Method Statement for Pouring Concrete on


Slab on Grade
By Noel Mades Posted on February 11, 2014 In Method Statements 14 Comments

Like 3 Share 3 Tweet Share Save


Stum

After backfilling works the next is casting slab on grade (ground), make sure that all the area beneath
grade slab have been properly backfilled and compacted.

Approval must be obtained from the Engineer for waterproofing and backfilling works prior to start slab
on grade casting.

Here is the method statement of Slab on Grade preparation and concrete pouring.

1. Title

Method Statement for Casting Slab on Grade

2. Purpose and scope

The purpose of this method statement is to explain the proper procedure on how to prepare and cast
slab on grade or any horizontal element or member including fixation of steel reinforcement, MEP
embedment’s, fixing of shutter etc. without injuries.

3. Work procedure

1. Site planning
Delivery – fresh concrete shall be batched from the approved supplier of concrete.
Concrete will be delivered direct to the site and to be received by assistant Quality
Engineer for checking of the required criteria of concrete. The assistant QC Engineer will BOOKS
make sure the concrete delivered is as per the approved design mix for the situated
member to be casted.
All data for testing on fresh concrete at site shall be recorded on the concrete pour card.
2. Preparation
After the blinding is casted and placement of waterproofing is done, the preparation and
casting for slab on grade shall be done.
Fix the reinforcement steel as per the approved drawings, sometimes A393 BRC mesh is
indicated in the drawing and most commonly use in 250mm thick concrete grade slab.
Any loose binder or ties along the splices reinforcement steel shall be re-tightened. Bend
inward the free ends of the binding wire or ties.
Use PVC spacer for vertical bars and concrete spacer for bottom as concrete covers.
Ensure and coordinate with MEP staff for any MEP works required on the area as per
approved drawings.
Fix the forms such; supports, sleeves etc., if any.
Any damaged materials used for form work or shutter like plywood shall not be used.

https://www.qualityengineersguide.com/method-statement-for-pouring-concrete-on-slab-on-grade 1/7
4/22/2018 Method Statement for Pouring Concrete on Slab on Grade | Quality Assurance and Quality Control in Construction
All surface of forms or shutter facing concrete shall be treated with shuttering oil and
dampen with water few minutes before concrete will be poured 1 .
Clean the slabs on grade using air compressor for dust or any small particles or
deleterious materials that may impair the workability of concrete.
The surveyor will then checked the level of the projected top surface of the slab and place
level strips if necessary to mark the exact level.
The concreting are as must be arranged with necessary equipment or tools for concreting
use such as vibrators, power float machine, shovel etc.
Skilled and unskilled labor shall need to use safety requirements such as safety helmet,
safety shoes, goggles, gloves, vest etc.
Safety devices and safety warnings shall be provided starting from the site entrance gate
till the casting area.
Proper lighting must be available in case of night concreting.

CATEGORIES

Select Category

3. Concrete pouring
The concrete mixer must be stopped at the check point for the inspection of slump test and
to obtain sample cubes for test.
One set of cubes shall be taken every 50 cubic meter concrete, each set consist of 6
cubes, 3 cubes to be tested on 7th days and 3 cubes to be tested for 28th days.
Extra three cubes can be made for re-checking if in case circumstances may happen.
Unload the concrete within 90 minutes from the batching plant loading time.
Compact the concrete properly by using mechanical vibrators, extra vibrator shall be
available in case of any shortage or mechanical problems.
Use approved hardener material after casting concrete when required. Make sure
applications shall be as per manufacturer’s recommendation.
Use the power float for the smooth finish surface purpose. Store extra power float near the POPULAR RECENT COMM
casting area in case of any mechanical malfunctioning.
Cure the casted area properly with covering concrete with hessian cloth and polythene
sheet on top but before placing the concrete wet the hessian with water.
Cure the concrete by spraying water three times per day for a period of 7 days. OTHER RELATED BSI STANDARD
The casted area or member shall be protected by placing barricade to prevent plants and
machineries damaged the concrete.
Concrete pour card shall be filled by Quality Engineer and to be submitted to the Engineer
including concrete delivery notes, this task will be done whenever required.
Concrete cube test report shall be submitted to the Engineer

Read also: Method Statement for Application of Waterproofing Membrane

4. Safety

1. All works shall comply with safety procedure or instruction set out in project safety plan and
municipality rules and regulations.
2. Basic PPE to be worn by all staff and laborers.
3. Trained operator and banksman would be engaged to control or operate heavy equipment
machine.

https://www.qualityengineersguide.com/method-statement-for-pouring-concrete-on-slab-on-grade 2/7
4/22/2018 Method Statement for Pouring Concrete on Slab on Grade | Quality Assurance and Quality Control in Construction
4. Provide sufficient lighting whenever night casting.

5. Equipment and tools

1. Concrete Pump
2. Concrete Mixer
3. Mini truck
4. Bob cat
5. Concrete vibrators
6. Wheel borrow
7. Slump tray
8. Slump cone and other associated tools
9. Rubber hammer

6. Materials and References

1. C40/20 Concrete Grade with additives


2. Deformed bars or A393 BRC mesh
3. Approved drawing

About the Author

NOEL My Other Posts 

Hi! Welcome to my blog. My name is Noel Mades and I’m the author of
qualityengineersguide.com. I am a Civil Engineer by profession but I’ve

   specialized and taken the journey in the field of Quality Engineering. I’ve worked
as a Quality Engineer in the well-known companies in the United Arab Emirates
for almost eleven years.

