GOVERNMENT OF ASSAM

OFFICE OF THE ADDL. CHIEF ENGINEER (PHE) UPPER ASSAM ZONE, NAGAON, ASSAM

NO.ACE/ PHEE/N/UAZ/PB-82(N) 2018-19 Dt.


To,
M/S D. Kumar & Co
East Chowkidingee
P.O.Dibrugarh-786001

Sub. :- Formal Work Order for the work of supplying, installation , fitting & fixing testing and
commissioning of centrifugal pump set with 100 HP motor 2900 RPM for Jagiroad PWSS.
Ref. :- No.EE/PHE/MOR/WS-349/2017-18/ 3642 dtd.05/02/18.Ch to : NRDWP (Quality)

Dear Sir,

In inviting a reference to the above, I am to inform you that the above mentioned work has been allotted
to you as per terms and conditions stated below. Please appear before the undersigned for signing the formal
tender agreement in A.P.W.D. F-2 form within 7(seven) days from the date of issue of this order including
performing all other necessary formalities. Failure on your part to do so, the order will be automatically cancelled.

You are hereby requested to deposit earnest money (2% for general and 1% for ST/SC/OBC) amounting to
Rs.8275.00 (Rupees eight Thousand two hundred Seventy five) only in the form of NSC/KVP/CDR/FDR pledged in
favour of the undersigned. You are requested to start the work in consultation with the Asstt.Executive
Engineer(PHE), Morigaon sub – Division and concerned sectional officer immediately and complete the same
within 15 days from the date of issue of this work order.

Quantity :- 1 (one)

Value of work :- Rs. 413685.00 (Rupees four lakh Thirteen Thousand and six hundred
Eighty five) only(estimated Amount)

TERMS AND CONDITIONS :

1. Specification & Price :- The specification and prices of the pump and motor will be as per
Annexure-‘A’ attached.

2. Taxes :- Taxes will be paid as admissible under rules & will be deducted from the bill.
The VAT (if to be deducted) will be deducted from the bill and paying Authority
will deposit the same directly to the Assam Govt. as per norms.

3. Place of installation :- The pump and motor will be installed at the Jagiroad water supply
scheme.

4. Time of completion :- The installation of pump and motor to be completed within 15


(fifteen) days from the date of issue of this order.

5. Testing :- The testing of pump and motor wil be initially tested by the Asstt. Executive
Engineer (PHE) Morigaon sub Division, Morigaon prior to dispatch of the same
to respective site for final installation and commissioning and you should
depute your qualified representative for the purpose as per programme to be
fixed by him.

6. Installation :- The installation of the pump and motor at site will be done by your authorized
representatives in presence of departmental persons as per program to be fixed
by the concerning Asstt. Executive Engineer (PHE) sub Division and the same will
be intimated to you in time. If you do not send your representatives within
15(fifteen) days from the date of intimation ,then installation will be done in your
absence and at your risk and responsibility. Any defect observed in the pump
and motor after installation/commission will be intimated to you in due course by
the undersigned.

Executive Engineer (PHE)/ Asstt. Executive Engineer (PHE) and you will have to
rectify the defect/defects as pointed out within 15 (fifteen) days failing which cost
of replacement of the pump and motor will be recovered from your outstanding
dues of any or from your security deposit.
7. Payment :- 90% of the value of the order will be paid against receipt of the materials in full
and good conditions and after proper verification as per specification in supply
order initial testing and subject availability of fund through FOC and balance 10%
amount will be retained from your bill and will be kept as security deposit. The
same will be released only after fitting, fixing and satisfactory installation,
commissioning, testing and running of the pump and motor at site unto the
satisfaction of the Engineer in-Charge for a period not less then 3 (three) months.

8. Performance : - The pump and motor ordered is as per your design, selection and
recommendation and it will be your responsibility that the pump and motor fit in
to the Well for which it is ordered and delivered the required quantity of water
against the head mentioned in the Annexure-A .Before delivery you are to
submit such design along with the pump and motor /pump curves to the
Executive Engineer (PHE)Morigaon division /Morigaon Sub Division for
securityand approval in case of any shortfall/defect/mis performance of any kind
found, it will be your responsibility to replace/rectify the same as and when
required at your cost and risk.

9. Guarantee Period :- One year from the date of commissioning and satisfactory testing against any
manufacturing defect, faulty design and bad workmanship. If any such defect is
found during the year from the date of installation and satisfactory testing you
should have to rectify the defects at you own cost and risk and if necessary you
will have to replace the pump and motor.

