Vous êtes sur la page 1sur 35

Department of Primary Industries,

Parks, Water and Environment


GPO Box 1751, Hobart, TAS 7001 Australia
Ph 1300 TAS PARKS / 1300 827 727 Fax 03) 6223 8308
www.parks.tas.gov.au

Enquiries: Anne Maginnity


Phone: (03) 6165 4684
Email: cls.enquiries@parks.tas.gov.au
Our ref: LM-LM-AU-CW-256136

12 July 2018

Meander Valley Council


WESTBURY Tas 7303

Dear Ms Szczyglowska

LODGEMENT OF PLANNING APPLICATION


MEANDER VALLEY COUNCIL
NETBALL COURTS
2 – 8 ALVESTON DRIVE, DELORAINE

This letter, issued pursuant to section 52(1B) of the Land Use Planning and Approvals Act 1993, is
to confirm that the Crown consents to the making of the enclosed Planning Permit Application,
insofar as the proposed development relates to Crown land managed by the Department of
Primary Industries, Parks, Water and Environment.

Crown consent is only given to the lodgement of this application. Any variation will require further
consent from the Crown.

This letter does not constitute, nor imply, any approval to undertake works, or that any other
approvals required under the Crown Lands Act 1976 have been granted. If planning approval is
given for the proposed development, the applicant will be required to obtain separate and distinct
consent from the Crown before commencing any works on Crown land.

If you need more information regarding the above, please contact the officer nominated at the
head of this correspondence.

Yours sincerely

Jesse Walker
Team Leader (Unit Manager, Policy & Projects)
Crown Land Services
APPLICATION FORM
PLANNING Meander Valley Council
Land Use Planning and AperovalsAct^993

• Application form & details MUST be completed IN FULL.


• Incomplete forms will not be accepted and may delay processing and issue of any Permits.

OFFICE USE ONLY

Property No: Assessment No;

DAY PAY

tsyourapplicationtheresultof an illegal building work? Q Yes Q No Indicate by ^ box

Is a new vehicle access or crossover required? Q Yes |7| No

PROPERTY DETAILS:

Address: Z.- •8 fii-\je-yukj c?e.i\)& Certificate of Title: [^L&W-loA

Suburb: Oit^tAlt^ 73o<<- Lot No: ! I

Land area: s-w 0^ / ha

Present use of (vacant, residential, rural, industrial,


CuMN-tuuiT^ /'uoyos^
land/building: commercial or forestry)

Does the application involve Crown Land or Private access via a Crown Access Licence: Yes Q No

Heritage Listed Property: Q Yes Q No

DETAILS OF USE OR DEVELOPMENT:

Indicate by ^ box \-^\ Building work I I Change of use I I Subdivision

Forestry I I Demolition

Q Other

Total cost of development


$ S&'.ouo Includes total cost of building work, landscaping, road works and infrastructure
(inclusive of GST):

Description CowT(?uCJlt»-l UA TWO hJ&TfcAC.L toUH.n, U^W|(^;<\, F€-/<JWJ^, IterAH^HOt, uAUJ>» ATO<-^"-°A're<f 4
of work: PAufeD fidKfs

Use of (main use of proposed building - dwelling, garage, farm building,


£>rt^T7KJ(, C>Uli~CW~^ ' <>-iOltA^£ ->^£D
building: factory, office, shop)

New floor area: Z.,2-"0 m' New building height: 1Z- m

Materials: External walls: t'-^UT APrucA&L£ Colour:

Roof cladding: | MOT APF<-ICA^<A Colour:


OWNER DETAILS:

Owner/s name: | HsAi^-'c'eR ^^.ey Cou^ci<- Phone No: | OS fo2,13 <>5uu

Postal address: Po &o^ 102- Mobile No:

\)&>T<>>U«-Y •7Su! Fax No: OS G3(<^ lt+T+

Email address: | MAIL(@ Hue. T^^. Ao\J. AU

APPLICANT DETAILS:

Applicant: KCAMO&C V^AUAy CtUMUt- Mobile No: u?> 63"'?' .SSoo

Postal address: Pu C'o^- lol. Phone No: | —


J
\^fe5T6<j<.y Fax No: uz y>11> ^-T<- ]

Email address: | HAU-(&> M\K . W>. £,u\). Ao

COPYRIGHT AUTHORITY:
I authorise the Council and the Crown in right of the state of Tasmania to provide to any person, for the purposes of assessment or
public consultation, a partial or complete copy of documents relating to this application.
t acknowledge that a charge may be made to recover costs of copying. I do not require to be paid a fee or to be informed of any
copies that are made under this authority.
I confirm that I am the copyright owner or have the authority to sign on behalf of any other person with copyright for documents
relating to this application.
NOTE: This authority is intended to cover copies made by the Crown or Council under Sections 40, 43,49, or 183 of the Copyright
Act 1968.

ENTRY TO LAND:
I consent to the entry of the land by an Authorised Officer in accordance with Section 65J (1) (a), for any purpose connected with the
administration and enforcement of the Land Use Planning and Approvals Act 1993 and assessment of this application.

Where the applicant is NOT the owner, I hereby declare that the owner of the land to which this application
relates has been notified of this application being made, has provided consent, and the information and details
supplied by me in this application are a true and accurate description of the proposal.
Name: (Print) Signed: Date:

Applicant:
NAicriio c<u^ I ^>-- \ \l7-6^
Please Note: If the application involves Crown land you wilt need to prff/Cde a letter of consent and this form signed by
the Minister, or a delegated officer of the Crown.

