Table of Content
1. Appellation of tender......................................................................................................... 4
All the engineer salary, allowance, travel fee, dormitory, and communication should be
1. Appellation of tender
India NPM Project E2E Service
Neighbor Planning.
100 new sites and 450 maintenance are planned with the project duration of 12 month(s).
Huawei will done the NPM project at Kolkata With 100 new sites and 450
maintenance
Based on the service provide model, the RF team is responsibility to support solve
all the technical issues during the project maintenance. For the details about duty,
it will be described in the following section. The final evaluation will be based on
Due to the needs of the project, the RF team must be complied as per Huawei
requirement.
Routine work: include Daily and Weekly Progress Report, Meeting, Memo;
per cluster, until the huawei end client approves the DT report;
trouble shooting, Monthly DT, customer complaint and all kinds DT as the
per DT, until the huawei end client approve the DT report.
management, current traffic, traffic forecast, and plan for each Sector Up
PM
Customer Complaint
RNO Team OMCR Monitor team &Trouble shooting DT team
Team
Work
WBS Activities included Description Report Delivery
Package
1 All Project Master Plan Project RF Implementation Plan Master Plan
Audit the site , collect the
location, antenna system
Site Audit information, including height, Engineer Parameters
azimuth, tilt and feeder cross
check, etc.
According to project
requirments, discuss&confirm
DT plan, DT method, select
proper & confirm DT routine with
Maintenance DT huawei, make the routine Cluster/Town level optimization
Performance (monthly&quarterly) coverage report
DT optimization of main towns
(which define by huawei),
anlaysis and optimization, make
Drive Test and sure the DT KPI meet the target
Analysis during Arrange team for DT/CQT
2 RNO MS
the project including the indoor walk test for
implementation customer complaint trouble
Customer
shooting according to project
complaint Customer complaint tracker
requriement, collect and
troubleshooting
analysis the drive test data,
solve the RF issue in the
complaint
According to project requirements,
discuss& Confirm DT plan, DT
method ,select proper& confirm DT
route with Huawei end client or
Quarterly DT and Quarterly Drive Test or
Huawei, perform DT for per cluster,
Benchmark test Benchmark test Report,.
record and analyze DT data,,
check the coverage, interference,
handover, drop etc, for all the
operators in the circle
The project delivery quality would be evaluated by the relative report required on
each step. Huawei reserves the right to modify the exact requirement through MOU
and work order with subcontractor during the project implementation under the
The subcontractor shall respond Huawei’s work order every time and every where,
The subcontractor shall output and delivery the DT report after 10:00 AM when
DT complete day, include logfile, DBF, KPI etc. , whatever the client request
If the subcontractor do the DT not in the DT plan& method& route which confirm
with customer and Huawei, Huawei can’t confirm the work, the subcontractor need
to do the DT again.
2011-01-12 HUA WEI Page 10
HUAWEI CONFIDENCIAL
The subcontractor shall full respond for all networks KPI achieve the Target which
confirm with Customer and Huawei. And The KPI can’t achieve the target should
provide root cause get the Customer and Huawei approval without any reason.
and penalty.
propose the solution in details for the non-compliances in order for further discussions.
In addition, bidder is required to highlight to Huawei all additional efforts that don’t
Definition:
2 Employers: Huawei
1
2 3
Tasks
Subcontrac
Employer Customer
tor
1
2 3
Tasks
Subcontrac
Employer Customer
tor
Daily and weekly
★
report
Minutes of
★
meeting(MOM)
with customer
1.3.2 Delivery
solution in details for the non-compliances in order for further discussions. In addition,
bidder is required to highlight to Huawei all additional efforts that don’t cover in this
section.
Definition:
Employer: Huawei
Work
WBS Activities included Description Report Delivery Subcontractor Employer
Package
1 All Project Master Plan Project RF Implementation Plan Master Plan R A
project requirement
DT Coordination R
All the engineer salary, allowance, travel fee, dormitory, and communication should be
provided by subcontractor.
Class A, is the Gold subscriber, such as management person of Customer, and VIP list
provide by Customer
Class B, is the Silver subscriber, such as normal customer staff and their relatives, and the
group user of Customer
Class C is the normal subcribers
The complaint from class A should be give the feedback and recommendation within 4
hours, The complaint from class B should give the feedback and recommendation with 8
hours, the complaint from class C should be give the feedback and recommendation with
2 days.
