Title:
REV: A1
Black Start/Emergency Diesel
DATE: 24/03/2015
Generator (EDG) With All 3 TG’s
And 3 Transformers Available PAGE: 1 of 6
DOCUMENT ADMINISTRATION:
Document Administrator : Document Expiry Date :
TML OPS Document Controller 3 years after the latest revision
Paper Master File: Electronic Master File:
TML OPS DCC TMS – Talisman Management System
Distribution:
Offshore Section:
Mat Coordinator
Ops Coordinator
HSE Coordinator
Lead Mech Tech
Lead Prod Tech
Wellhead tech
Lead E&I Tech
Sat Prod Tech
Roustabout
Maint Supv
Crane Op /
Mech Tech
Prod Supv
Prod Tech
Radio Op
E&I Tech
Sat Supv
Chemist
Medic
OIM
√ √ √ √ √
Onshore Section:
Operations Systems
Chemical Section
Training, CA &
Measurement
Maintenance
Construction
Engineering
Operations
Inspection
Facilities /
Marine
√ √
Specify any other distribution required: ‐
BLACK START/EMERGENCY DIESEL GENERATOR (EDG)
WITH ALL 3 TG’s AND 3 TRANSFORMERS AVAILABLE
DOCUMENT HISTORY
Rev. Date Author Description of change
A1 24/03/2015 Ir. Azhar Periodically Update
A0 06/10/2011 Shukry Saad Issue for Use
DOCUMENT STATUS:
REVIEWED BY: NAME SIGNATURE
Offshore Lead E&I Chooi SH / Murugesan
Senior Electrical Engineer Ir. Azhar Md Appandi
DOCUMENT OWNER
Shukry Saad / Ganesan Ramiah
Offshore Maintenance Supervisor
DOCUMENT AUTHORITY PLATFORM OIM
APPROVAL SIGNATURE
Attention: Paper copies are uncontrolled. This copy is valid only at time of printing, 3/27/2015. The controlled document is available from
the TML Ops DCC Controller. Only official paper copies as specified on the distribution list will be updated.
SITE SPECIFIC PROCEDURE DOC NO: PM3‐OPS‐BRA‐PR‐E‐0053
Title:
REV: A1
Black Start/Emergency Diesel
DATE: 24/03/2015
Generator (EDG) With All 3 TG’s
And 3 Transformers Available PAGE: 2 of 6
Purpose/ The purpose of this procedure is to describe the steps to perform switching
Background: of Black Start/Emergency Diesel Generator with all 3 nos. of Turbine
Generators and 3 nos. of Transformers are available.
References: Manufacturer Manual
Electrical Schematic Drawing
Overall Single Line Diagram ‐ BR‐A‐DR‐E‐0030, Rev.Z3
Table of Section Page
Contents Hazards / Precautions / Pre‐requisites/Competencies 2
Required, Special Equipment/Tools/Material Required
Overview 3
Switchgear Panel Status/Condition 4
Steps To Be Taken During Black Start/Emergency EDG 4 – 6
Switching
Close Out 6
Hazards and HAZARDS
Precautions
High Voltage 3300 Volts
Electrical Shock
Rotating Part
High Temperature/ Hot Surface
High Noise
GENERAL PRECAUTIONS
Work shall be carried out in the presence of at least one HV AEP and I&E.
JOB SPECIFIC PPE
Full and appropriate PPE
Pre‐requisites/ Competent HV AEP.
Competencies
Required Multi‐meter
Special Rubber Mat
Equipment/ Torch Light
Tools/Material
Required
Attention: Paper copies are uncontrolled. This copy is valid only at time of printing, 3/27/2015. The controlled document is available from
the TML Ops DCC Controller. Only official paper copies as specified on the distribution list will be updated.
SITE SPECIFIC PROCEDURE DOC NO: PM3‐OPS‐BRA‐PR‐E‐0053
Title:
REV: A1
Black Start/Emergency Diesel
DATE: 24/03/2015
Generator (EDG) With All 3 TG’s
And 3 Transformers Available PAGE: 3 of 6
OVERVIEW
BRA platform have 3 unit Solar Taurus 60 Turbine Generators each capable of providing 4.14 MW for the
platform use.