^
Name: (Print) -'Sidned: Date:

Crown Consent: •Jcs^ Matter 'IS^^Ufi^


/2-7-/?
(if required) (^^'W^^&ctQ .^-
NMiy-t^^,ia_ (C^yyuu-tiA^ft (,€(.) 2-y .0^ . (»

7 PRIVACY STATEMENT
The Meander Valley Council abJOp^by the Personal Information Protection Act 2004 and views the protection of your privacy
as an integral part of Its comn^jfrfient towards complete accountability and integrity in all its activities and programs.
Collection of Personal ln{tfrmation; The personal information being collected from you for the purposes of the Personal
Information Protection Act, 2004 and will be used solely by Council in accordance with its Privacy Policy. Council is
collecting this information from you in order to process your building application.
Disclosure of Personal Information: Council will take all necessary measures to prevent unauthorised access to or
disclosure of your personal information. External organisations to whom this personal information will be disclosed as
required under the Building Act 2000. This information will not be disclosed to any other external agencies unless required
or authorised by law.
Correction of Personal Information: If you wish to alter any personal information you have supplied to Council please
telephone the Meander Valley Council on (03)6393 5320. Please contact the Council's Privacy Officer on (03)6393 5300 if
you have any other enquires concerning Council's privacy procsdures.
DELORAINE SPORTS COMPLEX - NEW NETBALL COURTS
CONSTRUCTION IN ACCORDANCE WITH VOLUME ONE NCC 2016 BUILDING CODE OF AUSTRALIA & ALL RELEVANT AUSTRALIAN STANDARDS
A COPY OF VOLUME 1 NCC 2016 BUILDING CODE OF AUSTRALIA IS AVAILABLE TO DOWNLOAD FROM:
http://www.abcb.gov.au/Resources/Publications/NCC/NCC-2016-Volume-One

0
9.4

9
9.4
2
23
ES

9.3
40
2

9.2

23
9.3
ES

2323
EB 9.5

23
INV
TOK 23
ES

82
0

9.2
9.1
9.3

2323
EB

4
23
TOK
INV

9.5
7 48

1
9.6
23
9.5 EB9.4
9.5

06 2

23
23239.3
23
GR 23
INV
TOK SMH

9.2
9.4
EB

23

6 49
INV
TOK

64
3

9.0 9.29.2

9.4
9.3
9

23 2323

23
WM9.2

23
6 ES TPIT
TPIT

6
2
23
WM WM

23 9.0
9.1
9.1

23
23
TOK
INVEB GR

4
9.0
23
FENC

SECTION A GENERAL PROVISIONS

9.0 7
63

9
239.0

9.1
3

9.1
23
0 9.1

23
23
EB
INV
TOK SMH
9.2 23
SMH

5
9.1
23
SMH

23
SMH

7
5
9.0 239.0
8.9
9.1
23

23
TOK
GP G58P

6
2

W
9.1
8.9

9.14
52
23 9.2

239.0
239 23
23

8.9
TOK
GP GP

8.9 239
Part A0 Application ............................................................................................................. 14

/
23
ES

23
RELEVANT AUSTRALIAN STANDARDS NOT LIMITED TO BELOW & DOCUMENTS REFERENCED IN SPECIFICATION

23
GP TOK
GP 3

27
9.1
9.0

23
23
GPTOK
GP

9
9.0

9.171
2
9.2
239.0
23
ES 4

23
TOK
INV
EB 9.2 3 9

9.1 8
23 9.0
23
ES 9.19.1

65
23

23
23

9.1
EB ITOK
NV
EL

23
EL

Part A1 Interpretation .......................................................................................................... 16 A1.3 NATIONAL CONSTRUCTION CODE 2016 BUILDING CODE OF AUSTRALIA VOLUME ONE;

6
9.0/
23
FENC

8
9.2
ME

23

W
GR

AN
DE Part A2 Acceptance of Design and Construction ............................................................ 35
R

/
VA
LL Part A3 Classification of Buildings and Structures ......................................................... 37 HYDRAULIC

W
EY

/
5
9.5
Part A4 United Buildings .................................................................................................... 40 AS/NZS 3500.1, Water Services;

68
3
23 9.6
9.4
23
RO

9.5
ES

23

3
INV
TOK
EB

9.6
2

23

59
ES

9.4
9.5
9.5
23

23

5
EBINV
TOK

9.5
A

23
FENC

D
AS/NZS 3500.2, Sanitary Plumbing and drainage;

W
2
9.9
23
SMH

/
SECTION B STRUCTURE AS/NZS 3500.3 Stormwater; and

7
6
3

9.5
9.4
2

9.8 8
5
9.7

23

23 9.7
FENC

23
DRN23
ES 9.9

23

5
23
INV
TOK
EB

9.9
23
ES

9.7 6

/
39
23 9.8
9.9
5

23
Part B1 Structural Provisions ............................................................................................ 70
EB

8
INV
TOK

AS/NZS 3500.4, Heated water systems.