If need done the optimization according to customer complaint, the A level complaint the
recommendation need implement with 2 days, for B level complaint the recommendation
should be implement within 3 days, for C level complaint the recommendation should be
implement within 5 days.
2. Project Requirements
The bidder is required to provide the adequate information and Statement of
2.1 Expertise
The Engineer who has qualifications as below should be provided by bidder, and
The requirements for the expertise based on different roles are list below. As a
general requirement, the provided resources are requested to have general ability
as below:
flow
For the expertise requirements based on different positions are listed as below:
experience;
Chief Engineer
experience
experience
RNP engineer
experience
experience
RNO Engineer
experience
OMC Engineer
experience
analysis;
analysis.
Chief Engineer 1
RNP engineer 1
RNO Engineer 2
OMC Engineer 2
Rigger 4
Bidder shall use the template in annex 1 in order to provide the details of the
resources that are planned to be assigned in the project. The CV of engineers for
each position should be attached and it would have a major influence to the
The project principal personnel from awarded consultant should arrive on-site 1
week in advance after the Huawei confirmed the start of working date. This is to
ensure the smooth work handover to the successful consultant and to further
For all the personnel to leave the project during the project rollout, it is required to
inform the project manager that is directly attached to the project 2 weeks in
advance. The approval in e-mail form is required in order for the personnel to leave
the project.
The attachment below is the project schedule and timeline that the subcontractor
required to comply with. The subcontractor should accept the change about
and penalty.
The bidder is required to setup the in-country resources platform where the work
will be carried out. The bidder should overcome all of the needs of their working
personnel the during the project rollout such as but not limited to engineering
platform, etc. The Huawei can provide the necessary guidance if it is required by
the bidder.
For work related visa/permits, the bidder is required to provide all of the working
On top of the concerns as above, bidder is fully responsible for all of the working
resources benefits, safety and etc that work under bidder entity. The Huawei
The minimum tools that required to be provided by the bidder for Network
GPS Y 10
Compass Y 10
MS external antenna Y 10
Cars Y 10
Mapinfo Y 1/Engineer Necessary even quotation without
tools should including it
Voice
Voice Retainability
Data
Data Quality
Not provide Site survey & candidate selection (3 sites most of the cases), TX/LoS surveys & site design, Search Rings for new cell site
Network planning & design (NP),Deployment Support (DS),Network Expansion Management Predict coverage plot, Benchmarking
Deployment Support (DS),On going Roaming Testing ,Provide tools to capture customer experiences
Drive Test include to Perform daily, weekly and monthly drive test as SSTL requirement ,
Capacity Augmentation in Existing Network (CDMA) Carrier, where Additional Rack is required for Augmentation of Carrier Upgrades)
Capacity Augmentation in Existing Network (Cell Site because of Customer Complaint/Coverage Hole/Capacity Requirement) : Rehoming
is included where only configuration change is required.
Relocation of BTS
Terminal Testing
Bandwidth Connectivity for Uploading and Downloading Drive Test Data (With or Without Switch) Locations to Central server
Any Software Licenses required for Drive Test Data Collection, Post Processing, Analysis and Reporting
Data KPIs
The Payment including five parts, OSS KPI maintenance Payment, Coverage optimization
Payment, Worse cell optimization Payment, Customer complaint KPI, Capacity Management
Payment.
Final ESAR payment = K1 + K2 + K3 + K4 + K5
UCL: Upper control Line
LCL: Lower Control Line
SC: Suppose Current value
NQI Notes:
1. KPI with %, NQI=|∑(( SCn-UCLn)*WeightageN)|;
When the all the OSS KPI good than the LCL KPI then can start the payment, if any KPI bad than
LCL KPI, then OSS KPI maintenance will not be issued
When the all the Coverage KPI good than the LCL KPI then can start the payment, if any KPI bad
than LCL KPI, then OSS KPI manintenance will not be issued
When the all the Coverage KPI good than the LCL KPI then can start the payment, if any KPI bad
than LCL KPI, then OSS KPI manintenance will not be issued
For worse cell will just check the CSSR, HSR,DCR, TASR of all worse cell together.
2.8.2 Penatly
If any KPI worse than LCL then will touch of the penatly, the pently max will be 5% suppose K is
the KPI value which worse than LCL value, then
If penatly is more than 15% of total payment, then the penalty will be 5%, otherwise will refer to
the above formula