ADCOP – ABU DHABI CRUDE OIL PIPELINE

PROJECT – HABSHAN TO FUJAIRAH

ADMINISTRATION BUILDING (IPS)


STRUCTURAL CALCULATIONS
25-50-83-1601

EPC CONTRACTOR: ENGINEERING SUBCONTRACTOR: PROJECT MANAGEMENT CONSULTANT


China Petroleum Engineering Penspen International Limited ILF Consulting Engineers
& Construction (Group) Corporation P. O. Box 46562 P.O.Box 73250
Abu Dhabi Branch Abu Dhabi, UAE
Abu Dhabi, UAE
P.O. Box 127345 CONSULTING
EN GI N EERS

PROJECT: ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT


HABSHAN TO FUJAIRAH
EPC Contractor Doc. No.: 70175-CLC-CI-4001 PAGE: 1 of 12
DOCUMENT No.: 25-50-83-1601 Rev 0 Project No: E30153 DATE: 24/08/2009
REVISION RECORD

REV DATE ORIGINATOR REVIEWED APPROVED DESCRIPTION

A 17/06/2009 MP NZM JH Issued for Review

0 24/08/2009 RLG NZM JH Issued for Construction

© Copyright Penspen Limited 2009 All rights reserved.


“This document is issued in accordance with an agreement between Penspen International Limited and CPECC, which sets out the entire rights,
obligations and liabilities of the parties with respect to the content and use of this document.
Any other party relying in any way on any aspect of this document does so at its own risk. Penspen makes no warranty or representation, express or
implied, to any party other than its client under the Agreement and only then as stated therein, with respect to the accuracy, completeness, or usefulness of
any information contained in this document. Penspen assumes no liabilities with respect to any other party's use of, or damages suffered as a result of,
any use of or reliance on, any information, conclusions or recommendations contained in or imputed from the document.”

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 2 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
CONTENT PAGE

1  INTRODUCTION .................................................................................................................................4 
2  DESIGN PHILOSOPHY ......................................................................................................................4 
3  DESIGN DATA ....................................................................................................................................4 
3.1  Materials ..............................................................................................................................................4 
3.2  Clear cover to the Outermost Reinforcement ......................................................................................4 
3.3  Codes and Standards ..........................................................................................................................4 
3.4  Soil Data ..............................................................................................................................................4 
3.5  Software used ......................................................................................................................................4 
4  LOADS AND LOAD COMBINATIONS ...............................................................................................5 
4.1  Loads ...................................................................................................................................................5 
4.2  Load Combinations - (Refer Table 2.1 of BS 8110-1;1997) ................................................................6 
5  CHECK FOR DEFLECTION ...............................................................................................................7 
6  RESULTS AND CONCLUSION ..........................................................................................................7 
ATTACHMENT I:  WIND ANALYSIS .............................................................................................................8 
ATTACHMENT II:    STAAD DIAGRAM ...........................................................................................................9 
ATTACHMENT III:  SUMMARIZED STAAD ANALYSIS RESULTS .............................................................10 
ATTACHMENT IV:  CONCRETE MEMBER DESIGN ...................................................................................11
ATTACHMENT V:  TECHNICAL LAB RECOMMENDATION ....................................................................112

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 3 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
`

1 INTRODUCTION

This document presents Structural Design Calculation for the Admin building related to Intermediate
pump station-“Abu Dhabi Crude Oil Pipeline Project (ADCOP)”.

2 DESIGN PHILOSOPHY

Dead Loads (Roof finishes, Partition Load, Parapet Load) and Live Loads are calculated. Self
weight is calculated by STAAD Pro during analysis. The analysis and design has been performed
with appropriate load combinations using STAAD Pro software. The foundation design has been
carried out by hand calculations using Excel sheets. The analysis and design methodology are
based on BS 8110.

3 DESIGN DATA

3.1 Materials

Unit weight of concrete : 25 kN/m3


Characteristic strength of concrete (fcu) : 40 N/mm2
Characteristic strength of reinforcement (fy) : 460 N/mm2

3.2 Clear cover to the Outermost Reinforcement

(Refer Cl .20.1.3.1, page 260 of Design Basis Manual-30.99.91.0638)

For the Foundations : 75 mm


For the Grade Beams : 60 mm
For the Column above ground level
and parapet. : 40 mm
For the Column below ground level : 75 mm
For the Slab 30 mm
For the Beams : 40 mm (Internal)

3.3 Codes and Standards

1. BS 6399 Part-2 : Wind Load


2. BS 8110 : Structural Use of Concrete
3. UBC-1997 : Earthquake Load

3.4 Soil Data

Allowable bearing capacity : As per Geotechnical Report - (Refer Attachment-V)

3.5 Software used

STAAD Pro

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 4 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
`

4 LOADS AND LOAD COMBINATIONS

4.1 Loads

4.1.1 Self Weight


Self-weight of the Structure - Calculated by the stadd program
4.1.2 Roof Finish and Fall Ceiling
Roof finish + False ceiling Rf = 2.50 + 1.00 = 3.5 kN/m²
4.1.3 Parapet Wall Load
Thickness of parapet wall t = 150 mm
Depth of parapet wall b = 1000 mm
Unit weight of concrete ‫ﻻ‬ = 25 kN/m3
Projected length of slab L = 750 mm
Depth of slab ts = 200 mm
a) Force transfer to Roof Beam due to self weight of Parapet & Projected length of slab.
V = (‫ ﻻ‬x t x b) + (Rf x L) + (‫ ﻻ‬x ts x L)
V= (25 x 0.15 x 1.0) + (2.5 x 0.75) + (25 x 0.20 x 0.75) = 9.375 kN/m
b) Moment (Torsion) transfer to Roof Beam due to self weight of Parapet & Projected length of slab
M= (‫ ﻻ‬x t x b x 1) x L + (‫ ﻻ‬x ts x 1) x L x L/2 + (Rf x 1) x L x L/2
M= (25 x 0.15 x 1.0 x 1) x 0.75 + (25 x 0.20 x 1) x 0.75 x 0.75/2 + (2.5 x 1) x 0.75 x 0.75/2
= 4.922 kN.m/m
4.1.4 Roof / Floor Slab Load
Slab thickness = 200 mm
Slab load =Depth x unit wt of concrete = 0.20 x 25 = 5 kN/m²
4.1.5 Partition Load

Density of cavity wall/H (hollow block) ‫ﻻ‬1 = 20 kN/m3


Height of wall h = 3.4 m

Thickness of cavity wall t1 = 300 mm

Thickness of Hollow Concrete block t2 = 200 & 150 mm


Load due to cavity wall per ‘m’ length = ‫ ﻻ‬1 .t1.h = 20 x 0.3 x 3.4 = 20.4 kN/m
Load due to Hollow Concrete block per ‘m’ length = ‫ ﻻ‬1. t2.h = 20 x 0.2 x 3.4 = 13.6 kN/m
Load due to Hollow Concrete block per ‘m’ length = ‫ ﻻ‬1. t2.h = 20 x 0.15 x 3.4 = 10.2 kN/m
4.1.6 Live Load
Live load on roof = 2.0 kN/m²
(Refer cl.20.1.2 of Design basis manual)

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 5 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
`

4.1.7 Wind Load


Refer Attachment-1
4.1.8 Earthquake Load - (As per UBC-1997)

Seismic zone factor – for zone 1 = 0.075 (Refer table 16-I)


Importance factor (I) – for hazardous facilities = 1.25 (Refer table 16-K)
Numerical coefficient (R) –for building frame system = 5.6 (Refer table 16-N)
The above coefficients are applied in the Staad pro.
4.2 Load Combinations - (As per BS 8110-1; 1997)

Earthquake Dead loads Live Load Wind loads


Self Parapet slab+Roof
LCC

X-direction Z-direction Partition LL WXP WXN WZP WZN


weight load finish

1 2 3 4 5 6 7 8 9 10 11
Service Load Combinations
12 - - 1 1 1 1 1
13 1 - 1 1 1 1 1
14 - 1 1 1 1 1 1
15 1 - 1 1 1 1 -
16 - 1 1 1 1 1 -
17 - - 1 1 1 1 1
18 - - 1 1 1 1 1
19 - - 1 1 1 1 1
20 - - 1 1 1 1 1
21 - - 1 1 1 1 1 1
22 - - 1 1 1 1 1 1
23 - - 1 1 1 1 1 1
24 - - 1 1 1 1 1 1

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 6 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
`

Earthquake Dead loads Live Load Wind loads


Self Parapet slab+Roof
LCC

X-direction Z-direction Partition LL WXP WXN WZP WZN


weight load finish

1 2 3 4 5 6 7 8 9 10 11
Ultimate Load Combinations
25 - - 1.4 1.4 1.4 1.4 1.6
26 1.2 - 1.2 1.2 1.2 1.2 1.2
27 - 1.2 1.2 1.2 1.2 1.2 1.2
28 1.4 - 1.4 1.4 1.4 1.4 -
29 - 1.4 1.4 1.4 1.4 1.4 -
30 - - 1.4 1.4 1.4 1.4 1.4
31 - - 1.4 1.4 1.4 1.4 1.4
32 - - 1.4 1.4 1.4 1.4 1.4
33 - - 1.4 1.4 1.4 1.4 1.4
34 - - 1.2 1.2 1.2 1.2 1.2 1.2
35 - - 1.2 1.2 1.2 1.2 1.2 1.2
36 - - 1.2 1.2 1.2 1.2 1.2 1.2
37 - - 1.2 1.2 1.2 1.2 1.2 1.2

5 CHECK FOR DEFLECTION

FOR THE BEAM

Actual vertical deflection for service load combination = 12.302 mm (Refer page 76, Appendix III)

Length of the beam = 11700 mm

Allowable vertical Deflection = span/500 (Refer cl.3.4.6.3 of BS 8110-


1:1997)
= 23.4 mm

(Hence OK)
FOR THE COLUMN

Actual lateral deflection for service load combination = 9.591 mm (Refer page 77, Appendix III)

Height of the column = 5950 mm

Allowable lateral Deflection = span/300

= 19.83 mm

(Hence OK)

6 RESULTS AND CONCLUSION

All the members are found to be safe as per BS 8110 and for serviceability and stability point of
view structure is found satisfactory and safe to withstand the intended loads.

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 7 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
`

ATTACHMENT I: WIND ANALYSIS

(3 Pages)

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 8 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
CALCULATION SHEET

WIND LOAD CALCULATION

1 DESIGN DATA:

Height of building -(from FGL to top of parapet) H = 5.35 m

Basic wind speed Vb = 25.00 m/s cl 20.1.2 of Design


basis manual
Direction factor Sd = 1.00 cl 2.2.2.3 of BS 6399-2

Seasonal factor Ss = 1.00 table D.1 of BS 6399-2

Probability factor Sp = 1.00 cl 2.2.2.5 of BS 6399-2


refer drg, grading and
Site altitude(in metres above mean sea level) Δs = 153.00 road layout
Drg no 25-50-82-1602
Altitude factor Sa = 1 + 0.001 Δs cl 2.2.2.2.2 of BS 6399-2
= 1.153
Terrain and building factor Sb = 1.78 table 4 of BS 6399-2

2 DYNAMIC PRESSURE:

Dynamic pressure qs = 0.613 x Ve2 cl 2.1.2.1 of BS 6399-2

Effective wind speed Ve = Vs x Sb cl 2


2.2.3.1
2 3 1 of BS 6399-2
6399 2
= 51.31 m/s

Site wind speed , Vs = Vb x Sa x Sd x Ss x Sp = 28.83 m/s cl 2.2.2.1 of BS 6399-2

Therefore, Dynamic pressure qs = 1.61 kN/m2

3 PRESSURE CO-EFFICIENTS:

EXTERNAL PRESSURE CO-EFFICIENTS: fig 12 of BS 6399-2

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULTIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 3
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601- ATTACHMENT I Rev. 0 DATE :12/06/2009
CALCULATION SHEET

WIND LOAD CALCULATION

table 5 of BS 6399-2

INTERNAL PRESSURE CO-EFFICIENTS:

table 16 of BS 6399-2

From the above table 5 & 16, External pressure co-effiient 'Cpe' and Internal
pressure co-efficient 'Cpi' taken as below

Case 1: Wind on short face

D/H ratio = 11.93 > 4

L=D= 63.85 m

1.3 (-)
W=B
0.3 (-) 31 m
Wind ward direction
(short face) 0.6 0.3 (-) (-) 0.3 0.5
0.3 (-) (-)

1.3 (-)

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULTIONS Project No : E30153


ADCOP-ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 3
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601- ATTACHMENT I Rev. 0 DATE :12/06/2009
CALCULATION SHEET

WIND LOAD CALCULATION

Case 2: Wind on long face

D/H ratio = 5.85 > 4

L=B= 63.85 m

0.5 (-)
W=D
0.3 (-) 31 m

(-) 1.3 0.3 (-) (-) 0.3 1.3 (-)


0.3 (-)

0.6
Wind ward direction
(long face)

4 NET SURFACE PRESSURE:

Net surface pressue p = pe - pi cl 2.1.3.3 of BS 6399-2

pe = External surface pressure pe = qs x Cpe x Ca cl 2.1.3.1 of BS 6399-2

pi = Internal surface pressure pi = qs x Cpi x Ca cl 2.1.3.2 of BS 6399-2

Ca = Size effect factor (assuming here as) = 1 defined in cl 2.1.3.4


of BS 6399-2
Therefore ,Net surface pressue p = qs x ( Cpe- Cpi) x Ca

Case 1: Wind on short face

Net surface pressue for Windward Side = 1.45 kN/m2

Net surface pressue for Leeward Side = 0.32 kN/m2

Net surface pressue for Side Walls = 1.61 kN/m2

Case 2: Wind on long face

Net surface pressue for Windward Side = 1.45 kN/m2

Net surface pressue for Leeward Side = 0.32 kN/m2

Net surface pressue for Side Walls = 1.61 kN/m2

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULTIONS Project No : E30153


ADCOP-ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 3
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601-
25 50 83 1601 ATTACHMENT I Rev 0
Rev. DATE :12/06/2009
`

ATTACHMENT II: STAAD DIAGRAM

(16 Pages)

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 9 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
Job No Sheet No Rev
E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

Y
X
Z Load 1
3D MODEL

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 16
Job No Sheet No Rev
E30153 2 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

6.90m
6.30m
6.25m
2.50m
5.22m 4.20m
6.90m
5.22m
5.30m 6.00m
6.40m
4.79m 6.95m
5.23m
2.50m
4.20m 5.30m
6.25m
3.45m
4.00m
4.00m
1.95m
1.95m 6.25m
4.20m
6.30m
5.22m
2.50m 5.22m
3.60m
6.00m
3.45m 5.85m
6.95m 5.22m 3.60m 5.85m
2.50m 5.23m
4.20m
Y 5.30m 6.25m
X
Z Load 1

STRUCTURAL DIMENSIONS

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 2 of 16
Job No Sheet No Rev
E30153 3 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

Y
X
Z Load 1

SECTIONAL OUTLINE

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 3 of 16
Job No Sheet No Rev
E30153 4 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

310

307
296
305 306 96
282
371 293
304 93 203
279
303 292 82
92
91 291 278200 68
308 336
90 290 277
199
79 266 189
198 65 175
302
301 276
89 289 78 186
197 353265
300 275 77 64
264 172
94 294 185 357 251
196 63 52
299 103 76 263
280 184 171 356 240
372 88
87 288 201
287 330 354 250
418 62
298
75 262
183 408 170 51 159 361
274
273 329 249328
86 286
195
194
419 61
409
50 360239
364 359
80 227
297 272 267
344
182 169
255 248 327 158238 358362 37
85 285
193 102 66
168 382 49
157 355363 26
309 322
284 271 74
73 261 187
260
333 348380
254
350 247 410 237 36 226 144
84 192 60 48 22525
337 270 72 59 173 349 345 156
236 35 133
283 259
181
180 347252
253 411 143
53 13
83
295 71 58 41
155 235 34 224 24
269191 258
179 167
166 332245 346 142 132
95 246 234 12
281 70 57
257 47
46 160 40 148 33 223 23 131 120
190 338 178 165 233
232 141
56 244 331 222
22 11
202 69 45 39 147 130
395 119
339
256 177 164
335 243 231 38
154
153 221 21 140
10
81 55
268 44 415 118
163 152 32 220
219 129
67 176 334 242 230 146 31
145 20 9
43 414 324
128 117
188 162 340 151229 30 218 1819 8
241 342139
138 394
323
174 127 375 116 401
42 150 217 17 7
228 29 126
125
54 137 373 115
6 404
149 366341 28 21616
124 343
5 422 214
114
161 325 367365 15
136
4 421
27 215 135 113
112 400 405
123
14 3
122 111 213
134 2
121 110
1 109
Y
X 108
Z Load 1

NODE NUMBERS

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 4 of 16
Job No Sheet No Rev
E30153 5 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

510
588
337
509
586 587
334 498
589 590
508 194 96 323
581 484
240
333 497 675
507 332 309
576 193 93 483 320
331 572 496 674
559 585
306 182 82241
192 228 495372 92 611 482
330 567 91 319
504 580 168 68
191 494 671 481 318 305 181 79 471
335 558 90 229 575 400 584
502 480317 304
180 65 236 293
396 89 557 610 78 470
167
329 540
328 548 571 402 579
501 303179 77 166 406
189 670 222479 316 469 64 233 292 407 583
491
94 397 566 401 456
591 327 533 188
321 302178 76 468
165
642 63 230 291 574 405 52 237
592 216 547 478 362 361 155 447 278
326 186 8788 489 539 679 554 455 404 673 417 412 582
677 164 643 234
528 307 398 75665 467 62
565 360 51 413418 414 409 267
500 185 488 676 657210476314
315
678 385 290 231454 359 608 446277411410
523 86 546 176 644 153 416 415 238
578
325 538 80 466 163 61 289 50 358 408403
499 205 487 475313 301
300 553 224 607 564 672 445276 266 37 435
85 612 175 365
387 459 645453 573 140
219 152 357
324
518 350
668 474 299173
532
656 162
658
66 294604 282 49
444275 265
139 434 131 26 239 254
312 74
73 464 545 392 458391 395 394 386 606 563 646 36
513 373 486 206 390537 569
336 84 527 160 393 384 48 225 264138 433 130 253
184 473 311 298172 5960 288
287 603281 389 443
274 35 25 235
485 667 72 463 212 367 536
659 544 364 562
183 375 297171
522
159 53 220 442 38841 226 263137 432 129 24 232 252
119 13
83 512 472
310 71 462 58 286 150280
279
142 561 34
198 374 451 366535 543 441 262 118
95 517 158 363 431 128 251
195
322 296
170 70 461 57 207 285 526 147 213
4647660 141
40 550 33664 61923 12
511 376 450 669 439 273
272 261 430127 117
56 203 284 521 654 11
308
169 157
460 146 45 214
542
534 22 227 250650
69 369 449 438271 3839661 260
259 613 249
378 370 525 652
21 221 649 116
81196 156
55 283 516 368 44666
530
655427 125 631 10
199 377 448 437
270 258135 662
32
31 617 248 115
208 20 218 618353 352 633
67 295 43 524 381 9
197 144 426123 689 1819 247
246 598
436 269
204 257134 30 351
143
515380 519 215
663
597 599 8 682 638
42 200 256
133 425 122 245 383 113 107
268 29 17 209 629 7
54 421420 382 681
356 423 514 419 121 244 6 630 632
255 422 28 424 16 111 5 639
354 132
120 15 243 110 4
27201 106
109
3
14 202 242
108 2

Y 1
X
Z Load 1

MEMBER NUMBERS

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 5 of 16
Job No Sheet No Rev
E30153 6 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

32 kN

48 kN
16 kN 39 kN 9 kN36 kN
18 kN
29 kN
47 kN 9 52
kNkN
42 kN 45 kN 10 kN
47 kN 5 kN 7 kN
40 kN 41 kN 7 kN
52 kN 7 kN 7 kN
7 kN 38 kN
31 kN
24 51 kN 6 kN 1047
kNkN
11 kN 42 kN 5 kN
50 kN 8 kN 6 kN
59 kN
46 kN 9 kN 41 kN 65kN
16 kN 6 kN 55 kN 6 kN 755
kNkN 4 kN kN36 kN
29 kN 56 kN
kN 33 kN
26 45
6 kN kN 37 kN
6 kN 3 kN 5 kN 5 kN 30 kN
10 kN
3 kN 5 kN 45 kN 2 kN 5 kN
3 kN
3 kN
39 kN 7 kN 6 kN
27
21 kN 45
8 kN kN 6 kN37 kN 5 kN 3 kN
38 kN
51 kN 7 kN 4 kN 3 kN 5 kN 26 kN
2 kN
5 kN 39 kN 5 kN 550
kNkN 21 kN 7 kN 24 kN 6 kN 35 kN 3
2 kNkN
37 kN 40 kN
7 kN 1 kN 9 kN
20 kN 56kN
kN 4 kN 24 kN
4 kN 164 kNkN 12 kN 22 kN 6 kN 35 kN
42 kN
5 kN 37 kN 23
30 38 kN
7 kN 5 kN 45kN
kN
4 17
kNkN 27 3kNkN 5 kN 9 kN 32 kN8 kN
40 kN 41 kN 37 kN 9 kN 6 kN 7 kN34 kN 8 kN 8 kN
9 kN 8 kN 5 kN 4 kN 7 kN 35 kN
7 kN 23 kN 38 kN 6 kN
9 kN 42 kN
23 kN 4 kN 850
kNkN 57kN
kN 16 kN 6 kN
42 kN 6 kN39 kN 6 kN 10 kN
6 kN 518
20 kN
kNkN 9 kN
6 kN
59 kN 7 kN 23 kN 6
2 kN
kN 42 kN8 kN
7 kN 6 kN 4 kN 14 kN 7 kN
8 kN 5 kN 37 kN
19754
kNkN
kN 56kN
9 kN37 kN 53kNkN 1823 kN
42 kN
4 kN 24 kN
8 kN kN
45 kN 35 kN 24 kN4 kN 9 kN
8 kN 7 kN 34 5 5 kN
3 kN 5 kN
38 kN kNkN 144kN
kN 4 kN 2 kN
36 kN
11 kN 10 kN32 kN 7 kN 5 kN
7 kN 30 kN 4 kN 36 kN
kN 4 kN 2 kN
2 kN2 kN7 kN 35 kN 5 kN 5 kN
6 kN 3 kN 8 kN
5 kN 26 kN 6 kN 2 kN
9 kN 7 kN
7 kN
8 kN
Y
X
Z Load 1

SEISMIC IN X DIRECTION

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 6 of 16
Job No Sheet No Rev
E30153 7 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

32 kN
48 kN
39 kN 36 kN
16 52 kN
47 kN 29kN
kN 9 kN 18 kN
45 kN
47 kN 42 kN 9 kN
52 kN 40 kN 41 kN 10 kN
51 kN5 kN 7 kN 47 kN
38 kN 7 kN
7 kN 59 kN 7 kN
31 kN
24 kN 50 kN7 kN 42 kN
46 kN 556kN 10 kN
55 kN 11 kN 41 kN kN
8 kN 5 kN 36 kN
9 kN 45 kN 6 kN
16 kN 37 kN7 kN 45 kN 65kN
kN 30 kN
29 kN 33
6 kN kN 6 kN
39 kN kN 26 kN
56kN
51 kN 6 kN 10 kN
45 kN
6 kN 375 3kN
45kN
kN38 kN
27 kN
21 kN 50 kN 3 kN kN 5 kN
37 kN 40 kN7 kN 39 kN 6 kN 8 kN 3 kN 5 6kN kN 355kN
kN 3 kN2 kN 3 kN 26 kN
7 kN 4 kN 24 kN 21 kN 24 kN 3 kN 5 kN
425kN
kN 37 kN 38 6
kN kN 2 kN35 kN
3 kN 9 kN
20 kN 5 kN kN 5 kN
30 kN 7 kN
7 kN kN 23
56kN 16 kN 22 kN 1 kN kN2 kN
6 kN
40 kN 5 kN
41 kN 37 kN5 kN4 kN 427kNkN 4 kN 12 kN 34 kN 9 kN
32
8 kN
5 kN 4 kN kN 3 kN 5 kN 42 kN
23
7 kN
kN 38 kN
50 kN 917kN
4 kN 6 kN
35 kN
8 kN 8 kN
9 kN 598kN kN 5 kN 42 kN 7 kN 7
39 kN kN
7 kN 23 kN 6 16
9 kN
kN 4 kN 10 kN
8 kN 7kNkN kN 6 kN 42 kN 6 kN
kN4 kN
546kN 23 5kN 18kN
20
5 kN 42 kN
6 kN
9 kN
6 kN 37 kN7 kN 37 kN 8 kN 14 kN
7 kN 6 kN 455kN
kN 26 kN
kN
4 kN 24 kN 7 kN
8 kN 19 kN
7 kN 9 kN 35 kN 23 kN
kN
8 kN 56kN 38 kN 3kN
34 5kN kN 18 4 kN 24 kN 9 kN
368kN kN 5kN
kN 4 kN
kN 7 kN 3 14 kN 5 kN
11 kN 30 kN 32 kN 5 kN 4 kN 4 kN 2 kN
10kN
35 kN 7 kN 5 kN
7 kN 6 kN 4 kN
4 kN 7 kN
2 kN 5 kN 5 kN3 kN 2 kN
6 kN 3 26 2 kN
kNkN 6 kN 8 kN
5 kN 2 kN
9 kN 7 kN
7 kN
8 kN
Y
X
Z Load 2

SEISMIC IN Z DIRECTION

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 7 of 16
Job No Sheet No Rev
E30153 8 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

Y
X
Z Load 3 (SELF Y)

DEAD LOAD - SELFWEIGHT

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 8 of 16
Job No Sheet No Rev
E30153 9 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

-20 kN/m
-20 kN/m
-20 kN/m
-20 kN/m -20 kN/m
-20 kN/m
-20 kN/m
-20 kN/m
-20 kN/m -14 kN/m
-20 kN/m -20
-20 kN/m -14 kN/m -14 kN/m
-14 kN/m -20kN/m
kN/m
-20 kN/m -14 kN/m -6 kN/m -14 kN/m -14 kN/m
-20 kN/m
-20 kN/m -14 kN/m -14 -6 kN/m -14 kN/m
kN/m -14 kN/m -20 kN/m
-14 kN/m -20 kN/m-14 kN/m-14 kN/m -20 kN/m
-20 kN/m -14 kN/m -14 kN/m -14 kN/m -20 kN/m-14 kN/m
-14 kN/m -20 kN/m-14 kN/m -14 kN/m -14-14 kN/m
kN/m -20 kN/m
-14 kN/m
-14 kN/m-14 kN/m
-20 kN/m -20 kN/m -14 kN/m -14-14
kN/m
-14
kN/m
kN/m
-20 kN/m -14 kN/m -14 kN/m -14 kN/m
-14 kN/m -14 kN/m
-20 kN/m -4 kN/m -14 kN/m -14 kN/m -14 kN/m -20 kN/m -20 kN/m
-14 kN/m -14 kN/m -14 kN/m -14 kN/m
-20 kN/m -14 kN/m kN/m -14
-14kN/m
-20
kN/m
-14 kN/m
-14 kN/m
-20 kN/m -2 kN/m -20 kN/m
-14 kN/m -14 kN/m -14 kN/m -10 kN/m -10 kN/m -14 kN/m -20 kN/m
-20 kN/m -14 kN/m
-20 kN/m -14 kN/m -14 kN/m -2 kN/m
-14 kN/m -14 kN/m -14 kN/m
-10 kN/m -14 kN/m
-20 kN/m
-20 kN/m -14 kN/m -20 kN/m -14 kN/m
-14 kN/m -14 kN/m -14 kN/m -14 kN/m
-20 kN/m -14 kN/m -14 kN/m -20 kN/m
-14 kN/m -14 kN/m -14 kN/m -20 kN/m -20 kN/m
-14 kN/m -14
-20 kN/m -14 kN/mkN/m -2 kN/m -14 kN/m
-20 kN/m-14 kN/m
-20 kN/m -14 kN/m -20 kN/m -14 kN/m -20 kN/m
-2-14
kN/m
kN/m -20 kN/m
-14 kN/m
-14 kN/m
-20 kN/m -14 kN/m -20 kN/m
-20 kN/m
-20 -14
kN/m
-14 kN/m
kN/m -14 kN/m -14 kN/m
-20-14
-14 kN/m -14
kN/m kN/m
kN/m -20 kN/m
-14 kN/m -14 kN/m
-20 kN/m
-14 kN/m
-20 kN/m

Y
X
Z Load 4
DEAD LOAD - WALL

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 9 of 16
Job No Sheet No Rev
E30153 10 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

-9 kN/m-4.922 kNm/m
4.922 kNm/m
-9 kN/m
-9 kN/m-4.922 kNm/m -9 kN/m
-9 kN/m 4.922 kNm/m
-9 kN/m
-4.9224.922 -4.922
kNm/mkNm/m kNm/m
-9 kN/m
-9 kN/m
-4.922 kNm/m
-9 kN/m
-4.922 kNm/m 4.922 kNm/m
-9 kN/m
-9 kN/m-4.922 kNm/m
-9 kN/m 4.922
-4.922 kNm/m -9 kNm/m
kN/m
-9 kN/m
-4.922 kNm/m -9 kN/m -9 kN/m
-9 kN/m -4.922 kNm/m 4.922 kNm/m
-9 kN/m-4.922 kNm/m -9 kN/m 4.922 kNm/m
-4.922 kNm/m -4.922 kNm/m -9 kN/m
-9 kN/m 4.922 kNm/m
-9 kN/m
-9 kN/m-4.922 kNm/m -4.922 kNm/m -9 kN/m
4.922 kNm/m
-9 kN/m -9 kN/m -9 kN/m4.922 kNm/m
-4.922 kNm/m -4.922 kNm/m
4.922 kNm/m -9 kN/m
-9 kN/m -9
-4.9224.922 kN/m
kNm/m 4.922 kNm/m
-4.922 kNm/m
-9 kN/m kNm/m -9 kN/m
-9 kN/m
-4.922 kNm/m -9 kN/m 4.922 kNm/m
-9 kN/m 4.922 kNm/m -9 kN/m
4.922 kNm/m
-4.922 kNm/m -9 kN/m -9 kN/m
-4.922 kNm/m 4.922 kNm/m -9 kN/m
4.9224.922
kNm/m
-9 kN/m -9 kN/m kNm/m
-4.922 kNm/m
-9 kN/m 4.922 kNm/m -9 kN/m 4.922 kNm/m -9 kN/m
-9 kN/m
4.922 kNm/m 4.922 kNm/m
-4.922 kNm/m -9 kN/m -9 kN/m 4.922 kNm/m
-9 kN/m 4.922 kNm/m
4.922 kNm/m
4.922 kNm/m
-9 kN/m -9 kN/m
4.922 kNm/m
-4.922 kNm/m -9 kN/m
4.922 kNm/m
-4.922 kNm/m
-9 kN/m4.922 kNm/m

Y
X
Z Load 5
DEAD LOAD - PARAPET WALL

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 10 of 16
Job No Sheet No Rev
E30153 11 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

-15 kN/m
-13 kN/m
-13 kN/m
-15 kN/m -15
-13 kN/m
kN/m
-11 kN/m -9 kN/m -9 kN/m -5 kN/m
-13
-12 kN/m
kN/m -9 kN/m
-11 kN/m -15 kN/m-9 kN/m
-13 kN/m -5 kN/m
-12 kN/m
-11 kN/m -15 kN/m -9 -7 kN/m
kN/m -27 -9 kN/m
kN/m -13 kN/m
-5 kN/m
-14 kN/m -15 kN/m -11 kN/m -9
-8 kN/m -7
-5
kN/m
kN/m
kN/m -13 kN/m
kN/m -11
-16 kN/m -11
kN/m -8 kN/m kN/m -12 kN/m
-15 -8 kN/m -27 kN/m -13 kN/m -15 kN/m
-10 kN/m -11 kN/m -11 kN/m -5 kN/m -12
-15 kN/m -16 kN/m -8 kN/m -8 kN/m -9 kN/m
-11 kN/m -14
-14kN/m
kN/m -11 kN/m -5 kN/m -13 kN/m
-11 kN/m -15 kN/m
-13 kN/m
-12
-14 kN/m -8
-15 kN/m -9 kN/m
-14
kN/m
-5 kN/m -13
-11
-27 kN/m
kN/m -12 -9 kN/m
kN/m -13 kN/m -5 kN/m
-9 kN/m -15 kN/m -10 kN/m -9 kN/m -13 kN/m -9
-7 kN/m
kN/m -9 kN/m -11 kN/m
-13 kN/m -8 kN/m
-12 kN/m -10 kN/m-5 -5kN/m
kN/m -11 kN/m
-10 kN/m -5 kN/m
-11 -8 kN/m -7 kN/m -8 kN/m -9
-7 kN/m
kN/m -13 kN/m
-13 kN/m
-12 kN/m -8 kN/m -14
-13 kN/m -10 kN/m -5 kN/m -11 kN/m
-7 kN/m -9 kN/m -11 kN/m -5 kN/m
-8 kN/m
-12
-11kN/m
kN/m
-11 -10
-9
kN/m -8
-7 kN/m
kN/mkN/m -11 kN/m -11
kN/m kN/m
-8 kN/m
-13 kN/m -7 kN/m -5 kN/m -13
-12 kN/m -9 kN/m -8 kN/m -5 kN/m -11 kN/m
-11 kN/m -9 kN/m -10 kN/m -11 kN/m -11 kN/m -9 kN/m
-9 kN/m
-13 kN/m -7
-5 kN/m
kN/m -8
-7 kN/m -12
-11 kN/m
kN/m-8 kN/m -11 kN/m
-11 kN/m -13 kN/m
-12 kN/m
-11 -5 kN/m
-7 kN/m -9 kN/m -13
-12 kN/m
kN/m -11 kN/m -12
-11 kN/m-8 kN/m
kN/m
-9 kN/m -11
-10 kN/m
-7 -5 kN/m -9 kN/m -11 kN/m
-5 kN/m
kN/m -13 kN/m -8 kN/m -8 kN/m -11
-10
-8
kN/m
kN/m
-15 kN/m
-10 kN/m -12 kN/m -10 kN/m-5 kN/m -11 kN/m
-10kN/m -8 kN/m
-10 kN/m -15
-12 kN/m
kN/m-8 kN/m -8 kN/m -9 -15 kN/m
-7 kN/m -11 kN/m -5 kN/m -11
-10 kN/m
kN/m -8 kN/m
-9 kN/m
kN/m -7 kN/m -5 kN/m
-15 kN/m -8 kN/m -8 kN/m -9 kN/m
kN/m
-13 -9 kN/m -11
-10 kN/m -8
-13 kN/m -7
-9 kN/m -5 kN/m
kN/m -11 kN/m -8 kN/m
-9 kN/m -11 kN/m
-5 kN/m -9 kN/m
-13
-11 kN/m
kN/m

