Nelamangala 1
Is access to the F.E. free from obstruction?
Mr.Mahadeva 2
Is there any maintenance schedule for the above F.E's ?
3
Is training given to all staff/contractors regarding F.E.operation and
handling?
4
Is required PPE made available to staff as well as contractors?
5
6 Are the PPE conform to standards?
Are the PPE inspected periodically & records maintained ?
7
Is PPE display-board available in warehouse?
8
Is Emergency alarm system in place?
9
Is mock drill conducted regularly? And record maintained?
10
Is Emergency exit identified and marked?
11
Is Emergency exit free from obstructions?
12
Does the warehouse lay-out clearly defines Emergency Exit
location & types of portable Fire Extinguishers,First Aid box?
13
Do we have certified First-Aider?
14
Is the list of certified First-Aider displayed with contact number?
15
SWL (Safe Working Load) in KGS. written on each racks?
16
Is MPCB consent ( in case of chemical / lubricant storage )
obtained?
17
Is Fire brigade NOC obtained?
18
Is consent to operate taken from SPCB?
19
Is D.G monitoring done as per SPCB norms & records maintained ?
20
Is the required fire extinguisher of CO2 type installed near D.G. ?
21
22 Is it ensured that there is no spillage around the DG set ?
Is Danger Notice displayed in English and local language on Diesel
generator and Main electrical control panel {(I.E. Rule 35)}?
23
Are Rubber mats kept in front of Panel Boards {IS 15652: 2006}?
24
Are sand buckets provided near electrical control boards {(I.E. Rule
25 43(1)}?
Are cables provided with identification tags?
26
Are rigid PVC/ Metal conduits used for electrical installation?
27
Is there any combustible material present near panel boards?
28
Are extension boards and temporary connections/cable joints
observed ?
29
30 Is LOTO procedure in place for electrical maintenance ?+B15
Is scrap segregation done as per their properties and stored,
31 identified properly?
Are the racks provided with leg/row guard to protect form MHE
32 movement?
Are the safety signage's/poster's regarding MHE's displayed in
33 warehouse?
34 Do they have valid license?
Is SOP for MHE ( Maintenance & Operation) available and same is
being displayed at prominent locations ?
35
Are all MHE's tested & certified for load capacity thro' competent
person annually & records maintained ?
36
Are the SWL marked on each MHE's?
37
Is MHE battery charging area kept isolated & baricaded ?
38
Is there any housekeeping schedule/procedure of your warehouse?
39
Are the MSDS of all stored chemical's available with the W/H in
charge?
40
Is it been displayed/kept at required locations?
41
42 Are spill control kit's/mechanism available?
Is adequate training on MSDS with respect to chemical stored,
43 given to staff members?
status for OMR Warehouse
Tentative
Approx.Co date of
Action taken as on 06/08/09
st closure of
NCRS
0 Closed
0 No PPE
0 No PPE
0 WIP 13th Aug
0 Closed
0 Arranged 10th Aug
0 Note book has to bought
0 No First aider available
0 Yet to arrange for inspection
0 Following
0 Closed
0 Yet to buy
0 Closed
0 Closed
0 Closed
0
0
0
0
0
0
0
0
0
0
0
0
3
Is training given to all staff/contractors
regarding F.E.operation and handling? WH maintains between 10%-20% of
employees in all areas trained in use of
fire fighting equipment and certificates
has to filed.
4
Is required PPE made available to staff
as well as contractors? Adequate PPE has to provided to all
employees like
helmet,mask,googles,ear
plug/muff,gloves,shoes,safety belt and
aprons etc.
5
Are the PPE conform to standards?
6
Are the PPE inspected periodically &
records maintained ?
Inspect the all PPE's montly and
maintain the records
7
Is PPE display-board available in
warehouse?
Safety park has to have all types of
required ppe’s display with identification
8
Is Emergency alarm system in place? A fire alarm audible throughout the WH
with activation buttons in each section
and a distinctive sound from other
internal systems to be installed. fire
alarm to have battery backup with
9 identification.
