Facility: Rig-812 Original Issue Date: Jun 2008 Date: Page 1 of 3 TRA No: RM-001 Rev:
Work Group Preparing TRA: Drilling Crew Supervisor: (Name and Position)
Description of work activities: Rig Move SOP Ref No:
L - LIKELIHOOD S - SEVERITY LIKELIHOOD RESULT
CATEGORY DEFINITION CATEGORY DEFINITIONS L 1 2 3 Acceptable
SEVERITY
● Low(1) Remote ● Low(1) Minor Injury No Damage No Pollution M 2 4 6 Tolerable
Medium (2) Possible Medium (2) Serious Injury Minor Damage Minor Pollution H 3 6 9 Unacceptable
High(3) Probable High(3) Major Injury Major Damage Major Pollution L M H
Acceptable?
Risk Risk Remaining
No. Step Hazard Step To Lower Risk Tolerable?
L S R L S R Unacceptable?
Hold pre-task safety meeting Missed step or unknown Review all the steps,
1 with all men involved in the task hazard may cause accident 2 2 4 hazards & controls so all 1 2 2 Acceptable
and review the TRA injury. men understand the task.
3 Move out all electrical cables Pinch points, falling tools 2 2 4 Stay clear 1 2 2 Acceptable
4 Disconnect water, oil, air lines. Pinch points 2 2 4 Stay clear 1 2 2 Acceptable
5 Disconnect the air High air pressure 2 3 6 Mechanic turns off air supply 1 3 3 Tolerable
High(3) High(3)
Acceptable?
Risk Risk Remaining
No. Step Hazard Step To Lower Risk Tolerable?
L S R L S R Unacceptable?
8 Loading the Trucks Miscommunication, falling tools 2 2 4 One man supervision 1 2 2 Acceptable
Falling,Equipment damaged 0 Barrication 0 0 0
Remove the bleeder and safety
9 Hit by the hammer, 2 3 6 Correct hand placement 1 3 3 Tolerable
valve lines from
High(3) High(3)
Acceptable?
Risk Risk Remaining
No. Step Hazard Step To Lower Risk Tolerable?
L S R L S R Unacceptable?
don’t stay under suspended
0 load 0 0 0
16 Drive Collision ,accident can cause 2 1 2 Drive according the road 1 1 1 Acceptable
Low height Power Line on Rig Crossing under the low height Get complete power
17 power
3 2 6 shutdown 1 2 2 Acceptable
move route
line can cause an Electric check for shutdown,raise
0 0 0 0
shock, low
power line with proper
Injury/fatlity 0 0 0 0
bamboo
having depute one watch
0 0 0 0
man
0 on power line 0 0 0
0 1 0 0 0
0 0 0 0
0 0 0 0
18 Load Securing Falling load from truck 2 3 6 Secured loads properly with 3 0 0
High(3) High(3)
Acceptable?
Risk Risk Remaining
No. Step Hazard Step To Lower Risk Tolerable?
L S R L S R Unacceptable?
Driller/HSE Officer before
0 0 0 0
leaving
0 the location 0 0 0
Local Agricultural vehicles/Carts watch for them,Reduce
19 Children follow and pull crop 2 3 6 1 3 3 Tolerable
Trolly speed
off sugar cane trolly is Ensure adquate clearnce
0 0 0 0
overloaded while
and protude out from side
0 overtaking / passing them 0 0 0
sugar cane
watch out for falling sugar
is losely loaded /no tail light on 0 0 0 0
cane
bundles and keep
vehicle 0 0 0 0
adquate follo-
wing distance .Slow down
0 0 0 0
and
drive according to the
0 0 0 0
range
0 of heads lights 0 0 0
All workers should drink 3
20 Work in Summer season Dehydration 2 3 6 1 3 3 Tolerable
liters a
21
High(3) High(3)
Acceptable?
Risk Risk Remaining
No. Step Hazard Step To Lower Risk Tolerable?
L S R L S R Unacceptable?