CLIENT Saudi Aramco

LOCATION Saudi Arabia

CONTRACT Oct. 2016 ~ Nov. 2019


PERIOD Dammam

CAPACITY & Gas treatment Facilities (1,400 MMSCFCD)


DESCRIPTION • Inlet Facilities
150km
• Mercury Removal Unit
• Molsieve Dehydration Unit
• NGL Recovery Unit
Uthmaniyah
• Sales Gas Compression
• NGL Storage Facility
• Flare and Relief System
• Utility / Off-Site Systems
• Black Powder Removal Package

SCOPE OF EPCC
WORKS

3
CLIENT ADMA-OPCO

LOCATION U.A.E

CONTRACT Mar. 2013 ~ Apr. 2018


PERIOD

CAPACITY & 200,000 BPD Oil Treatment and SPM Facilities


DESCRIPTION 1) Zirku Island
• 200,000 BPD Oil Treatment Facilities
- 100,000 BPD from Umm Lulu
- 100,000 BPD from S1 & S2 Artificial Island
• 35 MMSCFD Gas Treatment Facilities
• Gas Compression, Water Injection
• Storage Tanks (159,436 m3 X 3)
• SPM (Single Point Mooring)
2) Satah Al-Razboot 1 & Satah Al-Razboot 2
Artificial Islands
• 86 Wells Oil Gathering Facilities
• Chemical Injection Facilities
• Pig Launcher & Receiver

SCOPE OF EPCC
WORKS

4
CLIENT Kuwait Oil Company (KOC)

LOCATION Kuwait

CONTRACT Jul. 2010 ~ Sep. 2016


PERIOD

CAPACITY & Part A


DESCRIPTION - Fuel Gas & LSFO Pipeline (198 km)

Part B
- Fuel Gas & Gas Oil Pipeline (65 km)
- Pumping Station

SCOPE OF EPCC
WORKS

5
CLIENT GASCO

LOCATION U.A.E

CONTRACT Jul. 2009 ~ Aug. 2013


PERIOD

CAPACITY & 1) Utilities & Offsities Facilities.


DESCRIPTION 2) New Pipelines (about 130 km) interconnecting
to existing and new facilities.
3) New equipment and piping in OAG Separation
and Stabilization unit 200 and debutanizer unit
210

SCOPE OF EPCC
WORKS

6
CLIENT Saudi Aramco

LOCATION Saudi Arabia

CONTRACT Mar. 2009 ~ Jan. 2012


PERIOD

CAPACITY & 1) FEED Gas Inlet Facilities


DESCRIPTION 2) Gas Treatment Facilities (600 MMSCFD x 3)
• Acid Gas Removal Unit
• Acid Gas Enrichment Unit
• TEG Gas Drying Unit
• Propane Refrigeration Unit
3) Offsites

SCOPE OF EPCC
WORKS

7
CLIENT Saudi Aramco

LOCATION Saudi Arabia

CONTRACT Sep. 2006 ~ May. 2009


PERIOD

CAPACITY & 1) Sour associated Gas : 563 MMSCFD


DESCRIPTION 2) Hydrocarbon Condensate : 18.8 MBD
(315 MMSCFD of associated Gas 70 MBPCD
of C3+ NGL Production)

SCOPE OF EPCC
WORKS

8
CLIENT Agip Iran BV

LOCATION Assaluyeh, Iran

CONTRACT Mar. 2002 ~ Feb. 2005


PERIOD

CAPACITY & Gas Treatment Unit : 500 MMSCFD x 4 Trains


DESCRIPTION • Methane : 1,800 MMSCFD
• Ethane : 70 MMSCFD
• Propane : 1,800 TPD
• Butane : 1,100 TPD
• Sulfur Production : 660 TPD
• Condensate : 100,000 Bbl/Day

SCOPE OF EPCC
WORKS

9
CLIENT Total Fina Elf – NIOC

LOCATION Assaluyeh, Iran

CONTRACT Mar. 1999 ~ Mar. 2003


PERIOD

CAPACITY & Gas Treatment Unit : 500 MMSCFD x 4 Trains


DESCRIPTION • Sales Gas : 1,900 MMSCFD
• Sulfur Production : 400 TPD
• Condensate : 80,000 Bbl/Day

SCOPE OF EPCC
WORKS

10
CLIENT Kuwait National Petroleum Company

LOCATION Kuwait

CONTRACT Jun. 2005 ~ Apr. 2008


PERIOD

CAPACITY & Ethane Recovery Plant : 320,000MTPY


DESCRIPTION
1) Inside Battery Limit :
• Feed Gas Compression 1,140 MMSCFD
• Feed Gas Dehydration 1,140 MMSCFD
• NGL Extraction Unit 570 MMSCFD x 2 Trains
2) Outside Battery Limit : Process Tie-ins,
Instrument Package