Is mock drill conducted regularly? And
record maintained? WH evacuation drills to be conducted
monthly. written records and time
/dated photographs to be maintained
for drill.
10
Is Emergency exit identified and
marked? All emergency exits have an exit sign
illuminated by a reliable light source
mounted above or directly beside each
exit.
11
Is Emergency exit free from
obstructions?
Emergency exits remain unobstructed
at all times
12
Does the warehouse lay-out clearly Evacuation plan should have all exits,
defines Emergency Exit location & fire extinguishers, first aid boxes,fire
types of portable Fire alarm call points and “you are here”
Extinguishers,First Aid box? point accurately marked on the plan in
the local language
13
Do we have certified First-Aider?
WH maintains between 10%-20% of
employees in all areas trained in first-
aid including CPR.
14
Is the list of certified First-Aider
displayed with contact number?
List of first-aiders name with photo and
contact numbers has to be affix near all
the first-aid boxes
15
SWL (Safe Working Load) in KGS.
written on each racks?
All the racks should have SWL display
16
Is MPCB consent ( in case of chemical /
lubricant storage )obtained?
PCB cert.has to take for Petronas
(lubricant) storages.
17
Is Fire brigade NOC obtained?
18
Is consent to operate taken from
SPCB?
DG set approval has to taken from
electrical inspectorate office and get the
PCB approval
19
Is D.G monitoring done as per SPCB
norms & records maintained ?
DG.has to be monitored with the
required chk list with rcords
20
Is the required fire extinguisher of CO2
type installed near D.G. ?
Keep one co2 type fire ext.near the DG
set
21
Is it ensured that there is no spillage
around the DG set ?
It should be clean neat and tidy
22
Is Danger Notice displayed in English Affix a danger notice board as per
and local language on Diesel generator standards
and Main electrical control panel {(I.E.
Rule 35)}?
23
Are Rubber mats kept in front of Panel Keep one rubber mats in front of panels
Boards {IS 15652: 2006}?
24
Are sand buckets provided near Keep sand buckets near panel and DG
electrical control boards {(I.E. Rule
43(1)}?
25
Are cables provided with identification All the cables should have identification
tags? tags
26
Are rigid PVC/ Metal conduits used for
electrical installation?
All the electrical installations should be
thru PVC/Metal conduits
27
Is there any combustible material
present near panel boards?
It should be clear and free always
28
Are extension boards and temporary
connections/cable joints observed ?
Don't use temporary wires it should be
permanent with conduits
29
Is LOTO procedure in place for Follow the LOTO in place
electrical maintenance ?
30
Is scrap segregation done as per their
properties and stored, identified
properly? Segregate the waste with their
properties
31
Are the racks provided with leg/row
guard to protect form MHE movement?
Provide leg row guard to whereever
necessary
32
Are the safety signage's/poster's
regarding MHE's displayed in
warehouse?
Affix necessary safety poster
33
Do they have valid license?
Should be trainined
34
Is SOP for MHE ( Maintenance &
Operation) available and same is being
displayed at prominent locations ? MHE's SOP should be availabe at the
work premises and maintenance
schedule displayed
35
Are all MHE's tested & certified for load
capacity thro' competent person
annually & records maintained ? It should be tested with the competent
persons and the certificate rcorded
36
Are the SWL marked on each MHE's?
37
Is MHE battery charging area kept
isolated & baricaded ?
Charger should be kept isolate and
baaricadded
38
Is there any housekeeping
schedule/procedure of your
warehouse? Should have a timing schedule of
house keeping
39
Are the MSDS of all stored chemical's
available with the W/H in charge?
Get all the required MSDS from vendor
and keep a file and dispay near
storages.
40
Is it been displayed/kept at required
locations?
Displayed the same at required
locations.
41
Are spill control kit's/mechanism
available?
Get the kit
42
Is adequate training on MSDS with
respect to chemical stored, given to
staff members? Arrange to give an training about MSDS
to all staff and labours
43
Approx.Cos Action taken as on Tentative date of
t 06/08/09 closure of NCRS
0 xx 20th Aug