Y
X
Z Load 6
DEAD LOAD - (SLAB LOAD + ROOF FINISHES + FALSE CEILING)

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 11 of 16
Job No Sheet No Rev
E30153 12 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

-3 kN/m
-3 kN/m
-3 kN/m
-4 kN/m -3 kN/m
-3 kN/m -2 kN/m -2 kN/m -1 kN/m
-3 kN/m -3 kN/m -2 kN/m
-4 -2 kN/m -1 kN/m
-3 kN/m
kN/m -10 -3 kN/m
-2 kN/m
kN/m
-3 kN/m -4 kN/m -2 kN/m -1 kN/m -3 kN/m
-3 kN/m -3
-2 kN/m
kN/m -10-2 -1 kN/m
kN/m
-4 kN/m -3 kN/m kN/m -3 kN/m
-3 kN/m -2
-1 kN/m
-2 kN/m -4 kN/m -2 kN/m kN/m -3
-3
-2 kN/m
kN/m
-3
-2
-1
kN/m
kN/m
kN/m -2 kN/m
kN/m -3 kN/m
-3-4
kN/m
kN/m -4 kN/m -3 kN/m -3 kN/m
-3kN/m
-3 kN/m -2
-1 kN/m
kN/m -10 kN/m -3 kN/m
-2 kN/m -4
-3 kN/m -2 kN/m-3 kN/m -3 kN/m -3 kN/m
-2 kN/m
-3 kN/m
-1 kN/m
-2 kN/m
-2 kN/m -2 kN/m
-1kN/m
-1 kN/m -2 kN/m -2 kN/m
-1 kN/m -3 kN/m
-3 kN/m -4 kN/m -2 kN/m -3
-2 kN/m -2
-3 kN/m
-3
-2 kN/m
kN/m -2
-1 kN/m
kN/m -3 kN/m -2 kN/m
-2 kN/m -2 kN/m -1 kN/m
kN/m -3
-3 kN/m
kN/m
-2 kN/m -2 kN/m -3 kN/m -3
-3kN/m
kN/m -2 -2 kN/m -3 kN/m
-2 kN/m -3
-2 kN/m
-2
-1 kN/m
kN/m -3
-2 kN/m kN/m -2 kN/m -1 kN/m
kN/m -3 kN/m
kN/m
-3 kN/m
-3 kN/m
kN/m -2 kN/m -3
-2 kN/m
kN/m -3 kN/m -3
-2 kN/m
kN/m -2
-2 -1 kN/m -2 kN/m -3 kN/m -1 kN/m -3 kN/m
-3 kN/m
-2 kN/m -1-3 kN/m -3 kN/m -2 kN/m
-2 kN/m
kN/m -3 kN/m -3 -2 kN/m
kN/m -3
-2 -3
-2 kN/m
kN/m -2 kN/m
-1 kN/m
kN/m -2 kN/m
-3 kN/m
-2kN/m
kN/m -3
-2 kN/m
-3 kN/m
-2 kN/m -1 -2 kN/m
-3 kN/m -2
-2 kN/m -3
-2 kN/m
kN/m -4 kN/m -2 kN/m
-2
-2 kN/m
kN/m -3
-3 kN/m
kN/m -2 kN/m -1 kN/m
kN/m -3
-2 kN/m
kN/m -4 kN/m -2 kN/m
-2 kN/m -2 -3 kN/m -2 kN/m
-1 kN/m
kN/m -3
-2 kN/m -2 kN/m
-3 kN/m -2
-2 kN/m -1 kN/m
kN/m -2 kN/m
-3 kN/m -3 kN/m
-2
-1 kN/m
kN/m -3 kN/m
kN/m
-2
-3 kN/m
-3 kN/m

Y
X
Z Load 7
LIVE LOAD

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 12 of 16
Job No Sheet No Rev
E30153 13 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

1 kN/m
-6 kN/m
6 kN/m
1 kN/m
11 kN/m
kN/m 6-11
kN/m 0 kN/m
kN/m
-8 kN/m -8 kN/m 1 kN/m
-8 kN/m
-8 kN/m 2 kN/m
-5kN/m
-5 kN/m -9 kN/m
2 kN/m
3 kN/m -8 kN/m 1 kN/m
-8 kN/m 5 kN/m
8 kN/m
8 kN/m 1 kN/m
-8 kN/m 8 kN/m
5 kN/m-3 kN/m -8 kN/m
7 kN/m
7 kN/m
6 kN/m 7 kN/m
6 kN/m 3 kN/m 0 kN/m
3 kN/m 8 kN/m 44kN/m
kN/m2 kN/m
5 kN/m
4 kN/m 8 kN/m
8 kN/m
7 kN/m
6 kN/m 5 kN/m
Y
X 4 kN/m
Z Load 8
WIND IN (+X) DIRECTION

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 13 of 16
Job No Sheet No Rev
E30153 14 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

-5 kN/m

-6 kN/m -6 kN/m
6 kN/m
-3 -5 kN/m
kN/m -2 kN/m
6-11
kN/m
kN/m
-4 kN/m
-8 kN/m -8 kN/m
-8 kN/m -9 kN/m
-8 kN/m
-5kN/m
-5 kN/m -9 kN/m -7 kN/m
-1 kN/m -6 kN/m
-8 kN/m
-8 kN/m 5 kN/m
8 kN/m -4 kN/m
8 kN/m
-1 kN/m -8 kN/m 8 kN/m
-3 kN/m -8 kN/m
7 kN/m
-1 kN/m 7 kN/m
-1 kN/m 7 kN/m
3 kN/m -2 kN/m
3 kN/m -1 kN/m 8 kN/m kN/m -0 kN/m
44kN/m
-1 kN/m
8 kN/m
-2 kN/m 8 kN/m
-1 kN/m
5 kN/m
Y -1 kN/m
X
Z Load 9
WIND IN (-X) DIRECTION

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 14 of 16
Job No Sheet No Rev
E30153 15 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

5 kN/m-1 kN/m
-2 kN/m
-2 kN/m -2 kN/m
3 kN/m
5 kN/m
7 kN/m 2 kN/m
-2 kN/m -5 kN/m
-2 kN/m 5 kN/m
-5 kN/m
-2 kN/m
-2kN/m
-2 kN/m 10 kN/m
-3 kN/m-2 kN/m
-2 kN/m 8 kN/m
6 kN/m
-2 kN/m
-5-2kN/m
kN/m 4 kN/m
-1 kN/m -5 kN/m
-7 kN/m -8 kN/m
-7 kN/m -7 kN/m
-6 kN/m 2 kN/m -8 kN/m
-5 kN/m -2 kN/m -6 kN/m
-3 kN/m -6 kN/m
-3 kN/m -8 kN/m -6 kN/m
-6 kN/m -6kN/m
-6 kN/m
-8 kN/m
-4 kN/m -7 kN/m
Y
X -8 kN/m
-5 kN/m
Z Load 10
WIND IN (+Z) DIRECTION

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 15 of 16
Job No Sheet No Rev
E30153 16 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH Ref 25-50-83-1601 - ATTACHMENT II
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

10 kN/m 5 kN/m

5 kN/m
7 kN/m 8 kN/m
8 kN/m
8 kN/m 3 kN/m 7 kN/m 2 1kN/m
kN/m
5 kN/m
9 kN/m 1 kN/m
5 kN/m
88kN/m
kN/m
8 kN/m
7 kN/m 10 kN/m
8 kN/m -3 kN/m
8 kN/m
7 kN/m 6 kN/m
1 kN/m
3 kN/m -5 kN/m 2 kN/m 4 kN/m
2 kN/m
-7 kN/m 2 kN/m
-7 kN/m
1 kN/m
-6 kN/m 1 kN/m
1 kN/m 1 kN/m 2 kN/m
-2 kN/m
-5 kN/m
1 kN/m 11kN/m
kN/m
-8 kN/m 2 kN/m
-6 kN/m 2 kN/m
2 kN/m
-4 kN/m
1 kN/m
Y
X
Z Load 11
WIND IN (-Z) DIRECTION

Print Time/Date: 18/08/2009 12:07 STAAD.Pro for Windows 20.07.02.15 Print Run 16 of 16
`

ATTACHMENT III: SUMMARIZED STAAD ANALYSIS RESULTS

(77 Pages)

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 10 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
Thursday, August 20, 2009, 10:38 AM
PAGE NO. 1

****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 02 *
* Proprietary Program of *
* Research Engineers, Intl. *
* Date= AUG 19, 2009 *
* Time= 15:47:58 *
* *
* USER ID: *
****************************************************

1. STAAD SPACE
INPUT FILE: 25-50-83-1601-0 -ATTACHMENT II.STD
2. START JOB INFORMATION
3. ENGINEER DATE 12-JUNE-09
4. JOB NAME ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO FUJAIRAH
5. JOB CLIENT INTERNATIONAL PETROLEUM INVESTMENT COMPANY
6. JOB NO E30153
7. JOB REV 0
8. JOB PART IPS - ADMINISTRATION BUILDING
9. JOB REF 25-50-83-1601 - ATTACHMENT II
10. ENGINEER NAME MP
11. CHECKER NAME NZM
12. APPROVED NAME JH
13. END JOB INFORMATION
14. INPUT WIDTH 79
15. UNIT METER KN
16. JOINT COORDINATES
17. 1 0 1.45 0; 2 6.25001 1.45 0; 3 10.45 1.45 0; 4 15.675 1.45 0; 5 20.47 1.45 0
18. 6 20.9 1.45 0; 7 24.55 1.45 0; 8 28.9501 1.45 0; 9 32.6001 1.45 0
19. 10 37.8251 1.45 0; 11 43.0501 1.45 0; 12 47.2501 1.45 0; 13 53.5001 1.45 0
20. 14 0 1.45 -5.30001; 15 6.25001 1.45 -5.30001; 16 10.45 1.45 -5.30001
21. 17 15.675 1.45 -5.30001; 18 20.47 1.45 -5.30001; 19 20.9 1.45 -5.30001
22. 20 24.55 1.45 -5.30001; 21 28.9501 1.45 -5.30001; 22 32.6001 1.45 -5.30001
23. 23 37.8251 1.45 -5.30001; 24 43.0501 1.45 -5.30001; 25 47.2501 1.45 -5.30001
24. 26 53.5001 1.45 -5.30001; 27 0 1.45 -7.80002; 28 6.25001 1.45 -7.80002
25. 29 10.45 1.45 -7.80002; 30 15.675 1.45 -7.80002; 31 20.47 1.45 -7.80002
26. 32 20.9 1.45 -7.80002; 33 32.6001 1.45 -7.80002; 34 37.8251 1.45 -7.80002
27. 35 43.0501 1.45 -7.80002; 36 47.2501 1.45 -7.80002; 37 53.5001 1.45 -7.80002
28. 38 20.47 1.45 -11.275; 39 20.9 1.45 -11.275; 40 27.3001 1.45 -11.275
29. 41 32.6001 1.45 -11.275; 42 0 1.45 -14.75; 43 6.25001 1.45 -14.75
30. 44 10.45 1.45 -14.75; 45 15.675 1.45 -14.75; 46 20.47 1.45 -14.75
31. 47 20.9 1.45 -14.75; 48 32.6001 1.45 -14.75; 49 37.8251 1.45 -14.75
32. 50 43.0501 1.45 -14.75; 51 47.2501 1.45 -14.75; 52 53.5001 1.45 -14.75
33. 53 27.3001 1.45 -14.75; 54 -3.45001 1.45 -14.75; 55 0 1.45 -20.75
34. 56 6.25001 1.45 -20.75; 57 10.45 1.45 -20.75; 58 15.675 1.45 -20.75
35. 59 20.47 1.45 -20.75; 60 20.9 1.45 -20.75; 61 32.6001 1.45 -20.75
36. 62 37.8251 1.45 -20.75; 63 43.0501 1.45 -20.75; 64 47.2501 1.45 -20.75
37. 65 53.5001 1.45 -20.75; 66 27.3001 1.45 -20.75; 67 -3.45001 1.45 -20.75
38. 68 60.4001 1.45 -20.75; 69 0 1.45 -23.25; 70 6.25001 1.45 -23.25
39. 71 10.45 1.45 -23.25; 72 15.675 1.45 -23.25; 73 20.47 1.45 -23.25
40. 74 20.9 1.45 -23.25; 75 32.6001 1.45 -23.25; 76 37.8251 1.45 -23.25

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENT Page


II.anl
1 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 2

41. 77 43.0501 1.45 -23.25; 78 47.2501 1.45 -23.25; 79 53.5001 1.45 -23.25
42. 80 27.3001 1.45 -23.25; 81 -3.45001 1.45 -23.25; 82 60.4001 1.45 -23.25
43. 83 0 1.45 -29.5501; 84 6.25001 1.45 -29.5501; 85 10.45 1.45 -31.3001
44. 86 15.675 1.45 -31.3001; 87 20.47 1.45 -31.3001; 88 20.9 1.45 -31.3001
45. 89 32.6001 1.45 -31.3001; 90 37.8251 1.45 -31.3001; 91 43.0501 1.45 -31.3001
46. 92 47.2501 1.45 -29.5501; 93 53.5001 1.45 -29.5501; 94 27.3001 1.45 -31.3001
47. 95 -3.45001 1.45 -29.5501; 96 60.4001 1.45 -29.5501; 102 23.3 1.45 -23.25
48. 103 23.3 1.45 -31.3001; 108 0 -0.5 0; 109 6.25001 -0.5 0; 110 10.45 -0.5 0
49. 111 15.675 -0.5 0; 112 20.47 -0.5 0; 113 20.9 -0.5 0; 114 24.55 -0.5 0
50. 115 28.9501 -0.5 0; 116 32.6001 -0.5 0; 117 37.8251 -0.5 0; 118 43.0501 -0.5 0
51. 119 47.2501 -0.5 0; 120 53.5001 -0.5 0; 121 0 -0.5 -5.30001
52. 122 6.25001 -0.5 -5.30001; 123 10.45 -0.5 -5.30001; 124 15.675 -0.5 -5.30001
53. 125 20.47 -0.5 -5.30001; 126 20.9 -0.5 -5.30001; 127 24.55 -0.5 -5.30001
54. 128 28.9501 -0.5 -5.30001; 129 32.6001 -0.5 -5.30001
55. 130 37.8251 -0.5 -5.30001; 131 43.0501 -0.5 -5.30001
56. 132 47.2501 -0.5 -5.30001; 133 53.5001 -0.5 -5.30001; 134 0 -0.5 -7.80002
57. 135 6.25001 -0.5 -7.80002; 136 10.45 -0.5 -7.80002; 137 15.675 -0.5 -7.80002
58. 138 20.47 -0.5 -7.80002; 139 20.9 -0.5 -7.80002; 140 32.6001 -0.5 -7.80002
59. 141 37.8251 -0.5 -7.80002; 142 43.0501 -0.5 -7.80002
60. 143 47.2501 -0.5 -7.80002; 144 53.5001 -0.5 -7.80002; 145 20.47 -0.5 -11.275
61. 146 20.9 -0.5 -11.275; 147 27.3001 -0.5 -11.275; 148 32.6001 -0.5 -11.275
62. 149 0 -0.5 -14.75; 150 6.25001 -0.5 -14.75; 151 10.45 -0.5 -14.75
63. 152 15.675 -0.5 -14.75; 153 20.47 -0.5 -14.75; 154 20.9 -0.5 -14.75
64. 155 32.6001 -0.5 -14.75; 156 37.8251 -0.5 -14.75; 157 43.0501 -0.5 -14.75
65. 158 47.2501 -0.5 -14.75; 159 53.5001 -0.5 -14.75; 160 27.3001 -0.5 -14.75
66. 161 -3.45001 -0.5 -14.75; 162 0 -0.5 -20.75; 163 6.25001 -0.5 -20.75
67. 164 10.45 -0.5 -20.75; 165 15.675 -0.5 -20.75; 166 20.47 -0.5 -20.75
68. 167 20.9 -0.5 -20.75; 168 32.6001 -0.5 -20.75; 169 37.8251 -0.5 -20.75
69. 170 43.0501 -0.5 -20.75; 171 47.2501 -0.5 -20.75; 172 53.5001 -0.5 -20.75
70. 173 27.3001 -0.5 -20.75; 174 -3.45001 -0.5 -20.75; 175 60.4001 -0.5 -20.75
71. 176 0 -0.5 -23.25; 177 6.25001 -0.5 -23.25; 178 10.45 -0.5 -23.25
72. 179 15.675 -0.5 -23.25; 180 20.47 -0.5 -23.25; 181 20.9 -0.5 -23.25
73. 182 32.6001 -0.5 -23.25; 183 37.8251 -0.5 -23.25; 184 43.0501 -0.5 -23.25
74. 185 47.2501 -0.5 -23.25; 186 53.5001 -0.5 -23.25; 187 27.3001 -0.5 -23.25
75. 188 -3.45001 -0.5 -23.25; 189 60.4001 -0.5 -23.25; 190 0 -0.5 -29.5501
76. 191 6.25001 -0.5 -29.5501; 192 10.45 -0.5 -31.3001; 193 15.675 -0.5 -31.3001
77. 194 20.47 -0.5 -31.3001; 195 20.9 -0.5 -31.3001; 196 32.6001 -0.5 -31.3001
78. 197 37.8251 -0.5 -31.3001; 198 43.0501 -0.5 -31.3001
79. 199 47.2501 -0.5 -29.5501; 200 53.5001 -0.5 -29.5501
80. 201 27.3001 -0.5 -31.3001; 202 -3.45001 -0.5 -29.5501
81. 203 60.4001 -0.5 -29.5501; 213 20.9 -0.5 3.60001; 214 32.6001 -0.5 3.60001
82. 215 0 5.45 0; 216 6.25001 5.45 0; 217 10.45 5.45 0; 218 15.675 5.45 0
83. 219 20.47 5.45 0; 220 20.9 5.45 0; 221 24.55 5.45 0; 222 28.9501 5.45 0
84. 223 32.6001 5.45 0; 224 37.8251 5.45 0; 225 43.0501 5.45 0; 226 47.2501 5.45 0
85. 227 53.5001 5.45 0; 228 0 5.45 -5.30001; 229 6.25001 5.45 -5.30001
86. 230 10.45 5.45 -5.30001; 231 15.675 5.45 -5.30001; 232 20.47 5.45 -5.30001
87. 233 20.9 5.45 -5.30001; 234 24.55 5.45 -5.30001; 235 28.9501 5.45 -5.30001
88. 236 32.6001 5.45 -5.30001; 237 37.8251 5.45 -5.30001
89. 238 43.0501 5.45 -5.30001; 239 47.2501 5.45 -5.30001
90. 240 53.5001 5.45 -5.30001; 241 0 5.45 -7.80002; 242 6.25001 5.45 -7.80002
91. 243 10.45 5.45 -7.80002; 244 15.675 5.45 -7.80002; 245 20.47 5.45 -7.80002
92. 246 20.9 5.45 -7.80002; 247 32.6001 5.45 -7.80002; 248 37.8251 5.45 -7.80002
93. 249 43.0501 5.45 -7.80002; 250 47.2501 5.45 -7.80002
94. 251 53.5001 5.45 -7.80002; 252 20.47 5.45 -11.275; 253 20.9 5.45 -11.275
95. 254 27.3001 5.45 -11.275; 255 32.6001 5.45 -11.275; 256 0 5.45 -14.75
96. 257 6.25001 5.45 -14.75; 258 10.45 5.45 -14.75; 259 15.675 5.45 -14.75

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENT Page


II.anl
2 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 3

97. 260 20.47 5.45 -14.75; 261 20.9 5.45 -14.75; 262 32.6001 5.45 -14.75
98. 263 37.8251 5.45 -14.75; 264 43.0501 5.45 -14.75; 265 47.2501 5.45 -14.75
99. 266 53.5001 5.45 -14.75; 267 27.3001 5.45 -14.75; 268 -3.45001 5.45 -14.75
100. 269 0 5.45 -20.75; 270 6.25001 5.45 -20.75; 271 10.45 5.45 -20.75
101. 272 15.675 5.45 -20.75; 273 20.47 5.45 -20.75; 274 20.9 5.45 -20.75
102. 275 32.6001 5.45 -20.75; 276 37.8251 5.45 -20.75; 277 43.0501 5.45 -20.75
103. 278 47.2501 5.45 -20.75; 279 53.5001 5.45 -20.75; 280 27.3001 5.45 -20.75
104. 281 -3.45001 5.45 -20.75; 282 60.4001 5.45 -20.75; 283 0 5.45 -23.25
105. 284 6.25001 5.45 -23.25; 285 10.45 5.45 -23.25; 286 15.675 5.45 -23.25
106. 287 20.47 5.45 -23.25; 288 20.9 5.45 -23.25; 289 32.6001 5.45 -23.25
107. 290 37.8251 5.45 -23.25; 291 43.0501 5.45 -23.25; 292 47.2501 5.45 -23.25
108. 293 53.5001 5.45 -23.25; 294 27.3001 5.45 -23.25; 295 -3.45001 5.45 -23.25
109. 296 60.4001 5.45 -23.25; 297 0 5.45 -29.5501; 298 6.25001 5.45 -29.5501
110. 299 10.45 5.45 -31.3001; 300 15.675 5.45 -31.3001; 301 20.47 5.45 -31.3001
111. 302 20.9 5.45 -31.3001; 303 32.6001 5.45 -31.3001; 304 37.8251 5.45 -31.3001
112. 305 43.0501 5.45 -31.3001; 306 47.2501 5.45 -29.5501
113. 307 53.5001 5.45 -29.5501; 308 27.3001 5.45 -31.3001
114. 309 -3.45001 5.45 -29.5501; 310 60.4001 5.45 -29.5501; 322 10.45 1.45 -29.5501
115. 323 24.55 1.45 -1.645; 324 28.9501 1.45 -1.645; 325 0 1.45 -9.55002
116. 327 43.0501 1.45 -12.8; 328 47.2501 1.45 -12.8; 329 43.0501 1.45 -16
117. 330 47.2501 1.45 -16; 331 23.2 1.45 -11.275; 332 23.2 1.45 -14.75
118. 333 23.2 1.45 -20.75; 334 6.25001 1.45 -15.75; 335 10.45 1.45 -15.75
119. 336 43.0501 1.45 -29.5501; 337 4.20001 1.45 -29.5501; 338 4.20001 1.45 -23.25
120. 339 3.95001 1.45 -20.75; 340 3.95001 1.45 -14.75; 341 3.95001 1.45 -9.55002
121. 342 18.375 1.45 -5.30001; 343 18.375 1.45 0; 344 30.3001 1.45 -20.75
122. 345 30.3001 1.45 -14.75; 346 30.3001 1.45 -11.275; 347 23.2 1.45 -18.175
123. 348 27.3001 1.45 -18.175; 349 27.3001 1.45 -16.5; 350 30.3001 1.45 -16.5
124. 353 49.5501 1.45 -20.75; 354 49.5501 1.45 -14.75; 355 49.5501 1.45 -7.80002
125. 356 49.5501 1.45 -15.85; 357 53.5001 1.45 -15.85; 358 49.5501 1.45 -9.55002
126. 359 53.5001 1.45 -9.55002; 360 49.5501 1.45 -11.25; 361 53.5001 1.45 -11.25
127. 362 50.7501 1.45 -9.55002; 363 50.7501 1.45 -7.80002; 364 50.7501 1.45 -11.25
128. 365 3.95001 1.45 -7.80002; 366 2.85001 1.45 -9.55002
129. 367 2.85001 1.45 -7.80002; 371 43.0501 5.45 -29.55; 372 10.45 5.45 -29.55
130. 373 24.55 1.45 1.25; 375 28.9501 1.45 1.25; 380 24.55 5.45 -11.275
131. 382 28.9501 5.45 -11.275; 394 20.9 5.45 3.60001; 395 32.6001 5.45 3.60001
132. 400 20.9 1.45 3.60001; 401 32.6001 1.45 3.60001; 404 26.7501 1.45 3.60001
133. 405 26.75 -0.5 3.60001; 408 37.8251 4 -14.75; 409 37.8251 4 -13.55
134. 410 37.8251 1.45 -13.55; 411 37.8251 -0.5 -13.55; 414 24.55 5.45 3.60001
135. 415 28.95 5.45 3.60001; 418 27.3001 1.45 -26.85; 419 23.3 1.45 -26.85
136. 421 24.55 -0.5 1.25; 422 28.9501 -0.5 1.25
137. MEMBER INCIDENCES
138. 1 1 108; 2 2 109; 3 3 110; 4 4 111; 5 5 112; 6 6 113; 7 7 114; 8 8 115
139. 9 9 116; 10 10 117; 11 11 118; 12 12 119; 13 13 120; 14 14 121; 15 15 122
140. 16 16 123; 17 17 124; 18 18 125; 19 19 126; 20 20 127; 21 21 128; 22 22 129
141. 23 23 130; 24 24 131; 25 25 132; 26 26 133; 27 27 134; 28 28 135; 29 29 136
142. 30 30 137; 31 31 138; 32 32 139; 33 33 140; 34 34 141; 35 35 142; 36 36 143
143. 37 37 144; 38 38 145; 39 39 146; 40 40 147; 41 41 148; 42 42 149; 43 43 150
144. 44 44 151; 45 45 152; 46 46 153; 47 47 154; 48 48 155; 49 49 156; 50 50 157
145. 51 51 158; 52 52 159; 53 53 160; 54 54 161; 55 55 162; 56 56 163; 57 57 164
146. 58 58 165; 59 59 166; 60 60 167; 61 61 168; 62 62 169; 63 63 170; 64 64 171
147. 65 65 172; 66 66 173; 67 67 174; 68 68 175; 69 69 176; 70 70 177; 71 71 178
148. 72 72 179; 73 73 180; 74 74 181; 75 75 182; 76 76 183; 77 77 184; 78 78 185
149. 79 79 186; 80 80 187; 81 81 188; 82 82 189; 83 83 190; 84 84 191; 85 85 192
150. 86 86 193; 87 87 194; 88 88 195; 89 89 196; 90 90 197; 91 91 198; 92 92 199
151. 93 93 200; 94 94 201; 95 95 202; 96 96 203; 106 213 400; 107 214 401; 108 1 2
152. 109 2 3; 110 3 4; 111 4 343; 113 6 7; 115 8 9; 116 9 10; 117 10 11; 118 11 12

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENT Page


II.anl
3 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 4

153. 119 12 13; 120 14 15; 121 15 16; 122 16 17; 123 17 342; 125 19 20; 127 21 22
154. 128 22 23; 129 23 24; 130 24 25; 131 25 26; 132 27 367; 133 28 29; 134 29 30
155. 135 30 31; 137 33 34; 138 34 35; 139 35 36; 140 36 355; 141 39 331; 142 40 346
156. 143 54 42; 144 42 340; 146 44 45; 147 45 46; 150 47 332; 152 48 49; 153 49 50
157. 155 51 354; 156 67 55; 157 55 339; 158 56 57; 159 57 58; 160 58 59; 162 60 333
158. 163 66 344; 164 61 62; 165 62 63; 166 63 64; 167 64 353; 168 65 68; 169 81 69
159. 170 69 338; 171 70 71; 172 71 72; 173 72 73; 175 74 102; 176 102 80; 178 75 76
160. 179 76 77; 180 77 78; 181 78 79; 182 79 82; 183 95 83; 184 83 337; 185 85 86
161. 186 86 87; 188 88 103; 189 103 94; 191 89 90; 192 90 91; 193 92 93; 194 93 96
162. 195 95 81; 196 81 67; 197 67 54; 198 83 69; 199 55 42; 200 42 325; 201 27 14
163. 202 14 1; 203 56 334; 204 43 28; 205 85 322; 206 71 322; 207 57 335; 208 44 29
164. 209 17 4; 210 88 74; 212 60 47; 213 47 39; 214 39 32; 215 19 6; 216 103 419
165. 218 20 323; 219 66 348; 220 53 40; 221 21 324; 222 89 75; 224 61 48; 225 48 41
166. 226 41 33; 227 22 9; 228 91 336; 229 77 336; 230 63 329; 231 50 327; 232 24 11
167. 233 64 330; 234 51 328; 235 25 12; 236 65 357; 237 52 361; 238 37 26
168. 239 26 13; 240 96 82; 241 82 68; 242 1 215; 243 2 216; 244 3 217; 245 4 218
169. 246 5 219; 247 6 220; 248 7 221; 249 8 222; 250 9 223; 251 10 224; 252 11 225
170. 253 12 226; 254 13 227; 255 14 228; 256 15 229; 257 16 230; 258 17 231
171. 259 18 232; 260 19 233; 261 20 234; 262 21 235; 263 22 236; 264 23 237
172. 265 24 238; 266 25 239; 267 26 240; 268 27 241; 269 28 242; 270 29 243
173. 271 30 244; 272 31 245; 273 32 246; 274 33 247; 275 34 248; 276 35 249
174. 277 36 250; 278 37 251; 279 38 252; 280 39 253; 281 40 254; 282 41 255
175. 283 42 256; 284 43 257; 285 44 258; 286 45 259; 287 46 260; 288 47 261
176. 289 48 262; 290 49 408; 291 50 264; 292 51 265; 293 52 266; 294 53 267
177. 295 54 268; 296 55 269; 297 56 270; 298 57 271; 299 58 272; 300 59 273
178. 301 60 274; 302 61 275; 303 62 276; 304 63 277; 305 64 278; 306 65 279
179. 307 66 280; 308 67 281; 309 68 282; 310 69 283; 311 70 284; 312 71 285
180. 313 72 286; 314 73 287; 315 74 288; 316 75 289; 317 76 290; 318 77 291
181. 319 78 292; 320 79 293; 321 80 294; 322 81 295; 323 82 296; 324 83 297
182. 325 84 298; 326 85 299; 327 86 300; 328 87 301; 329 88 302; 330 89 303
183. 331 90 304; 332 91 305; 333 92 306; 334 93 307; 335 94 308; 336 95 309
184. 337 96 310; 350 84 322; 351 323 7; 352 324 8; 353 323 324; 354 325 27
185. 356 325 366; 357 327 35; 358 328 36; 359 327 328; 360 329 50; 361 330 51
186. 362 329 330; 363 331 40; 364 332 53; 365 333 66; 366 331 332; 367 332 347
187. 368 334 43; 369 335 44; 370 334 335; 372 336 92; 373 337 84; 374 338 70
188. 375 337 338; 376 339 56; 377 340 43; 378 339 340; 380 340 341; 381 342 18
189. 382 343 5; 383 342 343; 384 53 345; 385 344 61; 386 345 48; 387 344 350
190. 388 346 41; 389 345 346; 390 347 333; 391 348 349; 392 347 348; 393 349 53
191. 394 350 345; 395 349 350; 396 94 89; 397 94 418; 398 80 75; 400 353 65
192. 401 354 52; 402 353 356; 403 355 363; 404 354 360; 405 356 354; 406 357 52
193. 407 356 357; 408 358 355; 409 359 37; 410 358 362; 411 360 358; 412 361 359
194. 413 360 364; 414 362 359; 415 363 37; 416 362 363; 417 364 361; 418 364 362
195. 419 365 28; 420 341 365; 421 366 341; 422 367 365; 423 366 367; 424 215 216
196. 425 216 217; 426 217 218; 427 218 219; 430 221 222; 431 222 223; 432 223 224
197. 433 224 225; 434 225 226; 435 226 227; 436 228 229; 437 229 230; 438 230 231
198. 439 231 232; 441 233 234; 442 234 235; 443 235 236; 444 236 237; 445 237 238
199. 446 238 239; 447 239 240; 448 241 242; 449 242 243; 450 243 244; 451 244 245
200. 453 247 248; 454 248 249; 455 249 250; 456 250 251; 458 253 380; 459 254 382
201. 460 268 256; 461 256 257; 462 257 258; 463 258 259; 464 259 260; 466 261 267
202. 467 267 262; 468 262 263; 469 263 264; 470 264 265; 471 265 266; 472 281 269
203. 473 269 270; 474 270 271; 475 271 272; 476 272 273; 478 274 280; 479 280 275
204. 480 275 276; 481 276 277; 482 277 278; 483 278 279; 484 279 282; 485 295 283
205. 486 283 284; 487 284 285; 488 285 286; 489 286 287; 491 288 294; 494 289 290
206. 495 290 291; 496 291 292; 497 292 293; 498 293 296; 499 309 297; 500 297 298
207. 501 299 300; 502 300 301; 504 302 308; 507 303 304; 508 304 305; 509 306 307
208. 510 307 310; 511 268 281; 512 281 295; 513 295 309; 514 215 228; 515 228 241