Failure on your part to comply with any of the above earnest money /security deposited by you will be forfeited to
the State Govt and the Deptt. Will at liberty to cancel this order in part or in full
without entertaining any claim of compensation from you.
This supersedes all your terms and conditions wherever at variance with this order. Please acknowledge receipt of
this supply order and arrange to supply the pump and motor within the stipulated time. Please also intimate
dispatch /delivery position in time.

Enclo:- Annexure – A Yours faithfully

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)
MEMO. NO ACE/ PHEE/N/UAZ/PB-82(N) 2018-19 Dt.
Copy to :-

1. The Executive Engineer (PHE)Morigaon Division,Morigaon for favour of kind information with
reference to his above letter under reference.

2. The Asstt. Executive Engineer(PHE) Morigaon Sub-Division,Morigaon for information and


necessary action.

3. The SO (PHE) i/e Jagiroad PWSS for information and necessary action. He is directed to see the
works and should be executed as per specification and see that in no case the ordered value exceeded.

4. Tender agreement.

5. concerning File for record.

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)
GOVERNMENT OF ASSAM
OFFICE OF THE ADDL. CHIEF ENGINEER (PHE) UPPER ASSAM ZONE
NAGAON, ASSAM
NO.ACE/ PHEE/N/UAZ/PB-82(N) 2018-19 Dt.
To,
M/S D. Kumar & Co
East Chowkidingee
P.O.Dibrugarh-786001

Sub. :- Formal Work Order for the work of supplying, installation , fitting & fixing testing and
commissioning of centrifugal pump set with 100 HP motor 1500 RPM for Jagiroad PWSS.
Ref. :- No.EE/PHE/MOR/WS-349/2017-18/ 3642 dtd.05/02/18.Ch to : NRDWP (Quality)

Dear Sir,

In inviting a reference to the above, I am to inform you that the above mentioned work has been allotted
to you as per terms and conditions stated below. Please appear before the undersigned for signing the formal
tender agreement in A.P.W.D. F-2 form within 7(seven) days from the date of issue of this order including
performing all other necessary formalities. Failure on your part to do so, the order will be automatically cancelled.

You are hereby requested to deposit earnest money (2% for general and 1% for ST/SC/OBC) amounting to
Rs.10240.00 (Rupees ten Thousand two hundred forty) only in the form of NSC/KVP/CDR/FDR pledged in favour of
the undersigned. You are requested to start the work in consultation with the Asstt.Executive Engineer(PHE),
Morigaon sub – Division and concerned sectional officer immediately and complete the same within 15 days from
the date of issue of this work order.

Quantity :- 1 (one)

Value of work :- Rs. 511930.00 (Rupees five lakh eleven Thousand and nine hundred thirty) only
(Estimated Amount)
TERMS AND CONDITIONS :

1. Specification & Price :- The specification and prices of the pump and motor will be as per
Annexure-‘A’ attached.
2. Taxes :- Taxes will be paid as admissible under rules & will be deducted from the bill. The VAT (if
to be deducted) will be deducted from the bill and paying Authority will deposit the same
directly to the Assam Govt. as per norms.

3. Place of installation :- The pump and motor will be installed at the Jagiroad water supply scheme.

4. Time of completion :- The installation of pump and motor to be completed within 15 (fifteen) days
from the date of issue of this order.

5. Testing :- The testing of the pump and motor will be initially tested by The Asst. Executive Engineer
(PHE) Morigaon sub Division, Morigaon prior to dispatch of the same to respective site
for final installation and commissioning and you should depute your qualified
representative for the purpose as per programme to be fixed by him.

6. Installation :- The installation of the pump and motor at site will be done by your authorized
representatives in presence of departmental persons as per program to be fixed by the
concerning Asstt. Executive Engineer (PHE)sub Division and the same will be intimated to
you in time. If you do not send your representatives within 15(fifteen) days from the date
of intimation ,then installation will be done in your absence and at your risk and
responsibility. Any defect observed in the pump and motor after
installation/commission will be intimated to you in due course by the undersigned.

Executive Engineer (PHE)/ Asstt. Executive Engineer (PHE) and you will
have to rectify the defect/defects as pointed out within 15 (fifteen) days failing which cost
of replacement of the pump and motor will be recovered from your outstanding dues of
any or from your security deposit.