SCOPE OF EPCC
WORKS

11
CLIENT Agip Gas BV - Libyan Branch

LOCATION Libya

CONTRACT Nov. 2002 ~ Sep. 2005


PERIOD

CAPACITY & Gas Treatment Unit : 700 MMSCFD


DESCRIPTION • Sales Gas : 700 MMSCFD
• Sulfur Production : 530 TPD
• Condensate : 39,000 Bbl/Day

Process Units
- Gas Processing Plant
- Condensate Stabilization Unit
- Sulphur Recovery Unit
- NGL Fractionate (2 trains)
- Offsite / Utilities including 2 substations

SCOPE OF EPCC
WORKS

12
CLIENT Qatar General Petroleum Corporation

LOCATION Qatar

CONTRACT Aug. 1999 ~ Apr. 2002


PERIOD

CAPACITY & - Dkadu Plant Upgrade at Dukhan


DESCRIPTION - Pipe Line
(NGL Transfer Pipeline from Dukhan to Mesaieed)
- NFGP Revamp at Mesaieed
- NGL-4 Plant (New) at Mesaieed:
51,000 TPD x 2 Trains
• Ethane 875,000 TPA
• Propane 735,000 TPA
• Buthane 490,000 TPA
- Tank (Propane Storage 58,000M³)

SCOPE OF EPCC
WORKS

13
CLIENT Sirte Oil Company

LOCATION Libya

CONTRACT Sep. 1999 ~ Feb. 2004


PERIOD

CAPACITY & Gas Treatment Unit : 175 MMSCFD x 2 Trains


DESCRIPTION (350 MMSCFD)
1) Well Fluid Flow Lines : Total 130 km
2) Plant Inlet Facility (Gathering & Separation)
3) Gas processing facilities
• Acid Gas Removal Unit(Amine Unit)
• Dew Point Control Unit(MEG, Propane Unit)
• Mercury Removal and Gas Export Unit
4) Condensate Unit: 31,000 BPD
5) Utilities
6) Sewers and drainage
7) Chemical / solvents and catalyst storage &
handling facilities

SCOPE OF EPCC
WORKS

14
CLIENT Conocophillips

LOCATION Indonesia

CONTRACT Aug. 2004 ~ Aug. 2006


PERIOD

CAPACITY & 200 MMSCFD Gas Plant x 2 Units


DESCRIPTION • Wells & Flow line
• Inlet Cooling and Separation
• MDEA Gas Treating
• EG/Condensate Separators
• Propane Refrigeration & Make-up Unit
• Condensate Stabilization
• GTGs & GTCs
• Flare Stacks & Utilities
• Pipeline : 26” x 43Km
8” / 10” / 12” / 16” X 33 Km

SCOPE OF EPCC
WORKS

15
CLIENT Conocophillips

LOCATION Indonesia

CONTRACT Feb. 2001 ~ Dec. 2002


PERIOD

CAPACITY & 150 MMSCFD Gas Plant x 2 Units


DESCRIPTION • 26" Trunk Pipeline 50 km
• Gas Cooling Separation
• TEG Dehydration
• Hydrocarbon Dew-Point Control
• Gas Compression
• Condensate Stabilization & UTOS

SCOPE OF EPCC
WORKS

16
CLIENT Conocophillips

LOCATION Indonesia

CONTRACT May. 2000 ~ Mar. 2002


PERIOD

CAPACITY & 150 MMSCFD Grissik Central Gas Plant


DESCRIPTION • 4 Wells
• Gathering Station 1 Unit
• Pipeline : 8” (5.9 Km) / 10” (1.78 Km) / 16” (4.5
Km) / 28” (9 Km)

SCOPE OF EPCC
WORKS

17
CLIENT SCOP (State Company for Oil Projects)

LOCATION Karbala City, Iraq

CONTRACT Apr.2014 ~ Oct.2018


PERIOD

CAPACITY & 140,000 BPSD Refinery


DESCRIPTION • Atmospheric Distillation
• Naphtha Hydrodesulfurization (UOP)
• Isomerization Unit (UOP)
• Catalytic Reforming (UOP)
• Kerosene Hydrodesulfurization (Axens)
• Diesel Hydrodesulfurization (Axens)
• Vacuum Distillation
• Vacuum Gasoil Hydrodesulfurization (UOP)
• Fluid Catalytic Cracking (UOP)
• Polynaphtha (Axens)
• LPG Production Unit
• Sulfur Recovery + TGT, 2 Trains (KTI)
• Asphalting Blowing Unit (Poerner)
• Gas Sweetening and Amine Regeneration
• Sour Water Stripper
• Hydrogen Unit, 2 Trains (Haldor Topsoe)