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENT Page


II.anl
4 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 5

209. 516 241 256; 517 256 269; 518 283 297; 519 216 229; 521 242 257; 522 257 270
210. 523 284 298; 524 217 230; 525 230 243; 526 243 258; 527 258 271; 528 285 372
211. 530 218 231; 532 259 272; 533 286 300; 534 219 232; 535 232 245; 536 245 252
212. 537 252 260; 538 260 273; 539 273 287; 540 287 301; 542 220 233; 543 233 246
213. 544 246 253; 545 253 261; 546 261 274; 547 274 288; 548 288 302; 550 221 234
214. 553 254 267; 554 267 280; 557 294 289; 558 294 308; 559 308 303; 561 222 235
215. 562 223 236; 563 236 247; 564 247 255; 565 255 262; 566 262 275; 567 289 303
216. 569 224 237; 571 263 276; 572 290 304; 573 225 238; 574 249 264; 575 264 277
217. 576 291 371; 578 226 239; 579 250 265; 580 265 278; 581 292 306; 582 227 240
218. 583 240 251; 584 251 266; 585 266 279; 586 293 307; 587 282 296; 588 296 310
219. 589 371 305; 590 371 306; 591 372 299; 592 298 372; 597 7 373; 598 8 375
220. 599 373 375; 603 234 380; 604 380 254; 606 235 382; 607 382 255; 608 238 249
221. 610 275 289; 611 277 291; 612 271 285; 613 220 221; 617 220 394; 618 394 414
222. 619 395 223; 629 400 394; 630 6 400; 631 401 395; 632 400 404; 633 9 401
223. 638 404 401; 639 405 404; 642 408 263; 643 408 409; 644 409 410; 645 49 410
224. 646 410 411; 649 414 415; 650 415 395; 652 414 221; 654 415 222; 655 32 19
225. 656 74 60; 657 87 73; 658 73 59; 659 59 46; 660 46 38; 661 38 31; 662 31 18
226. 663 18 5; 664 33 22; 665 75 61; 666 229 242; 667 269 283; 668 270 284
227. 669 231 244; 670 280 294; 671 276 290; 672 237 248; 673 239 250; 674 278 292
228. 675 279 293; 676 272 286; 677 418 80; 678 419 102; 679 418 419; 681 373 421
229. 682 375 422; 689 138 139
230. START GROUP DEFINITION
231. JOINT
232. _F1 161 202 213 214 405
233. _F2 108 TO 111 116 TO 120 127 128 147 148
234. _F3 190 191 199 200 203
235. _F4 149 TO 152 155 157 TO 160 201
236. _F5 192 193 196 TO 198
237. _F6-1 121 TO 124 129 TO 133
238. _F6-2 134 TO 137 140 TO 144
239. _F7-1 163 TO 165 168 TO 173 175
240. _F7-2 177 TO 179 182 TO 187 189
241. _F8-1 114 115
242. _F8-2 421 422
243. _F9-1 411
244. _F9-2 156
245. _F10-1 112 145 153 194
246. _F10-2 113 146 154 195
247. _F11-1 174
248. _F11-2 188
249. _F13 162 176
250. _F12 166 167 180 181
251. END GROUP DEFINITION
252. DEFINE MATERIAL START
253. ISOTROPIC CONCRETE
254. E 2.17184E+007
255. POISSON 0.17
256. DENSITY 25
257. ALPHA 5.5E-006
258. DAMP 0.05
259. END DEFINE MATERIAL
260. MEMBER PROPERTY BRITISH
261. 108 TO 111 113 115 TO 123 125 127 TO 131 133 141 TO 143 150 156 TO 160 162 -
262. 163 TO 173 175 176 178 TO 186 188 189 191 TO 207 209 210 212 TO 216 -
263. 218 TO 222 224 227 TO 230 232 TO 241 350 TO 352 354 358 360 361 363 TO 365 -
264. 368 369 372 TO 374 376 381 382 384 TO 386 388 391 393 396 TO 398 400 404 -

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENT Page


II.anl
5 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 6

265. 406 408 409 411 412 597 TO 599 630 632 633 638 655 TO 665 677 678 -
266. 689 PRIS YD 0.7 ZD 0.35
267. 132 134 135 137 TO 140 144 146 147 153 155 208 226 231 357 377 401 403 415 -
268. 419 422 PRIS YD 0.7 ZD 0.3
269. 353 356 359 362 366 367 370 375 378 380 383 387 389 390 392 394 395 402 405 -
270. 407 410 413 414 416 TO 418 420 421 423 679 PRIS YD 0.55 ZD 0.3
271. 152 225 PRIS YD 0.75 ZD 0.35
272. 424 TO 427 430 TO 439 441 TO 451 453 TO 456 458 TO 464 466 TO 476 478 TO 489 -
273. 491 494 TO 502 504 507 TO 519 521 TO 527 530 532 534 TO 539 542 TO 547 550 -
274. 553 554 557 559 561 TO 566 569 571 573 TO 575 578 TO 588 590 592 603 604 -
275. 606 TO 608 610 TO 613 617 619 652 654 666 TO 676 PRIS YD 0.65 ZD 0.35
276. 528 533 540 548 558 567 572 576 589 591 PRIS YD 0.7 ZD 0.35
277. 618 649 650 PRIS YD 0.8 ZD 0.35
278. 1 TO 96 106 107 242 TO 337 629 631 642 644 646 PRIS YD 0.4 ZD 0.4
279. 639 681 682 PRIS YD 0.4 ZD 0.4
280. 643 645 PRIS YD 0.55 ZD 0.3
281. CONSTANTS
282. MATERIAL CONCRETE ALL
283. SUPPORTS
284. 108 TO 203 213 214 405 411 421 422 FIXED
285. MEMBER RELEASE
286. 216 353 356 359 362 366 367 370 372 375 378 380 383 387 389 392 395 402 404 -
287. 407 410 413 416 418 423 590 652 654 679 START MY MZ
288. 350 353 359 362 366 370 375 378 383 389 390 392 394 395 405 407 408 414 416 -
289. 417 TO 418 420 421 423 592 603 606 678 679 END MY MZ
290. DEFINE UBC LOAD
291. ZONE 0.075 I 1.25 RWX 5.6 RWZ 5.6 STYP 5 CT 0.0731
292. SELFWEIGHT
293. MEMBER WEIGHT
294. *** STAIR LOAD ***********
295. 643 UNI 27.065
296. 574 UNI 27.065 5.79 6.95
297. 225 UNI 27.065 0 1.2
298. ****300 THICK CAVITY WALL LOAD
299. 108 TO 111 113 115 TO 119 134 135 137 138 143 146 147 152 153 168 183 TO 186 -
300. 188 189 191 TO 197 200 TO 202 205 208 213 214 225 226 228 231 236 TO 241 -
301. 350 354 357 372 373 382 396 406 409 412 597 TO 599 UNI 20.4
302. ****200 THICK HOLLOW CONCRETE BLOCK WALL LOAD
303. 120 TO 123 125 127 TO 133 139 TO 142 144 150 155 TO 160 162 TO 167 -
304. 169 TO 173 175 176 178 TO 182 198 199 203 204 206 207 209 210 212 215 216 -
305. 218 TO 222 224 227 229 230 232 TO 235 351 TO 353 356 358 TO 363 365 TO 370 -
306. 374 TO 378 380 381 383 TO 391 393 394 397 398 400 TO 405 407 408 410 411 -
307. 413 TO 423 677 TO 679 UNI 13.6
308. ****150 THICK HOLLOW CONCRETE BLOCK WALL LOAD
309. 364 392 395 UNI 10.2
310. ***********HVAC LOAD****************
311. 489 UNI 3.6 0 2.241
312. 533 UNI 3.6 0 4.193
313. 481 495 UNI 5.5 0.5 2.741
314. 439 451 UNI 1.643 2.095 4.295
315. 445 454 UNI 1.786 0.5 2.7
316. 424 TO 427 430 TO 435 450 451 453 454 460 463 464 468 469 484 499 TO 502 504 -
317. 507 TO 516 526 536 537 559 564 565 574 582 TO 585 587 TO 592 613 617 TO 619 -
318. 649 650 UNI 9.375
319. *********DEAD LOAD SLAB+ROOF FINISH***********
320. MEMBER WEIGHT

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENT Page


II.anl
6 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 7

321. 513 518 UNI 10.65


322. 485 499 UNI 7.33
323. 518 523 581 586 UNI 13.39
324. 486 497 500 509 UNI 13.28
325. 523 528 576 581 UNI 11.9
326. 487 496 590 592 UNI 8.93
327. 498 510 UNI 14.55
328. 586 588 UNI 13.39
329. 528 533 567 572 576 589 591 UNI 15
330. 572 UNI 15
331. 488 494 495 501 507 508 UNI 11.1
332. 533 540 UNI 14.31
333. 489 502 UNI 10.19
334. 548 558 UNI 16.39
335. 491 504 UNI 13.6
336. 558 567 UNI 15.11
337. 557 559 UNI 11.26
338. 472 485 UNI 6.78
339. 512 667 UNI 5.31
340. 436 447 448 456 473 483 486 497 UNI 8.5
341. 515 583 666 TO 668 673 TO 675 UNI 5.31
342. 437 446 449 455 474 482 487 496 UNI 7.46
343. 525 608 611 612 666 668 673 674 UNI 5.31
344. 438 444 445 450 453 454 475 480 481 488 494 495 UNI 8.08
345. 525 563 608 610 TO 612 669 671 672 676 UNI 5.31
346. 671 672 UNI 5.31
347. 439 451 476 489 UNI 7.86
348. 535 539 669 676 UNI 5.31
349. 478 491 UNI 8.55
350. 547 670 UNI 5.31
351. 479 557 UNI 8.12
352. 610 670 UNI 5.31
353. 484 498 UNI 8.7
354. 587 675 UNI 5.31
355. 511 517 UNI 10.45
356. 460 472 UNI 7.33
357. 461 471 473 483 UNI 13.26
358. 517 522 580 585 UNI 12.75
359. 522 527 575 580 UNI 11.6
360. 462 470 474 482 UNI 8.93
361. 527 532 566 571 575 UNI 12.54
362. 571 UNI 12.54
363. 463 468 469 475 480 481 UNI 11.1
364. 532 538 UNI 12.24
365. 464 476 UNI 10.19
366. 466 478 UNI 13.55
367. 546 554 UNI 12.75
368. 554 566 UNI 12.58
369. 467 479 UNI 11.26
370. 516 521 579 584 UNI 14.62
371. 448 456 461 471 UNI 13.28
372. 521 526 574 579 UNI 12.46
373. 449 455 462 470 UNI 8.93
374. 458 466 604 UNI 10.77
375. 545 553 UNI 7.4
376. 459 467 607 UNI 9.93

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENT Page


II.anl
7 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 8

377. 553 565 UNI 7.4


378. 543 544 563 564 603 606 UNI 10.77
379. 441 443 458 607 UNI 7.76
380. 603 606 UNI 11.81
381. 442 459 604 UNI 9.35
382. 424 435 436 447 UNI 12.97
383. 514 519 578 582 UNI 11.26
384. 519 524 573 578 UNI 10.78
385. 425 434 437 446 UNI 8.93
386. 524 530 562 569 573 UNI 11.26
387. 569 UNI 11.26
388. 426 432 433 438 444 445 UNI 11.1
389. 530 534 UNI 11.16
390. 427 439 UNI 10.18
391. 542 550 561 562 UNI 10.17
392. 431 441 443 613 UNI 7.76
393. 550 561 UNI 10.94
394. 430 442 UNI 9.35
395. 431 613 618 650 UNI 7.75
396. 617 619 652 654 UNI 7.65
397. 430 649 UNI 9.04
398. 652 654 UNI 15.3
399. **********LIVE LOAD 50%*******************
400. **********STAIR LOAD**********
401. MEMBER WEIGHT
402. 643 UNI 5.22
403. 574 UNI 5.22 5.79 6.95
404. 225 UNI 5.22 0 1.2
405. *********SLAB LOAD****************
406. MEMBER WEIGHT
407. 513 518 UNI 1.255
408. 485 499 UNI 0.865
409. 518 523 581 586 UNI 1.575
410. 486 497 500 509 UNI 1.565
411. 523 528 576 581 UNI 1.4
412. 487 496 590 592 UNI 1.05
413. 498 510 UNI 1.71
414. 586 588 UNI 1.575
415. 528 533 567 572 576 589 591 UNI 1.765
416. 572 UNI 1.765
417. 488 494 495 501 507 508 UNI 1.305
418. 533 540 UNI 1.685
419. 489 502 UNI 1.2
420. 548 558 UNI 1.93
421. 491 504 UNI 1.6
422. 558 567 UNI 1.78
423. 557 559 UNI 1.325
424. 472 485 UNI 0.795
425. 512 667 UNI 0.625
426. 436 447 448 456 473 483 486 497 UNI 1
427. 515 583 666 TO 668 673 TO 675 UNI 0.625
428. 437 446 449 455 474 482 487 496 UNI 0.88
429. 525 608 611 612 666 668 673 674 UNI 0.625
430. 438 444 445 450 453 454 475 480 481 488 494 495 UNI 0.95
431. 525 563 608 610 TO 612 669 671 672 676 UNI 0.625
432. 671 672 UNI 0.625

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENT Page


II.anl
8 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 9

433. 439 451 476 489 UNI 0.925


434. 535 539 669 676 UNI 0.625
435. 478 491 UNI 1.005
436. 547 670 UNI 0.625
437. 479 557 UNI 0.955
438. 610 670 UNI 0.625
439. 484 498 UNI 1.025
440. 587 675 UNI 0.625
441. 511 517 UNI 1.23
442. 460 472 UNI 0.865
443. 461 471 473 483 UNI 1.56
444. 517 522 580 585 UNI 1.5
445. 522 527 575 580 UNI 1.365
446. 462 470 474 482 UNI 1.05
447. 527 532 566 571 575 UNI 1.475
448. 571 UNI 1.475
449. 463 468 469 475 480 481 UNI 1.305
450. 532 538 UNI 1.44
451. 464 476 UNI 1.2
452. 466 478 UNI 1.595
453. 546 554 UNI 1.5
454. 554 566 UNI 1.48
455. 467 479 UNI 1.325
456. 516 521 579 584 UNI 1.72
457. 448 456 461 471 UNI 1.565
458. 521 526 574 579 UNI 1.465
459. 449 455 462 470 UNI 1.05
460. 458 466 604 UNI 1.265
461. 545 553 UNI 0.87
462. 459 467 607 UNI 1.17
463. 553 565 UNI 0.87
464. 543 544 563 564 603 606 UNI 1.265
465. 441 443 458 607 UNI 0.915
466. 603 606 UNI 1.39
467. 442 459 604 UNI 1.1
468. 424 435 436 447 UNI 1.525
469. 514 519 578 582 UNI 1.325
470. 519 524 573 578 UNI 1.27
471. 425 434 437 446 UNI 1.05
472. 524 530 562 569 573 UNI 1.325
473. 569 UNI 1.325
474. 426 432 433 438 444 445 UNI 1.305
475. 530 534 UNI 1.315
476. 427 439 UNI 1.2
477. 542 550 561 562 UNI 1.195
478. 431 441 443 613 UNI 0.915
479. 550 561 UNI 1.285
480. 430 442 UNI 1.1
481. 431 613 618 650 UNI 0.91
482. 617 619 652 654 UNI 0.9
483. 430 649 UNI 1.065
484. 652 654 UNI 1.8
485. LOAD 1 LOADTYPE SEISMIC TITLE LOAD CASE 1 - SEISMIC LOAD IN X DIRECTION
486. UBC LOAD X 1

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENT Page


II.anl
9 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 10

487. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 357/ 582/ 102

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER

ORIGINAL/FINAL BAND-WIDTH= 338/ 28/ 132 DOF


TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 1530
SIZE OF STIFFNESS MATRIX = 202 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 14.9/ 20871.8 MB

***********************************************************
* *
* X DIRECTION : Ta = 0.278 Tb = 0.417 Tuser = 0.000 *
* T = 0.278, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.1060 x 42021.21 = 4455.37 KN *
* *
***********************************************************

488. CHANGE
489. LOAD 2 LOADTYPE SEISMIC TITLE LOAD CASE 2 - SEISMIC LOAD IN Z -DIRECTION
490. UBC LOAD Z 1
491. PERFORM ANALYSIS

***********************************************************
* *
* Z DIRECTION : Ta = 0.278 Tb = 0.452 Tuser = 0.000 *
* T = 0.278, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.1060 x 42021.21 = 4455.37 KN *
* *
***********************************************************

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
10 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 11

492. CHANGE
493. LOAD 3 LOADTYPE DEAD TITLE LOAD CASE 3 - DEADLOAD- SELF WEIGHT
494. SELFWEIGHT Y -1
495. LOAD 4 LOADTYPE NONE TITLE LOADCASE 4 DEADLOAD - PARTITION WALL LOAD+STAIR LD
496. MEMBER LOAD
497. ****300 THICK CAVITY WALL LOAD
498. 108 TO 111 113 115 TO 119 134 135 137 138 143 146 147 152 153 168 183 TO 186 -
499. 188 189 191 TO 197 200 TO 202 205 208 213 214 225 226 228 231 236 TO 241 -
500. 350 354 357 372 373 382 396 406 409 412 597 TO 599 UNI GY -20.4
501. ****200 THICK HOLLOW CONCRETE BLOCK WALL LOAD
502. 120 TO 123 125 127 TO 133 139 TO 142 144 150 155 TO 160 162 TO 167 -
503. 169 TO 173 175 176 178 TO 182 198 199 203 204 206 207 209 210 212 215 216 -
504. 218 TO 222 224 227 229 230 232 TO 235 351 TO 353 356 358 TO 363 365 TO 370 -
505. 374 TO 378 380 381 383 TO 391 393 394 397 398 400 TO 405 407 408 410 411 -
506. 413 TO 423 677 TO 679 UNI GY -13.6
507. ****150 THICK HOLLOW CONCRETE BLOCK WALL LOAD
508. 364 392 395 UNI GY -10.2
509. ***********HVAC LOAD****************
510. 489 UNI GY -3.6 0 2.241
511. 533 UNI GY -3.6 0 4.193
512. 481 495 UNI GY -5.5 0.5 2.741
513. 439 451 UNI GY -1.643 2.095 4.295
514. 445 454 UNI GY -1.786 0.5 2.7
515. LOAD 5 LOADTYPE DEAD TITLE LOAD CASE 5 - DEAD LOAD -PARAPET WALL LOAD
516. MEMBER LOAD
517. 424 TO 427 430 TO 435 450 451 453 454 460 463 464 468 469 484 499 TO 502 504 -
518. 507 TO 516 526 536 537 559 564 565 574 582 TO 585 587 TO 592 613 617 TO 619 -
519. 649 650 UNI GY -9.375
520. 463 464 468 469 499 TO 502 504 507 TO 516 526 559 564 565 590 TO 591 -
521. 592 UMOM X -4.922
522. 424 TO 427 430 TO 435 450 451 453 454 536 537 574 582 TO 585 587 TO 589 613 -
523. 617 TO 619 649 650 UMOM X 4.922
524. LOAD 6 LOADTYPE NONE TITLE LOADCASE 6 DEAD LOAD OF SLAB+ROOF FINISH+
525. ****FALL CEILING
526. **********STAIR LOAD**********
527. MEMBER LOAD
528. 643 UNI GY -27.065
529. 574 UNI GY -27.065 5.79 6.95
530. 225 UNI GY -27.065 0 1.2
531. ********* SLAB LOAD ********************************
532. 513 518 UNI GY -10.65
533. 485 499 UNI GY -7.33
534. 518 523 581 586 UNI GY -13.39
535. 486 497 500 509 UNI GY -13.28
536. 523 528 576 581 UNI GY -11.9
537. 487 496 590 592 UNI GY -8.93
538. 498 510 UNI GY -14.55
539. 586 588 UNI GY -13.39
540. 528 533 567 572 576 589 591 UNI GY -15
541. 572 UNI GY -15
542. 488 494 495 501 507 508 UNI GY -11.1
543. 533 540 UNI GY -14.31
544. 489 502 UNI GY -10.19
545. 548 558 UNI GY -16.39
546. 491 504 UNI GY -13.6

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
11 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 12

547. 558 567 UNI GY -15.11


548. 557 559 UNI GY -11.26
549. 472 485 UNI GY -6.78
550. 512 667 UNI GY -5.31
551. 436 447 448 456 473 483 486 497 UNI GY -8.5
552. 515 583 666 TO 668 673 TO 675 UNI GY -5.31
553. 437 446 449 455 474 482 487 496 UNI GY -7.46
554. 525 608 611 612 666 668 673 674 UNI GY -5.31
555. 438 444 445 450 453 454 475 480 481 488 494 495 UNI GY -8.08
556. 525 563 608 610 TO 612 669 671 672 676 UNI GY -5.31
557. 671 672 UNI GY -5.31
558. 439 451 476 489 UNI GY -7.86
559. 535 539 669 676 UNI GY -5.31
560. 478 491 UNI GY -8.55
561. 547 670 UNI GY -5.31
562. 479 557 UNI GY -8.12
563. 610 670 UNI GY -5.31
564. 484 498 UNI GY -8.7
565. 587 675 UNI GY -5.31
566. 511 517 UNI GY -10.45
567. 460 472 UNI GY -7.33
568. 461 471 473 483 UNI GY -13.26
569. 517 522 580 585 UNI GY -12.75
570. 522 527 575 580 UNI GY -11.6
571. 462 470 474 482 UNI GY -8.93
572. 527 532 566 571 575 UNI GY -12.54
573. 571 UNI GY -12.54
574. 463 468 469 475 480 481 UNI GY -11.1
575. 532 538 UNI GY -12.24
576. 464 476 UNI GY -10.19
577. 466 478 UNI GY -13.55
578. 546 554 UNI GY -12.75
579. 554 566 UNI GY -12.58
580. 467 479 UNI GY -11.26
581. 516 521 579 584 UNI GY -14.62
582. 448 456 461 471 UNI GY -13.28
583. 521 526 574 579 UNI GY -12.46
584. 449 455 462 470 UNI GY -8.93
585. 458 466 604 UNI GY -10.77
586. 545 553 UNI GY -7.4
587. 459 467 607 UNI GY -9.93
588. 553 565 UNI GY -7.4
589. 543 544 563 564 603 606 UNI GY -10.77
590. 441 443 458 607 UNI GY -7.76
591. 603 606 UNI GY -11.81
592. 442 459 604 UNI GY -9.35
593. 424 435 436 447 UNI GY -12.97
594. 514 519 578 582 UNI GY -11.26
595. 519 524 573 578 UNI GY -10.78
596. 425 434 437 446 UNI GY -8.93
597. 524 530 562 569 573 UNI GY -11.26
598. 569 UNI GY -11.26
599. 426 432 433 438 444 445 UNI GY -11.1
600. 530 534 UNI GY -11.16
601. 427 439 UNI GY -10.18
602. 542 550 561 562 UNI GY -10.17

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
12 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 13

603. 431 441 443 613 UNI GY -7.76


604. 550 561 UNI GY -10.94
605. 430 442 UNI GY -9.35
606. 431 613 618 650 UNI GY -7.75
607. 617 619 652 654 UNI GY -7.65
608. 430 649 UNI GY -9.04
609. 652 654 UNI GY -15.3
610. LOAD 7 LOADTYPE LIVE TITLE LOAD CASE 7 - LIVE LOAD ON ROOF SLAB
611. **********STAIR LOAD**********
612. MEMBER LOAD
613. 643 UNI GY -10.44
614. 574 UNI GY -10.44 5.79 6.95
615. 225 UNI GY -10.44 0 1.2
616. *********SLAB LOAD****************
617. MEMBER LOAD
618. 513 518 UNI GY -2.51
619. 485 499 UNI GY -1.73
620. 518 523 581 586 UNI GY -3.15
621. 486 497 500 509 UNI GY -3.13
622. 523 528 576 581 UNI GY -2.8
623. 487 496 590 592 UNI GY -2.1
624. 498 510 UNI GY -3.42
625. 586 588 UNI GY -3.15
626. 528 533 567 572 576 589 591 UNI GY -3.53
627. 572 UNI GY -3.53
628. 488 494 495 501 507 508 UNI GY -2.61
629. 533 540 UNI GY -3.37
630. 489 502 UNI GY -2.4
631. 548 558 UNI GY -3.86
632. 491 504 UNI GY -3.2
633. 558 567 UNI GY -3.56
634. 557 559 UNI GY -2.65
635. 472 485 UNI GY -1.59
636. 512 667 UNI GY -1.25
637. 436 447 448 456 473 483 486 497 UNI GY -2
638. 515 583 666 TO 668 673 TO 675 UNI GY -1.25
639. 437 446 449 455 474 482 487 496 UNI GY -1.76
640. 525 608 611 612 666 668 673 674 UNI GY -1.25
641. 438 444 445 450 453 454 475 480 481 488 494 495 UNI GY -1.9
642. 525 563 608 610 TO 612 669 671 672 676 UNI GY -1.25
643. 671 672 UNI GY -1.25
644. 439 451 476 489 UNI GY -1.85
645. 535 539 669 676 UNI GY -1.25
646. 478 491 UNI GY -2.01
647. 547 670 UNI GY -1.25
648. 479 557 UNI GY -1.91
649. 610 670 UNI GY -1.25
650. 484 498 UNI GY -2.05
651. 587 675 UNI GY -1.25
652. 511 517 UNI GY -2.46
653. 460 472 UNI GY -1.73
654. 461 471 473 483 UNI GY -3.12
655. 517 522 580 585 UNI GY -3
656. 522 527 575 580 UNI GY -2.73
657. 462 470 474 482 UNI GY -2.1
658. 527 532 566 571 575 UNI GY -2.95

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
13 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 14

659. 571 UNI GY -2.95


660. 463 468 469 475 480 481 UNI GY -2.61
661. 532 538 UNI GY -2.88
662. 464 476 UNI GY -2.4
663. 466 478 UNI GY -3.19
664. 546 554 UNI GY -3
665. 554 566 UNI GY -2.96
666. 467 479 UNI GY -2.65
667. 516 521 579 584 UNI GY -3.44
668. 448 456 461 471 UNI GY -3.13
669. 521 526 574 579 UNI GY -2.93
670. 449 455 462 470 UNI GY -2.1
671. 458 466 604 UNI GY -2.53
672. 545 553 UNI GY -1.74
673. 459 467 607 UNI GY -2.34
674. 553 565 UNI GY -1.74
675. 543 544 563 564 603 606 UNI GY -2.53
676. 441 443 458 607 UNI GY -1.83
677. 603 606 UNI GY -2.78
678. 442 459 604 UNI GY -2.2
679. 424 435 436 447 UNI GY -3.05
680. 514 519 578 582 UNI GY -2.65
681. 519 524 573 578 UNI GY -2.54
682. 425 434 437 446 UNI GY -2.1
683. 524 530 562 569 573 UNI GY -2.65
684. 569 UNI GY -2.65
685. 426 432 433 438 444 445 UNI GY -2.61
686. 530 534 UNI GY -2.63
687. 427 439 UNI GY -2.4
688. 542 550 561 562 UNI GY -2.39
689. 431 441 443 613 UNI GY -1.83
690. 550 561 UNI GY -2.57
691. 430 442 UNI GY -2.2
692. 431 613 618 650 UNI GY -1.82
693. 617 619 652 654 UNI GY -1.8
694. 430 649 UNI GY -2.13
695. 652 654 UNI GY -3.6
696. LOAD 8 LOADTYPE WIND TITLE LOAD CASE 8 - WIND IN X - DIRECTION
697. MEMBER LOAD
698. 326 UNI GX 2.54
699. 336 UNI GX 4.58
700. 322 UNI GX 6.39
701. 308 UNI GX 6.17
702. 295 UNI GX 4.36
703. 283 UNI GX 5.05
704. 268 UNI GX 6.86
705. 255 UNI GX 5.66
706. 242 UNI GX 3.85
707. 248 UNI GX 1.82
708. 332 UNI GX 0.56
709. 332 337 UNI GX 1.02
710. 323 UNI GX 1.42
711. 309 UNI GX 0.4
712. 306 UNI GX 0.97
713. 293 UNI GX 2.09
714. 278 UNI GX 1.53

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
14 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 15

715. 267 UNI GX 1.26


716. 254 UNI GX 0.86
717. 249 UNI GX 0.4
718. 283 295 UNI GZ 2.78
719. 242 UNI GZ 5.04
720. 243 UNI GZ 8.43
721. 244 UNI GZ 7.6
722. 245 UNI GZ 8.43
723. 246 247 UNI GZ 3.58
724. 248 UNI GZ 6.5
725. 249 UNI GZ 6.5
726. 250 UNI GZ 7.16
727. 251 UNI GZ 8.43
728. 252 UNI GZ 7.6
729. 253 UNI GZ 8.43
730. 254 UNI GZ 5.04
731. 306 309 UNI GZ 5.57
732. 336 UNI GZ -2.78
733. 324 UNI GZ -7.83
734. 325 UNI GZ -8.43
735. 326 UNI GZ -7.6
736. 327 UNI GZ -8.43
737. 328 329 UNI GZ -4.69
738. 335 UNI GZ -9.44
739. 330 UNI GZ -8.49
740. 331 UNI GZ -8.43
741. 332 UNI GZ -7.6
742. 333 UNI GZ -8.43
743. 334 UNI GZ -10.61
744. 337 UNI GZ -5.57
745. LOAD 9 LOADTYPE WIND TITLE LOAD CASE 9 - WIND IN -X - DIRECTION
746. MEMBER LOAD
747. 326 UNI GX -0.56
748. 336 UNI GX -1.02
749. 322 UNI GX -1.42
750. 308 UNI GX -1.37
751. 295 UNI GX -0.97
752. 283 UNI GX -1.12
753. 268 UNI GX -1.53
754. 255 UNI GX -1.26
755. 242 UNI GX -0.86
756. 248 UNI GX -0.4
757. 332 UNI GX -2.54
758. 332 337 UNI GX -4.58
759. 323 UNI GX -6.39
760. 309 UNI GX -1.82
761. 306 UNI GX -4.36
762. 293 UNI GX -9.4
763. 278 UNI GX -6.86
764. 267 UNI GX -5.66
765. 254 UNI GX -3.85
766. 249 UNI GX -1.82
767. 283 295 UNI GZ 2.78
768. 242 UNI GZ 5.04
769. 243 UNI GZ 8.43
770. 244 UNI GZ 7.6

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
15 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 16

771. 245 UNI GZ 8.43


772. 246 247 UNI GZ 3.58
773. 248 UNI GZ 6.5
774. 249 UNI GZ 6.5
775. 250 UNI GZ 7.16
776. 251 UNI GZ 8.43
777. 252 UNI GZ 7.6
778. 253 UNI GZ 8.43
779. 254 UNI GZ 5.04
780. 306 309 UNI GZ 5.57
781. 336 UNI GZ -2.78
782. 324 UNI GZ -7.83
783. 325 UNI GZ -8.43
784. 326 UNI GZ -7.6
785. 327 UNI GZ -8.43
786. 328 329 UNI GZ -4.69
787. 335 UNI GZ -9.44
788. 330 UNI GZ -8.49
789. 331 UNI GZ -8.43
790. 332 UNI GZ -7.6
791. 333 UNI GZ -8.43
792. 334 UNI GZ -10.61
793. 337 UNI GZ -5.57
794. LOAD 10 LOADTYPE WIND TITLE LOAD CASE 10 - WIND IN -Z - DIRECTION
795. MEMBER LOAD
796. 326 UNI GX -2.82
797. 336 UNI GX -5.08
798. 322 UNI GX -7.1
799. 308 UNI GX -6.86
800. 295 UNI GX -4.84
801. 283 UNI GX -5.61
802. 268 UNI GX -7.63
803. 255 UNI GX -6.29
804. 242 UNI GX -4.28
805. 248 UNI GX -2.02
806. 332 UNI GX 2.82
807. 332 337 UNI GX 5.08
808. 323 UNI GX 7.1
809. 309 UNI GX 2.02
810. 306 UNI GX 4.84
811. 293 UNI GX 10.45
812. 278 UNI GX 7.63
813. 267 UNI GX 6.29
814. 254 UNI GX 4.28
815. 249 UNI GX 2.02
816. 283 295 UNI GZ -2.51
817. 242 UNI GZ -4.54
818. 243 UNI GZ -7.59
819. 244 UNI GZ -6.84
820. 245 UNI GZ -7.59
821. 246 247 UNI GZ -6.44
822. 248 UNI GZ -5.85
823. 249 UNI GZ -5.85
824. 250 UNI GZ -6.44
825. 251 UNI GZ -7.59
826. 252 UNI GZ -6.84

