Operation manual
Equipment list :
No. Item
1 YL-2455 single shaft shredder
2 YL-2455 belt conveyor
3 YL-PC500 crusher
4 YL-2455 blower storage system
5 YL-2455 electrical control cabinet
Form 1
Page 1 of 22
Content
一、Brief introduction ..................................................................................................................... 4
二、Warnings .................................................................................................................................. 4
三、Machine introduction ............................................................................................................... 4
四、Basic parameters ...................................................................................................................... 5
五、Transportation and location ...................................................................................................... 5
5.1Crane moving ...................................................................................................................... 5
5.2 Folk truck transportation .................................................................................................... 6
5.3 Machine location ................................................................................................................ 6
六、Machine function ..................................................................................................................... 6
6.1 Description ......................................................................................................................... 6
6.2 Machine structure parameters ............................................................................................ 6
6.3 Overload protection ............................................................................................................ 7
七、Safety items .............................................................................................................................. 7
7.1 Dangerous items ................................................................................................................. 7
7.2 Warning .............................................................................................................................. 7
八、Assembling .............................................................................................................................. 8
8.1 Pre-inspection before running ............................................................................................ 8
8.2 Circuit connection .............................................................................................................. 8
九、Operation and daily maintenance ............................................................................................. 8
9.1 Operator train ..................................................................................................................... 8
9.2 Operation instruction .......................................................................................................... 8
9.3 Basic operation method .................................................................................................... 10
9.4 Warnings .......................................................................................................................... 11
9.5 Inspection ......................................................................................................................... 11
9.5.1 Daily inspection .................................................................................................... 12
9.5.2 Week inspection .................................................................................................... 12
9.5.3 Half-year inspection .............................................................................................. 12
9.5.4 One year inspection ............................................................................................... 12
9.5.6 Bearing lubrication: ............................................................................................ 12
9.6 Cleaning ........................................................................................................................... 13
十、Troubleshooting ..................................................................................................................... 13
十一、Maintenance ....................................................................................................................... 13
11.1 Changing blades ............................................................................................................. 13
11.1.1 Blade disassembly ............................................................................................... 13
11.1.2 Blade assembly .................................................................................................... 13
11.2 Pulley assembly .............................................................................................................. 14
11.3 Driving belt assembly..................................................................................................... 14
11.4 Belt tension ..................................................................................................................... 14
11.5 Bearings replacement ..................................................................................................... 15
十二、Reducer condition .............................................................................................................. 15
12.1 Running caution ............................................................................................................. 15
12.2 Repair and maintenance ................................................................................................. 16
Page 2 of 22
12.3 Periodic table for maintenance ....................................................................................... 16
12.4 Common troubleshooting ............................................................................................... 17
十三、Hydraulic system ................................................................................................................ 17
13.1 Main technical parameter ............................................................................................... 17
13.2 Cautions for first time use .............................................................................................. 18
13.3 Repair and maintenance ................................................................................................. 19
13.3.1 Checking items for hydraulic system .................................................................. 19
13.3.2 Maintenance of hydraulic system ........................................................................ 20
13.3.3 Warning for hydraulic system maintenance ........................................................ 20
13.4 Common trouble shooting .............................................................................................. 21
13.4.1 Unusual system pressure ..................................................................................... 21
13.4.2 Abnormal movement ........................................................................................... 21
13.4.3 Oil temperature too high ..................................................................................... 22
Page 3 of 22
一、Brief introduction
Welcome to choose our shredder series products. Please carefully read the
operation manual before running the machine. Adept operation and skills will do a
lot of help to machine service life, running safety and improve working efficiency.
At the same time, this will largely decrease possibility of machine problem and
human safety threat. If you still get any confusion after understanding this
operation, please contact our after-sale service department immediately.
二、Warnings
Machine knives are very sharp and dangerous, please do take care during
maintenance. When checking machine, please do make sure the power supply is cut.
Any part of the body (hand, foot, hair etc.) should not get in touch with any part of
the running machine(Each machine has warning marks to remind).
三、Machine introduction
Page 4 of 22
四、Basic parameters
Page 5 of 22
Image 1
六、Machine function
6.1 Description
After the materials are feed into the hopper, the hydraulic ram at the back of the
shredder will push and hopper move towards the rotating shaft, where the fixed
knives and moving knives are bolted. Material will drop down from space of shaft
and fixed knife, then transported by the downside belt conveyor.
Page 6 of 22
Feeding mouth 780×550mm
Total weight 3600kg
Hopper design Hopper moving
Form 3
七、Safety items
7.1 Dangerous items
a) Rotary knife is very sharp and easy to cause into damage. Ensure power supply
is shut down when finishing work.
b) Feeding by man during the machine is running is dangerous. Do ensure machine
is shut down when feeding. Or choose belt conveyor automation feeding.
c) When opening the screen, do ensure machine is shut down.
d) Electrical cabinet is connected with high voltage, do be careful when opration.
e) High pressure oil pipe may have the risk of high pressure liquid erupting. Do
check the pipe is tight before running.
7.2 Warning
a) Electrical cabinet assembling and maintenance should be operated by
experienced engineers
b) When the machine maintenance must close the stop button, in order to prevent
misuse of the air circuit breaker can be disconnected and locked electrical boxes,
while hanging warning signs.
c) Make sure body is away from the machine before it totally stops.
d) Before unacknowledged machine stops running, do not open the screen bracket,
belt cover, cylinder cover.
e) If the motor is overloaded circuit caused the fire, you should first turn off the
power and use a fire extinguisher. As the use of reasonable basic cable this
situation does not occur.