SCOPE OF EPCC
WORKS

19
CLIENT PDVSA Petróleo, S.A (PDVSA)

LOCATION Venezuela

CONTRACT Jun. 2012 ~ Jul, 2017


PERIOD

CAPACITY & - Atmospheric Distillation Unit 1 (DA-1) Revamp


DESCRIPTION [80,000 BPSD→ 80,000 BPSD]
- Atmospheric Distillation Unit 2 (DA-2) Revamp
[65,000 BPSD → 90,000 BPSD (MEREY 16)]
- Vacuum Distillation Unit: 65,000 BPSD X 2trains
- Hydrogen Compression Unit:
80 MMSCFD X 5trains
- Hydrogen Production Unit: 135 MMSCFD X 2rains
- Sour Water Stripping Unit: 1,881 GPM
- Amine Regeneration Unit: 1,832 GPM
- Sulfur Recovery & Tail Gas Treatment Unit :
255 TPD X 3 SRU trains (TGTU 2train)
- Hydrogen Recovery Unit: 100.6 MMSCFD

SCOPE OF EPCC
WORKS

20
CLIENT PDVSA Petróleo, S.A (PDVSA)

LOCATION Venezuela

CONTRACT 47 Months from Effective Date


PERIOD (Awarded: Jun. 2014)

CAPACITY & - Hydrocracker : 25,000 BPSD x 2 trains


DESCRIPTION - Sequencing Hydroprocessing
: 47,442 BPSD x 2 Trains
- Residue Work-up : 11,043 BPSD X 2 trains
- Gas Recovery (GRU) : 34,029 BPSD X 1
- Catalyst Preparation
: 448 TPD Mo Solution + 135 TPD Ni Solution
- Coke Additive Reception : 132.4 TPD
- Heavy Slops Handling
- UT/OS

SCOPE OF EPCC
WORKS

21
CLIENT PDVSA Petróleo, S.A (PDVSA)

LOCATION Venezuela

CONTRACT 32 Months from Effective Date


PERIOD (Awarded: Dec. 2013)

CAPACITY & 40,000 BPD Refinery


DESCRIPTION Hydro Skimming
- Crude Distillation Unit
- Crude Oil Desalting
- Heating Section
- Atmospheric Fractionation and Side Stripping
- Naphtha Hydrotreatment Unit
- Catalytic Reforming Unit
- Aux. Unit

SCOPE OF EPCC
WORKS

22
CLIENT Hyundai Oilbank Co., Ltd.

LOCATION Daesan, Korea

CONTRACT Oct. 2016 ~ Jul. 2018


PERIOD

CAPACITY & Revamping of existing #1 HOU, #1/#2 Plant (10 Main Processes)
DESCRIPTION during Shutdown ('17~'18)
• #1 Fluidized Catalytic Cracking Unit (FCC): 73,600  86,000 BPSD
(UOP)
• #1 Propylene Recovery Unit (PRP): 31,500  36,800 BPSD
• #1 LPG Merox Unit (LMX): 31,500  36,800 BPSD
• #1 Alkylation Unit (ALK): 20,000  25,000 BPSD (DuPont)
• #1 Butamer Process Unit (BUT): 9,650  14,500 BPSD
• #1 Selective Hydrogenation Unit (SHU): 16,600  23,000 BPSD
• #1 Atmospheric Residue Desulfurization Unit (RDS): 66,000 
100,000 BPSD (SHELL)
• #1 Spent Acid regeeration Unit (SAR): 150  210 TPD (MECS)
• #1 Mogas Hydrotreating Unit (MHT): 28,000  41,000 BPSD (Axens)
• #2 Crude Distillation Unit (CDU): 310,000  340,000 BPSD
• #1 Aromatics Complex (BTX): PX 373  485 KTA (UOP)
• #2 Gasoil Hydrotreating Unit (GHT) / Dewaxing: 35,000 BPSD (SHELL)
• #1 Hydrocracking Unit (HCR): 40,000  50,000 BPSD (UOP or
SHELL)
• #1 Lube Base Oil Unit (LBO): 20,000  28,000 BPSD (SHELL)

SCOPE OF EPCC
WORKS

23
CLIENT Hyundai Chemical Co. Ltd.

LOCATION Daesan, Korea

CONTRACT Nov. 2014 ~ Oct. 2016


PERIOD

CAPACITY & - #3 CDU (Condensate Distillation Unit) : 130,000 BPSD


DESCRIPTION - #3 LMX (LPG Merox Unit) : 4,500 BPSD
- #3 LER (Light Ends Recovery Unit) : 5,300 BPSD
- #3 KMX (Kerosene Merox Unit) : 31,000 BPSD
- #5 GHT (Gasoil Hydrotreating Unit) : 18,000 BPSD
- #3 NHT (Naphtha Hytrotreating Unit) : 70,000 BPSD
- #3 PLT (CCR Platforming Unit) : 47,000 BPSD
- #4 PSA (Pressure Swing Adsorption) : 80 MMSCFD
- #3 AFU (Aromatics Fractionation Unit : 43,000 BPSD
- #3 TAU (Tatoray Unit) : 45,000 BPSD
- #3 BTU (BT Fractionation Unit ): 62,000 BPSD
- #3 SUL (Sulfolane Unit) : 28,000 BPSD