Under normal operating conditions TG will be running and distribute the load to 3300V Switchgear and
LV Switchgear via 3 unit transformers.
Platform also has one unit Emergency Diesel Generator capable of providing 1 MW power during any TG
power failure or ESD.
During platform power outage, the emergency generator will automatically start. The Air Circuit Breaker
(ACB‐8131) will open and air circuit breaker ACB‐8111 will close to power up the Preferential Bus “P”
This procedure is prepared with the following assumptions:
Diesel Generator DG‐8110 is started and ready for load.
ACB‐8131 has opened automatically.
ACB‐8111 has closed automatically.
Diesel Generator DG‐8110 sync control switch in auto position.
All Turbine Generators (TG‐8010/8030/8050) are available for re‐start.
All Transformers (TF‐8020, 8040 and 8060) Available. TF Rated at 437A (HV) / 3333A (LV).
All Motor Control Centre MCC‐8120/8130/8140 are available.
All synchronizing indication light, synchroscope and sync check relays are functional on all the
Turbine Generator and Emergency Generator.
TG‐8010/8030/8050 auto sync facility is operational.
All meters and other indication lights on the turbine control panel and the diesel emergency
generator are functional.
All MCC indicating lights are functional.
All switchgear 3300 and 415 V AC breakers are fully operational.
All electrical switching for the emergency generator and the gas turbine generators (both in auto and
manual mode) will be carried out in the MCC Switchgear Room.
SWITCHGEAR PANEL STATUS/CONDITION
Attention: Paper copies are uncontrolled. This copy is valid only at time of printing, 3/27/2015. The controlled document is available from
the TML Ops DCC Controller. Only official paper copies as specified on the distribution list will be updated.
SITE SPECIFIC PROCEDURE DOC NO: PM3‐OPS‐BRA‐PR‐E‐0053
Title:
REV: A1
Black Start/Emergency Diesel
DATE: 24/03/2015
Generator (EDG) With All 3 TG’s
And 3 Transformers Available PAGE: 4 of 6
CONDITION /
EQUIP.
No. DESCRIPTION STATUS REMARKS
TAG
(ENSURE)
BRA CPP ESD ‐ Emergency Generator Auto
1. DG‐8110 RUNNING AUTO START
Start, Running at Rated Speed
EDG Breaker will Auto Closed and BUS “P”
2. ACB‐8111 AUTO CLOSE
Energized the Preferential Bus “P” ENERGIZE
3. VCB‐8010 TG‐8010 Generator Breaker OPEN DE‐ENERGIZE
4. VCB‐8011 TG‐8030 Generator Breaker OPEN DE‐ENERGIZE
5. VCB‐8020 TG‐8050 Generator Breaker OPEN DE‐ENERGIZE
NORMALLY
6. VCB‐8021 3.3KV Bus A & B – Bus Tie CLOSE
CLOSED
NORMALLY
7. VCB‐8030 BRA‐BRE Tie‐Breaker OPEN
OPEN
8. VCB‐8017 3.3 KV Feeder to TF‐8020 OPEN DE‐ENERGIZE
9. VCB‐8022 3.3 KV Feeder to TF‐8040 OPEN DE‐ENERGIZE
10. VCB‐8023 3.3 KV Feeder to TF‐8060 OPEN DE‐ENERGIZE
11. ACB‐8130 415VAC Feeder To Bus A Via TF‐8020 OPEN / LOCAL DE‐ENERGIZE
12. ACB‐8150 415VAC Feeder To Bus B Via TF‐8040 OPEN / LOCAL DE‐ENERGIZE
13. ACB‐8170 415VAC Feeder To Bus C Via TF‐8060 OPEN / LOCAL DE‐ENERGIZE
14. ACB‐8131 415VAC – Bus P and A – Bus Tie OPEN /REMOTE DE‐ENERGIZE
15. ACB‐8151 415VAC – Bus A and B – Bus Tie OPEN / LOCAL DE‐ENERGIZE
16. ACB‐8171 415VAC – Bus B and C – Bus Tie OPEN / LOCAL DE‐ENERGIZE
STEPS TO BE TAKEN DURING BLACK START/EMERGENCY EDG SWITCHING
EQUIP. ACTION
STEPS DESCRIPTION STATUS
TAG ( ENSURE )
MANUALLY
1. P‐4430A Diesel Transfer Pump A at MCC‐8120 RUNNING
START
MANUALLY
2. C‐5420A/B Air Compressor at P Bus RUNNING
START
POWER FROM
3. MCC‐8120 Auxiliary Motor Starter for TG‐8010 AVAILABLE
BUS P
Emergency Diesel Generator Panel – SYNCH SW :
Remain Position the Synchronizing Switch AUTO EDG RUNNING
4. PN‐8110
in AUTO and Remain Select Breaker BREAKER SW: & LOAD BUS P
Selector Switch : OFF OFF
Request Start Permissive from CCR.
