MPMY-PM-PRC-0001
All major changes to the document at this current revision are recorded below.
(Does not include correction of typos or formatting changes)
Page 2 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
CONTENTS
1 INTRODUCTION............................................................................................ 4
2 DEFINITIONS ................................................................................................ 4
3 REFERENCES ............................................................................................... 4
3.1 Order of Precedence ...................................................................................... 4
4 APPLICABILITY AND SCOPE ....................................................................... 5
5 RESPONSIBILITIES ...................................................................................... 5
6 DETAIL .......................................................................................................... 6
6.1 Document Numbering Format ........................................................................ 6
6.1.1 Design Document .......................................................................................................... 6
6.1.2 Vendor Document.......................................................................................................... 7
6.2 Facility Identifier – LLFA ................................................................................. 7
6.3 Discipline – DD............................................................................................... 9
6.4 Type – TTT .................................................................................................. 10
6.5 Sequence Number ....................................................................................... 13
6.6 Sheet – SS ................................................................................................... 13
6.7 Revision ....................................................................................................... 13
6.8 Cancelled Documents .................................................................................. 14
6.9 Specific Deliverable ...................................................................................... 15
6.10 Document Number Visibility ......................................................................... 16
6.11 Change of Document Number ...................................................................... 16
6.12 Electronic Document Format ........................................................................ 17
7 IDENTIFICATION OF CHANGES WITHIN DOCUMENTS ........................... 17
Page 3 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
1 INTRODUCTION
This procedure defines the document numbering and revision systems to be followed
by MDC Oil and Gas (SK 320) Limited (COMPANY). The purpose of the procedure
is to ensure that all documents are systematically numbered and to allow systematic
registration, revision, filing and traceability.
2 DEFINITIONS
COMPANY MDC Oil and Gas (SK 320) Limited, a Mubadala Petroleum
affiliate
3 REFERENCES
The reference documents listed below, including industry codes and standards and
COMPANY specifications form an integral part of this general specification. Unless
stated otherwise the applicable version, including relevant appendices and
supplements is the latest revision published at the effective date of the contract.
Page 4 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
Any conflict shall be reported to COMPANY for decision. In such a case, and unless
otherwise agreed by COMPANY, the more stringent requirement shall apply.
Exceptions to or deviations from this document are not permitted unless accepted in
writing by COMPANY.
All Contractor numbered documents shall take the COMPANY number as the primary
number. Contractors may choose to allocate a secondary number to documents if it
suits their own internal systems. All lists and registers of documents shall use the
COMPANY number.
All Vendor document numbers must be preceded by the COMPANY purchase order
number. The individual Vendor document numbers shall use a numbering system
agreed with the Vendor.
Once a document has been assigned a number, it will retain that same number
throughout its life.
5 RESPONSIBILITIES
The revision and reissue of this procedure is the responsibility of COMPANY. Any
request to expand any of the tables of identifiers shall be routed to COMPANY. New
identifiers shall be used only when approved by COMPANY.
Page 5 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
The Contractor primarily responsible for the work on each facility shall maintain a
document register and allocate document numbers both internally and to Sub-
Contractors as required.
6 DETAIL
Where:
LL F A - DD - TTT - NNNN - SS
1. Facility Identifier:
i. Location
ii. Facility
iii. Sequence
2. Discipline
3. Document Type
4. Sequence Number
5. Sheet Number
Example:
Discipline Identifier : GE
Page 6 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
Where:
1. Facility Identifier:
i. Location
ii. Facility
iii. Sequence
2. PO Number
3. Discipline
4. Document Type
5. Sequence Number
6. Sheet Number
Example:
PO Number : 50131
Discipline Identifier : ME
Page 7 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
Allowable identifiers for the location shall comprising two (2) digits are:
LL Location
M5 M5 Field
PA Parisan
PG Pegaga
SN Sintok
SR Sirih
The physical facility within the field shall be defined by a single (1) digit as follows:
F Facility
A Accommodation Platform
B Bridge
C Central Production Platform
D Drilling
F FPSO / FSO
G General
H Helideck
J Jacket / Substructure
K Tanker
P Pipeline
R Turret
S Subsea
U Umbilical, fibre optic cable
V Flare / Vent Platform
W Wellhead Platform
The sequence code, A, defines the sequence of installation, ‘A’ is the first, ‘B’ the
second and ‘C’ the third etc. The same sequence code may not be repeated within the
same location and type of facility.