0.0

9.9
24
ES

23
FENC

W
2
4.2

6
9.9
24

6
FENC

0.0
23

0
CONC

0.0
8
24
24

0.1 239.9
7 CONC

5
/

24
4.4
GR

2
3.6 CONC

0.1
24

1
SMH / 24

0.2
6
FENC

24
4.5
CONC

4.1

2
5

24
CONC

3.7
24
S

24
FENC ES

8
/

24
/

243
CONC

0.0
24
S ES

4
24

0.1
CONC

7
S /

24

0.0
0 CONC

LOCAL COUNCIL AND TASWATER REQUIREMNETS


S

24
/ 2.0 CONC
24

7
S

/
FENC

1.9
242
S 1

24
FENC
1.8
S

S
24
ES
/

5
1.7
S

24
/
S FENC
3

/
3
S

1.2
5 1.6 /
S 24

24
4.1 ES FENC 2

0.2 6
0
24

24 0.2
ES S 0.1

241

/
2

24
24
TOK

SECTION C FIRE RESISTANCE


S 5 INV
EB

W
0.3

8
/

8
51
9.8

9.9
5
24

24 0.1
3 ES

0.2
0.1
S

2.8
S
23
DRN

23

9
24
0.9 FENC

240
EB

0.3
INV
TOK

24
S

0.4
ES 24
/

3
SMH

24
1.5
FENC

24
0
/
FENC

1.1
245

24
ES S /

24
ES
S /
S
4
S / 0.1
S 24
FENC

2
S

5
8

0.3
S

0.7
1.2

24
Part C1 Fire Resistance and Stability ................................................................................ 90
ES

24
4
ES S

0
24

2.2
SEE STRUCTURAL DRAWINGS AND SPECIFICATION FOR STANDARDS RELATING TO;
ES

2.6

24

4
ES S

24

0.4
ES
S

24
ES

0
2
5.3

0.5
S

4.6
24

24
24
FENC ES ES S

/
S

7
0.7
S
S

24
SMH

3.8
/

/
0
24

0.4
ES

0.4592

W
24

0.5
6
FENC

9
24 0.3
24240.4

0.5
5
0 TOK 3

0.4

0.5 8
5
Part C2 Compartmentation and Separation ...................................................................... 96

24
INV

24

240.4
EB

EARTHWORKS
0.4 TOK ES 0.4

24
24 ES

24
ES 24
EBITOK
NV 0
0.6
24
FENC

S
9
0.7
24

3
ES

3.2

2.1

3
1.2
24

24
ES ES

24

3
ES 2

0.5

0.5 0
24 0.6
0.672
0.5

1
24
FENC

240.6
24 1

24
/
ES TOK

24
0.5 INV
TOK
EB

6
24

4.9
ES

Part C3 Protection of Openings ......................................................................................... 105 FOUNDATIONS, FOOTINGS AND SLABS

24
ES

DRIVE
0
4.6
24

2
ES

0.7
24
6 ES

0
0.8
5.8

W/

24
S
24
FENC SMH

0.7 /
5
4

0
1.0

0.8
24
FENC 0

49
0.8
0.7
24

24
CONCRETE
0.8 EL

6
ES

7
1.5

0.9
24
0 24
TOK
INV
EB

5
60
24
4

24

24 0.8
0.7
0.9
3.7 ES ES 9

2.4

24
24
ES 8 EB 0.9

24
ES INV
TOK

6
0.7 24
FENC

0.8
24
ES

24
ES

5.1
S

24
ES

/ 246
SECTION D ACCESS AND EGRESS

9
4.7
MASONARY WALLS

24
ES

3
0.9
S

24
ES

/
6

ON
/
1.2

W
24
7
ES

1.8
24
ES

3
8

3.3

1.0
4.0

24

24
24 ES ES

7
ES

1.1
1.1
3
6.2
Part D1 Provision for Escape ............................................................................................. 164

24
2

24

1.1 16
ES FENC

5.4

9
1.2
24

24 1.1
FENC

24
1

24
ES

24
TOK
INV
EB 1.3

ALVEST
24 82

6
ES

1.2
1.11.1

/
24

24
24
EB TOK
INV

5
1.4

4
1.4/
24
ES

24
FENC

4.8

5
3.7
24
ES

5
S

1.48 9
1.3
24

9
1.4
ES

241.41.4
1

24
TPIT

24

2424
ES 1.5
TURRET
TURRET
0 24
TURRET
TURRET

Part D2 Construction of Exits ........................................................................................... 178


1.6

0
24
ES

2.3
24
6 ES

8
4.1
6.3

DESIGN FOR ACCESS AND MOBILITY - GENERAL REQUIREMENTS FOR ACCESS - NEW BUILDING WORK
24

24
1

W
FENC ES

/
1.3

1.3
S
5 24
ES

24
5.5 ES
24
ES

1
1.5

95
4
24

24 1.5
1.4
/
FENC

1.5

/
24

2
TOK
INV

Part D3 Access for People with a Disability .................................................................... 197


EB

1.7
1

5
98
4.9

24

24 1.5
1.4
1.5

24 1.75 6
ES

1.7 5
6

1.7
24

24

9
241.7
ES EB
INV 1.7

S
TOK

2424
CONC
CONC
24

3
3 CONC
CONCFENC

1.9
3.4

24
24
ES ES

1
2.1
1

24
2.7 ES
24
ES

2
5

1.6
4.2

24
4 24 ES 0

7
ES

5.6
6.5 1.6
24 24

24
ES

/
FENC ES

W
DISABILITY (ACCESS TO PREMISES BUILDINGS) STANDARDS 2010

0
1.7

1.8 82
4
1.9
24

24 1.7
FENC

24
24

/
TOK
INV

6
EB

1.9
0

1.7 2
S

04
24 1.8
1.9
24
5.1 ES

24
24
ES EB
ITOK
NV 6

0
2.2
2.1
24

24
ES FENC

SECTION E SERVICES AND EQUIPMENT


3

4
2.5

3.2 3.0
8

0
24

3.7
ES

24 24
6.5 ES

1
24
24
SMH ES
ES

8
2

1.9
6.6

9
3
0

1.8
4.4
5.8

24
24
FENC ES

24
24
24
ES ES ES

/
2
24
/
Part E1 Fire Fighting Equipment ................................................................................ 222