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
16 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 17

827. 253 UNI GZ -7.59


828. 254 UNI GZ -4.54
829. 306 309 UNI GZ -5.01
830. 336 UNI GZ -0.56
831. 324 UNI GZ -1.57
832. 325 UNI GZ -1.69
833. 326 UNI GZ -1.52
834. 327 UNI GZ -1.69
835. 328 329 UNI GZ -1.88
836. 335 UNI GZ -1.89
837. 330 UNI GZ -1.7
838. 331 UNI GZ -1.69
839. 332 UNI GZ -1.52
840. 333 UNI GZ -1.69
841. 334 UNI GZ -2.12
842. 337 UNI GZ -1.11
843. LOAD 11 LOADTYPE WIND TITLE LOAD CASE 11 - WIND IN Z - DIRECTION
844. MEMBER LOAD
845. 326 UNI GX -2.82
846. 336 UNI GX -5.08
847. 322 UNI GX -7.1
848. 308 UNI GX -6.86
849. 295 UNI GX -4.84
850. 283 UNI GX -5.61
851. 268 UNI GX -7.63
852. 255 UNI GX -6.29
853. 242 UNI GX -4.28
854. 248 UNI GX -2.02
855. 332 UNI GX 2.82
856. 332 337 UNI GX 5.08
857. 323 UNI GX 7.1
858. 309 UNI GX 2.02
859. 306 UNI GX 4.84
860. 293 UNI GX 10.45
861. 278 UNI GX 7.63
862. 267 UNI GX 6.29
863. 254 UNI GX 4.28
864. 249 UNI GX 2.02
865. 283 295 UNI GZ 0.56
866. 242 UNI GZ 1.01
867. 243 UNI GZ 1.69
868. 244 UNI GZ 1.52
869. 245 UNI GZ 1.69
870. 246 247 UNI GZ 1.43
871. 248 UNI GZ 1.3
872. 249 UNI GZ 1.3
873. 250 UNI GZ 1.43
874. 251 UNI GZ 1.69
875. 252 UNI GZ 1.52
876. 253 UNI GZ 1.69
877. 254 UNI GZ 1.01
878. 306 309 UNI GZ 1.11
879. 336 UNI GZ 2.51
880. 324 UNI GZ 7.04
881. 325 UNI GZ 7.59
882. 326 UNI GZ 6.84

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
17 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 18

883. 327 UNI GZ 7.59


884. 328 329 UNI GZ 8.44
885. 335 UNI GZ 8.5
886. 330 UNI GZ 7.64
887. 331 UNI GZ 7.59
888. 332 UNI GZ 6.84
889. 333 UNI GZ 7.59
890. 334 UNI GZ 9.55
891. 337 UNI GZ 5.01
892. **********SERVICE LOAD COMBINATION ******************
893. LOAD COMB 12 COMBINATION LOAD CASE 12 - (DL+LL)
894. 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0
895. LOAD COMB 13 COMBINATION LOAD CASE 13 -(SLX+DL+LL)
896. 1 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0
897. LOAD COMB 14 COMBINATION LOAD CASE 14 - (SLZ+DL+LL)
898. 2 1.0 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0
899. LOAD COMB 15 COMBINATION LOAD CASE 15 -(SLX+DL)
900. 1 1.0 3 1.0 4 1.0 5 1.0 6 1.0
901. LOAD COMB 16 COMBINATION LOAD CASE 16 - (SLZ+DL)
902. 2 1.0 3 1.0 4 1.0 5 1.0 6 1.0
903. LOAD COMB 17 COMBINATION LOAD CASE 17 -(DL+WXP)
904. 3 1.0 4 1.0 5 1.0 6 1.0 8 1.0
905. LOAD COMB 18 COMBINATION LOAD CASE 18 - (DL+WXN)
906. 3 1.0 4 1.0 5 1.0 6 1.0 9 1.0
907. LOAD COMB 19 COMBINATION LOAD CASE 19 - (DL+WZP)
908. 3 1.0 4 1.0 5 1.0 6 1.0 10 1.0
909. LOAD COMB 20 COMBINATION LOAD CASE 20 -(DL+WZN)
910. 3 1.0 4 1.0 5 1.0 6 1.0 11 1.0
911. LOAD COMB 21 COMBINATION LOAD CASE 21 -(DL+LL+WXP)
912. 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 8 1.0
913. LOAD COMB 22 COMBINATION LOAD CASE 22 -(DL+LL+WXN)
914. 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 9 1.0
915. LOAD COMB 23 COMBINATION LOAD CASE 23 -(DL+LL+WZP)
916. 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 10 1.0
917. LOAD COMB 24 COMBINATION LOAD CASE 24 -(DL+LL+WZN)
918. 3 1.0 4 1.0 5 1.0 6 1.0 7 1.0 11 1.0
919. *********ULTIMATE LOAD COMBINATION******************
920. LOAD COMB 25 COMBINATION LOAD CASE 25 -(DL+LL)
921. 3 1.4 4 1.4 5 1.4 6 1.4 7 1.6
922. LOAD COMB 26 COMBINATION LOAD CASE 26 -(SLX+DL+LL)
923. 1 1.2 3 1.2 4 1.2 5 1.2 6 1.2 7 1.2
924. LOAD COMB 27 COMBINATION LOAD CASE 27 -(SLZ+DL+LL)
925. 2 1.2 3 1.2 4 1.2 5 1.2 6 1.2 7 1.2
926. LOAD COMB 28 COMBINATION LOAD CASE 28 -(SLX+DL)
927. 1 1.4 3 1.4 4 1.4 5 1.4 6 1.4
928. LOAD COMB 29 COMBINATION LOAD CASE 29 -(SLZ+DL)
929. 2 1.4 3 1.4 4 1.4 5 1.4 6 1.4
930. LOAD COMB 30 COMBINATION LOAD CASE 30 -(DL+WXP)
931. 3 1.4 4 1.4 5 1.4 6 1.4 8 1.4
932. LOAD COMB 31 COMBINATION LOAD CASE 31 -(DL+WXN)
933. 3 1.4 4 1.4 5 1.4 6 1.4 9 1.4
934. LOAD COMB 32 COMBINATION LOAD CASE 32 -(DL+WZP)
935. 3 1.4 4 1.4 5 1.4 6 1.4 10 1.4
936. LOAD COMB 33 COMBINATION LOAD CASE 33 -(DL+WZN)
937. 3 1.4 4 1.4 5 1.4 6 1.4 11 1.4
938. LOAD COMB 34 COMBINATION LOAD CASE 34 -DL+LL+WXP

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
18 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 19

939. 3 1.2 4 1.2 5 1.2 6 1.2 7 1.2 8 1.2


940. LOAD COMB 35 COMBINATION LOAD CASE 35 -DL+LL+WXN
941. 3 1.2 4 1.2 5 1.2 6 1.2 7 1.2 9 1.2
942. LOAD COMB 36 COMBINATION LOAD CASE 36 - DL+LL+WZP
943. 3 1.2 4 1.2 5 1.2 6 1.2 7 1.2 10 1.2
944. LOAD COMB 37 COMBINATION LOAD CASE 37 - DL+LL+WZN
945. 3 1.2 4 1.2 5 1.2 6 1.2 7 1.2 11 1.2
946. PERFORM ANALYSIS PRINT STATICS CHECK

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
19 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 20

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 3


LOADTYPE DEAD TITLE LOAD CASE 3 - DEADLOAD- SELF WEIGHT

***TOTAL APPLIED LOAD ( KN METE ) SUMMARY (LOADING 3 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = -11770.88
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= -175456.74 MY= 0.00 MZ= -312946.78

***TOTAL REACTION LOAD( KN METE ) SUMMARY (LOADING 3 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = 11770.88
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 175456.74 MY= 0.00 MZ= 312946.78

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 3)


MAXIMUMS AT NODE
X = -9.59719E-03 310
Y = -2.56170E-01 419
Z = 1.02866E-02 308
RX= -5.73669E-04 341
RY= -4.71804E-05 305
RZ= -5.82347E-04 394

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 4


LOADTYPE NONE TITLE LOADCASE 4 DEADLOAD - PARTITION WALL LO

***TOTAL APPLIED LOAD ( KN METE ) SUMMARY (LOADING 4 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = -11932.40
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= -182887.09 MY= 0.00 MZ= -323281.43

***TOTAL REACTION LOAD( KN METE ) SUMMARY (LOADING 4 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = 11932.40
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 182887.09 MY= 0.00 MZ= 323281.43

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
20 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 21

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 4)


MAXIMUMS AT NODE
X = -1.45759E-02 260
Y = -6.24350E-01 419
Z = 1.17880E-02 310
RX= -1.88183E-03 341
RY= -6.50493E-05 305
RZ= -9.31017E-04 366

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 5


LOADTYPE DEAD TITLE LOAD CASE 5 - DEAD LOAD -PARAPET WALL L

***TOTAL APPLIED LOAD ( KN METE ) SUMMARY (LOADING 5 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = -2597.63
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= -35844.25 MY= 0.00 MZ= -71712.26

***TOTAL REACTION LOAD( KN METE ) SUMMARY (LOADING 5 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = 2597.63
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 35844.25 MY= 0.00 MZ= 71712.26

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 5)


MAXIMUMS AT NODE
X = 8.53784E-03 252
Y = -2.40551E-01 414
Z = -1.01560E-02 263
RX= 1.01430E-03 414
RY= -2.65407E-05 305
RZ= -6.11595E-04 394

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 6


LOADTYPE NONE TITLE LOADCASE 6 DEAD LOAD OF SLAB+ROOF FINIS

***TOTAL APPLIED LOAD ( KN METE ) SUMMARY (LOADING 6 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = -14058.84
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= -221094.80 MY= 0.00 MZ= -380900.25

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
21 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 22

***TOTAL REACTION LOAD( KN METE ) SUMMARY (LOADING 6 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = 14058.84
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 221094.80 MY= 0.00 MZ= 380900.25

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 6)


MAXIMUMS AT NODE
X = -1.70857E-02 310
Y = -3.95639E-01 414
Z = -5.42706E-02 90
RX= 1.45065E-03 304
RY= -7.10497E-05 305
RZ= -1.04997E-03 394

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 7


LOADTYPE LIVE TITLE LOAD CASE 7 - LIVE LOAD ON ROOF SLAB

***TOTAL APPLIED LOAD ( KN METE ) SUMMARY (LOADING 7 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = -3322.93
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= -52238.24 MY= 0.00 MZ= -90178.39

***TOTAL REACTION LOAD( KN METE ) SUMMARY (LOADING 7 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = 3322.93
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 52238.24 MY= 0.00 MZ= 90178.39

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 7)


MAXIMUMS AT NODE
X = -4.02230E-03 310
Y = -9.31073E-02 414
Z = -1.27449E-02 90
RX= 3.41475E-04 304
RY= -1.67352E-05 305
RZ= -2.47073E-04 394

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 8


LOADTYPE WIND TITLE LOAD CASE 8 - WIND IN X - DIRECTION

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
22 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 23

***TOTAL APPLIED LOAD ( KN METE ) SUMMARY (LOADING 8 )


SUMMATION FORCE-X = 235.24
SUMMATION FORCE-Y = 0.00
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 0.00 MY= -3619.91 MZ= -811.58

***TOTAL REACTION LOAD( KN METE ) SUMMARY (LOADING 8 )


SUMMATION FORCE-X = -235.24
SUMMATION FORCE-Y = 0.00
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 0.00 MY= 3619.91 MZ= 811.58

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 8)


MAXIMUMS AT NODE
X = 5.76702E-02 268
Y = -1.12832E-02 372
Z = 7.25095E-02 224
RX= -3.29118E-04 93
RY= 9.25478E-05 299
RZ= -9.18133E-05 27

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 9


LOADTYPE WIND TITLE LOAD CASE 9 - WIND IN -X - DIRECTION

***TOTAL APPLIED LOAD ( KN METE ) SUMMARY (LOADING 9 )


SUMMATION FORCE-X = -249.48
SUMMATION FORCE-Y = 0.00
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 0.00 MY= 4059.79 MZ= 860.71

***TOTAL REACTION LOAD( KN METE ) SUMMARY (LOADING 9 )


SUMMATION FORCE-X = 249.48
SUMMATION FORCE-Y = 0.00
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 0.00 MY= -4059.79 MZ= -860.71

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
23 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 24

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 9)


MAXIMUMS AT NODE
X = -5.80552E-02 310
Y = -1.14727E-02 371
Z = 7.22913E-02 224
RX= -3.30190E-04 93
RY= -9.21775E-05 382
RZ= 1.12945E-04 52

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 10


LOADTYPE WIND TITLE LOAD CASE 10 - WIND IN -Z - DIRECTION

***TOTAL APPLIED LOAD ( KN METE ) SUMMARY (LOADING 10 )


SUMMATION FORCE-X = 20.32
SUMMATION FORCE-Y = 0.00
SUMMATION FORCE-Z = -486.76

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= -1679.32 MY= 12955.03 MZ= -70.10

***TOTAL REACTION LOAD( KN METE ) SUMMARY (LOADING 10 )


SUMMATION FORCE-X = -20.32
SUMMATION FORCE-Y = 0.00
SUMMATION FORCE-Z = 486.76

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 1679.32 MY= -12955.03 MZ= 70.10

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 10)


MAXIMUMS AT NODE
X = -6.40412E-02 268
Y = 7.19047E-03 322
Z = -1.00334E-01 224
RX= -3.55633E-04 2
RY= -5.15197E-05 299
RZ= -1.25759E-04 52

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 11


LOADTYPE WIND TITLE LOAD CASE 11 - WIND IN Z - DIRECTION

***TOTAL APPLIED LOAD ( KN METE ) SUMMARY (LOADING 11 )


SUMMATION FORCE-X = 20.32
SUMMATION FORCE-Y = 0.00
SUMMATION FORCE-Z = 492.88

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 1700.44 MY= -14352.94 MZ= -70.10

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
24 of 27
Thursday, August 20, 2009, 10:38 AM
STAAD SPACE -- PAGE NO. 25

***TOTAL REACTION LOAD( KN METE ) SUMMARY (LOADING 11 )


SUMMATION FORCE-X = -20.32
SUMMATION FORCE-Y = 0.00
SUMMATION FORCE-Z = -492.88

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= -1700.44 MY= 14352.94 MZ= 70.10

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 11)


MAXIMUMS AT NODE
X = -6.50395E-02 268
Y = -1.23765E-02 322
Z = 9.28267E-02 300
RX= 4.39055E-04 93
RY= -6.87813E-05 337
RZ= -1.25497E-04 52

************ END OF DATA FROM INTERNAL STORAGE ************

947. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= AUG 19,2009 TIME= 15:48: 2 ****

D:\RAJALAKSHMI\ADCOP\Administration Building -IPS\Calculations\REV-A\REV-0\STAAD\25-50-83-1601-0 -ATTACHMENTPage


II.anl
25 of 27
26

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Beam Force Detail Summary FOR GRADE BEAM GB1 TO 10 - 350 X 700

Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 352 29:COMBINAT 0.000 85 -114 3 -1 -1 -54
Min Fx 638 28:COMBINAT 0.000 -89 -1 0 0 0 -16
Max Fy 188 31:COMBINAT 0.000 30 196 0 -1 -1 159
Min Fy 409 29:COMBINAT 1.750 43 -225 -2 2 -5 293
Max Fz 361 33:COMBINAT 0.000 9 -111 12 13 -4 3
Min Fz 598 28:COMBINAT 0.000 2 56 -36 -29 24 54
Max Mx 173 29:COMBINAT 0.000 7 74 8 32 -20 65
Min Mx 180 29:COMBINAT 0.000 7 53 -5 -32 14 37
Max My 598 28:COMBINAT 0.000 2 56 -36 -29 24 54
Min My 598 28:COMBINAT 1.250 2 10 -36 -29 -21 12
Max Mz 406 29:COMBINAT 1.100 37 -221 -2 -12 -4 329
Min Mz 411 28:COMBINAT 0.000 -0 -14 -3 -0 9 -338

MAX +VE MOMENT (TOP REINFORCEMENT) = 329 kNm


CORRESPONDING SHEAR = 221 kN
CORRESPONDING TORSION= 12 kNm

MAX -VE MOMENT (BOTTOM REINFORCEMENT) = 338 kNm


CORRESPONDING SHEAR = 14 kN
CORRESPONDING TORSION= 0 kNm

Print Time/Date: 19/08/2009 12:29 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
27

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Beam Force Detail Summary FOR GRADE BEAM GB11 TO 14 - 300 X 700
Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 155 31:COMBINAT 0.000 69 258 -0 -0 0 226
Min Fx 226 30:COMBINAT 0.000 -19 66 0 6 0 42
Max Fy 155 31:COMBINAT 0.000 69 258 -0 -0 0 226
Min Fy 419 28:COMBINAT 2.300 42 -221 -0 -0 0 277
Max Fz 231 28:COMBINAT 0.000 23 176 10 -3 -12 203
Min Fz 155 29:COMBINAT 0.000 49 252 -9 -1 11 211
Max Mx 147 29:COMBINAT 0.000 5 98 5 21 -12 91
Min Mx 146 29:COMBINAT 0.000 5 84 -4 -17 10 45
Max My 147 29:COMBINAT 4.795 5 -74 5 21 13 34
Min My 147 29:COMBINAT 0.000 5 98 5 21 -12 91
Max Mz 401 28:COMBINAT 3.950 51 -221 -0 -0 -1 329
Min Mz 155 28:COMBINAT 2.300 40 144 -1 -0 0 -338

MAX +VE MOMENT (TOP REINFORCEMENT) = 329 kNm


CORRESPONDING SHEAR = 221 kN
CORRESPONDING TORSION= 0 kNm

MAX -VE MOMENT (BOTTOM REINFORCEMENT) = 338 kNm


CORRESPONDING SHEAR = 144 kN
CORRESPONDING TORSION= 0 kNm

Print Time/Date: 19/08/2009 12:30 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
28

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Beam Force Detail Summary FOR GRADE BEAM GB 16 TO 19 & GB22- 300 X 550
Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 414 28:COMBINAT 0.000 8 6 -0 -12 1 -77
Min Fx 362 28:COMBINAT 0.000 -14 52 -0 0 0 0
Max Fy 380 29:COMBINAT 0.000 -4 98 0 -0 0 0
Min Fy 420 32:COMBINAT 1.750 -1 -133 -0 -0 0 0
Max Fz 421 29:COMBINAT 0.000 0 -31 2 20 -2 -49
Min Fz 410 29:COMBINAT 0.000 3 77 -3 -11 0 0
Max Mx 356 32:COMBINAT 0.000 0 61 0 20 0 0
Min Mx 423 28:COMBINAT 0.000 -1 22 -0 -26 0 0
Max My 380 28:COMBINAT 5.200 -1 -31 1 -1 3 -174
Min My 410 29:COMBINAT 1.200 3 48 -3 -11 -3 -75
Max Mz 353 25:COMBINAT 0.000 -3 55 0 -0 0 0
Min Mz 420 32:COMBINAT 0.000 -1 -90 -0 -0 0 -195

MAX +VE MOMENT (TOP REINFORCEMENT) = 0 kNm


CORRESPONDING SHEAR = 55 kN
CORRESPONDING TORSION= 0 kNm

MAX -VE MOMENT (BOTTOM REINFORCEMENT) = 195 kNm


CORRESPONDING SHEAR = 90 kN
CORRESPONDING TORSION= 0 kNm

Print Time/Date: 19/08/2009 12:31 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
29

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Beam Force Detail Summary FOR GRADE BEAM GB20 & 21- 350 X 750

Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 225 29:COMBINAT 0.000 28 35 -2 -1 2 -70
Min Fx 225 30:COMBINAT 0.000 -19 104 -0 -1 1 54
Max Fy 225 25:COMBINAT 0.000 2 119 -0 -1 0 54
Min Fy 152 28:COMBINAT 5.225 -3 -142 -0 -1 0 213
Max Fz 225 31:COMBINAT 0.000 -18 104 0 -1 -0 54
Min Fz 152 29:COMBINAT 0.000 3 97 -3 -9 10 95
Max Mx 225 28:COMBINAT 0.000 1 105 -1 5 3 55
Min Mx 152 29:COMBINAT 0.000 3 97 -3 -9 10 95
Max My 152 29:COMBINAT 0.000 3 97 -3 -9 10 95
Min My 152 29:COMBINAT 5.225 3 -100 -3 -9 -8 104
Max Mz 152 28:COMBINAT 5.225 -3 -142 -0 -1 0 213
Min Mz 225 29:COMBINAT 0.348 28 9 -2 -1 1 -77

MAX +VE MOMENT (TOP REINFORCEMENT) = 213 kNm


CORRESPONDING SHEAR = 142 kN
CORRESPONDING TORSION= 1 kNm

MAX -VE MOMENT (BOTTOM REINFORCEMENT) = 77 kNm


CORRESPONDING SHEAR = 9 kN
CORRESPONDING TORSION= 1 kNm

Print Time/Date: 19/08/2009 12:32 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
30

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Beam Force Detail Summary FOR ROOF BEAM RB1 TO 5,7,9 &10- 350 X 650
Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 571 29:COMBINAT 0.000 131 147 2 -0 -7 156
Min Fx 469 28:COMBINAT 0.000 -36 77 -1 5 4 31
Max Fy 459 25:COMBINAT 0.000 21 230 -1 -1 -1 253
Min Fy 604 25:COMBINAT 2.750 30 -231 0 0 -0 274
Max Fz 476 29:COMBINAT 0.000 -9 93 23 4 -56 82
Min Fz 539 29:COMBINAT 0.000 41 28 -25 1 32 95
Max Mx 617 25:COMBINAT 3.600 1 -67 1 61 3 44
Min Mx 619 25:COMBINAT 0.000 2 64 -1 -68 2 46
Max My 476 29:COMBINAT 4.795 -9 -67 23 4 55 19
Min My 476 29:COMBINAT 0.000 -9 93 23 4 -56 82
Max Mz 561 29:COMBINAT 0.000 -16 161 -3 -2 7 326
Min Mz 604 25:COMBINAT 0.000 30 -111 0 0 -1 -196

MAX +VE MOMENT (TOP REINFORCEMENT) = 326 kNm


CORRESPONDING SHEAR = 161 kN
CORRESPONDING TORSION= 2 kNm

MAX -VE MOMENT (BOTTOM REINFORCEMENT) = 196 kNm


CORRESPONDING SHEAR = 111 kN
CORRESPONDING TORSION= 0 kNm

Print Time/Date: 19/08/2009 12:33 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
31

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Beam Force Detail Summary FOR ROOF BEAM RB8- 350 X 700

Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 567 29:COMBINAT 0.000 66 238 -1 0 2 315
Min Fx 533 30:COMBINAT 0.000 -3 235 -0 0 1 265
Max Fy 533 25:COMBINAT 0.000 25 282 -0 0 1 318
Min Fy 558 25:COMBINAT 8.050 48 -240 -0 -0 -0 165
Max Fz 591 28:COMBINAT 0.000 49 -127 19 -3 -18 -165
Min Fz 589 29:COMBINAT 0.000 17 -98 -12 0 16 -215
Max Mx 589 32:COMBINAT 1.750 45 -196 -10 13 -8 125
Min Mx 591 28:COMBINAT 1.750 49 -202 19 -15 15 123
Max My 540 29:COMBINAT 0.000 39 139 -6 -0 21 189
Min My 540 29:COMBINAT 8.050 39 -91 -6 -0 -27 -4
Max Mz 558 25:COMBINAT 0.000 48 280 -0 -0 0 325
Min Mz 533 25:COMBINAT 4.025 25 17 -0 0 0 -285

MAX +VE MOMENT (TOP REINFORCEMENT) = 325 kNm


CORRESPONDING SHEAR = 280 kN
CORRESPONDING TORSION= 0 kNm

MAX -VE MOMENT (BOTTOM REINFORCEMENT) = 285 kNm


CORRESPONDING SHEAR = 17 kN
CORRESPONDING TORSION= 0 kNm

Print Time/Date: 19/08/2009 12:34 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
32

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Beam Force Detail Summary FOR ROOF BEAM RB6- 350 X 800
Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 650 28:COMBINAT 0.000 80 -91 -1 16 0 -264
Min Fx 618 28:COMBINAT 0.000 17 178 -3 -40 8 98
Max Fy 618 25:COMBINAT 0.000 54 217 -1 -40 3 216
Min Fy 650 25:COMBINAT 3.650 54 -218 1 41 2 221
Max Fz 650 29:COMBINAT 0.000 42 -82 8 15 -12 -318
Min Fz 618 29:COMBINAT 0.000 43 206 -13 -41 28 211
Max Mx 650 28:COMBINAT 3.650 80 -214 -1 41 -4 292
Min Mx 618 29:COMBINAT 0.000 43 206 -13 -41 28 211
Max My 618 29:COMBINAT 0.000 43 206 -13 -41 28 211
Min My 618 29:COMBINAT 3.650 43 83 -13 -16 -18 -316
Max Mz 650 28:COMBINAT 3.650 80 -214 -1 41 -4 292
Min Mz 649 25:COMBINAT 2.200 54 -1 0 0 -1 -391

MAX +VE MOMENT (TOP REINFORCEMENT) = 292 kNm


CORRESPONDING SHEAR = 214 kN
CORRESPONDING TORSION= 41 kNm

MAX -VE MOMENT (BOTTOM REINFORCEMENT) = 391 kNm


CORRESPONDING SHEAR = 1 kN
CORRESPONDING TORSION= 0 kNm

Print Time/Date: 19/08/2009 12:34 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
33

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Beam Force Detail Summary FOR STAIRCASE BEAM GB23 & SB1- 300 X 550
Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 643 29:COMBINAT 0.000 101 -256 -0 -0 -0 -200
Min Fx 645 29:COMBINAT 0.000 -8 -323 2 -1 -2 -189
Max Fy 643 35:COMBINAT 0.000 13 6 0 0 -0 -8
Min Fy 645 29:COMBINAT 1.200 -8 -330 2 -1 0 202
Max Fz 645 29:COMBINAT 0.000 -8 -323 2 -1 -2 -189
Min Fz 643 28:COMBINAT 0.000 17 -12 -12 -4 10 -19
Max Mx 645 28:COMBINAT 0.000 -1 -56 1 26 1 -35
Min Mx 643 28:COMBINAT 0.000 17 -12 -12 -4 10 -19
Max My 643 28:COMBINAT 0.000 17 -12 -12 -4 10 -19
Min My 643 28:COMBINAT 1.200 17 -64 -12 -4 -4 26
Max Mz 645 29:COMBINAT 1.200 -8 -330 2 -1 0 202
Min Mz 643 29:COMBINAT 0.000 101 -256 -0 -0 -0 -200

MAX +VE MOMENT (TOP REINFORCEMENT) = 202 kNm


CORRESPONDING SHEAR = 330 kN
CORRESPONDING TORSION= 1 kNm

MAX -VE MOMENT (BOTTOM REINFORCEMENT) = 200 kNm


CORRESPONDING SHEAR = 256 kN
CORRESPONDING TORSION= 0 kNm

Print Time/Date: 19/08/2009 12:35 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
34

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Beam Force Detail Summary FOR COLUMN C1 - 400 X 400


Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 51 25:COMBINAT 1.950 1226 -85 -8 -0 -5 48
Min Fx 49 29:COMBINAT 0.000 5 0 104 1 -79 -1
Max Fy 52 28:COMBINAT 0.000 1035 155 -11 -1 16 157
Min Fy 51 31:COMBINAT 0.000 1097 -100 -9 0 12 -132
Max Fz 37 29:COMBINAT 0.000 624 57 130 -1 -129 77
Min Fz 642 29:COMBINAT 0.000 363 1 -188 1 89 -0
Max Mx 8 28:COMBINAT 0.000 645 44 20 4 -28 31
Min Mx 642 28:COMBINAT 0.000 327 71 -34 -7 -5 -32
Max My 321 29:COMBINAT 0.000 526 13 -95 1 179 26
Min My 312 29:COMBINAT 4.000 382 -6 -96 0 -208 13
Max Mz 293 28:COMBINAT 0.000 464 79 6 1 -12 164
Min Mz 631 28:COMBINAT 4.000 275 97 -2 -1 -4 -234

MAX MOMENT :
MY = 4 kNm , MZ = 234 kNm
CORRESPONDING AXIAL LOAD = 275 kN

Print Time/Date: 19/08/2009 12:36 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
35

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 15:47

Beam Force Detail Summary FOR COLUMN C2 - 400 X 400


Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam
end A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 682 29:COMBINAT 1.950 211 13 74 0 71 -7
Min Fx 639 27:COMBINAT 1.950 33 -4 -6 1 2 4
Max Fy 639 28:COMBINAT 0.000 52 68 -0 -0 0 64
Min Fy 681 31:COMBINAT 0.000 94 -18 17 -1 -22 -23
Max Fz 682 29:COMBINAT 0.000 200 13 74 0 -74 19
Min Fz 639 29:COMBINAT 0.000 52 -5 -7 1 16 -5
Max Mx 682 28:COMBINAT 0.000 92 52 9 5 -14 52
Min Mx 681 33:COMBINAT 0.000 88 -14 14 -1 -20 -20
Max My 682 29:COMBINAT 1.950 211 13 74 0 71 -7
Min My 682 29:COMBINAT 0.000 200 13 74 0 -74 19
Max Mz 639 28:COMBINAT 0.000 52 68 -0 -0 0 64
Min Mz 639 28:COMBINAT 1.950 41 68 -0 -0 0 -69

MAX MOMENT :
MY = 74 kNm , MZ = 19 kNm
CORRESPONDING AXIAL LOAD = 200 KN

Print Time/Date: 20/08/2009 11:14 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
36

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F1&F14- SERVICE SUPPORT REACTION


Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 161 24:COMBINAT 16 250 -20 -14 0 -16
Min FX 405 15:COMBINAT -49 37 -0 -0 -0 46
Max FY 214 14:COMBINAT 9 347 -45 -54 0 -5
Min FY 405 14:COMBINAT 3 36 -5 -12 0 -3
Max FZ 202 19:COMBINAT 6 245 24 16 -0 -6
Min FZ 161 16:COMBINAT 7 265 -48 -50 1 -6
Max MX 202 19:COMBINAT 6 245 24 16 -0 -6
Min MX 214 14:COMBINAT 9 347 -45 -54 0 -5
Max MY 161 14:COMBINAT 8 273 -48 -50 1 -7
Min MY 202 22:COMBINAT 2 245 20 13 -0 -1
Max MZ 161 15:COMBINAT -42 138 -18 -11 -0 51
Min MZ 161 24:COMBINAT 16 250 -20 -14 0 -16

Print Time/Date: 19/08/2009 12:45 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
37

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F1&F14- ULTIMATE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 161 33:COMBINAT 22 340 -29 -20 0 -22
Min FX 405 28:COMBINAT -68 52 -0 -0 -0 64
Max FY 214 29:COMBINAT 11 463 -63 -75 1 -7
Min FY 405 27:COMBINAT 4 43 -6 -14 1 -4
Max FZ 202 32:COMBINAT 9 343 34 23 -0 -9
Min FZ 161 29:COMBINAT 10 371 -67 -70 1 -9
Max MX 202 32:COMBINAT 9 343 34 23 -0 -9
Min MX 214 29:COMBINAT 11 463 -63 -75 1 -7
Max MY 161 29:COMBINAT 10 371 -67 -70 1 -9
Min MY 202 31:COMBINAT 3 331 29 18 -1 -1
Max MZ 161 28:COMBINAT -58 194 -25 -15 -0 71
Min MZ 161 33:COMBINAT 22 340 -29 -20 0 -22

Print Time/Date: 19/08/2009 12:43 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
38

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F2- SERVICE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 108 19:COMBINAT 22 314 -10 -3 -0 -16
Min FX 147 15:COMBINAT -65 482 -5 -4 0 68
Max FY 147 14:COMBINAT -5 632 -57 -66 0 4
Min FY 108 15:COMBINAT -8 283 -13 -8 0 25
Max FZ 127 23:COMBINAT -5 428 30 22 -0 3
Min FZ 119 16:COMBINAT 10 521 -68 -75 0 -7
Max MX 128 23:COMBINAT 0 399 30 22 0 2
Min MX 109 14:COMBINAT -11 440 -33 -79 2 8
Max MY 109 14:COMBINAT -11 440 -33 -79 2 8
Min MY 110 14:COMBINAT 2 362 -32 -77 -2 -1
Max MZ 147 15:COMBINAT -65 482 -5 -4 0 68
Min MZ 108 19:COMBINAT 22 314 -10 -3 -0 -16

Print Time/Date: 19/08/2009 12:46 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
39