7. Payment :- 90% of the value of the order will be paid against receipt of the materials in full and
good conditions and after proper verification as per specification in supply order initial
testing and subject availability of fund through FOC and balance 10% amount will be
retained from your bill and will be kept as security deposit. The same will be released only
after fitting, fixing and satisfactory installation, commissioning, testing and running of the
pump and motor at site unto the satisfaction of the Engineer-In-Charge for a period not
less then 3 (three) months.

8. Performance : - The pump and motor ordered is as per your design, selection and
recommendation and it will be your responsibility that the pump and motor fit in to the
Well for which it is ordered and delivered the required quantity of water against the head
mentioned in the Annexure-A .Before delivery you are to submit such design along with
the pump and motor/pump curves to the Executive Engineer (PHE)Morigaon division
/Morigaon Sub Division for security and approval in case of any shortfall/defect/mis
performance of any kind found, it will be your responsibility to replace/rectify the same as
and when required at your cost and risk.

9. Guarantee Period :- One year from the date of commissioning and satisfactory testing against any
manufacturing defect, faulty design and bad workmanship.If any such defect is found
during the year from the date of installation and satisfactory testing you should have to
rectify the defects at you own cost and risk and if necessary you will have to replace the
pump and motor
Failure on your part to comply with any of the above earnest money security deposited by you will be
forfeited to the State Govt and the Deptt. Will at liberty to cancel this order in part or in
full without entertaining any claim of compensation from you.

This supersedes all your terms and conditions wherever at variance with this order. Please acknowledge receipt of
this supply order and arrange to supply the pump and motor within the stipulated time. Please also intimate
dispatch /delivery position in time.

Enclo:- Annexure – A

Yours faithfully

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)

MEMO. NO ACE/ PHEE/N/UAZ/PB-82(N) 2018-19 Dt.


Copy to :-

1. The Executive Engineer (PHE)Morigaon Division,Morigaon for favour of kind information


with reference to his above letter under reference.
2. The Asstt. Executive Engineer(PHE) Morigaon Sub-Division,Morigaon for information and
necessary action.
3. The SO (PHE) i/e Jagiroad PWSS for information and necessary action. He is directed to see
the works and should be executed as per specification and see that in no case the ordered
value exceeded
4. Tender agreement copy.
5. Concerning File for record.

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)
GOVERNMENT OF ASSAM
OFFICE OF THE ADDL. CHIEF ENGINEER (PHE) UPPER ASSAM ZONE
NAGAON, ASSAM

NO.ACE/ PHEE/N/UAZ/PB-82(N) 2018-19 Dt.

To,
M/S D. Kumar & Co
East Chowkidingee
P.O.Dibrugarh-786001

Sub. :- Formal Work Order for the work of supplying, installation , fitting & fixing testing and
commissioning of Monoblock pump set with 20 HP motor for Palachung PWSS.
Ref. :- No.EE/PHE/MOR/WS-386/2017-18/ 3641 dtd.05/03/18.Ch to : NRDWP (Quantity)

Dear Sir,

In inviting a reference to the above, I am to inform you that the above mentioned work has been allotted
to you as per terms and conditions stated below. Please appear before the undersigned for signing the formal
tender agreement in A.P.W.D. F-2 form within 7(seven) days from the date of issue of this order including
performing all other necessary formalities. Failure on your part to do so, the order will be automatically cancelled.

You are hereby requested to deposit earnest money (2% for general and 1% for ST/SC/OBC) amounting to
Rs.4300.00 (Rupees four Thousand three hundred ) only in the form of NSC/KVP/CDR/FDR pledged in favour of the
undersigned. You are requested to start the work in consultation with the Asstt.Executive Engineer(PHE),
Morigaon sub – Division and concerned sectional officer immediately and complete the same within 15 days from
the date of issue of this work order.

Quantity :- 1 (one)
Value of work ;- Rs.215000.00 (Rupees two lakh fifteen Thousand)only
(estimated Amount)

TERMS AND CONDITIONS :

1. Specification & Price :- The specification and prices of the pump and motor will be as per
Annexure-‘A’ attached.

2. Taxes :- Taxes will be paid as admissible under rules & will be deducted from the bill. The
VAT (if to be deducted) will be deducted from the bill and paying Authority will
deposit the same directly to the Assam Govt. as per norms.