14 Comments
MO. AJDID September 28, 2017

Please, do you have any concrete method statement of the sloped foundation?

View Comment

REPLY

Jimmy May 18, 2017

Considering a big volume and distance, can we pour concrete one time and one
place/form from two different batching plants?

View Comment

REPLY

https://www.qualityengineersguide.com/method-statement-for-pouring-concrete-on-slab-on-grade 3/7
4/22/2018 Method Statement for Pouring Concrete on Slab on Grade | Quality Assurance and Quality Control in Construction
Author
Noel Mades May 19, 2017

There is nothing wrong as long as the concrete has the same strength and
make sure that your engineer agrees on that.

View Comment

REPLY

percyjack0786 March 30, 2017

I can gain the knowledge from your site which is really interesting. Thank you for this
article because it is really informative about cement mortar mix it is really informative and
gives best suggestion about it. Thanks a lot and have a great day.

View Comment

REPLY

moin March 2, 2017

As seen around, most of the exterior plastered walls seems to be wavy/undulation when
completed with painting works during some part of the day sunlight. Would you please tell
us what will be the acceptance criteria for this painting works/plastered walls?
My work is rejected due to the above problem.

View Comment

REPLY

Author
Noel Mades March 2, 2017

You can find out here on one of my blog posts the “Tolerances” just type in
“tolerance” on the search tab and the website will reveal it for you. I’ve taken
that from our specification. The plaster should be properly checked and
should be within tolerance before the application of paint if it deviates more
than the tolerance then it is really not acceptable.

View Comment

REPLY

moin March 4, 2017

Thank you Mr.Noel for the response.


Today i received an NCR with description for the waviness in exterior
walls textured paints.
During my absence the external plastered walls were not inspected via
IR and been painted. When i checked the wall surface, alignments and
found to be within tolerances. Now the difficulty is that the construction
team doesn’t want to take out the paint for rectifying the waviness in
wall/paint. Please guide me what will be the corrective measures
should be taken inorder to close out the NCR.
Hope i will get answer for this.

View Comment

REPLY

moin March 5, 2017

https://www.qualityengineersguide.com/method-statement-for-pouring-concrete-on-slab-on-grade 4/7
4/22/2018 Method Statement for Pouring Concrete on Slab on Grade | Quality Assurance and Quality Control in Construction

Please advise

View Comment

REPLY

Author
Noel Mades March 6, 2017

You are welcome.


Now, it is also NCR if you did not raise an IR
before applying paint. It should have been
inspected and approved by the Engineer before
the application of any coats of paint.
This is my idea and perspective. Go first with the
diplomatic way. If you checked the area and found
the surface is within the tolerance, establish the
evidence, gather the standard that shows the limit
of deviation and then create a survey report that
your site investigation is true. There should be
something proof and evidence and then if survey
report is ready bring that to the Engineer along
with the standard and show to them that the wall is
within the tolerance. Convince them and let you
see what they will do and tell you.

View Comment

sivakumar B February 10, 2017

Dear Sir,
I Requested method statement for UG sump step by step from excavation

View Comment

REPLY

Author
Noel Mades February 12, 2017

UG stands for what?

View Comment

REPLY

Mohammad Ariful Islam July 29, 2016

How you test slump for SLAB ON GRADE….,? I think it is FLOOR PCC….Vibrator is used
or not? For Floor PCC used SRC 300 Kg/cu.m.

View Comment

REPLY

Author
Noel Mades July 29, 2016

I wrote a blog post about slump test you can search that here. PCC is not
required of vibrator. Yes, sometimes 250kg/cu. m. but it depends on the

https://www.qualityengineersguide.com/method-statement-for-pouring-concrete-on-slab-on-grade 5/7
4/22/2018 Method Statement for Pouring Concrete on Slab on Grade | Quality Assurance and Quality Control in Construction

approved design mix.

View Comment

REPLY

Forms for construction June 1, 2016

After backfilling works the next is casting slab on grade (ground), make sure that all the
area beneath grade slab have been properly backfilled and compacted. Nice post!

View Comment

REPLY

Leave a Reply

Comment Text*

Name*

Email*

Website

Post Comment

ABOUT ME RECENT POSTS POPULAR POSTS DOWNLOAD MY FREE GIFT H

Hi! Welcome to my blog. My name is Top 7 Projects in Dubai The QC Inspector Duties
Noel Mades and I’m the author of and Abu … and Responsibilities
Enter Your Name:
qualityengineersguide.com. I am a Civil
 April 8, 2018  January 26, 2014
Engineer by profession but I’ve
specialized
Shares and taken the journey in the Why We Crush Concrete The Duties and
eld of Quality Engineering. Read More Cubes or Cylinder … Responsibilities of a Enter Your Email:

Here. QA/QC …
 April 1, 2018
 January 15, 2014
5 Top Countries In The
Give Me The Ebook
burjkhalifaview
Middle East … Understanding About
itprev0page1Inspection and Test Plan
 March 31, 2018
(ITP) We respect your email privac

 January 21, 2014

CONNECT WITH ME

     

https://www.qualityengineersguide.com/method-statement-for-pouring-concrete-on-slab-on-grade 6/7
4/22/2018 Method Statement for Pouring Concrete on Slab on Grade | Quality Assurance and Quality Control in Construction

Copyright © 2018. by qualityengineersguide.com: Theme by MyThemeShop TERMS OF USE WEBSITE DISCLAIMER PRIVACY POLICY

https://www.qualityengineersguide.com/method-statement-for-pouring-concrete-on-slab-on-grade 7/7

Vous aimerez peut-être aussi