W
S

/
1
1

2.4
5.4

24
ES

24
ES

2
7

3.4
2
4.2
2.9

24
ES

S
24

24
ES ES

/
3
3.5
24

2
ES

3
Part E2 Smoke Hazard Management .......................................................................... 238

2.2
3

2.1
8

6.0
/
1
8.7

2.3 71
24

4
FENC

2.4
24

24 2.2
5

24
ES

8
2.3
24

ES
8.4

4.8
FENC

24
24
24 TOK
INV

9
ES EB
24

24
FENC

2.4

/
ES 5
T

6
82
247
6

24

24 2.3
2.4
ES

2.2
2.3
8.4

5
24
/ 24
EB
EB

2.7
24

FENC INV
TOK

S
8

24
8.0

FENC
STREE

/
24

FENC
248

9
7.6
/

W
24
FENC

92

4
249

7.1
7.2

2.8
Part E3 Lift Installations .............................................................................................. 259
/ 4

24

/
24
FENC
FENC 5.7 ES

1
7

4.0
9

0
24
ES

4.5

3.6
9.0

24
S
ES

24

24
24 ES

5
FENC ES

4.0

/
24
ES
1
2.6

6
24

6.3

8
ES
3

2.6
9.2

24

6
ES

24
5.0
ES
24

FENC
7

24
ES
9.0

S
24

Part E4 Visibility in an Emergency, Exit Signs and Warning Systems ................... 269
ES
3
8.8
/

24

ES
8.1

244

/
24

ES
2

7
7.6
AN

2.8 5
24
CONC
24

/
ES 2.9

2
2

3.2

2.8
24
CONC
4.3

24

24
5

W
ES CONC

5
S

8 242.9

0
24

3.9
8 ES

3.1
6

6
24
4.8 CONC

2.8

2.9
3

24
ES CONC

6.1
24
ES 9

98
1

24

24
FENC CONC

24 2.8
2.7
24
7

2.8
ES 4.3 2.9
9.5

5
4

24
24

3.0
8 ES INV
TOK24
EBCONC
24

24 2.8 1
FENC 3.0

2.8

24 2.9
24

2.8 5
6.5

51
CONC
24
ES
RICKM

2.9
24

24

24
ES ES CONC
/

24
6
EB
INV
TOK

0
2.9

3.1
3

243
9.3

24
ES

24
5.4
FENC
24

FENC

24
ES
/
2
8.7

6
24

3.0
FENC

24
EL 9

0
0
/

6 3.1
3.1
8.22 2

90
22

3.0
8.2
9

3.0 24
SECTION F HEALTH AND AMENITY
8.1

248.2

24
8.2

243.0
3.1
TURRET
TURRET FENC
2424

6
FENCSMH
SMH 24
8.1
24

24
TURRET
24

SMH TURRET

3.4
SMH

24
/
24

4.6

24
FENC ES

6
24
ES

4.2
/

24
ES

5
/

/
5.1
/

5 4
W

6.8 6.7

24
ES 4

24 24
/ ES 4.6
24
ES /

4
3.1
FENC 3

24
3
ES 3.2 W

3.3
4 /

3.2 8
1
24 6

24 3.23
/ FENC

24
3.1

243.2
ES

2
3.3

5.8
9 24
TOK

Part F1 Damp and Weatherproofing ........................................................................... 279


EB

24
24
INV
TOK 24
ES

24

3.21
2 59
5.9 /

5
/ ES

243.2
3.23.1
24
24 1

FENC
8.7

24

/
2424
EB
ITOK
NV
8.7

W
24

FENC TOK

5
/

5.5
ES

7
/

3.2
24
FENC
9

24
FENC
8.0

/
24

ES

4
W 6

4.9
/
3.2

7
24
/

3.6
7

FENC 24
FENC
7.5

3
2

4.2

24

1
4.5
ES 0 3.4 8

3.3
24

3.4 5
1
ES

2
24

243.3
249 /

24
3.4

3.4
FENC ES 24 3.4

24
FENC TOK /

9
3
24

24
ES 24

3.5
Part F2 Sanitary and Other Facilities ......................................................................... 296
INVEB

7.0

24
FENC TOK W

7
1
3.5

3.3
24

3.32
3.495
24
ES
/ ES

243.4
243.4
3

24

24
/

8
ES TOK FENC /

6.5

24
3.8

24
EB
INV
TOK

24
/

24
ES

67
FENC

3.7
3.7
2424
FENC
FENC
W /

6
6.0

8
3.1
24
ES

24
6
FENC

9
5.7

3.1
0
9.5

24
2

ES

24
3 FENC
9.1

2
24

3.9
FENC 3.9

5
24

ES

5.1

3.8
24

24
FENC
8

ES

Part F3 Room Heights ................................................................................................. 315


0
8.5

24

24

53.6 7
ES 4

4
EB

24 3.5

5
6

3.7
24

3.4
ES 3.7
8.0

24 24

3.73
50
24

4.6
24 TOK
INV 3.8

3.6

243.6
3.5

24
EB EB

3.4/
24

ES ES

24
9 24

/
ES ES

24
EB EB
INV
TOK

24
4.1 FENC
24

7
ES 5

3.9
3
4.0
7.5

24
EB

3.9
24 24
FENC
/

ES

24
ES
25

9
0

6.9

/
24
ES

Part F4 Light and Ventilation ...................................................................................... 318

