 10mm TMT


Fe 500

3. Straight Bar 18mm TMT


Fe 500

4. Straight Bar 20mm TMT


Fe 500

5. Straight Bar 32mm TMT


Fe 500

6. Straight Bar 36mm TMT


Fe 500

7. Chair Bar 36mm TMT


Fe 500

8. Lap Bar 36mm TMT


Fe 500

9. Radial Bar 32mm TMT


Fe 500

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Bending of Bars-

Stirrup and Links used in bars-

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Tying of Reinforcement-

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

BATCHING PLANT

Capacity of Batching Plant- 120m3/ hr.

Aggregate Store-40m3

Admixture Concrete- Cement+Additive+Water+Ice+Aggregate

Storage Bin-

1. 10mm aggregate
2. 20mm aggregate
3. Sand-20mm aggregate(Crush Sand and Natural Sand both)

Aggregate wear load cell (Capacity)- 5000 Kg/load*104

Conveyer- Feed the material in in bins.

Mixer- Mixer is used to mix the mixer (Flyash+Cement+Aggregate+Sand)

Capacity of mixer batch-3m3

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

Cylo- Cylo is used for the fly ash.

Capacity-200 ton. Total 12 Cyno is used in HCC.

Ice Plant-20 ton

Temperature in Ice Maker- (-30°C to -33°C)

Storage Container- 100 ton.

Maximum capacity of Plant- 60m3.

Maximum batch capacity-1.25m3

Transit Mixer-Concrete is being transport to by transit mixer of 600m3 capacity.

We take 15 days calibration.

Ammonia(NH3) is used for condensing the ice.

Ice maker consist of-

a. Vapor compression System.


b. Receiver
c. Compressor
d. Condenser
e. Ice cutting motor

In RCC use N45 concrete.


In PCC also use N45 concrete.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CRUSHING PLANT

Crushing of stones in machine as per requirement of size of aggregate.

BC-1 Jaw Crusher- To crush 82-100mm size bolders.


BC-2 Chock Pile- Hydrocone Crusher- 10, 20, 40mm size
aggregate.
BC-6 Screen-1 for greater than 40mm size aggregate.
BC-7 VSI Hopper(Vertical Shaft Impector) is used for stock the
aggregate.
BC-8 VSI Crusher(Vertical Shaft Impector) is used for plane the
aggregate.
Screen-2 for 40,20,10,4.75mm size aggregate.

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

SAND WASHING PLANT


Process of washing sand in plant:-

Convey the Sand with Conveyer to plant


|
4.75mm Sieve
|
Wash the river Sand
|
Screen the Aggregates
|
Sand Water
|
Screen Washer
|
Aggregate Sand
|
Use in Concrete

CIVIL ENGINEERING DEPARTMENT


Downloaded from https://www.studynama.com/.

CONCLUSION

On concluding the training report , I would like to say that I got a good
overview of HINDUSTAN CONSTRUCTION CO. LTD. I learn about the
practical knowledge at site. I learnt about many instrument at the site. I
think this training will come good in future use. Apart from my area of
project I also got an idea that ͞ How to do work at construction site͟,
which is important in my future.

CIVIL ENGINEERING DEPARTMENT


Studynama’s BDS Community is one of India’s Largest Community of Dental Students. About
19,232 Indian Dental Course students are members of this community and share FREE study
material, cases, projects, exam papers etc. to enable each other to do well in their semester exams.

Links to Popular Study Material for BDS (Dental) students:


 Orthodontic Fixed Appliances - BDS Lecture Notes PDF Download
 Amalgam Restoration - BDS Lecture Notes PDF Download
 COMPLEX NON-SKELETAL PROBLEMS IN PREADOLESCENT CHILDREN - BDS Lecture Notes
 Anatomy of Scalp - BDS Lecture Notes PDF Download
 Cerebrospinal Fluid (CSF) - BDS Lecture Notes PDF Download
 Cementum - BDS Lecture Notes PDF Download
 Recent Advances in Instrumentation Techniques - BDS Lecture Notes PDF Download
 Ameloblastoma - BDS Lecture Notes PDF Download
 Prevention of Odontogenic Infection - Principles of Management - BDS Lecture Notes
 Therapeutic Dentistry Histology of Teeth Dental Charting - BDS Lecture Notes PDF Download
 Maxillofacial Trauma and Management - BDS Lecture Notes PDF
 Technical Endodontics - BDS Lecture Notes PDF Download
And 698 more free downloads for Dental Students.
Other Popular Links for Law Study Material:
 BDS Lecture Notes, eBooks, Guides, Projects and Case Papers FREE PDF Download
 BDS Lecture Notes, eBooks, Guides & Handouts FREE PDF Download
 BDS University Previous Year Exam Question Papers & Solutions FREE PDF Download
India’s Mega Online Education Hub for Class 9-12 Students,
Engineers, Managers, Lawyers and Doctors.
Free Resources for Free Resources for Free Resources for Free Resources for Free Resources for
Class 9-12 Students Engineering Students MBA/BBA Students LLB/LLM Students MBBS/BDS Students

• Lecture Notes • Lecture Notes • Lecture Notes • Lecture Notes • Lecture Notes

• Project Reports • Project Reports • Project Reports • Project Reports • Project Reports

• Solved Papers • Solved Papers • Solved Papers • Solved Papers • Solved Papers

View More » View More » View More » View More » View More »

▼▼ Scroll Down to View your Downloaded File! ▼▼


Disclaimer

Please note none of the content or study material in this document or content in this file is prepared or
owned by Studynama.com. This content is shared by our student partners and we do not hold any
copyright on this content.

Please let us know if the content in this file infringes any of your copyright by writing to us at:
info@studynama.com and we will take appropriate action.

Vous aimerez peut-être aussi