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F2- ULTIMATE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 108 32:COMBINAT 31 440 -15 -4 -1 -22
Min FX 147 28:COMBINAT -91 675 -7 -6 0 95
Max FY 147 29:COMBINAT -7 812 -79 -92 0 6
Min FY 108 26:COMBINAT -10 359 -16 -9 0 30
Max FZ 127 32:COMBINAT -7 530 41 30 -0 5
Min FZ 119 29:COMBINAT 14 730 -96 -106 0 -9
Max MX 128 32:COMBINAT 0 494 41 30 0 3
Min MX 109 29:COMBINAT -16 577 -45 -108 3 11
Max MY 109 29:COMBINAT -16 577 -45 -108 3 11
Min MY 110 29:COMBINAT 3 475 -44 -105 -3 -1
Max MZ 147 28:COMBINAT -91 675 -7 -6 0 95
Min MZ 108 32:COMBINAT 31 440 -15 -4 -1 -22

Print Time/Date: 19/08/2009 12:48 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
40

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F3- SERVICE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 190 23:COMBINAT 18 490 21 16 0 -13
Min FX 203 15:COMBINAT -63 405 19 10 0 67
Max FY 190 13:COMBINAT -44 548 17 11 0 52
Min FY 203 16:COMBINAT -21 326 -11 -31 -1 11
Max FZ 203 19:COMBINAT -25 370 25 19 0 17
Min FZ 191 16:COMBINAT -6 493 -29 -65 -1 5
Max MX 200 22:COMBINAT 17 541 22 35 1 -15
Min MX 191 16:COMBINAT -6 493 -29 -65 -1 5
Max MY 190 14:COMBINAT 9 441 -28 -45 2 -4
Min MY 191 14:COMBINAT -7 528 -28 -64 -2 5
Max MZ 203 15:COMBINAT -63 405 19 10 0 67
Min MZ 200 18:COMBINAT 18 501 21 32 1 -16

Print Time/Date: 19/08/2009 12:58 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
41

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F3- ULTIMATE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 190 32:COMBINAT 25 645 30 22 -0 -18
Min FX 203 28:COMBINAT -88 568 26 14 1 94
Max FY 200 25:COMBINAT 13 771 11 18 1 -10
Min FY 203 27:COMBINAT -25 415 -14 -37 -1 13
Max FZ 203 32:COMBINAT -36 519 35 26 1 24
Min FZ 191 29:COMBINAT -9 690 -40 -91 -2 7
Max MX 200 31:COMBINAT 25 701 29 45 1 -22
Min MX 191 29:COMBINAT -9 690 -40 -91 -2 7
Max MY 190 29:COMBINAT 12 576 -39 -63 3 -6
Min MY 191 29:COMBINAT -9 690 -40 -91 -2 7
Max MZ 203 28:COMBINAT -88 568 26 14 1 94
Min MZ 200 31:COMBINAT 25 701 29 45 1 -22

Print Time/Date: 19/08/2009 12:56 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
42

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 15:47

Reaction Summary FOR FOUNDATION F4- SERVICE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 158 18:COMBINAT 71 792 7 4 0 -45
Min FX 159 15:COMBINAT -111 747 8 5 -0 103
Max FY 158 14:COMBINAT 61 877 -75 -82 1 -34
Min FY 152 15:COMBINAT -60 370 -6 -12 -0 63
Max FZ 201 17:COMBINAT -23 643 46 33 0 16
Min FZ 150 14:COMBINAT -41 794 -84 -89 0 23
Max MX 201 17:COMBINAT -23 643 46 33 0 16
Min MX 150 14:COMBINAT -41 794 -84 -89 0 23
Max MY 149 14:COMBINAT 26 788 -45 -54 1 -18
Min MY 152 14:COMBINAT -1 433 -34 -79 -2 -1
Max MZ 159 13:COMBINAT -110 788 8 4 -0 103
Min MZ 158 18:COMBINAT 71 792 7 4 0 -45

Print Time/Date: 19/08/2009 15:58 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
43

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 15:47

Reaction Summary FOR FOUNDATION F4- ULTIMATE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 158 31:COMBINAT 100 1108 9 6 0 -63
Min FX 159 28:COMBINAT -155 1046 11 6 -1 144
Max FY 158 25:COMBINAT 85 1226 8 5 -0 -48
Min FY 152 26:COMBINAT -72 480 -9 -17 -0 75
Max FZ 201 30:COMBINAT -33 900 64 46 0 22
Min FZ 160 29:COMBINAT -9 888 -118 -115 0 8
Max MX 201 30:COMBINAT -33 900 64 46 0 22
Min MX 150 29:COMBINAT -58 1011 -117 -125 0 32
Max MY 149 29:COMBINAT 37 1027 -62 -76 2 -26
Min MY 152 29:COMBINAT -1 564 -46 -108 -3 -1
Max MZ 159 28:COMBINAT -155 1046 11 6 -1 144
Min MZ 158 31:COMBINAT 100 1108 9 6 0 -63

Print Time/Date: 19/08/2009 15:57 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
44

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F5- SERVICE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 192 19:COMBINAT 16 406 40 29 -1 -12
Min FX 197 13:COMBINAT -60 476 16 25 -0 65
Max FY 196 23:COMBINAT -7 534 25 18 -1 8
Min FY 192 16:COMBINAT 12 343 -24 -55 -0 -7
Max FZ 198 18:COMBINAT -10 404 42 30 2 4
Min FZ 192 14:COMBINAT 12 369 -25 -55 -0 -7
Max MX 197 22:COMBINAT 7 492 28 44 -0 -6
Min MX 192 14:COMBINAT 12 369 -25 -55 -0 -7
Max MY 198 21:COMBINAT -15 434 41 30 2 10
Min MY 193 16:COMBINAT -3 438 -14 -45 -2 2
Max MZ 197 13:COMBINAT -60 476 16 25 -0 65
Min MZ 192 23:COMBINAT 16 431 39 28 -1 -12

Print Time/Date: 19/08/2009 13:56 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
45

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F5- ULTIMATE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 192 32:COMBINAT 22 568 56 40 -1 -16
Min FX 197 28:COMBINAT -84 611 19 29 -0 91
Max FY 196 25:COMBINAT 0 753 31 20 -1 1
Min FY 192 27:COMBINAT 15 442 -31 -66 -1 -9
Max FZ 198 31:COMBINAT -14 566 59 43 3 5
Min FZ 192 29:COMBINAT 17 480 -34 -77 -0 -10
Max MX 197 31:COMBINAT 10 633 36 56 -1 -9
Min MX 192 29:COMBINAT 17 480 -34 -77 -0 -10
Max MY 198 30:COMBINAT -21 571 59 42 3 15
Min MY 193 29:COMBINAT -4 613 -20 -63 -3 2
Max MZ 197 28:COMBINAT -84 611 19 29 -0 91
Min MZ 192 32:COMBINAT 22 568 56 40 -1 -16

Print Time/Date: 19/08/2009 13:56 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
46

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F6- SERVICE SUPPORT REACTION- COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 121 19:COMBINAT 19 337 16 13 -0 -14
Min FX 122 15:COMBINAT -52 356 2 3 -0 53
Max FY 124 23:COMBINAT 10 505 22 19 0 -9
Min FY 123 19:COMBINAT 8 302 4 8 0 -8
Max FZ 132 19:COMBINAT 2 417 23 19 0 1
Min FZ 133 14:COMBINAT -16 414 -62 -69 0 10
Max MX 124 19:COMBINAT 10 460 23 19 0 -9
Min MX 122 16:COMBINAT -7 386 -28 -72 2 5
Max MY 122 16:COMBINAT -7 386 -28 -72 2 5
Min MY 123 16:COMBINAT 2 327 -27 -70 -2 -1
Max MZ 122 15:COMBINAT -52 356 2 3 -0 53
Min MZ 121 19:COMBINAT 19 337 16 13 -0 -14

Print Time/Date: 19/08/2009 13:57 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
47

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F6- ULTIMATE SUPPORT REACTION COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 121 32:COMBINAT 27 472 23 18 -0 -20
Min FX 122 28:COMBINAT -73 499 3 4 -0 74
Max FY 124 25:COMBINAT 6 709 13 7 0 -4
Min FY 121 26:COMBINAT -16 390 11 7 0 35
Max FZ 132 32:COMBINAT 3 584 32 26 0 1
Min FZ 133 29:COMBINAT -23 549 -86 -97 0 14
Max MX 124 32:COMBINAT 14 645 32 27 0 -12
Min MX 122 29:COMBINAT -10 541 -40 -100 3 7
Max MY 122 29:COMBINAT -10 541 -40 -100 3 7
Min MY 123 29:COMBINAT 3 458 -38 -98 -3 -2
Max MZ 122 28:COMBINAT -73 499 3 4 -0 74
Min MZ 121 32:COMBINAT 27 472 23 18 -0 -20

Print Time/Date: 19/08/2009 13:59 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
48

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F6- SERVICE SUPPORT REACTION COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 143 18:COMBINAT 41 600 -23 -13 0 -28
Min FX 144 15:COMBINAT -75 580 -25 -16 2 70
Max FY 143 13:COMBINAT -17 666 -23 -14 1 35
Min FY 140 16:COMBINAT 10 207 -60 -63 1 -6
Max FZ 141 23:COMBINAT -5 316 3 8 -0 5
Min FZ 144 14:COMBINAT -40 483 -93 -88 -1 24
Max MX 141 23:COMBINAT -5 316 3 8 -0 5
Min MX 144 14:COMBINAT -40 483 -93 -88 -1 24
Max MY 144 13:COMBINAT -75 610 -25 -16 2 70
Min MY 137 14:COMBINAT -1 264 -23 -53 -2 -0
Max MZ 144 15:COMBINAT -75 580 -25 -16 2 70
Min MZ 143 18:COMBINAT 41 600 -23 -13 0 -28

Print Time/Date: 19/08/2009 13:58 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
49

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F6- ULTIMATE SUPPORT REACTION COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 143 31:COMBINAT 58 839 -32 -19 0 -39
Min FX 144 28:COMBINAT -105 813 -36 -22 3 99
Max FY 143 25:COMBINAT 48 929 -32 -19 0 -29
Min FY 140 27:COMBINAT 12 265 -72 -75 1 -7
Max FZ 141 32:COMBINAT -7 427 3 11 -0 8
Min FZ 144 29:COMBINAT -57 635 -130 -123 -1 34
Max MX 141 32:COMBINAT -7 427 3 11 -0 8
Min MX 144 29:COMBINAT -57 635 -130 -123 -1 34
Max MY 144 28:COMBINAT -105 813 -36 -22 3 99
Min MY 137 29:COMBINAT -1 354 -32 -74 -3 -0
Max MZ 144 28:COMBINAT -105 813 -36 -22 3 99
Min MZ 143 31:COMBINAT 58 839 -32 -19 0 -39

Print Time/Date: 19/08/2009 13:59 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
50

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F7- SERVICE SUPPORT REACTION - COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 171 18:COMBINAT 18 431 15 9 -0 -12
Min FX 173 15:COMBINAT -66 532 20 10 -1 68
Max FY 173 13:COMBINAT -65 576 20 10 -1 68
Min FY 175 19:COMBINAT -27 191 4 6 0 19
Max FZ 172 19:COMBINAT -4 543 22 17 -0 5
Min FZ 168 14:COMBINAT -7 535 -49 -57 -0 5
Max MX 172 19:COMBINAT -4 543 22 17 -0 5
Min MX 164 14:COMBINAT 5 353 -41 -63 1 -3
Max MY 171 14:COMBINAT 13 459 -39 -61 1 -8
Min MY 165 14:COMBINAT -1 405 -24 -60 -2 0
Max MZ 173 15:COMBINAT -66 532 20 10 -1 68
Min MZ 171 18:COMBINAT 18 431 15 9 -0 -12

Print Time/Date: 19/08/2009 14:03 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
51

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F7- ULTIMATE SUPPORT REACTION- COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 171 31:COMBINAT 25 604 21 13 -0 -17
Min FX 173 28:COMBINAT -92 744 28 15 -1 96
Max FY 173 25:COMBINAT -11 811 27 14 -0 8
Min FY 175 36:COMBINAT -33 236 5 7 0 23
Max FZ 172 32:COMBINAT -6 761 31 24 -0 7
Min FZ 168 29:COMBINAT -10 695 -68 -79 -0 7
Max MX 172 32:COMBINAT -6 761 31 24 -0 7
Min MX 164 29:COMBINAT 7 450 -57 -88 1 -4
Max MY 171 29:COMBINAT 19 587 -54 -85 2 -11
Min MY 165 29:COMBINAT -1 513 -34 -85 -3 0
Max MZ 173 28:COMBINAT -92 744 28 15 -1 96
Min MZ 171 31:COMBINAT 25 604 21 13 -0 -17

Print Time/Date: 19/08/2009 14:00 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
52

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F7- SERVICE SUPPORT REACTION-COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 178 20:COMBINAT 11 485 -38 -29 0 -9
Min FX 187 15:COMBINAT -77 677 -38 -22 1 75
Max FY 187 13:COMBINAT -76 752 -36 -21 1 75
Min FY 185 16:COMBINAT 3 375 -32 -76 3 -1
Max FZ 177 21:COMBINAT -18 512 0 -1 1 13
Min FZ 187 16:COMBINAT -20 673 -87 -85 -1 14
Max MX 177 19:COMBINAT -8 462 -1 2 0 2
Min MX 178 16:COMBINAT 7 495 -82 -91 0 -5
Max MY 185 14:COMBINAT 3 426 -33 -77 3 -1
Min MY 186 14:COMBINAT 3 558 -34 -78 -2 -1
Max MZ 187 15:COMBINAT -77 677 -38 -22 1 75
Min MZ 178 20:COMBINAT 11 485 -38 -29 0 -9

Print Time/Date: 19/08/2009 14:05 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
53

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F7- ULTIMATE SUPPORT REACTION - COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 178 33:COMBINAT 15 680 -54 -40 0 -13
Min FX 187 28:COMBINAT -107 948 -53 -31 2 105
Max FY 187 25:COMBINAT -26 1063 -50 -29 -0 17
Min FY 189 27:COMBINAT -22 492 -77 -75 -1 14
Max FZ 177 34:COMBINAT -21 614 0 -1 1 15
Min FZ 187 29:COMBINAT -29 942 -122 -119 -1 19
Max MX 177 32:COMBINAT -11 647 -1 2 1 3
Min MX 178 29:COMBINAT 9 693 -115 -127 0 -7
Max MY 185 29:COMBINAT 4 526 -45 -106 4 -2
Min MY 186 29:COMBINAT 4 688 -46 -107 -3 -2
Max MZ 187 28:COMBINAT -107 948 -53 -31 2 105
Min MZ 178 33:COMBINAT 15 680 -54 -40 0 -13

Print Time/Date: 19/08/2009 14:01 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
54

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F8- SERVICE SUPPORT REACTION -COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 115 18:COMBINAT 5 510 -17 -11 -0 -4
Min FX 114 15:COMBINAT -35 592 -14 -7 3 40
Max FY 114 13:COMBINAT -35 638 -15 -7 2 39
Min FY 115 15:COMBINAT -32 468 -14 -7 3 39
Max FZ 115 19:COMBINAT 1 523 -8 -1 0 1
Min FZ 115 14:COMBINAT 2 520 -57 -53 0 -2
Max MX 115 19:COMBINAT 1 523 -8 -1 0 1
Min MX 115 14:COMBINAT 2 520 -57 -53 0 -2
Max MY 115 13:COMBINAT -32 514 -14 -8 3 40
Min MY 114 22:COMBINAT -0 565 -19 -12 -0 -1
Max MZ 114 15:COMBINAT -35 592 -14 -7 3 40
Min MZ 115 18:COMBINAT 5 510 -17 -11 -0 -4

Print Time/Date: 19/08/2009 14:09 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
55

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F8- ULTIMATE SUPPORT REACTION - COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 115 31:COMBINAT 6 714 -24 -15 -0 -6
Min FX 114 28:COMBINAT -49 828 -20 -9 4 56
Max FY 114 28:COMBINAT -49 828 -20 -9 4 56
Min FY 115 26:COMBINAT -38 617 -17 -9 3 47
Max FZ 115 36:COMBINAT 1 682 -11 -1 0 1
Min FZ 115 29:COMBINAT 4 664 -78 -74 1 -2
Max MX 115 36:COMBINAT 1 682 -11 -1 0 1
Min MX 115 29:COMBINAT 4 664 -78 -74 1 -2
Max MY 115 28:COMBINAT -44 656 -20 -10 4 55
Min MY 114 31:COMBINAT -1 726 -26 -17 -0 -2
Max MZ 114 28:COMBINAT -49 828 -20 -9 4 56
Min MZ 115 31:COMBINAT 6 714 -24 -15 -0 -6

Print Time/Date: 19/08/2009 14:16 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
56

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F8- SERVICE SUPPORT REACTION- COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 421 22:COMBINAT 13 78 -13 -8 -0 -8
Min FX 422 15:COMBINAT -37 74 -6 -3 3 35
Max FY 422 14:COMBINAT -10 153 -54 -51 0 5
Min FY 422 19:COMBINAT -11 50 -0 4 1 7
Max FZ 422 19:COMBINAT -11 50 -0 4 1 7
Min FZ 422 14:COMBINAT -10 153 -54 -51 0 5
Max MX 422 19:COMBINAT -11 50 -0 4 1 7
Min MX 422 14:COMBINAT -10 153 -54 -51 0 5
Max MY 422 13:COMBINAT -37 76 -7 -3 3 35
Min MY 421 24:COMBINAT 10 73 -11 -6 -0 -6
Max MZ 422 15:COMBINAT -37 74 -6 -3 3 35
Min MZ 421 22:COMBINAT 13 78 -13 -8 -0 -8

Print Time/Date: 19/08/2009 14:12 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
57

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F8- ULTIMATE SUPPORT REACTION- COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 421 31:COMBINAT 18 105 -17 -11 -1 -12
Min FX 422 28:COMBINAT -52 103 -9 -4 5 49
Max FY 422 29:COMBINAT -13 211 -74 -71 0 7
Min FY 422 36:COMBINAT -14 63 -1 5 1 9
Max FZ 422 32:COMBINAT -16 70 -0 6 1 10
Min FZ 422 29:COMBINAT -13 211 -74 -71 0 7
Max MX 422 32:COMBINAT -16 70 -0 6 1 10
Min MX 422 29:COMBINAT -13 211 -74 -71 0 7
Max MY 422 28:COMBINAT -52 103 -9 -4 5 49
Min MY 421 33:COMBINAT 14 99 -14 -8 -1 -8
Max MZ 422 28:COMBINAT -52 103 -9 -4 5 49
Min MZ 421 31:COMBINAT 18 105 -17 -11 -1 -12

Print Time/Date: 19/08/2009 14:17 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
58

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F9- SERVICE SUPPORT REACTION-COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 411 14:COMBINAT 1 489 -72 -88 0 -0
Min FX 411 15:COMBINAT -12 108 -12 -11 1 37
Max FY 411 14:COMBINAT 1 489 -72 -88 0 -0
Min FY 411 18:COMBINAT 1 87 -9 -7 -0 -1
Max FZ 411 18:COMBINAT 1 87 -9 -7 -0 -1
Min FZ 411 14:COMBINAT 1 489 -72 -88 0 -0
Max MX 411 18:COMBINAT 1 87 -9 -7 -0 -1
Min MX 411 14:COMBINAT 1 489 -72 -88 0 -0
Max MY 411 15:COMBINAT -12 108 -12 -11 1 37
Min MY 411 22:COMBINAT 1 102 -10 -9 -0 -1
Max MZ 411 15:COMBINAT -12 108 -12 -11 1 37
Min MZ 411 22:COMBINAT 1 102 -10 -9 -0 -1

Print Time/Date: 19/08/2009 14:20 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
59

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F9- ULTIMATE SUPPORT REACTION- COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 411 29:COMBINAT 1 664 -99 -121 1 -0
Min FX 411 28:COMBINAT -16 152 -17 -15 2 52
Max FY 411 29:COMBINAT 1 664 -99 -121 1 -0
Min FY 411 35:COMBINAT 1 122 -12 -10 -0 -1
Max FZ 411 31:COMBINAT 1 122 -12 -10 -0 -1
Min FZ 411 29:COMBINAT 1 664 -99 -121 1 -0
Max MX 411 31:COMBINAT 1 122 -12 -10 -0 -1
Min MX 411 29:COMBINAT 1 664 -99 -121 1 -0
Max MY 411 28:COMBINAT -16 152 -17 -15 2 52
Min MY 411 31:COMBINAT 1 122 -12 -10 -0 -1
Max MZ 411 28:COMBINAT -16 152 -17 -15 2 52
Min MZ 411 31:COMBINAT 1 122 -12 -10 -0 -1

Print Time/Date: 19/08/2009 14:22 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
60

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F9- SERVICE SUPPORT REACTION-COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 156 22:COMBINAT 4 394 -10 -8 -0 -3
Min FX 156 15:COMBINAT -64 345 -11 -11 1 70
Max FY 156 22:COMBINAT 4 394 -10 -8 -0 -3
Min FY 156 16:COMBINAT -0 11 -74 -88 1 1
Max FZ 156 18:COMBINAT 4 365 -8 -6 -0 -3
Min FZ 156 14:COMBINAT -0 40 -76 -90 1 1
Max MX 156 18:COMBINAT 4 365 -8 -6 -0 -3
Min MX 156 14:COMBINAT -0 40 -76 -90 1 1
Max MY 156 14:COMBINAT -0 40 -76 -90 1 1
Min MY 156 18:COMBINAT 4 365 -8 -6 -0 -3
Max MZ 156 15:COMBINAT -64 345 -11 -11 1 70
Min MZ 156 22:COMBINAT 4 394 -10 -8 -0 -3

Print Time/Date: 19/08/2009 14:21 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
61

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

FOR FOUNDATION F9- ULTIMATE SUPPORT REACTION - COLUMN 2


Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 156 31:COMBINAT 6 510 -11 -9 -0 -5
Min FX 156 28:COMBINAT -89 483 -16 -15 1 99
Max FY 156 25:COMBINAT 1 532 -18 -17 0 1
Min FY 156 29:COMBINAT -0 16 -104 -124 1 2
Max FZ 156 31:COMBINAT 6 510 -11 -9 -0 -5
Min FZ 156 29:COMBINAT -0 16 -104 -124 1 2
Max MX 156 31:COMBINAT 6 510 -11 -9 -0 -5
Min MX 156 29:COMBINAT -0 16 -104 -124 1 2
Max MY 156 29:COMBINAT -0 16 -104 -124 1 2
Min MY 156 31:COMBINAT 6 510 -11 -9 -0 -5
Max MZ 156 28:COMBINAT -89 483 -16 -15 1 99
Min MZ 156 31:COMBINAT 6 510 -11 -9 -0 -5

Print Time/Date: 19/08/2009 14:22 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
62

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F10- SERVICE SUPPORT REACTION- COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 145 19:COMBINAT 1 93 5 5 -0 -4
Min FX 112 15:COMBINAT -50 264 -4 -2 0 50
Max FY 153 13:COMBINAT -47 315 -2 -1 -0 55
Min FY 145 22:COMBINAT -0 92 -0 0 -0 -2
Max FZ 194 19:COMBINAT -6 229 7 7 1 2
Min FZ 145 14:COMBINAT -1 97 -42 -44 1 -0
Max MX 194 19:COMBINAT -6 229 7 7 1 2
Min MX 145 14:COMBINAT -1 97 -42 -44 1 -0
Max MY 194 21:COMBINAT -14 252 3 4 3 10
Min MY 194 16:COMBINAT -11 207 -15 -28 -2 7
Max MZ 153 13:COMBINAT -47 315 -2 -1 -0 55
Min MZ 145 19:COMBINAT 1 93 5 5 -0 -4

Print Time/Date: 19/08/2009 14:25 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
63

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F10- ULTIMATE SUPPORT REACTION - COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 145 32:COMBINAT 1 131 7 8 -0 -6
Min FX 112 28:COMBINAT -69 370 -5 -3 0 70
Max FY 153 28:COMBINAT -66 421 -3 -2 -1 76
Min FY 145 35:COMBINAT -0 110 -0 0 -0 -3
Max FZ 194 32:COMBINAT -9 321 10 10 2 2
Min FZ 145 29:COMBINAT -1 137 -58 -61 1 -1
Max MX 194 32:COMBINAT -9 321 10 10 2 2
Min MX 145 29:COMBINAT -1 137 -58 -61 1 -1
Max MY 194 30:COMBINAT -19 329 6 6 3 15
Min MY 194 29:COMBINAT -15 290 -21 -39 -3 9
Max MZ 153 28:COMBINAT -66 421 -3 -2 -1 76
Min MZ 145 32:COMBINAT 1 131 7 8 -0 -6

Print Time/Date: 19/08/2009 14:23 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
64

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F10- SERVICE SUPPORT REACTION- COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 195 18:COMBINAT 47 407 26 16 -0 -30
Min FX 113 15:COMBINAT -23 188 -7 -4 -0 33
Max FY 154 22:COMBINAT 33 451 -7 -5 0 -20
Min FY 113 15:COMBINAT -23 188 -7 -4 -0 33
Max FZ 195 19:COMBINAT 38 402 29 19 -0 -19
Min FZ 113 14:COMBINAT 9 247 -47 -48 0 -6
Max MX 195 19:COMBINAT 38 402 29 19 -0 -19
Min MX 154 16:COMBINAT 31 390 -47 -48 1 -17
Max MY 195 14:COMBINAT 42 405 2 -19 2 -24
Min MY 113 13:COMBINAT -23 204 -7 -4 -0 32
Max MZ 154 13:COMBINAT -13 403 -6 -4 0 40
Min MZ 195 18:COMBINAT 47 407 26 16 -0 -30

Print Time/Date: 19/08/2009 14:26 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
65

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F10- ULTIMATE SUPPORT REACTION - COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 195 31:COMBINAT 66 570 37 22 -0 -42
Min FX 113 28:COMBINAT -33 263 -9 -6 -0 46
Max FY 154 25:COMBINAT 43 635 -10 -7 0 -24
Min FY 113 26:COMBINAT -28 244 -8 -5 -0 39
Max FZ 195 32:COMBINAT 53 563 41 26 -0 -26
Min FZ 113 29:COMBINAT 12 324 -66 -67 0 -9
Max MX 195 32:COMBINAT 53 563 41 26 -0 -26
Min MX 154 29:COMBINAT 43 546 -66 -67 1 -23
Max MY 195 29:COMBINAT 60 534 4 -26 3 -34
Min MY 113 28:COMBINAT -33 263 -9 -6 -0 46
Max MZ 154 28:COMBINAT -18 522 -9 -6 0 56
Min MZ 195 31:COMBINAT 66 570 37 22 -0 -42

Print Time/Date: 19/08/2009 14:24 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
66

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F11- SERVICE SUPPORT REACTION - COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 174 24:COMBINAT 6 307 6 2 0 -7
Min FX 174 15:COMBINAT -37 202 11 7 -0 45
Max FY 174 14:COMBINAT 2 340 -35 -42 0 -1
Min FY 174 15:COMBINAT -37 202 11 7 -0 45
Max FZ 174 19:COMBINAT 6 288 16 12 0 -7
Min FZ 174 14:COMBINAT 2 340 -35 -42 0 -1
Max MX 174 19:COMBINAT 6 288 16 12 0 -7
Min MX 174 14:COMBINAT 2 340 -35 -42 0 -1
Max MY 174 16:COMBINAT 2 328 -35 -42 0 -1
Min MY 174 13:COMBINAT -37 214 11 7 -0 45
Max MZ 174 15:COMBINAT -37 202 11 7 -0 45
Min MZ 174 24:COMBINAT 6 307 6 2 0 -7

Print Time/Date: 19/08/2009 14:27 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
67

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F11- ULTIMATE SUPPORT REACTION-COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 174 33:COMBINAT 8 413 9 3 0 -10
Min FX 174 28:COMBINAT -52 282 15 9 -0 63
Max FY 174 29:COMBINAT 2 459 -49 -59 0 -2
Min FY 174 26:COMBINAT -44 257 13 8 -0 54
Max FZ 174 32:COMBINAT 8 403 23 17 0 -10
Min FZ 174 29:COMBINAT 2 459 -49 -59 0 -2
Max MX 174 32:COMBINAT 8 403 23 17 0 -10
Min MX 174 29:COMBINAT 2 459 -49 -59 0 -2
Max MY 174 29:COMBINAT 2 459 -49 -59 0 -2
Min MY 174 28:COMBINAT -52 282 15 9 -0 63
Max MZ 174 28:COMBINAT -52 282 15 9 -0 63
Min MZ 174 33:COMBINAT 8 413 9 3 0 -10

Print Time/Date: 19/08/2009 14:28 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
68

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F11- SERVICE SUPPORT REACTION-COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 188 24:COMBINAT 6 324 -18 -13 0 -7
Min FX 188 15:COMBINAT -36 224 -13 -8 0 44
Max FY 188 23:COMBINAT 6 331 -8 -3 -0 -7
Min FY 188 15:COMBINAT -36 224 -13 -8 0 44
Max FZ 188 23:COMBINAT 6 331 -8 -3 -0 -7
Min FZ 188 16:COMBINAT 3 263 -59 -57 0 -3
Max MX 188 23:COMBINAT 6 331 -8 -3 -0 -7
Min MX 188 16:COMBINAT 3 263 -59 -57 0 -3
Max MY 188 16:COMBINAT 3 263 -59 -57 0 -3
Min MY 188 22:COMBINAT 3 322 -12 -7 -0 -3
Max MZ 188 15:COMBINAT -36 224 -13 -8 0 44
Min MZ 188 24:COMBINAT 6 324 -18 -13 0 -7

Print Time/Date: 19/08/2009 14:27 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
69

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F11- ULTIMATE SUPPORT REACTION - COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 188 33:COMBINAT 9 433 -25 -19 0 -10
Min FX 188 28:COMBINAT -51 313 -18 -11 0 62
Max FY 188 25:COMBINAT 4 452 -18 -11 0 -3
Min FY 188 26:COMBINAT -43 285 -16 -10 0 53
Max FZ 188 36:COMBINAT 8 397 -10 -4 -0 -8
Min FZ 188 29:COMBINAT 5 368 -83 -80 1 -4
Max MX 188 36:COMBINAT 8 397 -10 -4 -0 -8
Min MX 188 29:COMBINAT 5 368 -83 -80 1 -4
Max MY 188 29:COMBINAT 5 368 -83 -80 1 -4
Min MY 188 31:COMBINAT 4 432 -17 -10 -0 -4
Max MZ 188 28:COMBINAT -51 313 -18 -11 0 62
Min MZ 188 33:COMBINAT 9 433 -25 -19 0 -10

Print Time/Date: 19/08/2009 14:29 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
70

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F12- SERVICE SUPPORT REACTION-COLUMN 1

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 181 16:COMBINAT 37 401 -62 -58 1 -21
Min FX 180 16:COMBINAT -6 212 -43 -45 -2 3
Max FY 181 16:COMBINAT 37 401 -62 -58 1 -21
Min FY 180 16:COMBINAT -6 212 -43 -45 -2 3
Max FZ 180 16:COMBINAT -6 212 -43 -45 -2 3
Min FZ 181 16:COMBINAT 37 401 -62 -58 1 -21
Max MX 180 16:COMBINAT -6 212 -43 -45 -2 3
Min MX 181 16:COMBINAT 37 401 -62 -58 1 -21
Max MY 181 16:COMBINAT 37 401 -62 -58 1 -21
Min MY 180 16:COMBINAT -6 212 -43 -45 -2 3
Max MZ 180 16:COMBINAT -6 212 -43 -45 -2 3
Min MZ 181 16:COMBINAT 37 401 -62 -58 1 -21

Print Time/Date: 19/08/2009 14:32 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
71

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F12- ULTIMATE SUPPORT REACTION - COLUMN 1


Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 181 29:COMBINAT 52 562 -87 -81 2 -30
Min FX 180 29:COMBINAT -8 296 -60 -63 -3 4
Max FY 181 29:COMBINAT 52 562 -87 -81 2 -30
Min FY 180 29:COMBINAT -8 296 -60 -63 -3 4
Max FZ 180 29:COMBINAT -8 296 -60 -63 -3 4
Min FZ 181 29:COMBINAT 52 562 -87 -81 2 -30
Max MX 180 29:COMBINAT -8 296 -60 -63 -3 4
Min MX 181 29:COMBINAT 52 562 -87 -81 2 -30
Max MY 181 29:COMBINAT 52 562 -87 -81 2 -30
Min MY 180 29:COMBINAT -8 296 -60 -63 -3 4
Max MZ 180 29:COMBINAT -8 296 -60 -63 -3 4
Min MZ 181 29:COMBINAT 52 562 -87 -81 2 -30

Print Time/Date: 19/08/2009 14:31 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
72

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F12- SERVICE SUPPORT REACTION-COLUMN 2

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 167 16:COMBINAT 31 363 -34 -41 1 -18
Min FX 166 16:COMBINAT -8 247 -37 -41 -1 5
Max FY 167 16:COMBINAT 31 363 -34 -41 1 -18
Min FY 166 16:COMBINAT -8 247 -37 -41 -1 5
Max FZ 167 16:COMBINAT 31 363 -34 -41 1 -18
Min FZ 166 16:COMBINAT -8 247 -37 -41 -1 5
Max MX 167 16:COMBINAT 31 363 -34 -41 1 -18
Min MX 166 16:COMBINAT -8 247 -37 -41 -1 5
Max MY 167 16:COMBINAT 31 363 -34 -41 1 -18
Min MY 166 16:COMBINAT -8 247 -37 -41 -1 5
Max MZ 166 16:COMBINAT -8 247 -37 -41 -1 5
Min MZ 167 16:COMBINAT 31 363 -34 -41 1 -18