LLFA Corporate
MPIN Mubadala Petroleum – Indonesia
MPMY Mubadala Petroleum – Malaysia
MPTH Mubadala Petroleum - Thailand
MPVN Mubadala Petroleum - Vietnam
Page 8 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
6.3 Discipline – DD
The discipline identifier indicates the discipline which originates the document.
Allowable identifiers are:
DD Discipline
AI Asset Integrity
AR Architectural
CI Civil
CM Commissioning
CO Corrosion / Coatings
CS Construction
DR Drilling
EL Electrical
EN Environment
GE General
GG Geology
GP Geophysics
GS Geotechnical
HE Health
HS HSSE
HV HVAC
IN Instrumentation
LA Layout
LO Logistics
MA Maintenance
ME Mechanical
MG Management
MR Marine / Installation
MT Materials
NA Naval Architect
PC Procurement
PI Piping
PL Pipeline
PM Project Management
Page 9 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
DD Discipline
PP Petrophysics
PR Process
PS Project Services
PT Production Technology
OP Operations
QA Quality Assurance
QC Quality Control
QM Quality Management
RE Reservoir Engineering
SA Safety
SE Security
SS Subsea
ST Structural
TE Telecommunications
The type of document is defined by a three digit code. Allowable identifiers are:
TTT Document Type
ALS Alignment Sheet
ANL Analysis
BOD Basis of Design
BOM Bill of Materials
CAL Calculation
CAR Corrective Action Request
CBE Commercial Bid Evaluation
CED Cause and Effect Diagram
CEP Contract Execution Plan
CTR Cost Time Resource Sheet
DCN Design Change Notice
DEV Deviation Request
DOS Dossier
DSP Decision Support Package
DTS Data Sheet
Page 10 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
Page 11 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
Page 12 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
A four (4) digit number, commencing at 0001, allocated in sequence utilising the next
available number.
A sequence number can only be used once. If a document is formally issued to the
Project and is then cancelled, that sequence number cannot be reused.
6.6 Sheet – SS
If multiple sheet drawings or subsets are used then each sheet shall carry the same
document number and be clearly marked as Sheet 01, 02, etc. of XX (the total number
of sheets). All single sheet drawings shall be marked as Sheet 01 of 01.
6.7 Revision
All document changes are governed by a revision code, an alphanumeric code is used
to represent the current life cycle state of each document.
Numeric codes ‘0.n’, ‘1.n’, ‘2.n’ etc. are used to differentiate the phase of the project i.e.
concept, FEED, Detail Design, etc. See table 6.7 below.
Single decimal numeric code n.0, n.1, n.2, n.3, etc. depict the document or drawing is
currently in a state of review and approval process and it will sequentially increase the
decimal point number throughout the process until the document is approved for its
intended use.
Alphabetic codes F1, D1, C1, Z1 etc. are assigned to documents which have already
progressed through the review and approval life cycle stage and reserved for
documents or drawings which are deemed to be for final intended use such as those
under the status of Approved for Design, Issued for Use, Approved for Construction or
Approved for Purchase etc.
Documents rejected during review by COMPANY shall be revised and reissued at the
same status, and shall not progress to the next revision status until accepted.
Page 13 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
A document or drawing which is no longer used on the project shall not be removed
from circulation or destroyed without clearly indicating on the document / drawing as to
the reason for removal.
A document / drawing may become void for various reasons examples of those are:
c) The document or drawing has been assigned a new document number because
it contains information that has been transferred to another document or
drawing.
