05.07.

2018 0 FOR APPROVAL PM BGV


DATE REV. NO. DESCRIPTION Prepared Checked Approved
REVISIONS
PROJECT :

UJJAIN UNDER GROUND GROUND SEWERAGE SCHEME


CLIENT :

UJJAIN MUNCIPAL CORPORATION,UJJAIN, DIST, -


UJJAIN

PDMC

WAPCOS LTD,
UJJAIN

CONTRACTOR:

TATA PROJECT LIMITED


SECUNDERBAD,TELANGANA

ECO PROTECTION ENGINEERS PVT LTD.,


Designed By
CHENNAI,600101

TITLE :
NAME SIGN DATE

PRED PM 05.07.2018 DG Sizing Calculation for Sewage Treatment plant of 92.5


CHKD BGV 05.07.2018
MLD STP
APPD 05.07.2018

NO.SHEET SIZE REV.


DOC.No. TPL - 340062-UJN-STP-EL- EL - 4003 03 (Including cover
A4 0
sheet)

RELEASED FOR PRELIMINARY TENDER INFORMATION P APPROVAL CONSTRUCTION


PROJECT UJJAIN MUNCIPAL CORPORATION,UJJAIN, DIST,
PDMC WAPCOS LTD,UJJAIN REV-00 DATE -05.07.18
CONTRACTOR TATA PROJECT LIMITED DOC.NO – TPL-340062-UJN-STP-EL-DSC-4003
SECUNDERBAD,TELANGANA
DESIGNED BY ECO PROTECTION ENGINEERS-AV RAMBABU PM BGV
TITLE DG SIZING CALCULATION DESIGNED CHECKED APPROVED

415V DG SIZING CALCULATION

DG Capacity

a. Total Running Load in (Ref-Load list) KVA 2158.25

b. Consider 50% Load of Total running Load KVA 1079.12

c. Provide 1 No. of DG as per standard rating KVA 1250.00


PROJECT UJJAIN MUNCIPAL CORPORATION,UJJAIN, DIST,
PDMC WAPCOS LTD,UJJAIN REV-00 DATE -05.07.18
CONTRACTOR TATA PROJECT LIMITED DOC.NO – TPL-340062-UJN-STP-EL-DSC-4003
SECUNDERBAD,TELANGANA
DESIGNED BY ECO PROTECTION ENGINEERS-AV RAMBABU PM BGV
TITLE DG SIZING CALCULATION DESIGNED CHECKED APPROVED

Largest Motor Rating : 160 KW


Largest Motor Rating : 196.25 KVA

Assuming the starting current of motor as 3 times (Soft Starter considered)

Largest Motor Starting : 196.25 x 3


: 570.75 KVA

Total load when starting


Largest motor : Total load (50%) – Largest motor rating + largest motor starting

: 1079.12 – 196.25 + 570.75


Total starting KVA required : 1453.62 KVA ……………………………………… (1)

The DG set is capable of withstanding 150%


Over load withstand capacity of the DG : Selected DG capacity x 1.5 ……. (2)
: 1250 x 1.5
: 1515 KVA
Result
Value of Eqn. (2) is greater than Eqn. (1)
Thus the selected DG capacity of 1250 KVA is adequate to start the largest drive of the system.

Subtransient Dip Calculation

DG Subtransient reactance : 12%

Total starting KVA X DG subtransient reactance


%Voltage Drop :
DG Rating

.
: %

% Vd : 13.95% < 15%