3. Place of installation :- The pump and motor will be installed at the Palachung water supply
scheme.

4. Time of completion :- The installation of pump and motor to be completed within 15


(fifteen) days from the date of issue of this order.

5. Testing :- The testing of pump and motor will be initially tested by the Asstt. Executive
Engineer (PHE) Morigaon sub Division, Morigaon prior to dispatch of the same
to respective site for final installation and commissioning and you should
depute your qualified representative for the purpose as per program to be fixed by
him.

6. Installation :- The installation of the pump and motor at site will be done by your authorized
representatives in presence of departmental persons as per program to be fixed by the
concerning Asstt. Executive Engineer (PHE) sub Division and the same will be intimated to
you in time. If you do not send your representatives within 15(fifteen) days from the date
of intimation ,then installation will be done in your absence and at your risk and
responsibility. Any defect observed in the pump after installation/commission will be
intimated to you in due course by the undersigned.

Executive Engineer (PHE)/ Asstt. Executive Engineer (PHE) and you will have to rectify the
defect/defects as pointed out within 15 (fifteen) days failing which cost of replacement of
the pump and motor will be recovered from your outstanding dues of any or from your
security deposit.
7. Payment :- 90% of the value of the order will be paid against receipt of the materials in full
and good conditions and after proper verification as per specification in supply
order initial testing and subject availability of fund through FOC and balance 10%
amount will be retained from your bill and will be kept as security deposit. The
same will be released only after fitting, fixing and satisfactory installation,
commissioning, testing and running of the pump and motor at site unto the
satisfaction of the Engineer-In-Charge for a period not less then 3 (three)
months.

8. Performance : - The pump and motor ordered is as per your design, selection and
recommendation and it will be your responsibility that the pump and motor fit in
to the Well for which it is ordered and delivered the required quantity of water
against the head mentioned in the Annexure-A .Before delivery you are to submit
such design along with the pump / motor pump curves to the Executive Engineer
(PHE)Morigaon division / Morigaon Sub Division for security and approval in case
of any shortfall/defect/mis performance of any kind found, it will be your
responsibility to replace/rectify the same as and when required at your
cost and risk

9. Guarantee Period :- One year from the date of commissioning and satisfactory testing against any
manufacturing defect, faulty design and bad workmanship.If any such defect is
found during the year from the date of installation and satisfactory testing you
should have to rectify the defects at you own cost and risk and if necessary you
will have to replace the pump And motor

Failure on your part to comply with any of the above earnest money / security deposited by you will be forfeited
to the State Govt and the Deptt. Will at liberty to cancel this order in part or in full
without entertaining any claim of compensation from you.
This supersedes all your terms and conditions wherever at variance with this order. Please acknowledge receipt of
this supply order and arrange to supply the pump and motor within the stipulated time. Please also intimate
dispatch /delivery position in time.

Enclo:- Annexure – A

Yours faithfully

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)

MEMO. NO ACE/ PHEE/N/UAZ/PB-82(N) 2018-19 Dt.


Copy to :-

1. The Executive Engineer (PHE)Morigaon Division,Morigaon for favour of kind information


with reference to his above letter under reference.
2. The Asstt. Executive Engineer(PHE) Morigaon Sub-Division,Morigaon for information and
necessary action.
3. The SO (PHE) i/e Palachung PWSS for information and necessary action. He is directed to see
the works and should be executed as per specification and see that in no case the ordered
value exceeded.
4. Tender agreement.
5. Concerning file for record.

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)
GOVERNMENT OF ASSAM
OFFICE OF THE ADDL. CHIEF ENGINEER (PHE) UPPER ASSAM ZONE
NAGAON, ASSAM

NO.ACE/ PHEE/N/UAZ/PB-82(N) 2018-19 Dt.

To,
M/S D. Kumar & Co
East Chowkidingee
P.O.Dibrugarh-786001

Sub. :- Formal Work Order for the work of supplying, installation , fitting & fixing testing and
commissioning of Monoblock pump set with 15 HP motor for Palachung PWSS.
Ref. :- No.EE/PHE/MOR/WS-386/2017-18/ 3641 dtd.05/03/18.

Ch to : NRDWP (Quantity)

Dear Sir,

In inviting a reference to the above, I am to inform you that the above mentioned work has been allotted
to you as per terms and conditions stated below. Please appear before the undersigned for signing the formal
tender agreement in A.P.W.D. F-2 form within 7(seven) days from the date of issue of this order including
performing all other necessary formalities. Failure on your part to do so, the order will be automatically cancelled.