Print Time/Date: 19/08/2009 14:34 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
73

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F12- ULTIMATE SUPPORT REACTION - COLUMN 2


Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 167 29:COMBINAT 43 509 -47 -57 1 -25
Min FX 166 29:COMBINAT -11 346 -52 -58 -1 6
Max FY 167 29:COMBINAT 43 509 -47 -57 1 -25
Min FY 166 29:COMBINAT -11 346 -52 -58 -1 6
Max FZ 167 29:COMBINAT 43 509 -47 -57 1 -25
Min FZ 166 29:COMBINAT -11 346 -52 -58 -1 6
Max MX 167 29:COMBINAT 43 509 -47 -57 1 -25
Min MX 166 29:COMBINAT -11 346 -52 -58 -1 6
Max MY 167 29:COMBINAT 43 509 -47 -57 1 -25
Min MY 166 29:COMBINAT -11 346 -52 -58 -1 6
Max MZ 166 29:COMBINAT -11 346 -52 -58 -1 6
Min MZ 167 29:COMBINAT 43 509 -47 -57 1 -25

Print Time/Date: 19/08/2009 14:35 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
74

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F13- SERVICE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 162 15:COMBINAT -37 481 12 7 -0 45
Min FX 176 15:COMBINAT -37 525 -16 -9 -0 45
Max FY 176 15:COMBINAT -37 525 -16 -9 -0 45
Min FY 162 15:COMBINAT -37 481 12 7 -0 45
Max FZ 162 15:COMBINAT -37 481 12 7 -0 45
Min FZ 176 15:COMBINAT -37 525 -16 -9 -0 45
Max MX 162 15:COMBINAT -37 481 12 7 -0 45
Min MX 176 15:COMBINAT -37 525 -16 -9 -0 45
Max MY 176 15:COMBINAT -37 525 -16 -9 -0 45
Min MY 162 15:COMBINAT -37 481 12 7 -0 45
Max MZ 176 15:COMBINAT -37 525 -16 -9 -0 45
Min MZ 162 15:COMBINAT -37 481 12 7 -0 45

Print Time/Date: 19/08/2009 14:38 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
75

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 19-Aug-2009 12:26

Reaction Summary FOR FOUNDATION F13- ULTIMATE SUPPORT REACTION

Horizontal Vertical Horizontal Moment


Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 162 28:COMBINAT -52 674 16 10 -0 63
Min FX 176 28:COMBINAT -52 734 -22 -13 -0 63
Max FY 176 28:COMBINAT -52 734 -22 -13 -0 63
Min FY 162 28:COMBINAT -52 674 16 10 -0 63
Max FZ 162 28:COMBINAT -52 674 16 10 -0 63
Min FZ 176 28:COMBINAT -52 734 -22 -13 -0 63
Max MX 162 28:COMBINAT -52 674 16 10 -0 63
Min MX 176 28:COMBINAT -52 734 -22 -13 -0 63
Max MY 176 28:COMBINAT -52 734 -22 -13 -0 63
Min MY 162 28:COMBINAT -52 674 16 10 -0 63
Max MZ 176 28:COMBINAT -52 734 -22 -13 -0 63
Min MZ 162 28:COMBINAT -52 674 16 10 -0 63

Print Time/Date: 19/08/2009 14:37 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
76

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

Beam Displacement Detail Summary FOR BEAM DEFLECTION


Displacements shown in italic indicate the presence of an offset
Beam L/C d X Y Z Resultant
(m) (mm) (mm) (mm) (mm)
Max X 292 13:COMBINAT 4.000 8.043 -1.005 0.087 8.106
Min X 629 14:COMBINAT 2.800 -1.891 -0.373 4.184 4.607
Max Y 638 13:COMBINAT 3.510 0.822 0.449 0.019 0.936
Min Y 649 14:COMBINAT 2.200 -0.418 -12.302 8.262 14.824
Max Z 592 14:COMBINAT 1.680 0.332 -1.771 9.689 9.855
Min Z 331 22:COMBINAT 2.000 -0.307 -0.461 -2.353 2.418
Max Rst 649 14:COMBINAT 2.200 -0.418 -12.302 8.262 14.824

MAX VERTICAL DEFLECTION = 12.302 mm

Print Time/Date: 18/08/2009 12:52 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
77

Job No Sheet No Rev


E30153 1 0

Part IPS - ADMINISTRATION BUILDING


Software licensed to
Job Title ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN TO Ref 25-50-83-1601 - ATTACHMENT II
FUJAIRAH
By MP Date12-June-09 Chd NZM
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY File 25-50-83-1601-0 -ATTAC Date/Time 18-Aug-2009 11:22

Node Displacement Summary FOR COLUMN DEFLECTION

Node L/C X Y Z Resultant rX rY rZ


(mm) (mm) (mm) (mm) (rad) (rad) (rad)
Max X 265 13:COMBINAT 8.042 -1.004 0.087 8.105 0.000 -0.000 -0.000
Min X 310 22:COMBINAT -1.020 -0.443 0.190 1.128 0.001 0.000 0.001
Max Y 108 12:COMBINAT 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Min Y 415 14:COMBINAT -0.429 -10.230 8.175 13.103 0.001 0.000 0.002
Max Z 298 14:COMBINAT 0.335 -0.636 9.591 9.617 0.001 -0.000 -0.000
Min Z 90 22:COMBINAT -0.092 -0.274 -1.115 1.152 -0.001 0.000 -0.000
Max rX 299 14:COMBINAT 0.072 -0.451 9.512 9.523 0.002 0.000 -0.000
Min rX 341 24:COMBINAT -0.159 -8.147 0.091 8.149 -0.002 0.000 0.000
Max rY 301 14:COMBINAT 0.041 -0.286 5.204 5.212 0.001 0.001 0.000
Min rY 414 14:COMBINAT -0.406 -10.201 7.507 12.672 0.001 -0.001 -0.002
Max rZ 395 14:COMBINAT -0.449 -0.480 7.232 7.261 0.000 0.000 0.003
Min rZ 394 13:COMBINAT 6.669 -0.347 0.247 6.683 0.000 0.000 -0.003
Max Rst 415 14:COMBINAT -0.429 -10.230 8.175 13.103 0.001 0.000 0.002

MAX LATERAL DEFLECTION = 9.591 mm

Print Time/Date: 18/08/2009 12:51 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1
`

ATTACHMENT IV: CONCRETE MEMBER DESIGN

(150 Pages)

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 11 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
Page 1 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 1 TO 10"
1 DIAGRAM:

4 - 16 φ + 4 - 16 φ +
0 - 0 φ 2 - 16 φ

700 10 φ - 150mm 700 10 φ - 150mm

4 - 16 φ + 4 - 16 φ +
4 - 16 φ 0 - 0 φ
350mm 350mm
At mid span Reinforcement detail At support

At support second layer of top Reinforcement is not provided, where the beams are released at the end.
2 LOADS

a. At mid span

Ultimate Bending moment = Mm = 338 kNm page.26 ,Appendix-III

Ultimate Torsional moment = Tm = 0 kNm page.26 ,Appendix-III

Ultimate shear force = Vm = 14 kN page.26 ,Appendix-III

b. At support

Ultimate Bending moment = Ms = 329 kNm page.26 ,Appendix-III

Ultimate Torsional moment = Ts = 12 kNm page.26 ,Appendix-III

Ultimate shear force = Vs = 221 kN page.26 ,Appendix-III

3 DATA

Breadth of beam = b = 350 mm

Overall depth of beam = D = 700 mm

Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1 of design


basis manual
Grade of main steel = fy = 460 N/mm2 "

Grade of stirrups = fyv = 460 N/mm2 "

Clear cover = c = 60 mm "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 2 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 1 TO 10"

Clear side cover = cs = 60 mm "

2
Elastic modulus of steel = Es = 2.05E+05 N/mm

2
Elastic modulus of concrete = Ec = 2.70E+04 N/mm

Actual Span = L = 6.95 m

4 CHECK FOR FLEXURE AT MID SPAN

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 557.9 mm cl 3.4.4.4 of BS8110-1

Area of steel required = Mm/0.95fyz = Ast reqd = 1386 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 318.5 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 9800 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 4 Nos


+
Di off b
Dia bars provided
id d = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1608 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 606 mm

K' -value = K' = 0.156 cl 3.4.4.4 of BS8110-1

K -value Mm/bd2fcu = K = 0.066 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 490 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 3 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 1 TO 10"

5 CHECK FOR FLEXURE AT SUPPORT

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 559.3 mm cl 3.4.4.4 of BS8110-1

Area of steel required = MS/0.95fyz = Ast reqd = 1144 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 318.5 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 9800 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 2 Nos


+
Dia of bars provided = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1206 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 606 mm

K' -value
l = K' = 0 156
0.156 cl 3.4.4.4 of BS8110-1

K -value MS/bd2fcu = K = 0.064 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 490 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok
6 CHECK FOR SHEAR AT SUPPORT

Actual shear stress at the support v = Vs/bd = 1.04 N/mm2 cl 3.4.5.2 of BS8110-1

0.8*fcu^0.5 -value = 5.06


v <(0.8*fcu^0.5 & 5) Hence ok

100Ast prov/bd-value = 0.569 % Table3.8 - BS8110-1

(400/d)^(1/4)-value = 0.901 "


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 4 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 1 TO 10"

Therefore design value of (400/d)^(1/4) taken as = 1

Ultimate shear stress that the beam can carry (vc) = 0.612 N/mm2 "
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Shear resistance of beam (vs) = (vc*b*d)/1000 = 130 kN

Design shear for stirrups = V-vs = 91 kN

Vertical stirrups spacing = Sv = 150 mm


Min. area of shear reinforcement required (Asv) = 52 mm2 Table3.7 - BS8110-1
Asv=(0.4*b*sv/0.95*fyv) or (b*sv*(v-vc)/0.95*fyv)

Area of reinforcement provided = Asv pr = 157 mm2


φ3 = 10 mm dia bar 2 legged stirrups Hence ok

7 CHECK FOR SHEAR AT MID SPAN

Provide minimum shear reinforcement at mid span

Provide φ4 = 10 mm dia bar @ 150 mm spacing


< 0.75*d = 455 mm cl 3.4.5.5 of BS8110-1
Hence ok
8 CHECK FOR CRACK WIDTH cl 3.8.3 of BS8110-2
εc
0.5fcubx
x
NA
D d S

εs fsAst
c
ε1 acr
Strain stress
For acr-value

Steel ratio = Ast prov/bd = ρ = 0.0076

Modular ratio = Es/(Ec/2) = αe = 15.185

x/d ratio = αe*ρ{SQRT[1+2/(αe*ρ)}-1} = 0.378

Depth of neutral axis = x = 229 mm

Lever arm = d-x/3 = z = 530 mm

Tensile stress on steel= Max(Mms ,Mss)/(z*Ast) = fs = 265 N/mm2


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 5 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 1 TO 10"

Concrete comp. stress= 2*Max(Mms ,Mss)/(zbx) = fcb = 10.60 N/mm2

Permissible tensile stress on steel = 0.8*fy = 368 N/mm2 > fs


Hence ok cl 3.8.3 of BS8110-2

Permissible comp. stress on concrete= 0.45*fcu = 18 N/mm2 > fcb


Hence ok Fig-2.1 of BS8110-1

Elastic strain at surface (D-x)*fs


= = ε1 = 0.0016
(d-x)*Es
Distance from the comp. face to the point at which
the crack width is being calculated = a' = 700 mm

Stiffening effect of conc. ε1- b(D-x)(a'-x) εm = cl 3.8.3 of BS8110-2


= 0.00140
3EsAst(d-x)

Rows of tension reinforcement at mid span 2

Rows of tension reinforcement at support 2

C/C distance of main bar at mid span = S = 64.67 mm

C/C distance of main bar at support = S = 64.67 mm

Distance from concrete surface to the nearest longitudinal bar =


sqrt((s/2)2+(c+φ3+φ1/2)2))-φ1/2 = acr = 76 mm

Surface crack width= 3*acr*εm cl 3.8.3 of BS8110-2


= w = 0.298 mm
1+2((acr-cmin)/(D-x))

Allowable crack width = wallow = 0.3 mm cl 3.2.4.1 of BS8110-2


Hence ok
9 CHECK FOR SPAN/DEPTH RATIO

Modification factor for the tension reinforcement (mt)

(477-fs) Table3.10 - BS8110-1


= 0.55+ = 1.05 < 2
120(0.9+(Max(Mm,Ms)/bd2))
Hence ok
Modification factor for the compression reinforcement (mc)

100Asc prov/bd Table3.11 - BS8110-1


= 1+
(3+(100Asc prov/bd))
= 1.11 < 1.5
Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 6 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 1 TO 10"

Design modification factor = mt*mc = md = 1.17

Actual span/depth ratio = L/D = la = 9.93

Modified span/depth ratio = la*md = lm = 11.61

Min. effective depth required = L/lm = dreqd = 569 mm


Provided effective depth = 606 mm
Hence ok

10 CHECK FOR TORSIONAL REINFORCEMENT

Torsional shear stress =


2*max(Tm,Ts) BS8110-2:1985
= = vt = 0.336 N/mm2
b2(D-b/3) Clause 2.4.4.1

Allowable torsional shear stress = vt min = 0.4 N/mm2 BS8110-2:1985


Torsional reinforcement is not reqd. Table 2.3

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 7 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 11 TO 14"
1 DIAGRAM:

4 - 16 φ + 4 - 16 φ +
0 - 0 φ 2 - 16 φ

700 10 φ - 150mm 700 10 φ - 150mm

4 - 16 φ + 4 - 16 φ +
4 - 16 φ 0 - 0 φ
300mm 300mm
At mid span Reinforcement detail At support

At support second layer of top Reinforcement is not provided, where the beams are released at the end.
2 LOADS

a. At mid span

Ultimate Bending moment = Mm = 338 kNm page.27 ,Appendix-III

Ultimate Torsional moment = Tm = 0 kNm page.27 ,Appendix-III

Ultimate shear force = Vm = 144 kN page.27 ,Appendix-III

b. At support

Ultimate Bending moment = Ms = 329 kNm page.27 ,Appendix-III

Ultimate Torsional moment = Ts = 0 kNm page.27 ,Appendix-III

Ultimate shear force = Vs = 221 kN page.27 ,Appendix-III

3 DATA

Breadth of beam = b = 300 mm

Overall depth of beam = D = 700 mm

Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1 of design


basis manual
Grade of main steel = fy = 460 N/mm2 "

Grade of stirrups = fyv = 460 N/mm2 "

Clear cover = c = 60 mm "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 8 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 11 TO 14"

Clear side cover = cs = 60 mm "

2
Elastic modulus of steel = Es = 2.05E+05 N/mm

2
Elastic modulus of concrete = Ec = 2.70E+04 N/mm

Actual Span = L = 6.25 m

4 CHECK FOR FLEXURE AT MID SPAN

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 549.0 mm cl 3.4.4.4 of BS8110-1

Area of steel required = Mm/0.95fyz = Ast reqd = 1409 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 273 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 8400 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 4 Nos


+
Di off b
Dia bars provided
id d = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1608 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 606 mm

K' -value = K' = 0.156 cl 3.4.4.4 of BS8110-1

K -value Mm/bd2fcu = K = 0.077 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 420 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 9 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 11 TO 14"

5 CHECK FOR FLEXURE AT SUPPORT

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 550.7 mm cl 3.4.4.4 of BS8110-1

Area of steel required = MS/0.95fyz = Ast reqd = 1162 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 273.0 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 8400 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 2 Nos


+
Dia of bars provided = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1206 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 606 mm

K' -value
l = K' = 0 156
0.156 cl 3.4.4.4 of BS8110-1

K -value MS/bd2fcu = K = 0.075 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 420 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok
6 CHECK FOR SHEAR AT SUPPORT

Actual shear stress at the support v = Vs/bd = 1.22 N/mm2 cl 3.4.5.2 of BS8110-1

0.8*fcu^0.5 -value = 5.06


v <(0.8*fcu^0.5 & 5) Hence ok

100Ast prov/bd-value = 0.664 % Table3.8 - BS8110-1

(400/d)^(1/4)-value = 0.901 "


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 10 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 11 TO 14"

Therefore design value of (400/d)^(1/4) taken as = 1

Ultimate shear stress that the beam can carry (vc) = 0.645 N/mm2 "
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Shear resistance of beam (vs) = (vc*b*d)/1000 = 117 kN

Design shear for stirrups = V-vs = 104 kN

Vertical stirrups spacing = Sv = 150 mm


Min. area of shear reinforcement required (Asv) = 59 mm2 Table3.7 - BS8110-1
Asv=(0.4*b*sv/0.95*fyv) or (b*sv*(v-vc)/0.95*fyv)

Area of reinforcement provided = Asv pr = 157 mm2


φ3 = 10 mm dia bar 2 legged stirrups Hence ok

7 CHECK FOR SHEAR AT MID SPAN

Provide minimum shear reinforcement at mid span

Provide φ4 = 10 mm dia bar @ 150 mm spacing


< 0.75*d = 455 mm cl 3.4.5.5 of BS8110-1
Hence ok
8 CHECK FOR CRACK WIDTH cl 3.8.3 of BS8110-2
εc
0.5fcubx
x
NA
D d S

εs fsAst
c
ε1 acr
Strain stress
For acr-value

Steel ratio = Ast prov/bd = ρ = 0.0088

Modular ratio = Es/(Ec/2) = αe = 15.185

x/d ratio = αe*ρ{SQRT[1+2/(αe*ρ)}-1} = 0.401

Depth of neutral axis = x = 243 mm

Lever arm = d-x/3 = z = 525 mm

Tensile stress on steel= Max(Mms ,Mss)/(z*Ast) = fs = 267 N/mm2


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 11 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 11 TO 14"

Concrete comp. stress= 2*Max(Mms ,Mss)/(zbx) = fcb = 11.77 N/mm2

Permissible tensile stress on steel = 0.8*fy = 368 N/mm2 > fs


Hence ok cl 3.8.3 of BS8110-2

Permissible comp. stress on concrete= 0.45*fcu = 18 N/mm2 > fcb


Hence ok Fig-2.1 of BS8110-1

Elastic strain at surface (D-x)*fs


= = ε1 = 0.0016
(d-x)*Es
Distance from the comp. face to the point at which
the crack width is being calculated = a' = 700 mm

Stiffening effect of conc. ε1- b(D-x)(a'-x) εm = cl 3.8.3 of BS8110-2


= 0.00146
3EsAst(d-x)

Rows of tension reinforcement at mid span 2

Rows of tension reinforcement at support 2

C/C distance of main bar at mid span = S = 48.00 mm

C/C distance of main bar at support = S = 48.00 mm

Distance from concrete surface to the nearest longitudinal bar =


sqrt((s/2)2+(c+φ3+φ1/2)2))-φ1/2 = acr = 74 mm

Surface crack width= 3*acr*εm cl 3.8.3 of BS8110-2


= w = 0.296 mm
1+2((acr-cmin)/(D-x))

Allowable crack width = wallow = 0.3 mm cl 3.2.4.1 of BS8110-2


Hence ok
9 CHECK FOR SPAN/DEPTH RATIO

Modification factor for the tension reinforcement (mt)

(477-fs) Table3.10 - BS8110-1


= 0.55+ = 0.99 < 2
120(0.9+(Max(Mm,Ms)/bd2))
Hence ok
Modification factor for the compression reinforcement (mc)

100Asc prov/bd Table3.11 - BS8110-1


= 1+
(3+(100Asc prov/bd))
= 1.13 < 1.5
Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 12 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 11 TO 14"

Design modification factor = mt*mc = md = 1.12

Actual span/depth ratio = L/D = la = 8.93

Modified span/depth ratio = la*md = lm = 9.99

Min. effective depth required = L/lm = dreqd = 594 mm


Provided effective depth = 606 mm
Hence ok

10 CHECK FOR TORSIONAL REINFORCEMENT

Torsional shear stress =


2*max(Tm,Ts) BS8110-2:1985
= = vt = 0.000 N/mm2
b2(D-b/3) Clause 2.4.4.1

Allowable torsional shear stress = vt min = 0.4 N/mm2 BS8110-2:1985


Torsional reinforcement is not reqd. Table 2.3

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 13 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB-16 TO 19 & GB22"
1 DIAGRAM:

4 - 16 φ + 4 - 16 φ +
0 - 0 φ 0 - 0 φ

550 10 φ - 150mm 550 10 φ - 150mm

4 - 16 φ + 4 - 16 φ +
2 - 16 φ 0 - 0 φ
300mm 300mm
At mid span At support

Reinforcement detail
2 LOADS

a. At mid span

Ultimate Bending moment = Mm = 195 kNm page.28 ,Appendix-III

Ultimate Torsional moment = Tm = 0 kNm page.28 ,Appendix-III

Ultimate shear force = Vm = 90 kN page.28 ,Appendix-III

b. At support

Ultimate Bending moment = Ms = 0 kNm page.28 ,Appendix-III

Ultimate Torsional moment = Ts = 0 kNm page.28 ,Appendix-III

Ultimate shear force = Vs = 55 kN page.28 ,Appendix-III

3 DATA

Breadth of beam = b = 300 mm

Overall depth of beam = D = 550 mm

Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1 of design


basis manual
Grade of main steel = fy = 460 N/mm2 "

Grade of stirrups = fyv = 460 N/mm2 "

Clear cover = c = 60 mm "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 14 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB-16 TO 19 & GB22"

Clear side cover = cs = 60 mm "

2
Elastic modulus of steel = Es = 2.05E+05 N/mm

2
Elastic modulus of concrete = Ec = 2.70E+04 N/mm

Actual Span = L = 6.95 m

4 CHECK FOR FLEXURE AT MID SPAN

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 412.2 mm cl 3.4.4.4 of BS8110-1

Area of steel required = Mm/0.95fyz = Ast reqd = 1083 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 214.5 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 6600 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 2 Nos


+
Di off b
Dia bars provided
id d = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1206 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 456 mm

K' -value = K' = 0.156 cl 3.4.4.4 of BS8110-1

K -value Mm/bd2fcu = K = 0.078 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 330 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 15 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB-16 TO 19 & GB22"

5 CHECK FOR FLEXURE AT SUPPORT

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 448.4 mm cl 3.4.4.4 of BS8110-1

Area of steel required = MS/0.95fyz = Ast reqd = 0 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 214.5 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 6600 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 0 Nos


+
Dia of bars provided = φ1 = 16 0 mm

Area of tension steel provided = Ast prov. = 804 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 472 mm

K' -value
l = K' = 0 156
0.156 cl 3.4.4.4 of BS8110-1

K -value MS/bd2fcu = K = 0.000 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 330 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok
6 CHECK FOR SHEAR AT SUPPORT

Actual shear stress at the support v = Vs/bd = 0.39 N/mm2 cl 3.4.5.2 of BS8110-1

0.8*fcu^0.5 -value = 5.06


v <(0.8*fcu^0.5 & 5) Hence ok

100Ast prov/bd-value = 0.568 % Table3.8 - BS8110-1

(400/d)^(1/4)-value = 0.959 "


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 16 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB-16 TO 19 & GB22"

Therefore design value of (400/d)^(1/4) taken as = 1

Ultimate shear stress that the beam can carry (vc) = 0.612 N/mm2 "
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Shear resistance of beam (vs) = (vc*b*d)/1000 = 87 kN

Design shear for stirrups = V-vs = -32 kN

Vertical stirrups spacing = Sv = 150 mm


Min. area of shear reinforcement required (Asv) = 41 mm2 Table3.7 - BS8110-1
Asv=(0.4*b*sv/0.95*fyv) or (b*sv*(v-vc)/0.95*fyv)

Area of reinforcement provided = Asv pr = 157 mm2


φ3 = 10 mm dia bar 2 legged stirrups Hence ok

7 CHECK FOR SHEAR AT MID SPAN

Provide minimum shear reinforcement at mid span

Provide φ4 = 10 mm dia bar @ 150 mm spacing


< 0.75*d = 342 mm cl 3.4.5.5 of BS8110-1
Hence ok
8 CHECK FOR CRACK WIDTH cl 3.8.3 of BS8110-2
εc
0.5fcubx
x
NA
D d S

εs fsAst
c
ε1 acr
Strain stress
For acr-value

Steel ratio = Ast prov/bd = ρ = 0.0085

Modular ratio = Es/(Ec/2) = αe = 15.185

x/d ratio = αe*ρ{SQRT[1+2/(αe*ρ)}-1} = 0.395

Depth of neutral axis = x = 187 mm

Lever arm = d-x/3 = z = 410 mm

Tensile stress on steel= Max(Mms ,Mss)/(z*Ast) = fs = 263 N/mm2


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 17 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB-16 TO 19 & GB22"

Concrete comp. stress= 2*Max(Mms ,Mss)/(zbx) = fcb = 11.33 N/mm2

Permissible tensile stress on steel = 0.8*fy = 368 N/mm2 > fs


Hence ok cl 3.8.3 of BS8110-2

Permissible comp. stress on concrete= 0.45*fcu = 18 N/mm2 > fcb


Hence ok Fig-2.1 of BS8110-1

Elastic strain at surface (D-x)*fs


= = ε1 = 0.0016
(d-x)*Es
Distance from the comp. face to the point at which
the crack width is being calculated = a' = 550 mm

Stiffening effect of conc. ε1- b(D-x)(a'-x) εm = cl 3.8.3 of BS8110-2


= 0.00145
3EsAst(d-x)

Rows of tension reinforcement at mid span 2

Rows of tension reinforcement at support 1

C/C distance of main bar at mid span = S = 48.00 mm

C/C distance of main bar at support = S = 48.00 mm

Distance from concrete surface to the nearest longitudinal bar =


sqrt((s/2)2+(c+φ3+φ1/2)2))-φ1/2 = acr = 74 mm

Surface crack width= 3*acr*εm cl 3.8.3 of BS8110-2


= w = 0.297 mm
1+2((acr-cmin)/(D-x))

Allowable crack width = wallow = 0.3 mm cl 3.2.4.1 of BS8110-2


Hence ok
9 CHECK FOR SPAN/DEPTH RATIO

Modification factor for the tension reinforcement (mt)

(477-fs) Table3.10 - BS8110-1


= 0.55+ = 1.02 < 2
120(0.9+(Max(Mm,Ms)/bd2))
Hence ok
Modification factor for the compression reinforcement (mc)

100Asc prov/bd Table3.11 - BS8110-1


= 1+
(3+(100Asc prov/bd))
= 1.16 < 1.5
Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 18 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB-16 TO 19 & GB22"

Design modification factor = mt*mc = md = 1.18

Actual span/depth ratio = L/D = la = 12.64

Modified span/depth ratio = la*md = lm = 14.90

Min. effective depth required = L/lm = dreqd = 443 mm


Provided effective depth = 456 mm
Hence ok

10 CHECK FOR TORSIONAL REINFORCEMENT

Torsional shear stress =


2*max(Tm,Ts) BS8110-2:1985
= = vt = 0.000 N/mm2
b2(D-b/3) Clause 2.4.4.1

Allowable torsional shear stress = vt min = 0.4 N/mm2 BS8110-2:1985


Torsional reinforcement is not reqd. Table 2.3

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 19 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 20 & GB-21"
1 DIAGRAM:

4 - 16 φ + 4 - 16 φ +
0 - 0 φ 0 - 0 φ

750 10 φ - 150mm 750 10 φ - 150mm

4 - 16 φ + 4 - 16 φ +
0 - 0 φ 0 - 0 φ
350mm 350mm
At mid span At support

Reinforcement detail
2 LOADS

a. At mid span

Ultimate Bending moment = Mm = 77 kNm page.29 ,Appendix-III

Ultimate Torsional moment = Tm = 1 kNm page.29 ,Appendix-III

Ultimate shear force = Vm = 9 kN page.29 ,Appendix-III

b. At support

Ultimate Bending moment = Ms = 213 kNm page.29 ,Appendix-III

Ultimate Torsional moment = Ts = 1 kNm page.29 ,Appendix-III

Ultimate shear force = Vs = 142 kN page.29 ,Appendix-III

3 DATA

Breadth of beam = b = 350 mm

Overall depth of beam = D = 750 mm

Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1 of design


basis manual
Grade of main steel = fy = 460 N/mm2 "

Grade of stirrups = fyv = 460 N/mm2 "

Clear cover = c = 60 mm "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 20 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 20 & GB-21"

Clear side cover = cs = 60 mm "

2
Elastic modulus of steel = Es = 2.05E+05 N/mm

2
Elastic modulus of concrete = Ec = 2.70E+04 N/mm

Actual Span = L = 6.95 m

4 CHECK FOR FLEXURE AT MID SPAN

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 638.4 mm cl 3.4.4.4 of BS8110-1

Area of steel required = Mm/0.95fyz = Ast reqd = 276 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 341.25 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 10500 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 0 Nos


+
Di off b
Dia bars provided
id d = φ1 = 16 0 mm

Area of tension steel provided = Ast prov. = 804 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 672 mm

K' -value = K' = 0.156 cl 3.4.4.4 of BS8110-1

K -value Mm/bd2fcu = K = 0.012 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 525 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 21 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 20 & GB-21"

5 CHECK FOR FLEXURE AT SUPPORT

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 638.4 mm cl 3.4.4.4 of BS8110-1

Area of steel required = MS/0.95fyz = Ast reqd = 649 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 341.3 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 10500 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 0 Nos


+
Dia of bars provided = φ1 = 16 0 mm

Area of tension steel provided = Ast prov. = 804 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 672 mm

K' -value
l = K' = 0 156
0.156 cl 3.4.4.4 of BS8110-1

K -value MS/bd2fcu = K = 0.034 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 525 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok
6 CHECK FOR SHEAR AT SUPPORT

Actual shear stress at the support v = Vs/bd = 0.60 N/mm2 cl 3.4.5.2 of BS8110-1

0.8*fcu^0.5 -value = 5.06


v <(0.8*fcu^0.5 & 5) Hence ok

100Ast prov/bd-value = 0.342 % Table3.8 - BS8110-1

(400/d)^(1/4)-value = 0.878 "


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 22 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 20 & GB-21"

Therefore design value of (400/d)^(1/4) taken as = 1

Ultimate shear stress that the beam can carry (vc) = 0.517 N/mm2 "
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Shear resistance of beam (vs) = (vc*b*d)/1000 = 122 kN

Design shear for stirrups = V-vs = 20 kN

Vertical stirrups spacing = Sv = 150 mm


Min. area of shear reinforcement required (Asv) = 48 mm2 Table3.7 - BS8110-1
Asv=(0.4*b*sv/0.95*fyv) or (b*sv*(v-vc)/0.95*fyv)

Area of reinforcement provided = Asv pr = 157 mm2


φ3 = 10 mm dia bar 2 legged stirrups Hence ok

7 CHECK FOR SHEAR AT MID SPAN

Provide minimum shear reinforcement at mid span

Provide φ4 = 10 mm dia bar @ 150 mm spacing


< 0.75*d = 504 mm cl 3.4.5.5 of BS8110-1
Hence ok
8 CHECK FOR CRACK WIDTH cl 3.8.3 of BS8110-2
εc
0.5fcubx
x
NA
D d S

εs fsAst
c
ε1 acr
Strain stress
For acr-value

Steel ratio = Ast prov/bd = ρ = 0.0034

Modular ratio = Es/(Ec/2) = αe = 15.185

x/d ratio = αe*ρ{SQRT[1+2/(αe*ρ)}-1} = 0.274

Depth of neutral axis = x = 184 mm

Lever arm = d-x/3 = z = 611 mm

Tensile stress on steel= Max(Mms ,Mss)/(z*Ast) = fs = 289 N/mm2


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 23 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 20 & GB-21"

Concrete comp. stress= 2*Max(Mms ,Mss)/(zbx) = fcb = 7.21 N/mm2

Permissible tensile stress on steel = 0.8*fy = 368 N/mm2 > fs


Hence ok cl 3.8.3 of BS8110-2

Permissible comp. stress on concrete= 0.45*fcu = 18 N/mm2 > fcb


Hence ok Fig-2.1 of BS8110-1

Elastic strain at surface (D-x)*fs


= = ε1 = 0.0016
(d-x)*Es
Distance from the comp. face to the point at which
the crack width is being calculated = a' = 750 mm

Stiffening effect of conc. ε1- b(D-x)(a'-x) εm = cl 3.8.3 of BS8110-2


= 0.00117
3EsAst(d-x)

Rows of tension reinforcement at mid span 1

Rows of tension reinforcement at support 1

C/C distance of main bar at mid span = S = 64.67 mm

C/C distance of main bar at support = S = 64.67 mm

Distance from concrete surface to the nearest longitudinal bar =


sqrt((s/2)2+(c+φ3+φ1/2)2))-φ1/2 = acr = 76 mm

Surface crack width= 3*acr*εm cl 3.8.3 of BS8110-2


= w = 0.254 mm
1+2((acr-cmin)/(D-x))

Allowable crack width = wallow = 0.3 mm cl 3.2.4.1 of BS8110-2


Hence ok
9 CHECK FOR SPAN/DEPTH RATIO

Modification factor for the tension reinforcement (mt)