1
4.0
/

24
ES

0
6.6

W
2
4.0
24
1

ES

0
0.2

24

/
3.9
ES 8
25

ES 2

24
ES 3.5
4.1

9
24

6.0
24
ES ES

24
ES

/
6 6
3.4 3.4
24

1
24
9

BLDG

5.6
0.6

9
24

3.5
ES
25

6
FENC

Part F5 Sound Transmission and Insulation ............................................................. 325

4.7

24
7
ES

3.8

/
5.0

24
ES

5
1

24
24 FENC

3.4
24
6 ES 4.1

24
7
24
CONC FENC

4.7
4

2
8 84
0.2

24 4.1
24

4.0
FENC

4.04.1
2
25

251 4.7

24 24
4.1
ES EB

24 24
24 INV
TOK

8
ES

4.7

7
EB

1
EB
/

3.7
3.8
0 24

4.13 92

6
6
EB

24 4.0
4.2

3.4
4

24
3.4

24
ES FENC

4.6

4.1

0
24

24
4.8
4

4.2

24
TOK
INV
2

24

24

3
ES EB 6
TOK4.17 CONC
9.8

24

24
4.1
EL 24 4.2
24

TOK
4.1

24
ES INV
24
TOK
7 24
EB

7
4.2
/
4.3 3 7

240
4.30
6

W
24
ES 4.5 4.1 CONC

244.2
1
9.4 24 24INV
TOK

4.3

24
24
ES ES EB

6
24

3.4

3.4
ES

1
4.3

24

24
4.2 2
5

0
24 4
24 4.2
8.8

4.3

/
CONC

24
24

EB

6
ES ITOK
NV

3.4
24
ES
DAYCARE CENTRE
/

8
8.3

6
6
24

ES

3.4
3.4
SECTION G ANCILLARY PROVISIONS
252

24
24

/
/
3
7.8

1
4

3.9
5.4
24

7
ES

24

4.1
ES

24

5.5
ES

24
6

3.4
FENC

24

3.4
EB

/
24
BLDG

24
6
BLDG

7.4

1
8

4.3

8
24

4
5.2

4.3
ES

3.8
24
ES

24

24
ES
1

24
7 82 FENC ES
2.6

9
4.7
2
5

W
4.7
6.9 4.6
4.8
25

5.0
Part G1 Minor Structures and Components ............................................................... 344
FENC

24
2.3 24 24
24

24
ES 8 EBINV
TOK CONC

24
25
ES ES
9

5.1
1.6

24
ES

2
25

9
ES

5.0
6.3

24
24
ES ES

8
5

6.3
9
1.1

1
4.2

24

4.3
FENC
25

ES 24
FENC 244

24
3

7
ES
2.9

4.1
6
25

0.6

24

0
FENC TPIT

4.1
/
25

/ ES
5

24
2.7

6
FENC
4

5.1
0.0
25

FENC

24
/

Part G2 Boilers, Pressure Vessels, Heating Appliances, Fireplaces, Chimneys


EL
25

/ ES
4

/
2.3

0
4.2
25

FENC

24
/
9

/
FENC
9.4

/
24
8

ES 24
1.5

7 /
25

FENC

1
4.3
5

8
8.9

24
FENC 4.4

1
24

ES
65

4.6
24
FENC
1.4

880

W
9

5.50

24
ES

24245.4
5.3
25

5.3
5.4
ITOK
CONC

24
24
9

24
EB
EB
NV CONC

8
8.4

7.1
andFlues................................................................................................................. 348
24

24
ES ES

6
8

5.2
5

6.8

9
5
7.8

5.0
6.9
25 24

24
24
ES

24
2 8 ES EB

24

9
ES

24
ES

4.7
5
5.5
0
2.1

24
ES

24

6
9

0
EB 8

4.6
25

7.4

6.6
FENC 4.4

24
24

24
ES ES

3
FENC 24
ES

4.5
24
ES

0
6.1

2
3

24

4.6
ES

8
5.6

6.2

24
Part G3 Atrium Construction ....................................................................................... 352
24 ES
/

2
ES

24

/
ES

6.1
24
ES

9
4.9

6
4.9
24
BLDG

24
3 ES
6.0

5
6.0

W
24
EB

4.9
824
EB

24

8
ES

5.1
6.0

8
6.0

5.9
245

24
24
EBEB BLDG

1
24

24

5.2
ES

24
9

Part G4 Construction in Alpine Areas ........................................................................ 362


SHED
5
2.5

2.4

4
5.4 245.4
25

FENC
25

ES
3

/
EB
1.8

8
25

ES

24
/

3
EB

0
8

7.8
7.8

5.3

2
1.1

5.1
24

5
24

24
EB
EB EB3

1 5.3
25

24
/

ES
COMMUNITY SHED
6

0 FENC
0.4

5.3

5.4 24
8.0 ES

4
24
25

ES EB

6.3
24
EL 6

1
5.9
24
ES 5.4

24

24
EB0 24
EB EB
4
3
9.9

7
9.1 5.4

7.2
24
24

Part G5 Construction in Bushfire Prone Areas ......................................................... 367