RESET‐ALARM
5. PN‐8010 Reset Alarm at TG 8010 Unit Control Panel. READY TO LOAD
START‐ TG‐8010
Ensure unit in Liquid Fuel.
Attention: Paper copies are uncontrolled. This copy is valid only at time of printing, 3/27/2015. The controlled document is available from
the TML Ops DCC Controller. Only official paper copies as specified on the distribution list will be updated.
SITE SPECIFIC PROCEDURE DOC NO: PM3‐OPS‐BRA‐PR‐E‐0053
Title:
REV: A1
Black Start/Emergency Diesel
DATE: 24/03/2015
Generator (EDG) With All 3 TG’s
And 3 Transformers Available PAGE: 5 of 6
Start TG‐8010 until “Ready To Load”.
Reset The VCB‐8010 Lock‐Out Relay,
Generator Breaker. RESET AND VCB‐
SG‐8000
6. VCB‐8010 Turn the “Manual Synchronize” to ON. 8010 CLOSE
ENERGIZE
Manually CLOSE the TG‐8010 Gen Breaker
to 3.3KV Bus Bar (Dead Bus)
Reset all VCB L/O Relay at 3.3KV RESET 3.3KV VCB / VCU
7. SG‐8000
Switchgear VCB READY
TF‐8020
8. VCB‐8017 Manually Close ‐ 3.3KV Feeder for TF‐8020 CLOSE
ENERGIZE
Manually Close – TF‐8020 Transformer BUS A
9. ACB‐8130 CLOSE
Feeder To Bus A (415VAC) ENERGIZE
415VAC – Bus P and A – Bus Tie. Ensure TO ENERGIZE
10. ACB‐8131 OPEN/ REMOTE
breaker in OPEN / REMOTE Position. FR. PN 8110
Emergency Diesel Generator Cont. Panel: SYNCH : AUTO/
Synch Control Switch Remain AUTO or can MAN
11. PN‐8110 AUTO SYNCH
be select to MANUAL. BREAKER: ACB‐
Select Breaker Sel. Switch : ACB ‐ 8131 8131
EDG PLC will auto synch between Bus P & SYNCH – BUS
12. PN‐8110 AUTO SYNCH
Bus A via ACB‐8131. “P” AND “A”
EDG PLC will Auto Close the ACB‐8131(Bus EDG‐8110 &
ACB‐8131 AUTO
13. ACB‐8131 “P” and “A”‐ Bus Tie) when Synchronize TG‐8010 SHARE
CLOSE
Scope at 12 O’clock LOAD
EDG will Auto Transfer the DG Load by EDG AUTO
EDG – OFF
14. PN‐8110 decrease the Load / Governor until +/‐ TRANSFER LOAD
LOAD
100KW. TO TG
15. ACB‐8111 EDG Will Auto Open the EDG Breaker AUTO OPEN DE‐ENERGIZE
DG will auto Stop after 5 minutes cool
down. DG AUTO STOP EDG‐8110 AUTO
16. PN‐8110 Reset any alarm if required. Ensure Key KEY SWITCH: & STANDBY
Switch Remain in “AUTO” after unit AUTO MODE
completely Stop.