(477-fs) Table3.10 - BS8110-1


= 0.55+ = 1.25 < 2
120(0.9+(Max(Mm,Ms)/bd2))
Hence ok
Modification factor for the compression reinforcement (mc)

100Asc prov/bd Table3.11 - BS8110-1


= 1+
(3+(100Asc prov/bd))
= 1.10 < 1.5
Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 24 of 150
CALCULATION SHEET
DESIGN CALCULATION-GRADE BEAM "GB- 20 & GB-21"

Design modification factor = mt*mc = md = 1.37

Actual span/depth ratio = L/D = la = 9.27

Modified span/depth ratio = la*md = lm = 12.73

Min. effective depth required = L/lm = dreqd = 519 mm


Provided effective depth = 672 mm
Hence ok

10 CHECK FOR TORSIONAL REINFORCEMENT

Torsional shear stress =


2*max(Tm,Ts) BS8110-2:1985
= = vt = 0.026 N/mm2
b2(D-b/3) Clause 2.4.4.1

Allowable torsional shear stress = vt min = 0.4 N/mm2 BS8110-2:1985


Torsional reinforcement is not reqd. Table 2.3

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 25 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM "RB-1 TO 5, 7,9 & 10"
1 DIAGRAM:

4 - 16 φ + 4 - 16 φ +
0 - 0 φ 4 - 16 φ

650 10 φ - 150mm 650 10 φ - 150mm

4 - 16 φ + 4 - 16 φ +
2 - 16 φ 0 - 0 φ
350mm 350mm
At mid span Reinforcement detail At support

At support second layer of top Reinforcement is not provided, where the beams are released at the end.
2 LOADS

a. At mid span

Ultimate Bending moment = Mm = 196 kNm page.30 ,Appendix-III

Ultimate Torsional moment = Tm = 0 kNm page.30 ,Appendix-III

Ultimate shear force = Vm = 111 kN page.30 ,Appendix-III

b. At support

Ultimate Bending moment = Ms = 326 kNm page.30 ,Appendix-III

Ultimate Torsional moment = Ts = 2 kNm page.30 ,Appendix-III

Ultimate shear force = Vs = 161 kN page.30 ,Appendix-III

3 DATA

Breadth of beam = b = 350 mm

Overall depth of beam = D = 650 mm

Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1 of design


basis manual
Grade of main steel = fy = 460 N/mm2 "

Grade of stirrups = fyv = 460 N/mm2 "

Clear cover = c = 40 mm "

DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 26 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM "RB-1 TO 5, 7,9 & 10"

Clear side cover = cs = 40 mm "

2
Elastic modulus of steel = Es = 2.05E+05 N/mm

2
Elastic modulus of concrete = Ec = 2.70E+04 N/mm

Actual Span = L = 6.95 m

4 CHECK FOR FLEXURE AT MID SPAN

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 547.2 mm cl 3.4.4.4 of BS8110-1

Area of steel required = Mm/0.95fyz = Ast reqd = 820 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 295.75 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 9100 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 2 Nos


+
Di off b
Dia bars provided
id d = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1206 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 576 mm

K' -value = K' = 0.156 cl 3.4.4.4 of BS8110-1

K -value Mm/bd2fcu = K = 0.042 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 455 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok

DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 27 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM "RB-1 TO 5, 7,9 & 10"

5 CHECK FOR FLEXURE AT SUPPORT

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 526.9 mm cl 3.4.4.4 of BS8110-1

Area of steel required = MS/0.95fyz = Ast reqd = 1203 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 295.8 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 9100 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 4 Nos


+
Dia of bars provided = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1608 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 576 mm

K' -value
l = K' = 0 156
0.156 cl 3.4.4.4 of BS8110-1

K -value MS/bd2fcu = K = 0.070 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 455 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok
6 CHECK FOR SHEAR AT SUPPORT

Actual shear stress at the support v = Vs/bd = 0.80 N/mm2 cl 3.4.5.2 of BS8110-1

0.8*fcu^0.5 -value = 5.06


v <(0.8*fcu^0.5 & 5) Hence ok

100Ast prov/bd-value = 0.798 % Table3.8 - BS8110-1

(400/d)^(1/4)-value = 0.913 "


DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 28 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM "RB-1 TO 5, 7,9 & 10"

Therefore design value of (400/d)^(1/4) taken as = 1

Ultimate shear stress that the beam can carry (vc) = 0.686 N/mm2 "
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Shear resistance of beam (vs) = (vc*b*d)/1000 = 138 kN

Design shear for stirrups = V-vs = 23 kN

Vertical stirrups spacing = Sv = 150 mm


Min. area of shear reinforcement required (Asv) = 48 mm2 Table3.7 - BS8110-1
Asv=(0.4*b*sv/0.95*fyv) or (b*sv*(v-vc)/0.95*fyv)

Area of reinforcement provided = Asv pr = 157 mm2


φ3 = 10 mm dia bar 2 legged stirrups Hence ok

7 CHECK FOR SHEAR AT MID SPAN

Provide minimum shear reinforcement at mid span

Provide φ4 = 10 mm dia bar @ 150 mm spacing


< 0.75*d = 432 mm cl 3.4.5.5 of BS8110-1
Hence ok
8 CHECK FOR CRACK WIDTH cl 3.8.3 of BS8110-2
εc
0.5fcubx
x
NA
D d S

εs fsAst
c
ε1 acr
Strain stress
For acr-value

Steel ratio = Ast prov/bd = ρ = 0.0080

Modular ratio = Es/(Ec/2) = αe = 15.185

x/d ratio = αe*ρ{SQRT[1+2/(αe*ρ)}-1} = 0.386

Depth of neutral axis = x = 222 mm

Lever arm = d-x/3 = z = 502 mm

Tensile stress on steel= Max(Mms ,Mss)/(z*Ast) = fs = 269 N/mm2


DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 29 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM "RB-1 TO 5, 7,9 & 10"

Concrete comp. stress= 2*Max(Mms ,Mss)/(zbx) = fcb = 11.13 N/mm2

Permissible tensile stress on steel = 0.8*fy = 368 N/mm2 > fs


Hence ok cl 3.8.3 of BS8110-2

Permissible comp. stress on concrete= 0.45*fcu = 18 N/mm2 > fcb


Hence ok Fig-2.1 of BS8110-1

Elastic strain at surface (D-x)*fs


= = ε1 = 0.0016
(d-x)*Es
Distance from the comp. face to the point at which
the crack width is being calculated = a' = 650 mm

Stiffening effect of conc. ε1- b(D-x)(a'-x) εm = cl 3.8.3 of BS8110-2


= 0.00140
3EsAst(d-x)

Rows of tension reinforcement at mid span 2

Rows of tension reinforcement at support 2

C/C distance of main bar at mid span = S = 78.00 mm

C/C distance of main bar at support = S = 78.00 mm

Distance from concrete surface to the nearest longitudinal bar =


sqrt((s/2)2+(c+φ3+φ1/2)2))-φ1/2 = acr = 62 mm

Surface crack width= 3*acr*εm cl 3.8.3 of BS8110-2


= w = 0.237 mm
1+2((acr-cmin)/(D-x))

Allowable crack width = wallow = 0.3 mm cl 3.2.4.1 of BS8110-2


Hence ok
9 CHECK FOR SPAN/DEPTH RATIO

Modification factor for the tension reinforcement (mt)

(477-fs) Table3.10 - BS8110-1


= 0.55+ = 1.02 < 2
120(0.9+(Max(Mm,Ms)/bd2))
Hence ok
Modification factor for the compression reinforcement (mc)

100Asc prov/bd Table3.11 - BS8110-1


= 1+
(3+(100Asc prov/bd))
= 1.12 < 1.5
Hence ok

DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 30 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM "RB-1 TO 5, 7,9 & 10"

Design modification factor = mt*mc = md = 1.14

Actual span/depth ratio = L/D = la = 10.69

Modified span/depth ratio = la*md = lm = 12.15

Min. effective depth required = L/lm = dreqd = 572 mm


Provided effective depth = 576 mm
Hence ok

10 CHECK FOR TORSIONAL REINFORCEMENT

Torsional shear stress =


2*max(Tm,Ts) BS8110-2:1985
= = vt = 0.061 N/mm2
b2(D-b/3) Clause 2.4.4.1

Allowable torsional shear stress = vt min = 0.4 N/mm2 BS8110-2:1985


Torsional reinforcement is not reqd. Table 2.3

a1 Additional links for torsional reinforcement

Smaller C/C dimension of a rectangular link = x1 = 260 mm

Larger C/C dimension of a rectangular link = y1 = 560 mm

Area of legs of closed links provided = Asv pr = 157 mm2

Spacing of the links = sv = 150 mm

Area of additional links required for torsion


Max(Tm,Ts)*sv = 6 mm2 BS8110-2:1985
= Asv tr
0.8*x1*y1*(0.95*fyv) Clause 2.4.7

Area of links required for shear = Asv reqd = 48 mm2

Total area of links required for shear and torsion = 54 mm2

Area of legs of closed links provided = Asv pr = 157 mm2 > 54 mm2
Therefore additional torsional shear links is not reqd

DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 31 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM "RB-1 TO 5, 7,9 & 10"

a2 Additional torsional main reinforcement


Area of additional main torsional reinforcement required
BS8110-2:1985
Asv*fyv*(x1+y1) = 32 mm2 Clause 2.4.7
= As
sv*fy

Area of additional main reinforcement provided at mid span = 736 mm2 > 32 mm2

Provided main reinforcement is sufficient.Additional reinforcement is not reqd at mid span

Area of additional main reinforcement provided at support = 754 mm2 > 32 mm2

Provided main reinforcement is sufficient.Additional reinforcement is not reqd at support

DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 7 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 32 of 150
CALCULATION SHEET
DESIGN CALCULATION- ROOF BEAM "RB- 8"
1 DIAGRAM:

4 - 16 φ + 4 - 16 φ +
0 - 0 φ 2 - 16 φ

700 10 φ - 150mm 700 10 φ - 150mm

4 - 16 φ + 4 - 16 φ +
3 - 16 φ 0 - 0 φ
350mm 350mm
At mid span At support

Reinforcement detail
2 LOADS

a. At mid span

Ultimate Bending moment = Mm = 285 kNm page.31 ,Appendix-III

Ultimate Torsional moment = Tm = 0 kNm page.31 ,Appendix-III

Ultimate shear force = Vm = 17 kN page.31 ,Appendix-III

b. At support

Ultimate Bending moment = Ms = 325 kNm page.31 ,Appendix-III

Ultimate Torsional moment = Ts = 0 kNm page.31 ,Appendix-III

Ultimate shear force = Vs = 280 kN page.31 ,Appendix-III

3 DATA

Breadth of beam = b = 350 mm

Overall depth of beam = D = 700 mm

Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1 of design


basis manual
Grade of main steel = fy = 460 N/mm2 "

Grade of stirrups = fyv = 460 N/mm2 "

Clear cover = c = 40 mm "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 33 of 150
CALCULATION SHEET
DESIGN CALCULATION- ROOF BEAM "RB- 8"

Clear side cover = cs = 40 mm "

2
Elastic modulus of steel = Es = 2.05E+05 N/mm

2
Elastic modulus of concrete = Ec = 2.70E+04 N/mm

Actual Span = L = 8.05 m

4 CHECK FOR FLEXURE AT MID SPAN

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 587.5 mm cl 3.4.4.4 of BS8110-1

Area of steel required = Mm/0.95fyz = Ast reqd = 1110 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 318.5 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 9800 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 3 Nos


+
Di off b
Dia bars provided
id d = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1407 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 626 mm

K' -value = K' = 0.156 cl 3.4.4.4 of BS8110-1

K -value Mm/bd2fcu = K = 0.052 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 490 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 34 of 150
CALCULATION SHEET
DESIGN CALCULATION- ROOF BEAM "RB- 8"

5 CHECK FOR FLEXURE AT SUPPORT

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 581.7 mm cl 3.4.4.4 of BS8110-1

Area of steel required = MS/0.95fyz = Ast reqd = 1087 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 318.5 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 9800 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 2 Nos


+
Dia of bars provided = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1206 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 626 mm

K' -value
l = K' = 0 156
0.156 cl 3.4.4.4 of BS8110-1

K -value MS/bd2fcu = K = 0.059 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 490 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok
6 CHECK FOR SHEAR AT SUPPORT

Actual shear stress at the support v = Vs/bd = 1.28 N/mm2 cl 3.4.5.2 of BS8110-1

0.8*fcu^0.5 -value = 5.06


v <(0.8*fcu^0.5 & 5) Hence ok

100Ast prov/bd-value = 0.551 % Table3.8 - BS8110-1

(400/d)^(1/4)-value = 0.894 "


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 35 of 150
CALCULATION SHEET
DESIGN CALCULATION- ROOF BEAM "RB- 8"

Therefore design value of (400/d)^(1/4) taken as = 1

Ultimate shear stress that the beam can carry (vc) = 0.606 N/mm2 "
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Shear resistance of beam (vs) = (vc*b*d)/1000 = 133 kN

Design shear for stirrups = V-vs = 147 kN

Vertical stirrups spacing = Sv = 150 mm


Min. area of shear reinforcement required (Asv) = 81 mm2 Table3.7 - BS8110-1
Asv=(0.4*b*sv/0.95*fyv) or (b*sv*(v-vc)/0.95*fyv)

Area of reinforcement provided = Asv pr = 157 mm2


φ3 = 10 mm dia bar 2 legged stirrups Hence ok

7 CHECK FOR SHEAR AT MID SPAN

Provide minimum shear reinforcement at mid span

Provide φ4 = 10 mm dia bar @ 150 mm spacing


< 0.75*d = 470 mm cl 3.4.5.5 of BS8110-1
Hence ok
8 CHECK FOR CRACK WIDTH cl 3.8.3 of BS8110-2
εc
0.5fcubx
x
NA
D d S

εs fsAst
c
ε1 acr
Strain stress
For acr-value

Steel ratio = Ast prov/bd = ρ = 0.0064

Modular ratio = Es/(Ec/2) = αe = 15.185

x/d ratio = αe*ρ{SQRT[1+2/(αe*ρ)}-1} = 0.355

Depth of neutral axis = x = 222 mm

Lever arm = d-x/3 = z = 552 mm

Tensile stress on steel= Max(Mms ,Mss)/(z*Ast) = fs = 279 N/mm2


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 36 of 150
CALCULATION SHEET
DESIGN CALCULATION- ROOF BEAM "RB- 8"

Concrete comp. stress= 2*Max(Mms ,Mss)/(zbx) = fcb = 10.10 N/mm2

Permissible tensile stress on steel = 0.8*fy = 368 N/mm2 > fs


Hence ok cl 3.8.3 of BS8110-2

Permissible comp. stress on concrete= 0.45*fcu = 18 N/mm2 > fcb


Hence ok Fig-2.1 of BS8110-1

Elastic strain at surface (D-x)*fs


= = ε1 = 0.0016
(d-x)*Es
Distance from the comp. face to the point at which
the crack width is being calculated = a' = 700 mm

Stiffening effect of conc. ε1- b(D-x)(a'-x) εm = cl 3.8.3 of BS8110-2


= 0.00138
3EsAst(d-x)

Rows of tension reinforcement at mid span 2

Rows of tension reinforcement at support 2

C/C distance of main bar at mid span = S = 78.00 mm

C/C distance of main bar at support = S = 78.00 mm

Distance from concrete surface to the nearest longitudinal bar =


sqrt((s/2)2+(c+φ3+φ1/2)2))-φ1/2 = acr = 62 mm

Surface crack width= 3*acr*εm cl 3.8.3 of BS8110-2


= w = 0.235 mm
1+2((acr-cmin)/(D-x))

Allowable crack width = wallow = 0.3 mm cl 3.2.4.1 of BS8110-2


Hence ok
9 CHECK FOR SPAN/DEPTH RATIO

Modification factor for the tension reinforcement (mt)

(477-fs) Table3.10 - BS8110-1


= 0.55+ = 1.05 < 2
120(0.9+(Max(Mm,Ms)/bd2))
Hence ok
Modification factor for the compression reinforcement (mc)

100Asc prov/bd Table3.11 - BS8110-1


= 1+
(3+(100Asc prov/bd))
= 1.11 < 1.5
Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 37 of 150
CALCULATION SHEET
DESIGN CALCULATION- ROOF BEAM "RB- 8"

Design modification factor = mt*mc = md = 1.17

Actual span/depth ratio = L/D = la = 11.50

Modified span/depth ratio = la*md = lm = 13.45

Min. effective depth required = L/lm = dreqd = 598 mm


Provided effective depth = 626 mm
Hence ok

10 CHECK FOR TORSIONAL REINFORCEMENT

Torsional shear stress =


2*max(Tm,Ts) BS8110-2:1985
= = vt = 0.000 N/mm2
b2(D-b/3) Clause 2.4.4.1

Allowable torsional shear stress = vt min = 0.4 N/mm2 BS8110-2:1985


Torsional reinforcement is not reqd. Table 2.3

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 38 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM " RB-6"
1 DIAGRAM:

4 - 16 φ + 4 - 16 φ +
0 - 0 φ 3 - 16 φ

800 10 φ - 150mm 800 10 φ - 150mm

4 - 16 φ + 4 - 16 φ +
3 - 16 φ 0 - 0 φ
350mm 350mm
At mid span At support

Reinforcement detail
2 LOADS
At support second layer of top Reinforcement is not provided, where the beams are released at the end.
a. At mid span

Ultimate Bending moment = Mm = 391 kNm page.32 ,Appendix-III

Ultimate Torsional moment = Tm = 0 kNm page.32 ,Appendix-III

Ultimate shear force = Vm = 1 kN page.32 ,Appendix-III

b. At support

Ultimate Bending moment = Ms = 292 kNm page.32 ,Appendix-III

Ultimate Torsional moment = Ts = 41 kNm page.32 ,Appendix-III

Ultimate shear force = Vs = 214 kN page.32 ,Appendix-III

3 DATA

Breadth of beam = b = 350 mm

Overall depth of beam = D = 800 mm

Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1 of design


basis manual
Grade of main steel = fy = 460 N/mm2 "

Grade of stirrups = fyv = 460 N/mm2 "

Clear cover = c = 40 mm "

DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 39 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM " RB-6"

Clear side cover = cs = 40 mm "

2
Elastic modulus of steel = Es = 2.05E+05 N/mm

2
Elastic modulus of concrete = Ec = 2.70E+04 N/mm

Actual Span = L = 11.7 m

4 CHECK FOR FLEXURE AT MID SPAN

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 680.4 mm cl 3.4.4.4 of BS8110-1

Area of steel required = Mm/0.95fyz = Ast reqd = 1315 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 364 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 11200 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 3 Nos


+
Di off b
Dia bars provided
id d = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1407 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 726 mm

K' -value = K' = 0.156 cl 3.4.4.4 of BS8110-1

K -value Mm/bd2fcu = K = 0.053 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 560 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok

DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 40 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM " RB-6"

5 CHECK FOR FLEXURE AT SUPPORT

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 689.7 mm cl 3.4.4.4 of BS8110-1

Area of steel required = MS/0.95fyz = Ast reqd = 823 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 364.0 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 11200 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 3 Nos


+
Dia of bars provided = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1407 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 726 mm

K' -value
l = K' = 0 156
0.156 cl 3.4.4.4 of BS8110-1

K -value MS/bd2fcu = K = 0.040 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 560 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok
6 CHECK FOR SHEAR AT SUPPORT

Actual shear stress at the support v = Vs/bd = 0.84 N/mm2 cl 3.4.5.2 of BS8110-1

0.8*fcu^0.5 -value = 5.06


v <(0.8*fcu^0.5 & 5) Hence ok

100Ast prov/bd-value = 0.554 % Table3.8 - BS8110-1

(400/d)^(1/4)-value = 0.862 "


DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 41 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM " RB-6"

Therefore design value of (400/d)^(1/4) taken as = 1

Ultimate shear stress that the beam can carry (vc) = 0.607 N/mm2 "
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Shear resistance of beam (vs) = (vc*b*d)/1000 = 154 kN

Design shear for stirrups = V-vs = 60 kN

Vertical stirrups spacing = Sv = 150 mm


Min. area of shear reinforcement required (Asv) = 48 mm2 Table3.7 - BS8110-1
Asv=(0.4*b*sv/0.95*fyv) or (b*sv*(v-vc)/0.95*fyv)

Area of reinforcement provided = Asv pr = 157 mm2


φ3 = 10 mm dia bar 2 legged stirrups Hence ok

7 CHECK FOR SHEAR AT MID SPAN

Provide minimum shear reinforcement at mid span

Provide φ4 = 10 mm dia bar @ 150 mm spacing


< 0.75*d = 545 mm cl 3.4.5.5 of BS8110-1
Hence ok
8 CHECK FOR CRACK WIDTH cl 3.8.3 of BS8110-2
εc
0.5fcubx
x
NA
D d S

εs fsAst
c
ε1 acr
Strain stress
For acr-value

Steel ratio = Ast prov/bd = ρ = 0.0055

Modular ratio = Es/(Ec/2) = αe = 15.185

x/d ratio = αe*ρ{SQRT[1+2/(αe*ρ)}-1} = 0.335

Depth of neutral axis = x = 243 mm

Lever arm = d-x/3 = z = 645 mm

Tensile stress on steel= Max(Mms ,Mss)/(z*Ast) = fs = 287 N/mm2


DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 42 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM " RB-6"

Concrete comp. stress= 2*Max(Mms ,Mss)/(zbx) = fcb = 9.51 N/mm2

Permissible tensile stress on steel = 0.8*fy = 368 N/mm2 > fs


Hence ok cl 3.8.3 of BS8110-2

Permissible comp. stress on concrete= 0.45*fcu = 18 N/mm2 > fcb


Hence ok Fig-2.1 of BS8110-1

Elastic strain at surface (D-x)*fs


= = ε1 = 0.0016
(d-x)*Es
Distance from the comp. face to the point at which
the crack width is being calculated = a' = 800 mm

Stiffening effect of conc. ε1- b(D-x)(a'-x) εm = cl 3.8.3 of BS8110-2


= 0.00136
3EsAst(d-x)

Rows of tension reinforcement at mid span 2

Rows of tension reinforcement at support 2

C/C distance of main bar at mid span = S = 78.00 mm

C/C distance of main bar at support = S = 78.00 mm

Distance from concrete surface to the nearest longitudinal bar =


sqrt((s/2)2+(c+φ3+φ1/2)2))-φ1/2 = acr = 62 mm

Surface crack width= 3*acr*εm cl 3.8.3 of BS8110-2


= w = 0.233 mm
1+2((acr-cmin)/(D-x))

Allowable crack width = wallow = 0.3 mm cl 3.2.4.1 of BS8110-2


Hence ok
9 CHECK FOR SPAN/DEPTH RATIO

Modification factor for the tension reinforcement (mt)

(477-fs) Table3.10 - BS8110-1


= 0.55+ = 1.07 < 2
120(0.9+(Max(Mm,Ms)/bd2))
Hence ok
Modification factor for the compression reinforcement (mc)

100Asc prov/bd Table3.11 - BS8110-1


= 1+
(3+(100Asc prov/bd))
= 1.10 < 1.5
Hence ok

DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 43 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM " RB-6"

Design modification factor = mt*mc = md = 1.18

Actual span/depth ratio = L/D = la = 14.63

Modified span/depth ratio = la*md = lm = 17.21

Min. effective depth required = L/lm = dreqd = 680 mm


Provided effective depth = 726 mm
Hence ok

10 CHECK FOR TORSIONAL REINFORCEMENT

Torsional shear stress =


2*max(Tm,Ts) BS8110-2:1985
= = vt = 0.980 N/mm2
b2(D-b/3) Clause 2.4.4.1

Allowable torsional shear stress = vt min = 0.4 N/mm2 BS8110-2:1985


Torsional reinforcement is reqd. Table 2.3

a1 Additional links for torsional reinforcement

Smaller C/C dimension of a rectangular link = x1 = 260 mm

Larger C/C dimension of a rectangular link = y1 = 710 mm

Area of legs of closed links provided = Asv pr = 157 mm2

Spacing of the links = sv = 150 mm

Area of additional links required for torsion


Max(Tm,Ts)*sv = 95 mm2 BS8110-2:1985
= Asv tr
0.8*x1*y1*(0.95*fyv) Clause 2.4.7

Area of links required for shear = Asv reqd = 48 mm2

Total area of links required for shear and torsion = 143 mm2

Area of legs of closed links provided = Asv pr = 157 mm2 > 143 mm
2

Therefore additional torsional shear links is not reqd

DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 44 of 150
CALCULATION SHEET
DESIGN CALCULATION-ROOF BEAM " RB-6"

a2 Additional torsional main reinforcement


Area of additional main torsional reinforcement required
BS8110-2:1985
Asv*fyv*(x1+y1) = 616 mm2 Clause 2.4.7
= As
sv*fy

Area of additional main reinforcement provided at mid span = 337 mm2 < 616 mm
2

Provided main reinforcement is sufficient.Additional reinforcement is not reqd at mid span

Area of additional main reinforcement provided at support = 828 mm2 > 616 mm
2

Provided main reinforcement is sufficient.Additional reinforcement is not reqd at support

DOCUMENT TITLE : FIRE STATION STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 7 of 7
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1605 ATTACHMENT - IV Rev 0 DATE :30/05/2009
Page 45 of 150
CALCULATION SHEET
DESIGN CALCULATION-STAIR BEAM "GB-23 & SB- 1"
1 DIAGRAM:

4 - 16 φ + 4 - 16 φ +
0 - 0 φ 2 - 16 φ

550 10 φ - 150mm 550 10 φ - 125mm

4 - 16 φ + 4 - 16 φ +
2 - 16 φ 0 - 0 φ
300mm 300mm
At mid span At support

Reinforcement detail
2 LOADS

a. At mid span

Ultimate Bending moment = Mm = 200 kNm page.33 ,Appendix-III

Ultimate Torsional moment = Tm = 0 kNm page.33 ,Appendix-III

Ultimate shear force = Vm = 256 kN page.33 ,Appendix-III

b. At support

Ultimate Bending moment = Ms = 202 kNm page.33 ,Appendix-III

Ultimate Torsional moment = Ts = 1 kNm page.33 ,Appendix-III

Ultimate shear force = Vs = 330 kN page.33 ,Appendix-III

3 DATA

Breadth of beam = b = 300 mm

Overall depth of beam = D = 550 mm

Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1 of design


basis manual
Grade of main steel = fy = 460 N/mm2 "

Grade of stirrups = fyv = 460 N/mm2 "

Clear cover = c = 40 mm "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 46 of 150
CALCULATION SHEET
DESIGN CALCULATION-STAIR BEAM "GB-23 & SB- 1"

Clear side cover = cs = 40 mm "

2
Elastic modulus of steel = Es = 2.05E+05 N/mm

2
Elastic modulus of concrete = Ec = 2.70E+04 N/mm

Actual Span = L = 1.2 m

4 CHECK FOR FLEXURE AT MID SPAN

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 433.3 mm cl 3.4.4.4 of BS8110-1

Area of steel required = Mm/0.95fyz = Ast reqd = 1056 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 214.5 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 6600 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 2 Nos


+
Di off b
Dia bars provided
id d = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1206 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 476 mm

K' -value = K' = 0.156 cl 3.4.4.4 of BS8110-1

K -value Mm/bd2fcu = K = 0.074 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 330 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 47 of 150
CALCULATION SHEET
DESIGN CALCULATION-STAIR BEAM "GB-23 & SB- 1"

5 CHECK FOR FLEXURE AT SUPPORT

a. Tension reinforcement:

Lever arm(z) = (Min of{0.95d&d[0.5+sqrt(0.25-k/0.9]}) = 432.8 mm cl 3.4.4.4 of BS8110-1

Area of steel required = MS/0.95fyz = Ast reqd = 886 mm2 "

Min. area of steel = 0.13%bD = Ast Min. = 214.5 mm2 Table3.25 - BS8110-1

Max. area of steel = 4%bD = Ast Max. = 6600 mm2 cl 3.12.6.1 of BS8110-1

No of bars provided = Nb1 = 4 2 Nos


+
Dia of bars provided = φ1 = 16 16 mm

Area of tension steel provided = Ast prov. = 1206 mm2


Hence ok
b. Compression reinforcement:

Effective depth = d = 476 mm

K' -value
l = K' = 0 156
0.156 cl 3.4.4.4 of BS8110-1

K -value MS/bd2fcu = K = 0.074 "


K < K' Compression reinforcement is not required
Provide minimum compression reinforcement

Min. area of steel reqd.= Asc min = 0.2%bD = 330 mm2 Table3.25 - BS8110-1

No of bars provided = Nb2 = 4 0 Nos


+
Dia of bars provided = φ2 = 16 0 mm

Area of comp. steel provided = Asc prov. = 804 mm2


Hence ok
6 CHECK FOR SHEAR AT SUPPORT

Actual shear stress at the support v = Vs/bd = 2.31 N/mm2 cl 3.4.5.2 of BS8110-1

0.8*fcu^0.5 -value = 5.06


v <(0.8*fcu^0.5 & 5) Hence ok

100Ast prov/bd-value = 0.845 % Table3.8 - BS8110-1

(400/d)^(1/4)-value = 0.957 "


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 48 of 150
CALCULATION SHEET
DESIGN CALCULATION-STAIR BEAM "GB-23 & SB- 1"

Therefore design value of (400/d)^(1/4) taken as = 1

Ultimate shear stress that the beam can carry (vc) = 0.699 N/mm2 "
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Shear resistance of beam (vs) = (vc*b*d)/1000 = 100 kN

Design shear for stirrups = V-vs = 230 kN

Vertical stirrups spacing = Sv = 125 mm


Min. area of shear reinforcement required (Asv) = 138 mm2 Table3.7 - BS8110-1
Asv=(0.4*b*sv/0.95*fyv) or (b*sv*(v-vc)/0.95*fyv)

Area of reinforcement provided = Asv pr = 157 mm2


φ3 = 10 mm dia bar 2 legged stirrups Hence ok

7 CHECK FOR SHEAR AT MID SPAN

Provide minimum shear reinforcement at mid span

Provide φ4 = 10 mm dia bar @ 150 mm spacing


< 0.75*d = 357 mm cl 3.4.5.5 of BS8110-1
Hence ok
8 CHECK FOR CRACK WIDTH cl 3.8.3 of BS8110-2
εc
0.5fcubx
x
NA
D d S

εs fsAst
c
ε1 acr
Strain stress
For acr-value

Steel ratio = Ast prov/bd = ρ = 0.0084

Modular ratio = Es/(Ec/2) = αe = 15.185

x/d ratio = αe*ρ{SQRT[1+2/(αe*ρ)}-1} = 0.394

Depth of neutral axis = x = 188 mm

Lever arm = d-x/3 = z = 413 mm

Tensile stress on steel= Max(Mms ,Mss)/(z*Ast) = fs = 270 N/mm2


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 49 of 150
CALCULATION SHEET
DESIGN CALCULATION-STAIR BEAM "GB-23 & SB- 1"

Concrete comp. stress= 2*Max(Mms ,Mss)/(zbx) = fcb = 11.57 N/mm2

Permissible tensile stress on steel = 0.8*fy = 368 N/mm2 > fs


Hence ok cl 3.8.3 of BS8110-2

Permissible comp. stress on concrete= 0.45*fcu = 18 N/mm2 > fcb


Hence ok Fig-2.1 of BS8110-1

Elastic strain at surface (D-x)*fs


= = ε1 = 0.0017
(d-x)*Es
Distance from the comp. face to the point at which
the crack width is being calculated = a' = 550 mm

Stiffening effect of conc. ε1- b(D-x)(a'-x) εm = cl 3.8.3 of BS8110-2


= 0.00147
3EsAst(d-x)

Rows of tension reinforcement at mid span 2

Rows of tension reinforcement at support 2

C/C distance of main bar at mid span = S = 61.33 mm

C/C distance of main bar at support = S = 61.33 mm

Distance from concrete surface to the nearest longitudinal bar =


sqrt((s/2)2+(c+φ3+φ1/2)2))-φ1/2 = acr = 58 mm

Surface crack width= 3*acr*εm cl 3.8.3 of BS8110-2


= w = 0.232 mm
1+2((acr-cmin)/(D-x))

Allowable crack width = wallow = 0.3 mm cl 3.2.4.1 of BS8110-2


Hence ok
9 CHECK FOR SPAN/DEPTH RATIO

Modification factor for the tension reinforcement (mt)

(477-fs) Table3.10 - BS8110-1


= 0.55+ = 1.00 < 2
120(0.9+(Max(Mm,Ms)/bd2))
Hence ok
Modification factor for the compression reinforcement (mc)

100Asc prov/bd Table3.11 - BS8110-1


= 1+
(3+(100Asc prov/bd))
= 1.16 < 1.5
Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 50 of 150
CALCULATION SHEET
DESIGN CALCULATION-STAIR BEAM "GB-23 & SB- 1"

Design modification factor = mt*mc = md = 1.15

Actual span/depth ratio = L/D = la = 2.18

Modified span/depth ratio = la*md = lm = 2.52

Min. effective depth required = L/lm = dreqd = 453 mm


Provided effective depth = 476 mm
Hence ok

10 CHECK FOR TORSIONAL REINFORCEMENT

Torsional shear stress =


2*max(Tm,Ts) BS8110-2:1985
= = vt = 0.049 N/mm2
b2(D-b/3) Clause 2.4.4.1

Allowable torsional shear stress = vt min = 0.4 N/mm2 BS8110-2:1985


Torsional reinforcement is not reqd. Table 2.3

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT, HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 51 of 150
CALCULATION SHEET
DESIGN CALCULATION -COLUMN-C1 - ( 400 mm x 400 mm )
Column data

Width of column = b = 400.0 mm

Depth of column x = h = 400.0 mm

Eff. width=b-c-dia of link-D/2 = b' = 302.5 mm Figure 3.22 of BS 8110

Eff. depth=h-c-dia of link-D/2 = h' = 302.5 mm Figure 3.22 of BS 8110

Clear height y = lo1 = 4.00 m


lo2 = 5.95 m
Design axial load = N = 275.00 kN Page-34, Appendix-III

Ultimate moment about - x Mx = 234.00 kN.m Page-34, Appendix-III

Ultimate moment about - y My = 4.00 kN.m Page-34, Appendix-III

Concrete & Reinforcement data

Characteristic strength of concrete = fcu = 40.0 N/mm2 Cl .20.1.3.1 of Design

Characteristic strength of reinforcing bar = fy = 460.0 N/mm2 basis manual

Clear cover to links = c = 75.0 mm ,,

Diameter of links = 10.0 mm

Diameter of reinforcement D = 25.0 mm

Number of bars n = 12.0 Nos.