You are hereby requested to deposit earnest money (2% for general and 1% for ST/SC/OBC) amounting to
Rs.3014.00 (Rupees three Thousand and fourteen ) only in the form of NSC/KVP/CDR/FDR pledged in favour of the
undersigned. You are requested to start the work in consultation with the Asstt.Executive Engineer(PHE),
Morigaon sub – Division and concerned sectional officer immediately and complete the same within 15 days from
the date of issue of this work order.

Quantity :- 1 (one)

Value of work ;- Rs.150680.00 (Rupees one lakh fifty Thouand six hundred
eighty)only( Estimated Amount).
TERMS AND CONDITIONS :

1. Specification & Price :- The specification and prices of the pump and motor will be as per
Annexure-‘A’ attached.

2. Taxes :- Taxes will be paid as admissible under rules & will be deducted from the bill. The
VAT (if to be deducted) will be deducted from the bill and paying Authority will
deposit the same directly to the Assam Govt. as per norms.

3. Place of installation :- The pump and motor will be installed at the Palachung water supply
scheme.

4. Time of completion :- The installation of pump and motor to be completed within 15


(fifteen) days from the date of issue of this order.

5. Testing :- The testing of pump and motor wil be initially tested by the Asstt. Executive
Engineer (PHE) Morigaon sub Division, Morigaon prior to dispatch of the
same to respective site for final installation and commissioning and you should
depute your qualified representative for the purpose as per program to be fixed by
him.

6. Installation :- The installation of the pump and motor at site will be done by your authorized
representatives in presence of departmental persons as per program to be fixed
by the concerning Asstt. Executive Engineer (PHE) sub Division and the same will
be intimated to you in time. If you do not send your representatives within
15(fifteen) days from the date of intimation ,then installation will be done in your
absence and at your risk and responsibility. Any defect observed in the pump
after installation/commission will be intimated to you in due course by the
undersigned.
Executive Engineer (PHE)/ Asstt. Executive Engineer (PHE) and you will have to
rectify the defect/defects as pointed out within 15 (fifteen) days failing which cost
of replacement of the pump and motor will be recovered from your outstanding
dues of any or from your security deposit.

7. Payment :- 90% of the value of the order will be paid against receipt of the materials in full
and good conditions and after proper verification as per specification in supply
order initial testing and subject to availability of fund through FOC and balance
10% amount will be retained from your bill and will be kept as security deposit.
The same will be released only after fitting, fixing and satisfactory installation,
commissioning, testing and running of the pump and motor at site unto the
satisfaction of the Engineer-In-Charge for a period not less then 3 (three) months.

8. Performance : - The pump and motor ordered is as per your design, selection and recommendation
and it will be your responsibility that the pump and motor fit in to the Well for which it is
ordered and delivered the required quantity of water against the head mentioned in the
Annexure-A .Before delivery you are to submit such design along with the pump / and
motor pump curves the Executive Engineer (PHE)Morigaon division /AEE Morigaon Sub
Division for security and approval in case of any shortfall/defect/mis performance of any
kind found, it will be your responsibility to replace/rectify the same as and when required
at your cost and risk.

9. Guarantee Period :- One year from the date of commissioning and satisfactory testing against any
manufacturing defect, faulty design and bad workmanship. If any such defect is found
during the year from the date of installation and satisfactory testing you should have to
rectify the defects at your own cost and risk and if necessary you will have to replace the
pump and Motor.
Failure on your part to comply with any of the above earnest money / security deposited by you will be forfeited
to the State Govt and the Deptt. Will at liberty to cancel this order in part or in full without
entertaining any claim of compensation from you.
This supersedes all your terms and conditions wherever at variance with this order. Please acknowledge receipt of
this supply order and arrange to supply the pump and motor within the stipulated time. Please also inimate
dispatch /delivery position in time.

Enclo:- Annexure – A

Yours faithfully

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)

MEMO. NO ACE/ PHEE/N/UAZ/PB-82(N) 2018-19 Dt.


Copy to :-

1. The Executive Engineer (PHE)Morigaon Division,Morigaon for favour of kind information


with reference to his above letter under reference.
2. The Asstt. Executive Engineer(PHE) Morigaon Sub-Division,Morigaon for information and
necessary action.
3. The SO (PHE) i/e Palachung PWSS for information and necessary action. He is directed to see
the works and should be executed as per specification and see that in no case the ordered
value exceeded.
4. Tender agreement.
5. Concerning File for record.