ES 24

0
ES EB 8

24

1
6.6
ES

5.8
5.7

24

24
EB

6.9
24BLDG
8

EB

4
2.7

6.6
24
ES 0 3

5
25

24
FENC EF

5.5
7.1 5.5

24
24
ES 24
EB
EF

6.9
/
6

W
8

0 4
2.8

5.55.5
2

24
ES 6.5
8.9
25

24 24
FENC / 24 BLDG

6
ES
6

24

5.4
FENC
1.7

6.3
EF

24
SHED
25

24
/ FENC EF
/

7
6.8
24
/ 2 EF

/
6.0
7.0
/

24

24
EB EF
/

5
1

6.6
7.1
249

24
24
/ ES EF
2
8.9

7
5.9
24

FENC

24
EF

2
7.3

2
24

6.2

7
EB

5.9
24
EF

24
246 ES
25

1
7.0
3

24
ES
/

1.0

/
8.7
4

W
6

25
2.9

ES
4

8.3

8
24
3.0

5.9
EB

6.1
25

4
24

ES ES

6.8
25

24
FENC

4
EF

24
EF

7.6

24
4 ES

24
4

SMH
7.6

7.5

4
24

5
24

5
8

EB

6.0
6.1
ES

6.6
7.7

8
5.7
24
24
24
EF
24

ES ES EF

6
/

24
7.6
FENC

2
6.6
24

3
ES

6.1
SECTION H SPECIAL USE BUILDINGS

24
ES

24
EF

6.5
2

24
7.6 ES 3

S
24
/

EL 6.4 5

4
2
24 6.0

7.3
BLDG

8 7.6
24
EF 0

24
SMH

24
EB 6.1

7.6
24
EF

5
24

6.0
2
6.5

24
S EF

24
ES

8
5

5.8
9.9

24
/

S
24

TOP 8 FENC

Part H1 Class 9b Buildings .......................................................................................... 372


250
EXIST CAR PARK 6.2

W
24
8

BLDG

6
7.6
0

6.1
1.3

S
8

24

S
9.1

EB 9

24
7.7 7
25

ES
8

EF
24 247.7
24
0.3

4 EB 7.7
5
7

24
TURRET
TURRET
25

ES 0.2 7.7
8.4

24

0
25
FENC TURRET
TURRET

6.6
S
24

ES

7
4

7.4

24
8.0

2
ES

7.2

6.1
24
3 ES
24

ES 9

24

24
8.1 ES 7.0 EF
7

24
ES S
7.9

24
ES

6
6.8
24

S
ES

Part H2 Public Transport Buildings ............................................................................ 374

24
ES
/

0
7.6

6
24

/
6.7
ES
S

24
ES
8

7
0.0

6.0
5
8

6.2
6.6
25

24
2

TOP FENC
7.8

24
24
BLDG EF

8
6

24

6.6
EB
1.3

24
BLDG
S
25

ES
S

ROTARY BUILDING
/

W
7.7

Part H3 FarmBuildingsandFarmSheds ....................................................................... 377


24

ES
251
/

5
1

6.3
0.3 0

24
25 EF
1 FENC 9.3
4
9.3

2.0 24
EL
S
24

25
ES 0 EB
S

4
8

7.6
8.7

0.1
25
24
24

TOP ES ES 2
7.4 6
24
1

ES 7.1
8.1

4 4
7.8

6.7
24
6

2
ES

6.7

/
24

8.1

7.0
24

ES EB

24 24
24

6.7
2
24

24
BLDG
8

8.0

ES ES
2.2

3
SHED

6.8
24

ES

9
25

S
S

8 8
6.7
FENC

24

6.6 6.6
ES

24
FP

24 24
5

0
6.6

5
6.5

6.5

6.3
BLDG

24

24
EB

24

24
BLDG FH FENC

2
6.4
3
1

6.5
/

6.6

6.5
4

24
6.5

6.5
EF

24

4
24

24
ES BLDG 24 EF

6.5
/

BLDG

24
8

EB
1.3

24
ES
2

S
0.4
25

ES
S
25

FENC

SECTIONI* * * * *

5
6.4

2
6.3
24
EB

24
FENC
6

5
9.9

6.6

6.6
0
9.2
24

24
S

TOP ES

24

6
EB

6.4
24

EB

W
3

7.8

24
8.6

8 ES
S
24

EB
7

5
24

6.8

2
7.0

ES
8
5

6.4
7.2

8.0 24
1.9

ES
2

24
8

ES
7.5

24
24
24

ES ES
8.0

2 ES
25

FENC
7.6

24
24

ES 7.9 ES 0
24

0
24 ES

PartI1 ***** .................................................................................................................... 385


ES

6.5
6.5

24
6.6
24
ES EF
S

24
/

EF

5
6.3
/

24
7 ES
7.9

6 7.7
24
3

ES 7.8 24
0.5

VEGN
3
24 94 2

24
2

7.5

VEGN
25

7.77.8
7.8

FENC 6

/
0

24
7.8

3
ES
77.9
2424

EB EB 7.7

7
6.5

6.3
24

INV 24
24

TOK TOK
INV
8.0

24
EF
1

24
S

6
SV
24 7.8
31

8
24

32
6.6
2

7 1
7.7

6.3
9

EL
7.8

6.6
9.1

6.6
2
9.9

24

24

EB 7.6 6.5

24
EB
24

24
INV FENC
24

24
8

TOK 6.4 ES
24

TOP EB 24 24
8.6

VEGN ES

2
PartI2 ***** ................................................................................................................... 386
24