SCOPE OF EPCC
WORKS

24
CLIENT HSB (Hyundai & Shell Base Oil) / HDO (Hyundai
Oil Bank)

LOCATION Korea

CONTRACT Sep. 2012 ~ Sep. 2014


PERIOD

CAPACITY & 1) New


DESCRIPTION • Lube Base Oil Plant (LBOP): 20,000 BPSD
• Tankage: 110,000 BBL * 4 EA
45,000 BBL * 4 EA
• Utility
2) Revamp
• Hydrocracking Unit (HCR):
Min. 40,000 BPSD
• Vacuum Distillation Unit (VDU):
Min. 76,000 BPSD (VGO: 35,000 BD)
3) Jetty Modification

SCOPE OF EPCC
WORKS

25
CLIENT SK innovation

LOCATION Inchon, Korea

CONTRACT Jun. 2012 ~ Oct. 2014


PERIOD

CAPACITY & - Condensate Splitter Unit (CSU): 100,000 BPSD


DESCRIPTION - Light End Recovery Unit (LER)
- Naphtha Splitter Unit (NSU)
- LPG Merox Unit (LMX): 8,000 BPSD
- Light Naph. Hydrotreating Unit (LHT): 30,000 BPSD
- Heavy Naph. Hydrotreating Unit (NHT): 40,000 BPSD
- Kerosene Merox Unit (KMX): 25,000 BPSD
- Reformer Unit (REF): 35,000 BPSD
- Aromizer CCR Unit (CCR): 3,000 PPH
- Olefin Reduction Unit (ORU)
- ED Sulforane Unit (SUL)
- Bz. Tol. Fractionation Unit (BFU)
- Transalkylation Unit (TAU)
- PX Plant (XFU, ISU, PXU): 1,300 KTA
- Control Room

SCOPE OF EPCC
WORKS

26
CLIENT Hyundai Oil Refinery Co., Ltd., Korea

LOCATION Daesan. Korea

CONTRACT Oct. 2008 ~ Jun. 2011


PERIOD

CAPACITY & 1) Process Units


DESCRIPTION • ARDS : 66,000 BPSD (Chevorn Lummus
Global)
• HMU : 110 MMSCFD (Haldor Topose)
• GHT : 40,000 BPSD (Shell Global Solutions)
2) Process Units
• Steam Boiler: 120 Ton/Hr
• Cooling Water: 45,000 Ton/Hr
• Raw Water Treatment: 36,000 Ton/Day
• Waste Water Treatment: 16,000 Ton/Day
3) Common Facilities
• Common (Pipe Rack & U/G Pipe)
• Substation / Control Building etc.

SCOPE OF EPCC
WORKS

27
CLIENT S-OIL Corporation

LOCATION Ulsan, Korea

CONTRACT Sep. 2007 ~ Sep. 2009


PERIOD

CAPACITY & 1) Alkylation Unit & SAR Unit


DESCRIPTION • Alkylation Unit: 9,200 BPD (DUPONT)
• Sulfuric Acid Regeneration (SAR) Unit: 118 T/D
(MECS)

2) Off-site Facilities
• Alkylate Tank : 100,000 BBL × 2
• Alkylate Tank Pump : 2,500 GPM × 2
• Olefinic C4 Feed Tank : 200,000 BBL × 1
• Olefinic C4 Feed Tank Pump : 6,000 BPD × 2

3) Utility Facilities
• Cooling Tower: 2,000 T/H × 2
(Expansion of existing cooling tower in #4 Utility
area)
• Cooling Water Pump: 4,000 T/H × 2 (M-1, T-1)

SCOPE OF EPCC
WORKS

28
CLIENT SK Corporation

LOCATION Ulsan, Korea

CONTRACT Jan. 2006 ~ Jun. 2008


PERIOD

CAPACITY & 1) Sulfur Plant


DESCRIPTION • Sulfur Recovery Unit : 310 TPD x 2 (TPA)
• Amine Regeneration Unit : 651 m3/hr, 80
m3/hr (S&W / FEED)
• Tail Gas Treatment Unit : 44,168 Nm3/hr,
31,459 Nm3/hr (TPA)
• Sour Water Treatment Unit : 90 Nm3/hr × 2
(HEC / FEED)

2) Alkylation Plant
• Alkylation Unit : 18,000 BPSD (STRATCO
License, DuPont Refinery Solutions)
• Spent Acid Regeneration : 180 TPD (MECS)
• Butamer Unit : 13,000 BPSD (UOP)
• Selective Hydrogeneration Process : 14,500
BPSD (UOP)

SCOPE OF EPCC
WORKS

29
CLIENT Hyundai Oil Refinery Co., Ltd., Korea

LOCATION Daesan. Korea

CONTRACT May. 2004 ~ Dec. 2005


PERIOD

CAPACITY & 1) New Plant


DESCRIPTION • #1 Mogas Hydrotreating Unit : 20,000 BPSD
(Axens License)
• #3 Gas Oil Hydrotreating Unit : 25,000 BPSD
(Axens License)
• #2 Hydrogen Manufacturing Unit : 45,000
Nm3/hr (Haldor Topsoe License)