TF‐8040
17. VCB‐8022 Manually Close ‐ 3.3KV Feeder for TF‐8040 CLOSE
ENERGIZE
ACB‐8150 Manually Close – TF‐8040 Transformer
18. CLOSE BUS B ENERGIZE
Feeder To Bus B (415VAC)
TF‐8060
19. VCB‐8023 Manually Close ‐ 3.3KV Feeder for TF‐8060. CLOSE
ENERGIZE
Manually Close – TF‐8060 Transformer
20. ACB‐8170 CLOSE BUS C ENERGIZE
Feeder To Bus C (415VAC)
Liaise with CCR to Increase Load for TG by TG PICK‐UP TG LOAD
21. SG‐8000
start the 3.3KV Motor such as P‐1150, P‐ LOAD INCREASE
Attention: Paper copies are uncontrolled. This copy is valid only at time of printing, 3/27/2015. The controlled document is available from
the TML Ops DCC Controller. Only official paper copies as specified on the distribution list will be updated.
SITE SPECIFIC PROCEDURE DOC NO: PM3‐OPS‐BRA‐PR‐E‐0053
Title:
REV: A1
Black Start/Emergency Diesel
DATE: 24/03/2015
Generator (EDG) With All 3 TG’s
And 3 Transformers Available PAGE: 6 of 6
4810 and P‐4710
Reset Alarm at TG 8030 Unit Control Panel. TG‐8030
RESET‐ALARM
22. PN‐8030 Ensure unit in Liquid Fuel. STARTING &
START‐ TG‐8030
Start TG‐8030 until “Ready To Load”. READY TO LOAD
RESET – VCB‐
Reset The VCB‐8011 Lock‐Out Relay, for
8011
TG‐8030 Generator Breaker.
Once Load above 2MW, Press AUTO
AUTO SYNCH TG‐8030 AND
23. VCB‐8011 SYNCH Push Button. TG will be AUTO Synch
TG‐8010
and CLOSE the VCB‐8011. (Permissive by
CLOSE SHARING LOAD
Synch Check Relay once Voltage, Speed
VCB‐8011
and Phase Rotation are Match)
Liaise with CCR to add More Load for TG’s
TG PICK‐UP TG LOAD
24. SG‐8000 by start another 3.3KV Motor such as BRA
LOAD INCREASE
or BRAU WI Pump.
Reset Alarm at TG 8050 Unit Control Panel. TG‐8050
RESET‐ALARM
25. PN‐8050 Ensure unit in Liquid Fuel. STARTING &
START‐ TG‐8050
Start TG‐8050 until “Ready To Load”. READY TO LOAD
RESET – VCB
Reset The VCB‐8020 Lock‐Out Relay, for
8020
TG‐8050 Generator Breaker.
Once Load above 4MW, Press AUTO TG‐8010, 8030
AUTO SYNCH
26. VCB‐8020 SYNCH Push Button. TG will be AUTO Synch AND 8050
and CLOSE the VCB‐8020. (Permissive by SHARING THE
CLOSE
Synch Check Relay once Voltage, Speed LOAD
VCB‐8020
and Phase Rotation are Match)
Monitor the System Voltage, PF and KVAR.
ADJUST TG TG‐8010, 8030
Make and adjustment to sharing the PF &
PN‐8010, GOVERNOR AND 8050
KVAR.
27. PN‐ 8030 EQUALLY
Monitor and Slowly adjust each TG load to
& PN‐8050 ADJUST SHARING THE
equally share the running load.
VOLTAGE LOAD
CLOSE OUT
ACTION REMARKS
1. Clean work site.
2. Inform CCR the power supply is back to normal.
3. Complete IMMS Documentation in MAXIMO
End of Procedure