8
EF

6.4
6.3
1

24

ES
1.1

1
248
8

S
8

24
7.2

24
1.6

EB
7.8

8.0

0
ES
25

ES

6.6
24

ES
25

24

7.7 7

24

7
6.5
96

FENC ES ES
24 7.6

24
7.5

8.0 EF
24
EA

EL
24
8

EB
INV
TOK 24
TREE
9.1
20

S
9.1
9.2
24

EB
24

INV
TOK
EXIST CAR PARK
4

3
3
7

247
6

6
8.1
8

6.9
5

8.0
6
7.98
0.6

1
9.9

6.3
7.7
247.9

7.9

6.4
24

24
24

TREE ES ES 24
25

INVEB ES
24

24

TREE 24
24
/

TOP

24
TOK ES EF
S
/
ST

7
6.4
7

W
0.2

5
24
24

ES

6
25

ES 7.6

6.3
8
9.0

0
3

24
7.6

2
9.6

EB

24
24

ES
0

TOP
8.7

6.7
7.4
24

0.8
24

TREE EB
7.2
24

24

25
8
24

FENC TREE ES
0

/
EB
7.9

6.6
7.6

24

VEGN
1

24

4
7.6

24
7.9

ES
24

EB

6.3
1

EB
4

7.4
0

24
8.8

24

EB

24
9.3

ES ES
W

24
0

EB
0.2

24

TOP
2247.4
24

8.1

TREE
3
25

3
5

7.4

TREE
24

6 1 8
9.5

7
9

TREE EB
S

6.3
1.1

7.2

7.0 8
24

9 7.1 49

7.27.3 6.6
24

2
247.1

EB 7.1
6 24 7.2

EL 24
FENC
6.5
9

9
25

24

247.06 0

24 24 24
8

89

FENC EB 24
7.0

6.7

INV
TOK EB ES
24 24247.07.1
24
8.8

7.2

4
24

EB
24

ITOK
NV
6.7

ES
6.9 7.0

24

1
ES

124

TOK TPIT ES
24

24

TURRET

6.4
TOP VEGN TURRET
24
7 24

SECTION J ENERGY EFFICIENCY


TURRET ES
7

TURRET
6.9 7.0

24
5

EB
8.4

4
7.17.0
72
2

6.3
24 24
24247.0
6.9

EB 4EB
0.2

24
6

TREE

0
TOK
0.6

24

6.2
24

6.9
25

TREE EB
INV
TOK EB ES
25

24

24
FENC EB ES
S
4

6
S
9.2

6.8
24

24
TB

TOP VEGN
14
7.0
4

13
7.1

0
7.0

7
1

6.5
249 47
2424

6.4
6.7

7.1
7.0
7.0

GP 6.6
24
7.0

6.6

24 1
/

ES
24
24
2424

6.818 3 9

W
EB 24
5

TOK
INV EB
6.9

6.65
6.8 6.8

24

EB
3

EB
25

6.26.8
6.9

03

24
24

2
EL
242424

INV
TOK 6.6

6.2
1

24

GP
246.9

EB

Part J0 Energy Efficiency ............................................................................................ 404


24

24
S

GPGP EB
UR

2424

8 ES
72

GP
7

8 1
6.86.9

6.3

6.7
6.6
16
86.8
9

6.8

7.0 6.8
2424

6 93

24
0.3

6.7

24

INV
TOK
24
6.76.6
6.8
6.724

/
24 TOK24 EB ES
8
7.2 72

ES INV TOK
24

EB
25

2424

6.5

TOK
7.3
1

24 7.1
3

2424

6.65
1

ES INV
TOK
9.5

246.66

EB
24
24
24

6.6

TOK EB ES
6.5

INV 2
24

3
24

TOP EB TOK EB
24

6.6
TOK
INV 6.4
2424 52 97 6

24
6.36.4

EB 24
27

EB
3

6
4
6.3
6.46.3

6.5

6.3
2424

TOK
6.4
Y

5.7
6.4
242424

24

24
S

INV
GP
57 7

GP ES
3

24 FENC
6.56.46.5

GP
6.5

8 EBE323
GP
1
7

242424

6.5
S

24

1
TOK
1.5

6.8 EB

6.3
2

7 9

INV
24
25

6.7

24
6.6 6.6

846

ES 0 ES

24
FENC EB ES
6.66.66.6
24

24 24

6.6

Part J1 Building Fabric ................................................................................................ 406


ES TOK
242424
PL

24
INV EB
EB EB
2

EB
6.4
1

24
1.3

5 ES
4 6
S

5.66
6.6 56.6

7 8
25

TREE 48
6.6 6.5

79
6.6

616.6
24
2476.6
424

2 6.6 24
SMH 2
24 24

6.6
24246.7

6.7 24 ES
6.7
6.8

24
0
24

04 2

9.7 6.7
24 6.5 EB
6.7

24EB SMH 6.4


6.5

6.6

24 6.7SMH
4.66.4
AC

24INV
TOK
79 46

24 EB
INV 24 ES 5
TOK TOK
8

24
6.5

TOP TOK EB ES
24

24

24

24
W
4.6
24 24

2
6.4

INV 72 ES
5.2

TOK ES 6.5
2

24

22
4.6
5.47 2

6.5
56

24
6.8

7.2 6.4
24

6.5 24
24 6.4

2424

EB
3

5.7
36

6.4
4

24 6.3

24 6.4
6.8

/
24
6.3

ES 24
INV
6.4
24

TOK SWMH
6.8

2424

TOK 24
GP
7.313
9

24

24
GP
1

E324
E323
24

EB
247.5
7.4

PATH PATH
5

GP
6.5
24

0 GP
INV
6.8

6.6
4
24

61

6.6

24

TOK
INV
EB 6.9
6.9

ES
24
S

1
6.9

24

Part J2 Glazing ............................................................................................................. 415