2) Revamp
• #2 Gas Hydrotreating Unit : 35,000 BPSD
(Axens License)
• Utility & Offsite

SCOPE OF EPCC
WORKS

30
CLIENT Hyundai Oil Refinery Co., Ltd., Korea

LOCATION Daesan. Korea

CONTRACT Mar. 1996 ~ Jan. 1998


PERIOD

CAPACITY & 1) Products


DESCRIPTION • Benzene: 106,600 TPY
• Paraxylene 300,000 TPY

2) Process Units
• Sulfolane Unit : 8,425 BPSD (Udeh)
• Benzene / Toluene Fractionation Unit :
15,200 BPSD (UOP)
• Tatoray Unit : 11,496 BPSD (UOP)
• Aromatics Fractionation Unit : 13,800 BPSD
(UOP)
• Parex Unit : 29,190 BPSD (UOP)
• Isomer Unit : 22,836 BPSD (UOP)

SCOPE OF EPCC
WORKS

31
CLIENT Hyundai Oil Refinery Co., Ltd., Korea

LOCATION Daesan. Korea

CONTRACT Feb. 1994 ~ Dec. 1995


PERIOD

CAPACITY & 1) Process Units


DESCRIPTION • Crude Distallation Unit : 200,000 280,000
BPSD (RKPH M.Parsons)
• Light End Recovery Unit : 6,000 BPSD (UOP)
• Kerosene Hydrotreating Unit : 24,000 BPSD
(Exxon)
• Kerosen/Gas Oil Hydrotreating Unit : 32,000
(Exxon)
• Naphtha Hydrotreating Unit : 20,000 (UOP)
• Naphtha Platforming Unit (incl. CCR) : 20,000
(UOP)
• Sulfur Recovery Unt : 180 TPD (JGC & Shell)
2) Utilities & Offsites
• Cogeneration Units & Utility
• Crude Tankage : 800,000 BBL
• Product Tankage : 3,200,000 BBL
• Jetty : 100,000 / 30,000 DWT

SCOPE OF EPCC
WORKS

32
CLIENT Hyundai Oil Refinery Co., Ltd., Korea

LOCATION Daesan. Korea

CONTRACT Apr. 1986 ~ May. 1988


PERIOD

CAPACITY & Process Units


DESCRIPTION • Atmosphere Crude Unit : 60,000 → 110,000
BPSD (Badger)
• Vacuum Unit : 44,000 BPSD (Badger)
• Light Ends Recovery Unit : 34,000 BPSD (UOP)
• LPG Merox Unit : 4,000 BPSD (UOP)
• Kerosene Merox Unit : 7,000 BPSD (UOP)
• Naphtha Hydrotreating Unit : 7,000 BPSD
(UOP)
• Catalytic Reforming Unit : 3,000 BPSD (UOP)
• Gas Oil Hydrotreating Unit : 15,000 BPSD
(UOP)
• Delayed Coker Unit : 19,000 BPSD (FW)
• Hydrocracker Unit : 22,000 MGO/CHGO (UOP)
• Hydrogen Plant (Incl. P.S.A PKG) : 54
MMSCFD (KTI)
• Acid Gas Removal Plant (JGC)
• Sulfur Recovery Plant : 360 MTD (JGC)

SCOPE OF EPCC
WORKS

33
CLIENT Abu Dhabi Polymers Company Limited

LOCATION U.A.E

CONTRACT Feb. 2011 ~ Dec. 2016


PERIOD

CAPACITY & 1) 80kta XLPE Units


DESCRIPTION • Compounding Section
• Soaking Section
• Packaging Section
2) Extension of Laboratory

SCOPE OF EPCC
WORKS

35
CLIENT Abu Dhabi Polymers Company Limited

LOCATION U.A.E

CONTRACT Jun. 2010 ~ Dec. 2017


PERIOD

CAPACITY & 1) 1-Butene Process


DESCRIPTION 2) Marine / Seawater intake
3) Utility & Offsites facilities
4) Main Control Building ETC.
5) 13 Tanks

SCOPE OF EPCC
WORKS

36
CLIENT LABIX Company Limited

LOCATION Thailand

CONTRACT Aug. 2013 ~ Jan. 2016


PERIOD

CAPACITY & LAB Production : 100,000 MTPA


DESCRIPTION - Kerosene Prefractionation Unit
- Distillate Unionfining Unit
- Molex Unit
- Pacol (with Define) Unit
- PEP Unit
- Detal Plus Unit
- Hot Oil System
- Shell Amine Absorber section
- Utilities and Offsite