Page 7 of 22
八、Assembling
(1) All parts must be correctly installed, to avoid personal injury or damage to the
machine.
(2) Blade is very sharp, when installed, should be very careful not to cut.
(3) Machine's power cord is connected by electrical workers.
Page 9 of 22
Form 4
9.4 Warnings
1) Try to remove the fan before starting the indoor residual material.
2) Machine should be equipped with conveyor belt feeding machine, such as the
need to manually direct feed, you must set the necessary security measures to
ensure personal safety, please contact our company or dealer.
9.5 Inspection
Note: 1. Machine maintenance and repair should be carried out in strict accordance
with safety regulations, it must be cut off.
2. The following care and maintenance period is limited to 8 hours / day, if
more than 8 hours / day, maintenance and service intervals are reduced
Page 11 of 22
accordingly.
Page 12 of 22
表格 4
2) If you do not use the proper lubricating oil too much or not enough will cause
overheating and wear situation that we refuse to take responsibility.
3) When the grease dirty, dry or aging time, should be replaced. Under normal
circumstances, must be well-lubricated bearings must be re-added grease after 24
hours of operation, the grease from the fuel injection nozzle into the bearing.
9.6 Cleaning
Before cleaning the machine, be sure to first turn off the power switch and locked in the off
position and place the maintenance warning signs! When the machine cleanup should wear work
gloves to avoid injury, wear a mask to prevent inhalation of dust, if necessary; open sieve tray,
first brush cleaning, blow clean with compressed air; as long the machine does not work, should
guide the internal chassis Article knife roll, fixed knife clean up after the coated anti-rust oil.
十、Troubleshooting
a) If the machine can’t running, please firstly check the circuit according to
electrical diagram.
b) Check the hopper finding if there are materials stuck.
c) Then check whether hydraulic ram and travel switch is running good.
d) If still can’t solve the problem, please contact our company or agent.
十一、Maintenance
To avoid personal injury and damage to the machine, all repairs must be
performed by professional service personnel. Before servicing the machine, be sure
to first turn off the power switch and locked in the off position and place the
maintenance warning signs! Maintenance should strictly abide by safety rules.
Page 13 of 22
Form 5
All blades fixing screws, non-arbitrary replacement! Such as the need to
replace damaged and must be replaced with the same level of performance
screw element screws;
Page 14 of 22
To determine the belt tension: Measuring two pulley center distance, according to
16mm / m calculated belt deflection.
Center distance (m) X16 = deflection (mm)
Force must be enough to make belt slanted
Compared the force on The force required to make belt deflection at 16mm
the belt with the number
Small block diameter(mm) Newton(N) (kg*h)
in the chat
Small pulley diameter(mm) Newton(N) (kg*h)
十二、Reducer condition
12.1 Running caution
Before starting machine, ensure there is enough oil in reducer. First time oil
adding amount as below:
十三、Hydraulic system
13.1 Main technical parameter
Shredder Model YL-2455
Hydraulic ram power 4kw
Oil pump displacement 5.5L/min
Cooling method By cooling water
Pushing forward time Adjustable
Dragging backward time Adjustable
System rated pressure 7MPa
Page 17 of 22
Form 11
Form 12
Image 5
Check oil level every three months, ensure oil level at 80% of total volume.
Choose at least ISO VG32-46 anti-wear hydraulic oil
Do not take out the screen mesh when adding oil.
First time start, should pay attention to the hydraulic motor rotation direction and
the cooling air cooling blade rotation direction is correct;
Ambient temperature range is used when the hydraulic station is 15 DEG -35
DEG, the ambient temperature is lower than 15 DEG C, should choose a heater
or depressant. In normal use, the temperature range of hydraulic oil should be
within 25 -50, and the highest should not be higher than 70. In use, such as in
case of high temperature and temperature mutation, should immediately stop
inspection, troubleshooting, and then use;
The hydraulic system is equipped with rheumatism, cooler, air cooler should be
placed in ventilated open position, try to avoid in a closed space and near the
heat source.
Page 18 of 22
13.3 Repair and maintenance
13.3.1 Checking items for hydraulic system
Checked Checking Checking During Rated standard Maintenance Remark
item method period checking method
Run stop
Page 20 of 22
To replace the seal, using a sharp tool does not allow the notice shall not damage
the seal or working surface;
The removal or decomposition of hydraulic components should pay attention to
the direction and sequence of parts and properly preserved, not lost, not to hurt
the finish surface. When components are assembled, the parts must be cleaned;
The hydraulic valve on the connecting screws does not allow arbitrary
replacement.
Page 21 of 22
3.Indicator signal not stable Check and repair
4.Sensor feedback failure Repair or replace
5.Valve center stuck Wash, clean oil
6.Oil pump too much wear Repair or replace
1.Air get in hydraulic pump or oil tank Exhaust air
2.Low or unstable pressure Repair or replace pressure valve
3.Sliding part too large resistance Repair, adding lubrication oil
Movement failure
4.Hydraulic cylinder and sliding parts of the Adjust and tighten
installation, such as the rigidity of the frame is not
enough, the fastening bolts loose, etc.
Form 15
Page 22 of 22