Risk Rating Residual
Activities (Job Action Party /
S/N Potential Hazard Before Controls/Mitigation Measures Risk /
Steps) Remark
Mitigation Rating
Work Permit Unauthorized commencement of works Medium= C2 Authorized work permit holders shall ensure obtaining Low=C1 Site Supervisor
May result in exposing people and/or potential and maintaining valid work permits. and
to harm or danger. The supervisor responsible for this activity has to Safety Officer
check the PPE of his staff to ensure that all required
items are available and properly used.
1
Inform all people regarding permit conditions before
work starts.
Supervisors must conduct daily toolbox talk about
nature of work and associated potential hazards and
their essential precautionary measures.
Gas test May found toxic gas or H2S gas leak or extreme Medium= C2 Carryout gas test by Authorized gas tester time to time if Low =C1 Site
oxygen limit in air required. Supervisor/PTW
2
All groups working in different area inside station shall
have H2S personal gas monitor/Toxic clips
Using of hand tools Body pain Medium= C2 All operatives shall be trained for proper handling of Low= C1 Site Supervisor
Risk of injury due to use of hand tools tools. and
Safety Officer
Risk of striking hand Appropriate tools only have to be used and its
Risk of striking others requirements
Risk of eye injury from metal chips All operatives shall wear their PPEs without fail.
Cuts From Sharp Objects Keep only required amount of tools at site.
3
Fall, hit and strip All tools shall be kept clean for easy use.
Ensure other personnel are well clear.
Beware of sharp edges on tools
The right tool for the job should always be used to
decrease the chances of injury, incidents, or damage
to a tool through improper use
HSE check list &Prior Lack of safety awareness Medium= C2 Obtain work permits/ All personnel shall be H2S Low= C1 Site supervisor &
to commencing trained safety officer
mobilization to site Comply with all general job requirements mentioned
on PTW
4
Toolbox Talk on possible emergency and response
procedure and work activities.
All safety requirements stated on the work permit
must be fulfilled
5 General Faulty Equipment Medium= C2 Survey the work area and check utilities that need to Low =C1 All
safety/Emergency Health Hazards / Heat Stress turn off
condition
Back-strain Ensure equipment is maintained in good working
Emergency condition order and properly used .check equipment before
use.
Work in confined space
Page. 2
Block of emergency access by excavated Ensure that proper barricade and sign have been
materials OR trenches placed around the working areas
Provide drinking water at the jobsite according
weather condition.
QP work and rest procedure shall be followed.
Follow summer period working law and procedures
Each employee should be instructed in safe working
procedure/technique and emergency procedure and
what they should to do in case of emergency inform
every one about the emergency exit and assembly
points and emergency contact numbers.
Provide proper access and ladders
If excavation dept. more hen 1.20 meter confined
space procedure to be followed
Follow the security rules and regulation .using proper
gate and exit for entering and exit.
Don’t block operation access and emergency access
OR access to fire equipment.
Provide proper access to emergency gates
Lack of safety awareness Medium= C2 Obtain all required work permits/ Low= C1 Site supervisor &
HSE check list &Prior Comply with all general job requirements mentioned safety officer
to commencing on PTW
mobilization to site
6 Toolbox Talks on possible emergency and response
procedure.
All safety requirements stated on the work permit
must be fulfilled
Site preparation and Personal injury Medium= C2 Inspect all tool and equipment Low= C1 Site supervisor &
movement of Manually handling injury Observe proper manual handling techniques safety officer
personnel, tools
equipment
Uninspected tools equipment Provide adequate amount of cold drinking water
7
Over exhaustion/extreme weather condition Maintain work rest period
Slips ,trips and falls Suitable access and egress to be provided
Sharp object Wearing of PPE
Medium= C2 Working area shall be barricaded and access shall be Low= C1 Site supervisor &
Barricading and Accidents and incidents may take place as a restricted. safety officer/ALL
setting warning sign result of lack of attention. Use safety cones bounded by safety caution tape to
8
cordon the working area.
Warning signs will be settled in place of work for
attention
9 Asphalt Cutting Using Concrete or other debris embedded in eyes. Medium= C2 Area cordon off. Low= C1 Site Supervisor,
Jack Hammer Loss of hearing. Know your weight lifting capacity and get help if and
Safety Officer
Back strain needed. Lift using leg muscles. Keep back straight.
Body vibration Maintain work and rest period
Personal injury All operatives shall be trained for proper handling of
Page. 3
Body pain task.
Risk of striking hand Jack Hammer shall use only for Asphalt cutting
Risk of striking others Al people working for jack hammer shall always use
Cuts From Sharp Objects ear plugs and proper PPE
Fall, hit and strip All operatives shall wear their PPEs without fail.
Fire ignition. Beware of sharp edges on tools
Electric shock. Provide proper fitting, safety whips and safety
requirements for air hoses.
High Water Table.
Continuously checking of hoses for damaged or leaks
Equipment In Unsafe Operating Condition
Continuously checking of compressor
Damaging Buried Utilities
Remove soil/ stock pile material maximum away from
edge.
Fire extinguisher
Thoroughly Inspect Equipment Before Use. Make
Sure All Safety Devices And Guards Are Intact And
Operable.
All equipment must be diesel fuel driven with spark
arrestor
Use Extreme Caution Around Existing Utilities,
Medium= C2 Inform control room on end of the day /shift Low =C1 Site Supervisor,
Complete the task on daily base .doesn’t leave any and
cut OR excavated road without proper arrangement Safety Officer
Falling hazards and inform to control room.
10 Post Asphalt Cutting Traffic hazards Use warning signs & lights if work not competed
Backfill and compact the area daily bases.
Don’t block operation access/Road and emergency
access OR access to fire equipment.
Provide proper access to emergency gates
Housekeeping. Debris causing Slips, trips and falls. Medium= Regular housekeeping at site shall be performed. Low= C1 Site Supervisor,
Fire risk due to presence of combustible C2 Adequate and correct stacking of materials. Workers
and
11 materials / debris. Regular inspection and immediate corrective action.
Safety Officer
Keep always clear of obstruction.
Regular clearing of work site shall be implemented.
Page. 4
JHA Team Leader Authorization: Ref Indicator: Sign:
Page. 5