SCOPE OF EPCC
WORKS

37
CLIENT Turkmennefte Gas State Trade Co.

LOCATION Turkmenistan

CONTRACT Feb. 1999 ~ Oct. 2001


PERIOD

CAPACITY & 1) PP 100,000MTPY


DESCRIPTION 2) C3/C4 Splitter & PP Recovery Unit
3) Hydrogen Purification Unit

SCOPE OF EPCC
WORKS

38
CLIENT Ras Lanuf Oil & Gas Processing Co.

LOCATION Ras Lanuf, Libya

CONTRACT Aug. 1991 ~ Dec. 1997 (PKG 3)


PERIOD Oct. 1992 ~ Nov. 1997 (PKG A)
May. 1995 ~ Jun. 1998 (PKG B)

CAPACITY & 1) Package 3 (16,000 MTPA Polyethylene Plant) :


DESCRIPTION • HDPE 80,000 MTPA (UCC Unipol)
• LLDPE 80,000 MTPA (UCC Unipol)
2) Package A (Tank Farm & Cryogenic Storage)
- Storage Tank
• Butadiene: 10,000 M3 x 2 Base
• Benzene/MTBE/Methanol: 5,000 M3 x 6 Base
• Butene-1/Spent C4: 2,000 M3 x 4 Base
- Refrigeration System & Flare System
3) Package B (Polymer Handling & Film Plant):
HDPE 80,000 MTPA / LLDPE 80,000 MTPA /
PP 80,000 MTPA

SCOPE OF EPCC
WORKS

39
CLIENT Hyundai Petrochemical Co., Ltd., Korea

LOCATION Daesan, Korea

CONTRACT Jun. 1995 ~ Dec. 1997


PERIOD

CAPACITY & Naphtha Cracking Center (Capa:450,000 tons)


DESCRIPTION • Ethylene : 450,000 MTPA (MW Kellogg)
• Butadiene : 104,000 MTPA (Nippon Zeon)
• MTBE : 100,000 MTPA (CD-Tech)
• Styrene Monomer : 220,000 MTPA (Raytheon
(Badger))
• EO/EG : 200,000 MTPA (Scientific Design)
• EVA/LDPE : 85,000 MTPA (Exxon)
• HDPE/LLDPE : 130,000 MTPA (UCC)
• PP : 160,000 MTPA (Technipol)
• VCM : 150,000 MTPA (Mitsui Toatsu)
• PVC : 150,000 MTPA (Geon)
• Benzene Recovery : 198,000 MTPA (IFP)
• SBR : 82,000 MTPA (Goodyear)

SCOPE OF EPCC
WORKS

40
CLIENT Hyundai Petrochemical Co., Ltd., Korea

LOCATION Daesan, Korea

CONTRACT Dec. 1988 ~ Jun. 1991


PERIOD

CAPACITY & Naphtha Cracking Center (Capa:350,000 tons)


DESCRIPTION • Ethylene : 350,000 MTPA (MW Kellogg)
• Butadiene : 57,000 MTPA (Nippon Zeon)
• Styrene Monomer : 100,000 MTPA (Raytheon
(Badger))
• LDPE :100,000 MTPA (BASF)
• LLDPE : 80,000 MTPA (Stamicarbon)
• HDPE : 100,000 MTPA (Phillips)
• Polypropylene : 170,000 MTPA (Himont)
• EO/EG : 100,000 MTPA (Scientific Design)
• RPG Hydrotreating : 430,000 MTPA (IFP)
• Benzene Recovery : 140,000 MTPA (HRI)

SCOPE OF EPCC
WORKS

41
CLIENT Uzbekistan GTL LLC

LOCATION Uzbekistan

CONTRACT Nov. 2016 ~ Apr. 2020


PERIOD

CAPACITY & 3.3 BCMA of Gas treatment facilities


DESCRIPTION (37,980 BPSD)
• Diesel : 19,840 BPSD
• Kerosene : 7,370 BPSD
• Naphtha : 10,400 BPSD
• LPG : 370 BPSD

SCOPE OF EPCC
WORKS

43
CLIENT Qatar Shell GTL Limited (QP+Shell)

LOCATION Ras Laffan, Qatar

CONTRACT Jul. 2006 ~ Oct. 2010


PERIOD

CAPACITY & - LPU Package Product : 140,000 BPSD


DESCRIPTION - Naphtha : 18,000 BPSD
- Gas Oil : 33,000 BPSD
- Base Oil : 17,000 BPSD

SCOPE OF EPCC
WORKS

44
CLIENT Nakhodka Mineral Fertilizers Factory

LOCATION Russia

CONTRACT 61.5 Months from Effective Date


PERIOD (Awarded: Sep. 2016)

CAPACITY & Ammonia Plant : 3,300 TPD x 2 Trains (Uhde)


DESCRIPTION Urea Plant : 3,000 TPD x 2 Trains (Toyo)
Methanol Plant : 3,000 TPD x 1 Train (Toyo)