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)
ANNEXURE -A

Specification Unit Rate Quantity


Sl (Rs)
No.
1.
FOR PUMP & MOTOR
1)Supplying ,fitting and fixing Centrifugal
Monoblock Pump set with 20HP capacity Motor
and base frame duly coupled with bronze Per Job 215000.00 1(one)Pump&
impeller ,S/S shaft ,Heavy bearing and Bracket all (Combined rate 1(one) Motor
complete for 1(one)Pump&
With the following specification: 1(one) Motor)

Total Head: 86mtrs.


Pipe Size: 65mmX50mm
Capacity: 9litres per second.
HP: 20HP

A) This Pump and Motor set are meant for : PALACHUNG PWSS
Ch. To: NRDWP(Quantity)
Note: No other charges /cost will be paid extra. The VAT etc. will be deducted from the supply bill and
Will be paid to the Govt. directly by the Department.

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)
ANNEXURE -A

Specification Unit Rate Quantity


Sl (Rs)
No.
1.
FOR PUMP & MOTOR
1)Supplying ,fitting and fixing Centrifugal
Monoblock Pump set with 15HP capacity Motor
and base frame duly coupled with bronze Per Job 150680.00 1(one)Pump&
impeller ,S/S shaft ,Heavy bearing and Bracket all (Combined rate for 1(one) Motor
completeWith the following specification: 1(one)Pump&
1(one) Motor)
Total Head: 90mtrs.
Pipe Size: 65mmX50mm
Capacity: 5.7litres per second.
HP: 15HP

A) This Pump and Motor set are meant for : PALACHUNG PWSS
Ch. To: NRDWP(Quantity)
Note: No other charges /cost will be paid extra. The VAT etc. will be deducted from the supply bill and
Will be paid to the Govt. directly by the Department.

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)
ANNEXURE -A

Specification Unit Rate Quantity


Sl
No.
1.
FOR PUMP
1)Supplying ,fitting and fixing Centrifugal Pump
set of kirloskar make, model No. DB80/26 with
Impeller S.S.shaft, Heavy bearing bracket all Per Job 413685.00 1(one)Pump&
complete of the following capacity: (Combined rate for 1(one) Motor
Total Head:100mtr. 1(one)Pump&
Capacity:100m3/hour 1(one) Motor)
Stage:2
Pipe size:100mmX80mm.

FOR 100HP MOTOR


Supplying ,fitting and fixing 100HP 75KW,2900
RPM Electric driven fan cooled Induction Motor
of National Reputed make of following
Specification:
100HP Electric driven Fan cooled Squirrel cage
induction motor 3 phase 2900 RPM 2pole of
100HP,75Kw.of any reputed national brand
induction Motor.

A) This Pump and Motor set are meant for : JAGIROAD PWSS
B) Ch. To: NRDWP(Quality)
Note: No other charges /cost will be paid extra. The VAT etc. will be deducted from the supply bill and
Will be paid to the Govt. directly by the Department.

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)
ANNEXURE -A

Specification Unit Rate Quantity


Sl
No.
1.
FOR PUMP
1)Supplying ,fitting and fixing Centrifugal Pump
set of kirloskar make, model No. DSM100/36 with
Impeller S.S.shaft, Heavy bearing bracket all Per Job 511930.00 1(one)Pump&
complete of the following capacity: (Combined rate for 1(one) Motor
Total Head: 97mtr. 1(one)Pump&
Capacity:100m3/hour 1(one) Motor)
Stage:2
Pipe size:100mmX125mm.

FOR 100HP MOTOR


Supplying ,fitting and fixing 100HP 75KW,1500
RPM Electric driven fan cooled Induction Motor
of National Reputed make of following
Specification:
100HP Electric driven Fan cooled Squirrel cage
induction motor 3 phase 1500 RPM 4pole of
100HP,75Kw.of any reputed national brand
induction Motor.

A) This Pump and Motor set are meant for : JAGIROAD PWSS
B) Ch. To: NRDWP(Quality)
Note: No other charges /cost will be paid extra. The VAT etc. will be deducted from the supply bill and
Will be paid to the Govt. directly by the Department.

Addl. Chief Engineer (PHE)


Upper Assam Zone , Nagaon (Assam)