PATH
9
6.9

24
24

EB
6.6

PATH
6.5
24

6.6
24

95

INV
TOK
24

50 9
6.5
4

PATH
6.6

24

24
6.66.6
6

24
E

EB EB
7.0

PATH
6.9
1

24

6.7
24

INV
2424
9.5

TOK
5

24

PATH EB 2
24
9.9
/

PATH
24

0 TOK
INV
24

TOP 6.70
4

6.8
24

10

6.6

SMH 7.0
6.9

6.8
24
EB
24
6.7

24 ES
24

24
24

EBINV INV
TOK
9

TOK
24

6.7

PATH
3
7

24

6.5
1.8

PATH
1.0

6.8

24
25

FENC ES
0

247
25

24

ES PATH
7.1
2

06
24247.0
9.9

6.9
7.1

5
24

EB PATH
24

24

TREE 8
2

0.9 INV
TOK
6.839

/
6.8
246.7
2

25
TREE 9.4
6.9

6.4

Part J3 Building Sealing .............................................................................................. 435


24

24
7

TREE PATH TOK


INV
EB
24

6.7

24

FENC
1

9
6.4
24

7.1 TREE
24
6

ES
0

24 9
1.4

PATH
7.2
47
S

9.9

7.1
7.3

8.2
25

2
2424

09 3

TREE EB
8.2
24

7.07.1

6 6
24 2

24
24

TREE INV
TOK 7.1 BLDG
7

8.3 9

5
24 7.1
7.2

24
246.5

24 8.4
2

24
7.0
EB7.0 BLDG 2
3

0.6 GP
24
0

7.2

GP 24
8.2
0

24

GP
INV 6.5
7.3

25 24
GP TOK 9 BLDG
9.2

TREE PATH 4 24
24

24
00

24

PATH 7.3 PATH TREE


7
24

PATH 8
8.4

24 6.8
6.8
5

TOP 24
BLDG 6.9
1.0

6.8
24

24
2

TOP
PATH 24TOK
6

INVEB
7.2

7
7.3 5

9 24
6.9
25

TREE TOK
7.3

2
3

6.9
6.5
24

8.2
7

24

PATH
1

24

PATH
0.0
9

PATH 24
S

24 PATH
9.4

24

BLDG
1.7

8.3

24

TOE ES
9
/

25

PartJ4 ***** ................................................................................................................... 438


TREE
7.3
24
25

24

TREE PATH PATH


24

ES 9
9

0.8
9.3

9
8

25
7.3

6.8
24

VER
1.7

7.5

PATH
6
7

9.3

24

24
4

3
0.6
25

24

BLDG EB EB
7.8

7.0

FENC
24

TOP
25

TREE
9

24

24
9
4

EB EB
8.4 248.4
46

0.8
0.3

9.4
5

6.9 6

/
S
0.9

0.8
25

BLDG
25

VER
24 246.9
24

PATH TREE 9
2

61
25

24 5

25

9
7.3

7.0

TREE 8
249

7.3

TOK6.9
6

6.5
8.3
7

7.6
5

24

24

WM
TOE BLDG 24
TOK
INV
EB
1 0.2

7.3

24
1.1

ES
24

24
0.0

BLDG
4

7
9.2

TREE
0.3 25

24

7.9

7.4
25

TREE PATH FH
0.8
25
7

24

TREE TOP
1.3

24

24
8.0

Part J5 Air-Conditioning and Ventilation Systems ................................................... 439


WM TREE
7

25

VER
25

0.3
25

EL
24

9 TREE EB
6.8
25

1.4 TREE
24

0 25 FENC
3

TREE
S

W
0.9

0
8

1.6
7
8.3

5
0.5

8.0
25

25
9

TREE PATH 7.1


7.3

24
25

TREE EB
3
3

24

6.7

EB 24
1.8

EB
24
0.9

BLDG
24
25

TREE ES
9

6.9
25

9.8
7

PATH
/
1.8

24
24

ES
7

ES
25

9.4

FENC
24
7

TOP
1.7

S
8

25

FENC
1.8

1.6

0.3

Part J6 Artificial Lighting and Power ......................................................................... 444


259

0.1

PATH
1.8

25

25

PATH ES
25

5
9
25

TREE 6
6.9

PATH
7.3
6

8
1.6

1.5

7.2 9
6

24
0.6

24

BLDG ES
8.3

24
256

25

PATH PATH TOE 7.3


20
25

1
1.6

24

8.48.3

ES
7.3

24
BLDG BLDG
25

PATH
7.3 5

2424
7.1 86497

24

EB
1.6

2424247.3

9 PATH
7.36.1
6.1

SHED
6
27.1 8
7.3

39 5 21
25

6.8
7.3
24

PATH
S

0.9 TOE
SWMH 2
242424
246.8
3

24

25
242424

ES D100
SWMH
GP
GP 7
1.6

7.1
6.9
7.1

248

7.1
D100
/

7.3
25

24

24
24

ES GP
GP
8

DRN
DRN
DRN
7

7.1

24
3311

BLDG
7.1 524 7.3
33

6
7.3
7.3
7.3

5
9
7.3

24
74

0
7.3

24

6
7.3

7.3

EB

Vous aimerez peut-être aussi