Utilities & Offsites


• Power Generation, HRSG, EDG
• Sea Water Intake & Blow Down System
• Raw Water Treatment, Desalination & Pure Water System
• Cooling / Waste / Hot Water System
• Steam / N2 / Instrument & Plant Air System
• Urea Solid Handling, Storage, Transportation, Loading
Facilities
• Ammonia/Methanol Product, Storage & Marine Export
• Fire & Safety
• Flare System

SCOPE OF EPCC
WORKS

46
CLIENT Qatar Fertilizer Company (S.A.Q)

LOCATION Qatar

CONTRACT Dec. 2007 ~ Sep. 2012


PERIOD

CAPACITY & No. 2 Ammonia plants 2,300 Tons/day each


DESCRIPTION No. 2 Urea plant 3,850 Tons/day
No. 2 Urea granulation 3,850 Tons/day

Utilities & Offsites


• Urea Granulation Storage Shelter (100,00 Ton)
• Interconnecting between Q5 Site and Existing
Plant
• Power (Gas Turbine with Steam Cogeneration)
• Ammonia Storage Tank (50,000 Ton X 2)
• Extension of existing Jetty & Ship Loader
(1,000 T/H)

SCOPE OF EPCC
WORKS

47
CLIENT National Fertilizer Corporation

LOCATION Rayong, Thailand

CONTRACT Dec. 1994 ~ May. 1998


PERIOD

CAPACITY & - P2O5 : 600 MTPD


DESCRIPTION - NP/NPK : 3,300 MTPD

SCOPE OF EPCC
WORKS

48
CLIENT KNPC (Kuwait National Petroleum Company)

LOCATION Kuwait

CONTRACT Apr. 2016 ~ Dec. 2020


PERIOD

CAPACITY & 1) Marine Works


DESCRIPTION • Jetty I (Berth # 47), Jetty II (Berth # 48) and the
interconnecting system located in Sea
• Seawater Intake & Outfall

2) LNG Terminal
• 8 LNG Tanks (225,000m3 each) & LP Pumps
• Recondenser, HP pumps and interconnecting
• BOG Compressors & Fuel Gas
• Vaporization (ORV´s & SCV´s) and Metering Station
• Flare
• Utilities

3) Infrastructure & Building

4) Offsites

SCOPE OF EPCC
WORKS

50
CLIENT KOGAS (Korea Gas Corporation)

LOCATION Samcheok, Korea

CONTRACT Mar. 2012 ~ Jun. 2016


PERIOD

CAPACITY & LNG Storage Tank : 200,000 Kℓ × 2 Units (Over-ground)


DESCRIPTION • Grounded full containment type
• Interior:9% NI stell (DI:84.0m, H:37.8m)
• Exterior: Prestressed Deck Type (DI:86.4m,
H:52.8m)
• Roof: Suspended Deck Type
• Electric Heating Type, Nodike Type.

SCOPE OF EPCC
WORKS

51
CLIENT KOGAS (Korea Gas Corporation)

LOCATION Incheon, Korea

CONTRACT Dec. 2011 ~ Dec. 2013


PERIOD

CAPACITY & Vaporizer Send-out Facility


DESCRIPTION • Submerged Combustion Vaporizer Facility : 480 T/H
(120 T/H x 4)
• HP Pumps : 550 T/H (110 T/H x 5)
• Degassing Pot × 5 Units
• Fuel Gas System

SCOPE OF EPCC
WORKS

52
CLIENT KOGAS (Korea Gas Corporation)

LOCATION Pyeongtaek, Korea

CONTRACT Sep. 2007 ~ Aug. 2011


PERIOD

CAPACITY & LNG Storage Tank : 200,000 Kℓ x 2 Units (Over-ground)


DESCRIPTION • Grounded full containment type
• Interior of Tank : 9 % Ni Steel
• Outerior of Tank : Prestressed Concrete
• Roof: Suspended Deck Type
• Electric Heating Type
• No-Dike Type
• Design Pressure: 0.29 Kpa

Vaporizer Send-out Facility


• SMV (Submerged Combustion Vaporizer) : 120 T/H

SCOPE OF EPCC
WORKS

53
CLIENT KOGAS (Korea Gas Corporation)

LOCATION Tongyung, Korea

CONTRACT Jun. 2006 ~ Aug. 2010


PERIOD

CAPACITY & LNG Storage Tank : 200,000 Kℓ x 2 Units (Over-ground)


DESCRIPTION • Grounded full containment type
• Interior of Tank : 9 % Ni Steel (DI:84.0m, H:37.8m)
• Outerior of Tank : Prestressed Concrete (DI:86.4m,
H:52.8m)
• Roof: Suspended Deck Type
• Erectrucal Heating Type, Nodike Type.