Page 14 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
Where a document / drawing becomes redundant in its entirety due to for example, the
removal of equipment; then the document / drawing shall be reissued at the next
revision status with the word "CANCELLED" as the reason for re-issue. The document
/ drawing register shall be amended to indicate the document / drawing status revision
and the word "CANCELLED" added to the document / drawing title.
The revision code of the cancelled document / drawing shall be set to ‘X’ meaning
voided or cancelled.
Records of documents / drawings shall not be deleted from their Document Registers.
If a document / drawing is intended to be issued and a record is entered in the register,
but for some reason the document / drawing is not issued, then the existing document /
drawing title shall be removed along with issue status and the words "CANCELLED
WITHOUT ISSUE" added to the title box.
With the approval of COMPANY some types of deliverable may be allocated sequence
numbers that depart from this procedure but lend themselves to a better understanding
of the engineering design. The same overall field formatting must be maintained.
Examples are:
LLFA The facility identifier defining location, facility and sequence. The
physical location that the document is associated with. See Section 5.2.
Page 15 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
(X)LD The document type, where X defines the control parameter as detailed
below:
X Control Parameter
A Analysis
B Burner
F Flow
K Time
L Level
P Pressure
Q Quantity
R Radiation
S Speed / Frequency
T Temperature
V Vibration
W Weight / Force
X Miscellaneous
Y Event
Z Position
NNNN Sequence Number. The four digit system code and sequence number,
taken from the instrument tag number, as defined within procedure
MPMY-PM-PRC-0002.
The document number and revision shall appear clearly on every page of any
document.
The number of a document shall not be changed within the same revision sequence. If
necessary, the original document should be issued as cancelled and a new document
allocated with a newly started revision sequence.
Page 16 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
All electronic documents shall be saved with the same file name as the original
document number, with the revision code preceded by the letter ‘R’. Electronic file
name shall not have a description of the document included.
PGGA-GE-BOD-0101-rB.pdf
PGGA-GE-BOD-0101-rB.docx
PGGA-50131-ME-DTS-0001-rB.pdf
PGGA-50131-ME-DTS-0001-rB.xlsx
If the sheet number is not used then it need not be identified in the electronic file name.
"Native" and "pdf' file formats of the same document shall have the same electronic file
name with the different file extension (such as .dwg or .doc etc. and .pdf).
All native file format documents shall be self-contained, links to other files should be
removed prior to issue, unless the linked files are also provided.
Electronic files and data submitted shall not contain any password protection.
All documents issued to COMPANY for review shall be native documents or in .pdf
format generated directly from an original native file. Colour copy shall be provided
where necessary to understand the content.
Only the front cover shall be scanned to capture wet signatures following approval by
COMPANY and at ‘as-built’ status.
Scanning of the wet signed front cover shall be a minimum of 400 dpi to a maximum of
600 dpi in greyscale except where colour is necessary to understand the content. Once
the front cover has been scanned; OCR (Optical Character Recognition) shall be
applied to enable indexing and search ability, on completion cover to be inserted into
the main .pdf file. Scanned documents shall be quality checked to ensure that all
details are legible and drawings are not skewed.
Drawings shall indicate the location of the change by including a cloud around the
revised part of the drawing or document with a small triangle inserted adjacent to the
cloud with the new issue number marked within it.
Page 17 of 18
Document No.:
MDC Oil & Gas (SK 320) Limited
MPMY-PM-PRC-0001
Document Numbering Procedure Revision: 2.0
For documents where the use of clouds may be un-suitable, confusing or inadequate,
then in-place of a cloud, a vertical line or a revision column may be added.
When the drawing or document is updated again to the next issue, the previous vertical
line or clouds must be removed and only the new revision vertical line or clouds must
be shown.
When a document reaches the issued ‘As-built” status, it shall be issued as “cleaned
copy” with no “change identification” marks from earlier issues showing.
Page 18 of 18