Vaporizer Send-out Facility


• ORV (Open Rack Vaporizer) : 360 T/H (180 T/H x 2)

SCOPE OF EPCC
WORKS

54
CLIENT KOGAS (Korea Gas Corporation)

LOCATION Incheon, Korea

CONTRACT Jul. 2004 ~ Jun. 2009


PERIOD

CAPACITY & LNG Storage Tank : 200,000 Kℓ x 2 Units (In-ground)


DESCRIPTION • Double Wall Type: 79m (ID) x 63.1m (H) x1.8
(Slurry Wall)
• Main Structure: 72m (ID) x 65.5m (H) x 3.3m (Steel
Concrete Wall)
• Storage Tank: Membrane SUS 304 -2mm
• Insulation - PUF Panel 204mm

Vaporizer Send-out Facility


• ORV (Open Rack Vaporizer) : 1,020 T/H

SCOPE OF EPCC
WORKS

55
CLIENT KOGAS (Korea Gas Corporation)

LOCATION Incheon, Korea

CONTRACT Oct. 1997 ~ Oct. 2001


PERIOD

CAPACITY & LNG Storage Tank : 140,000 Kℓ x 2 Units (In-ground)


DESCRIPTION • Send Out : HP LNG Pump 110 T/H × 2 Units
• BOG Compressor: 12,000 ㎥/ H × 1 Unit
• Seawater Heater: 12 MW × 2 Units
• Seawater Pump: 12,000 ㎥/ H × 2 Units)

Vaporizer Send-out Facility


• ORV (Open Rack Vaporizer) : 270 T/H (90 T/H x 3)

SCOPE OF EPCC
WORKS

56
CLIENT KOGAS (Korea Gas Corporation)

LOCATION Incheon, Korea

CONTRACT Dec. 1995 ~ Nov. 2009


PERIOD

CAPACITY & LNG Storage Tanks


DESCRIPTION • Over-ground LNG Tank : 100,000 Kℓ x 4 Units
• In-ground LNG Tank : 10 Units
(140,000 Kℓ x 2 Units / 200,000 Kℓ x 8 Units)

Vaporizer Send-out Facility


• Capacity: 2,730 T/H

Berth Facilities :
• Capacity : 75,000 Ton
• LNG Ship Jetty & Trestle

SCOPE OF Basic/Detailed Engineering


WORKS Procurement Service, Construction Service
Pre-Comm./Commissioning Support

57
CLIENT KOGAS (Korea Gas Corporation)

LOCATION Incheon, Korea

CONTRACT 1991 ~ 1998


PERIOD

CAPACITY & LNG Storage Tanks


DESCRIPTION • Over-ground LNG Tank : 10 Units
• In-ground LNG Tank : 8 Units

Vaporizer Send-out Facility


• Capacity : 3,060 T/H

SCOPE OF Basic/Detailed Engineering


WORKS Procurement Service, Construction Service
Pre-Comm./Commissioning Support

58
CLIENT KOGAS (Korea Gas Corporation)

LOCATION Incheon, Korea

CONTRACT May. 1991 ~ Dec. 2006


PERIOD

CAPACITY & LNG Storage Tanks


DESCRIPTION • Over-ground LNG Tank : 100,000 Kℓ x 3 Units
• Grounded full containment type
• Interior of Tank : 9 % Ni Steel
• Outerior of Tank : Prestressed Concrete

Vaporizer Send-out Facility


• Capacity : 1,080 T/H

Other Facilities :
• LNG Berth : 75,000 DWT
• Seawater Systems including Seawater Intake Structure
• Utilities including Cogeneration System (9MW x 2)

SCOPE OF Basic/Detailed Engineering


WORKS Procurement Service, Construction Service
Pre-Comm./Commissioning Support

59
CLIENT Ma’aden Bauxite Alumina Company

LOCATION Saudi Arabia

CONTRACT Mar. 2012 ~ Feb. 2015


PERIOD

CAPACITY & 1.8 Million Ton of Alumina Product


DESCRIPTION • Raw Caustic Receival, Storage & Supply
• Bauxite Grinding
• Bauxite Slurry Heating & Predesilication
• Digestion
• Lime Receival & Preparation
• Mud Separation
• Bauxite Residue Storage Facility
• Precipitation
• Hydrate Classification
• Hydrate Storage
• Calcination
• Alumina Storage & Handling
• Compressed Air Preparation

SCOPE OF EPCC
WORKS

61
CLIENT Hyundai Steel Company

LOCATION Dangjin, Korea

CONTRACT Phase 1 : Jul. 2007 ~ Jan. 2010


PERIOD Phase 2 : Jul. 2008 ~ Nov. 2010
Phase 3 : Apr. 2011 ~ Sep. 2013

CAPACITY & Total Capacity : 12 MTPY (4 MTPY each)


DESCRIPTION • Blast Furnace
• Material Handling Facilities
• Sintering Plant
• Coke Oven
• Calcining Plant
• Steel Making Facilities
• Hot Rolled Mill Facilities
• Plate Making Facilities
• Auxiliary Facilities
• Piping Work
• Electrical and Instrumentation Works