Area of Vertical reinforcement Asc = n π D^2/4 = 5890.50 mm2

Net C/S area of concrete Ac = bh-Asc = 154109.50 mm2

Check for slenderness

Effective height = le = βlo eqn 30 of BS 8110-1

Check about y - axis

Type of restraint about y-axis (Braced or Unbraced) = Un Braced Cl .3.8.1.5of BS-8110-1

End condition at top = 1 Cl.3.8.1.6.2of BS-8110-1

End condition at bottom = 1


β = 1.2 Table 3.20 of BS-8110-1
Effective height lex = βlo2 = 7.14 m
lex /b = 17.9 > Cl.3.8.1.3 of BS-8110-1
10

Hence slender column

DOCUMENT TITLE ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT
PROJECT Page 1 of 3
HABSHAN TO FUJAIRAH
DOCUMENT No. 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE : 12/06/2009
Page 52 of 150
CALCULATION SHEET
DESIGN CALCULATION -COLUMN-C1 - ( 400 mm x 400 mm )

Additional moment due to slenderness

Additional moment, May = N au eqn 35 of BS 8110-1

May = N h (lex/b )^2 /2000 eqn 32&34 of BS 8110-1


= 17.52 kN.m

Check about x - axis

Type of restraint about x-axis (Braced or Unbraced) = Un Braced Cl .3.8.1.5 of BS-8110-1

End condition at top = 1 Cl.3.8.1.6.2of BS-8110-1

End condition at bottom = 1


β = 1.2 Table 3.20 of BS-8110-1
Effective height ley = βlo1 = 4.80 m
ley /h = 12.0 > Cl .3.8.1.3 of BS-8110-1
10
Hence slender column

Additional moment due to slenderness

Additional moment, Max = N au eqn 35 of BS 8110-1

Max = N h (ley/b )^2 /2000 eqn 32&34 of BS 8110-1


= 7.92 kN.m
Final Moments
MX = Mx + Max = 241.92 kN.m

MY = My + May = 21.52 kN.m

CASE 1 - Design check by assuming minimum eccentricity


Axial capacity of the column = N = 0.35fcuAc + 0.7 fyAsc eqn 39 of BS 8110-1
= 4054 kN
> Design axial load OKAY
CASE 2 -Max axial load + Bending

Design check for biaxial bending

The ratio = MX/h' = 800 Cl .3.8.4.5 of BS-8110-1

The ratio MY/b' = 71 Cl .3.8.4.5 of BS-8110-1

The ratio N / bhfcu = 0.043 Table 3.22 of BS-8110-1


β = 1.00 Table 3.22 of BS-8110-1
Design equivalent uniaxial moment = Mx' = Mx + beta(h'/b')My eqn 41 of BS8110-1
= 263.44 kN.m
Design width of section = b = 400 mm
Design depth of section = h = 400 mm
Effective depth = d = 302.5 mm
The ratio = d/h = 0.76
The ratio = N/bh = 1.72

DOCUMENT TITLE ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT
PROJECT Page 2 of 3
HABSHAN TO FUJAIRAH
DOCUMENT No. 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE : 12/06/2009
Page 53 of 150
CALCULATION SHEET
DESIGN CALCULATION -COLUMN-C1 - ( 400 mm x 400 mm )

The ratio = M/bh2 = 4.12

100As Chart 36 of BS- 8110-3


The ratio = = 3.20 %
bh

Reinforcement required = As = 5689 mm2

Reinforcement provided = Ap = 5891 mm2 OKAY

Links:

Dia of bar required=1/4th dia of main bar or 6mm = 6 mm Cl.3.12.7.1of BS-8110-1


(whichever is the greater)

Dia of bar provided = 10 mm OKAY

Spacing of bar required = 12D = 300 mm Cl.3.12.7.1of BS-8110-1


(12 times the size of the smallest compression bar)
Spacing of bar provided = 150 mm OKAY

Cl.3.8.4.6 of BS-8110-1

RESULTS

Width of column = 400 mm


Depth of column = 400 mm
Dia of main reinforcement = 12 Nos 25 mm
Links = 10 mm 150 c/c

DOCUMENT TITLE ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT
PROJECT Page 3 of 3
HABSHAN TO FUJAIRAH
DOCUMENT No. 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE : 12/06/2009
Page 54 of 150
CALCULATION SHEET
DESIGN CALCULATION -COLUMN-C2- ( 400 mm x 400 mm )
Column data

Width of column = b = 400.0 mm

Depth of column x = h = 400.0 mm

Eff. width=b-c-dia of link-D/2 = b' = 307.0 mm Figure 3.22 of BS 8110

Eff. depth=h-c-dia of link-D/2 = h' = 307.0 mm Figure 3.22 of BS 8110

Clear height y = lo1 = 1.95 m


lo2 = 1.95 m
Design axial load = N = 200.00 kN Page-35, Appendix-III

Ultimate moment about - x Mx = 19.00 kN.m Page-35, Appendix-III

Ultimate moment about - y My = 74.00 kN.m Page-35, Appendix-III

Concrete & Reinforcement data

Characteristic strength of concrete = fcu = 40.0 N/mm2 Cl .20.1.3.1 of Design

Characteristic strength of reinforcing bar = fy = 460.0 N/mm2 basis manual

Clear cover to links = c = 75.0 mm ,,

Diameter of links = 10.0 mm

Diameter of reinforcement D = 16.0 mm

Number of bars n = 12.0 Nos.

Area of Vertical reinforcement Asc = n π D^2/4 = 2412.75 mm2

Net C/S area of concrete Ac = bh-Asc = 157587.25 mm2

Check for slenderness

Effective height = le = βlo eqn 30 of BS 8110-1

Check about y - axis

Type of restraint about y-axis (Braced or Unbraced) = Un Braced Cl .3.8.1.5of BS-8110-1

End condition at top = 1 Cl.3.8.1.6.2of BS-8110-1

End condition at bottom = 1


β = 1.2 Table 3.20 of BS-8110-1
Effective height lex = βlo2 = 2.34 m
lex /b = 5.9 < Cl.3.8.1.3 of BS-8110-1
10

Hence short column

DOCUMENT TITLE ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT
PROJECT Page 1 of 3
HABSHAN TO FUJAIRAH
DOCUMENT No. 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE : 12/06/2009
Page 55 of 150
CALCULATION SHEET
DESIGN CALCULATION -COLUMN-C2- ( 400 mm x 400 mm )

Additional moment due to slenderness

Additional moment, May = N au eqn 35 of BS 8110-1

May = N h (lex/b )^2 /2000 eqn 32&34 of BS 8110-1


= 1.37 kN.m

Check about x - axis

Type of restraint about x-axis (Braced or Unbraced) = Un Braced Cl .3.8.1.5 of BS-8110-1

End condition at top = 1 Cl.3.8.1.6.2of BS-8110-1

End condition at bottom = 1


β = 1.2 Table 3.20 of BS-8110-1
Effective height ley = βlo1 = 2.34 m
ley /h = 5.9 < Cl .3.8.1.3 of BS-8110-1
10
Hence short column

Additional moment due to slenderness

Additional moment, Max = N au eqn 35 of BS 8110-1

Max = N h (ley/b )^2 /2000 eqn 32&34 of BS 8110-1


= 1.37 kN.m
Final Moments
MX = Mx + Max = 20.37 kN.m

MY = My + May = 75.37 kN.m

CASE 1 - Design check by assuming minimum eccentricity


Axial capacity of the column = N = 0.35fcuAc + 0.7 fyAsc eqn 39 of BS 8110-1
= 2983 kN
> Design axial load OKAY
CASE 2 -Max axial load + Bending

Design check for biaxial bending

The ratio = MX/h' = 66 Cl .3.8.4.5 of BS-8110-1

The ratio MY/b' = 246 Cl .3.8.4.5 of BS-8110-1

The ratio N / bhfcu = 0.031 Table 3.22 of BS-8110-1


β = 1.00 Table 3.22 of BS-8110-1
Design equivalent uniaxial moment = My' = My + beta(b'/h')Mx eqn 41 of BS8110-1
= 95.74 kN.m
Design width of section = b = 400 mm
Design depth of section = h = 400 mm
Effective depth = d = 307 mm
The ratio = d/h = 0.77
The ratio = N/bh = 1.25

DOCUMENT TITLE ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT
PROJECT Page 2 of 3
HABSHAN TO FUJAIRAH
DOCUMENT No. 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE : 12/06/2009
Page 56 of 150
CALCULATION SHEET
DESIGN CALCULATION -COLUMN-C2- ( 400 mm x 400 mm )

The ratio = M/bh2 = 1.50

100As Chart 36 of BS- 8110-3


The ratio = = 1.00 %
bh

Reinforcement required = As = 1778 mm2

Reinforcement provided = Ap = 2413 mm2 OKAY

Links:

Dia of bar required=1/4th dia of main bar or 6mm = 6 mm Cl.3.12.7.1of BS-8110-1


(whichever is the greater)

Dia of bar provided = 10 mm OKAY

Spacing of bar required = 12D = 192 mm Cl.3.12.7.1of BS-8110-1


(12 times the size of the smallest compression bar)
Spacing of bar provided = 150 mm OKAY

Cl.3.8.4.6 of BS-8110-1

RESULTS

Width of column = 400 mm


Depth of column = 400 mm
Dia of main reinforcement = 12 Nos 16 mm
Links = 10 mm 150 c/c

DOCUMENT TITLE ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP-ABU DHABI CRUDE OIL PIPELINE PROJECT
PROJECT Page 3 of 3
HABSHAN TO FUJAIRAH
DOCUMENT No. 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE : 12/06/2009
Page 57 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F1 & F14"
DIAGRAM
h=400 b=400
FGL

2000

10 φ ‐ 150 10 φ ‐ 150

350

12 φ - 150 12 φ - 150
L=2100 B=2100

1 LOADS: RESULTS FROM STAAD PRO


Critical loads Ultimate load Service load
Design load P = 463.00 kN Ps = 347.00 kN page.36,37 -Appendix-III

Design moment about (L) ML = 75.00 kNm MLs = 54.00 kNm page.36,37 -Appendix-III

Design moment about (B) MB = 7.00 kNm MBs = 5.00 kNm page.36,37 -Appendix-III

Horizontal force along "L" HL = 11.00 kN HLs = 9.00 kN page.36,37 -Appendix-III

Horizontal force along "B" HB = 63.00 kN HBs = 45.00 kN page.36,37 -Appendix-III

2 DESIGN DATA
Width of column = b = 400 mm

Depth of column = h = 400 mm

Depth of footing = D = 350 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 158.5 kN/m2 Refer Attachment-v

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 58 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F1 & F14"

3 SIZE OF FOOTING

Length of footing = L = 2.1 m

Width of footing = B = 2.1 m

Self weight of footing = L.B.D. γc = w1 = 38.5875 kN

self wt of earth on footing= (L.B-b.h)(Dg-D) γs = w2 = 126 kN

Total design axial load= Ps+w1+w2 = Pd = 512 kN

Area of base required= Pd/qs = Areqd = 3.23 m2

Area of base provided= L*B = Aprov = 4.41 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)

Section modulus about (L)= LB2/6 = ZL = 1.54 m3

Section modulus about (B)= BL2/6 = ZB = 1.54 m3

Max. earth pressure=Pd/Aprov+MLs/ZL+MBs/ZB= qmax = 151.2 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs/ZL-MBs/ZB= qmin = 77.8 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT
(For ultimte limit state)
Total Ultimate Axial load =P+1.4(w1+w2)= Pa = 694 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML/ZL+MB/ZB = q1 = 210 kN/m2

Pa/Aprov-ML/ZL+MB/ZB = q2 = 113 kN/m2

Pa/Aprov+ML/ZL-MB/ZB = q3 = 201 kN/m2

Pa/Aprov-ML/ZL-MB/ZB = q4 = 104 kN/m2

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 59 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F1 & F14"

Pressure diagram

104 201
q4 q3
104 201
q4 Side-L2 q3

Side-B1 b Side-B2

q2 Side-L1 q1
113 210
q2 q1
113 210
b. Design moment
Conservatively assuming max. bearing pressure on both the sides

Design moment about (L)


2
= max(q1:q4)*(L-h) /8*B = MLD = 159.6 kNm

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MBD = 159.6 kNm

6 CALCULATION FOR REINFORCEMENT

a. Reinforcement along (L)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 269 mm

K' Value 0.156

K -value MLD/Ld2fcu = K1 = 0.026 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 255.6 mm "

Area of steel required = MLD/0.95fyz1 = As1 reqd = 1430 mm2 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 60 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F1 & F14"

Minimum area of steel = 0.13%LD = As1 Min. = 955.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 29400 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 14 Nos

Dia of bars provided = φ1 = 12 mm

Area of tension steel provided = As1 prov. = 1583 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 277 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 182 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 151 mm

Spacing of bars provided = 150 mm


Hence ok

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As2 = 715 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 150 mm

No of bars provided = Nb2 = 15 Nos

Area of compression steel provided = As2 prov. = 1178 mm2


Hence ok
b. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c-φ1- φ2/2 = d2 = 257 mm

K' Value 0.156

K -value MBD/Bd2fcu = K2 = 0.029 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 244.2 mm "

Area of steel required = MBD/0.95fyz2 = As3 reqd = 1496 mm2 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 61 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F1 & F14"

Minimum area of steel = 0.13%BD = As3 Min. = 955.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 29400 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb3 = 14 Nos

Dia of bars provided = φ3 = 12 mm

Area of tension steel provided = As3 prov. = 1583 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 290 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 174 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 152 mm

Spacing of bars provided = 150 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel As4 = 748 mm2

Dia of bars provided = φ4 = 10 mm

Spacing of bars 150 mm

No of bars provided = Nb4 = 15 Nos

Area of compression steel provided = As4 prov. = 1178 mm2


Hence ok

7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b+2h = S1 = 1600 mm

Actual shear stress = P/s1*min(d1&d2) = vc1 = 1.13 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.29 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 1.12 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 62 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F1 & F14"

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.12

Ultimate shear stress that the footing can carry = (vc) = 0.549 N/mm2 Table-3.8 of BS8110-1
vc = (0.79*{100*Ast prov/(bd)}^(1/3)*(400/d)^(1/4)/1.25*(fcu/25)^(1/3))

Critical perimeter =12d+2b+2h = Lp = 4684 mm

Area within the perimeter =(b+3d)*(h+3d) = A' = 1.37E+06 mm2

Average earth pressure = Pavg = 162 kN/m2

Punching shear force = Vpun = 492 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.41 N/mm2


vc2 < vc Hence ok
c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(L,B)-max(b,h))/2-max(d1,d2)= Lo = 0.581 m

Shear force = Pavg*Lo*min(L,B) = Vo = 197 kN

Actual shear stress =Vo/min(B,L)*min(d1,d2)= vc3 = 0.366 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps = Pd = 512 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 204.7 kN

Total horizontal force =max(HLs,HBs) = H = 45.00 kN

Safety index = Fr/H = 4.55 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs+MBs) = Mo = 54.0 kNm

Resisting moment = Pd*max(L,B)/2 = MR = 537 kNm

Safety index = MR/Mo = 10.0 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 63 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F2"
DIAGRAM
h=400 b=400
FGL

2000

10 φ ‐ 150 10 φ ‐ 150

450

16 φ - 150 16 φ - 150
L=2700 B=2700

1 LOADS: RESULTS FROM STAAD PRO


Critical loads Ultimate load Service load
Design load P = 812.00 kN Ps = 632.00 kN page.38,39 -Appendix-III

Design moment about (L) ML = 92.00 kNm MLs = 66.00 kNm page.38,39 -Appendix-III

Design moment about (B) MB = 6.00 kNm MBs = 4.00 kNm page.38,39 -Appendix-III

Horizontal force along "L" HL = 7.00 kN HLs = 5.00 kN page.38,39 -Appendix-III

Horizontal force along "B" HB = 79.00 kN HBs = 57.00 kN page.38,39 -Appendix-III

2 DESIGN DATA
Width of column = b = 400 mm

Depth of column = h = 400 mm

Depth of footing = D = 450 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 149.5 kN/m2 Refer Attachment-v

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 64 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F2"

3 SIZE OF FOOTING

Length of footing = L = 2.7 m

Width of footing = B = 2.7 m

Self weight of footing = L.B.D. γc = w1 = 82.0125 kN

self wt of earth on footing= (L.B-b.h)(Dg-D) γs = w2 = 199 kN

Total design axial load= Ps+w1+w2 = Pd = 913 kN

Area of base required= Pd/qs = Areqd = 6.11 m2

Area of base provided= L*B = Aprov = 7.29 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)

Section modulus about (L)= LB2/6 = ZL = 3.28 m3

Section modulus about (B)= BL2/6 = ZB = 3.28 m3

Max. earth pressure=Pd/Aprov+MLs/ZL+MBs/ZB= qmax = 146.6 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs/ZL-MBs/ZB= qmin = 103.9 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT
(For ultimte limit state)
Total Ultimate Axial load =P+1.4(w1+w2)= Pa = 1205 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML/ZL+MB/ZB = q1 = 195 kN/m2

Pa/Aprov-ML/ZL+MB/ZB = q2 = 139 kN/m2

Pa/Aprov+ML/ZL-MB/ZB = q3 = 192 kN/m2

Pa/Aprov-ML/ZL-MB/ZB = q4 = 135 kN/m2

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 65 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F2"

Pressure diagram

135 192
q4 q3
135 192
q4 Side-L2 q3

Side-B1 b Side-B2

q2 Side-L1 q1
139 195
q2 q1
139 195
b. Design moment
Conservatively assuming max. bearing pressure on both the sides

Design moment about (L)


2
= max(q1:q4)*(L-h) /8*B = MLD = 348.5 kNm

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MBD = 348.5 kNm

6 CALCULATION FOR REINFORCEMENT

a. Reinforcement along (L)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 367 mm

K' Value 0.156

K -value MLD/Ld2fcu = K1 = 0.024 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 348.7 mm "

Area of steel required = MLD/0.95fyz1 = As1 reqd = 2288 mm2 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 66 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F2"

Minimum area of steel = 0.13%LD = As1 Min. = 1579.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 48600 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 12 Nos

Dia of bars provided = φ1 = 16 mm

Area of tension steel provided = As1 prov. = 2413 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 291 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 178 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 230 mm

Spacing of bars provided = 150 mm


Hence ok

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As2 = 1144 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 150 mm

No of bars provided = Nb2 = 19 Nos

Area of compression steel provided = As2 prov. = 1492 mm2


Hence ok
b. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c-φ1- φ2/2 = d2 = 351 mm

K' Value 0.156

K -value MBD/Bd2fcu = K2 = 0.026 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 333.5 mm "

Area of steel required = MBD/0.95fyz2 = As3 reqd = 2392 mm2 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 67 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F2"

Minimum area of steel = 0.13%BD = As3 Min. = 1579.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 48600 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb3 = 12 Nos

Dia of bars provided = φ3 = 16 mm

Area of tension steel provided = As3 prov. = 2413 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 304 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 171 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 230 mm

Spacing of bars provided = 150 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel As4 = 1196 mm2

Dia of bars provided = φ4 = 10 mm

Spacing of bars 150 mm

No of bars provided = Nb4 = 19 Nos

Area of compression steel provided = As4 prov. = 1492 mm2


Hence ok

7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b+2h = S1 = 1600 mm

Actual shear stress = P/s1*min(d1&d2) = vc1 = 1.45 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.25 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 1.03 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 68 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F2"

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.03

Ultimate shear stress that the footing can carry = (vc) = 0.484 N/mm2 Table-3.8 of BS8110-1
vc = (0.79*{100*Ast prov/(bd)}^(1/3)*(400/d)^(1/4)/1.25*(fcu/25)^(1/3))

Critical perimeter =12d+2b+2h = Lp = 5812 mm

Area within the perimeter =(b+3d)*(h+3d) = A' = 2.11E+06 mm2

Average earth pressure = Pavg = 167 kN/m2

Punching shear force = Vpun = 866 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.42 N/mm2


vc2 < vc Hence ok
c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(L,B)-max(b,h))/2-max(d1,d2)= Lo = 0.783 m

Shear force = Pavg*Lo*min(L,B) = Vo = 353 kN

Actual shear stress =Vo/min(B,L)*min(d1,d2)= vc3 = 0.373 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps = Pd = 913 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 365.2 kN

Total horizontal force =max(HLs,HBs) = H = 57.00 kN

Safety index = Fr/H = 6.41 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs+MBs) = Mo = 66.0 kNm

Resisting moment = Pd*max(L,B)/2 = MR = 1232 kNm

Safety index = MR/Mo = 18.7 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 69 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F3"
DIAGRAM
h=400 b=400
FGL

2000

10 φ ‐ 175 10 φ ‐ 175

400

16 φ - 175 16 φ - 175
L=2450 B=2450

1 LOADS: RESULTS FROM STAAD PRO


Critical loads Ultimate load Service load
Design load P = 771.00 kN Ps = 548.00 kN page.40,41 -Appendix-III

Design moment about (L) ML = 18.00 kNm MLs = 11.00 kNm page.40,41 -Appendix-III

Design moment about (B) MB = 10.00 kNm MBs = 52.00 kNm page.40,41 -Appendix-III

Horizontal force along "L" HL = 13.00 kN HLs = 44.00 kN page.40,41 -Appendix-III

Horizontal force along "B" HB = 11.00 kN HBs = 17.00 kN page.40,41 -Appendix-III

2 DESIGN DATA
Width of column = b = 400 mm

Depth of column = h = 400 mm

Depth of footing = D = 400 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 153 kN/m2 Refer Attachment-v

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 70 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F3"

3 SIZE OF FOOTING

Length of footing = L = 2.45 m

Width of footing = B = 2.45 m

Self weight of footing = L.B.D. γc = w1 = 60.025 kN

self wt of earth on footing= (L.B-b.h)(Dg-D) γs = w2 = 168 kN

Total design axial load= Ps+w1+w2 = Pd = 776 kN

Area of base required= Pd/qs = Areqd = 5.07 m2

2
Area of base provided= L*B = Aprov = 6.0025 m
Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)

Section modulus about (L)= LB2/6 = ZL = 2.45 m3

Section modulus about (B)= BL2/6 = ZB = 2.45 m3

Max. earth pressure=Pd/Aprov+MLs/ZL+MBs/ZB= qmax = 151.9 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs/ZL-MBs/ZB= qmin = 103.6 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT
(For ultimte limit state)
Total Ultimate Axial load =P+1.4(w1+w2)= Pa = 1091 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML/ZL+MB/ZB = q1 = 193 kN/m2

Pa/Aprov-ML/ZL+MB/ZB = q2 = 178 kN/m2

Pa/Aprov+ML/ZL-MB/ZB = q3 = 185 kN/m2

Pa/Aprov-ML/ZL-MB/ZB = q4 = 170 kN/m2

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 71 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F3"

Pressure diagram

170 185
q4 q3
170 185
q4 Side-L2 q3

Side-B1 b Side-B2

q2 Side-L1 q1
178 193
q2 q1
178 193
b. Design moment
Conservatively assuming max. bearing pressure on both the sides

Design moment about (L)


2
= max(q1:q4)*(L-h) /8*B = MLD = 248.5 kNm

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MBD = 248.5 kNm

6 CALCULATION FOR REINFORCEMENT

a. Reinforcement along (L)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 317 mm

K' Value 0.156

K -value MLD/Ld2fcu = K1 = 0.025 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 301.2 mm "

Area of steel required = MLD/0.95fyz1 = As1 reqd = 1889 mm2 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 72 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F3"

Minimum area of steel = 0.13%LD = As1 Min. = 1274 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 39200 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 11 Nos

Dia of bars provided = φ1 = 16 mm

Area of tension steel provided = As1 prov. = 2212 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 262 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 195 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 228 mm

Spacing of bars provided = 175 mm


Hence ok

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As2 = 944 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 175 mm

No of bars provided = Nb2 = 15 Nos

Area of compression steel provided = As2 prov. = 1178 mm2


Hence ok
b. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c-φ1- φ2/2 = d2 = 301 mm

K' Value 0.156

K -value MBD/Bd2fcu = K2 = 0.028 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 286.0 mm "

Area of steel required = MBD/0.95fyz2 = As3 reqd = 1989 mm2 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 73 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F3"

Minimum area of steel = 0.13%BD = As3 Min. = 1274 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 39200 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb3 = 11 Nos

Dia of bars provided = φ3 = 16 mm

Area of tension steel provided = As3 prov. = 2212 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 276 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 186 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 228 mm

Spacing of bars provided = 175 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel As4 = 994 mm2

Dia of bars provided = φ4 = 10 mm

Spacing of bars 175 mm

No of bars provided = Nb4 = 15 Nos

Area of compression steel provided = As4 prov. = 1178 mm2


Hence ok

7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b+2h = S1 = 1600 mm

Actual shear stress = P/s1*min(d1&d2) = vc1 = 1.60 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.30 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 1.07 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 74 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F3"

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.07

Ultimate shear stress that the footing can carry = (vc) = 0.531 N/mm2 Table-3.8 of BS8110-1
vc = (0.79*{100*Ast prov/(bd)}^(1/3)*(400/d)^(1/4)/1.25*(fcu/25)^(1/3))

Critical perimeter =12d+2b+2h = Lp = 5212 mm

Area within the perimeter =(b+3d)*(h+3d) = A' = 1.70E+06 mm2

Average earth pressure = Pavg = 186 kN/m2

Punching shear force = Vpun = 800 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.51 N/mm2


vc2 < vc Hence ok
c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(L,B)-max(b,h))/2-max(d1,d2)= Lo = 0.708 m

Shear force = Pavg*Lo*min(L,B) = Vo = 322 kN

Actual shear stress =Vo/min(B,L)*min(d1,d2)= vc3 = 0.437 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps = Pd = 776 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 310.5 kN

Total horizontal force =max(HLs,HBs) = H = 44.00 kN

Safety index = Fr/H = 7.06 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs+MBs) = Mo = 52.0 kNm

Resisting moment = Pd*max(L,B)/2 = MR = 951 kNm

Safety index = MR/Mo = 18.3 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 75 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F4"
DIAGRAM
h=400 b=400
FGL

2000

10 φ ‐ 150 10 φ ‐ 150

550

16 φ - 150 16 φ - 150
L=3300 B=3300

1 LOADS: RESULTS FROM STAAD PRO


Critical loads Ultimate load Service load
Design load P = 1011.00 kN Ps = 877.00 kN page.42,43 -Appendix-III

Design moment about (L) ML = 125.00 kNm MLs = 82.00 kNm page.42,43 -Appendix-III

Design moment about (B) MB = 32.00 kNm MBs = 34.00 kNm page.42,43 -Appendix-III

Horizontal force along "L" HL = 58.00 kN HLs = 61.00 kN page.42,43 -Appendix-III

Horizontal force along "B" HB = 117.00 kN HBs = 75.00 kN page.42,43 -Appendix-III

2 DESIGN DATA 149 to 152,155,157 to 160,201


Width of column = b = 400 mm

Depth of column = h = 400 mm

Depth of footing = D = 550 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 143.5 kN/m2 Refer Attachment-v

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 76 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F4"

3 SIZE OF FOOTING

Length of footing = L = 3.3 m

Width of footing = B = 3.3 m

Self weight of footing = L.B.D. γc = w1 = 149.7375 kN

self wt of earth on footing= (L.B-b.h)(Dg-D) γs = w2 = 280 kN

Total design axial load= Ps+w1+w2 = Pd = 1307 kN

Area of base required= Pd/qs = Areqd = 9.11 m2

Area of base provided= L*B = Aprov = 10.89 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)

Section modulus about (L)= LB2/6 = ZL = 5.99 m3

Section modulus about (B)= BL2/6 = ZB = 5.99 m3

Max. earth pressure=Pd/Aprov+MLs/ZL+MBs/ZB= qmax = 139.4 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs/ZL-MBs/ZB= qmin = 100.6 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT
(For ultimte limit state)
Total Ultimate Axial load =P+1.4(w1+w2)= Pa = 1613 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML/ZL+MB/ZB = q1 = 174 kN/m2

Pa/Aprov-ML/ZL+MB/ZB = q2 = 133 kN/m2

Pa/Aprov+ML/ZL-MB/ZB = q3 = 164 kN/m2

Pa/Aprov-ML/ZL-MB/ZB = q4 = 122 kN/m2

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 77 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F4"

Pressure diagram

122 164
q4 q3
122 164
q4 Side-L2 q3

Side-B1 b Side-B2

q2 Side-L1 q1
133 174
q2 q1
133 174
b. Design moment
Conservatively assuming max. bearing pressure on both the sides

Design moment about (L)


2
= max(q1:q4)*(L-h) /8*B = MLD = 604.7 kNm

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MBD = 604.7 kNm

6 CALCULATION FOR REINFORCEMENT

a. Reinforcement along (L)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 467 mm

K' Value 0.156

K -value MLD/Ld2fcu = K1 = 0.021 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 443.7 mm "

Area of steel required = MLD/0.95fyz1 = As1 reqd = 3119 mm2 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 78 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F4"

Minimum area of steel = 0.13%LD = As1 Min. = 2359.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 72600 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 16 Nos

Dia of bars provided = φ1 = 16 mm

Area of tension steel provided = As1 prov. = 3217 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 297 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 174 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 209 mm

Spacing of bars provided = 150 mm


Hence ok

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As2 = 1559 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 150 mm

No of bars provided = Nb2 = 23 Nos

Area of compression steel provided = As2 prov. = 1806 mm2


Hence ok
b. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c-φ1- φ2/2 = d2 = 451 mm

K' Value 0.156

K -value MBD/Bd2fcu = K2 = 0.023 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 428.5 mm "

Area of steel required = MBD/0.95fyz2 = As3 reqd = 3230 mm2 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 79 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F4"

Minimum area of steel = 0.13%BD = As3 Min. = 2359.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 72600 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb3 = 17 Nos

Dia of bars provided = φ3 = 16 mm

Area of tension steel provided = As3 prov. = 3418 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 290 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 178 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 196 mm

Spacing of bars provided = 150 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel As4 = 1615 mm2

Dia of bars provided = φ4 = 10 mm

Spacing of bars 150 mm

No of bars provided = Nb4 = 23 Nos

Area of compression steel provided = As4 prov. = 1806 mm2


Hence ok

7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b+2h = S1 = 1600 mm

Actual shear stress = P/s1*min(d1&d2) = vc1 = 1.40 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.22 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 0.97 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 80 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F4"

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.00

Ultimate shear stress that the footing can carry = (vc) = 0.444 N/mm2 Table-3.8 of BS8110-1
vc = (0.79*{100*Ast prov/(bd)}^(1/3)*(400/d)^(1/4)/1.25*(fcu/25)^(1/3))

Critical perimeter =12d+2b+2h = Lp = 7012 mm

Area within the perimeter =(b+3d)*(h+3d) = A' = 3.07E+06 mm2

Average earth pressure = Pavg = 153 kN/m2

Punching shear force = Vpun = 1199 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.38 N/mm2


vc2 < vc Hence ok
c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(L,B)-max(b,h))/2-max(d1,d2)= Lo = 0.983 m

Shear force = Pavg*Lo*min(L,B) = Vo = 498 kN

Actual shear stress =Vo/min(B,L)*min(d1,d2)= vc3 = 0.334 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps = Pd = 1307 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 522.7 kN

Total horizontal force =max(HLs,HBs) = H = 75.00 kN

Safety index = Fr/H = 6.97 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs+MBs) = Mo = 82.0 kNm

Resisting moment = Pd*max(L,B)/2 = MR = 2156 kNm

Safety index = MR/Mo = 26.3 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 81 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F5"
DIAGRAM
h=400 b=400
FGL

2000

10 φ ‐ 150 10 φ ‐ 150

450

12 φ - 150 12 φ - 150
L=2500 B=2500

1 LOADS: RESULTS FROM STAAD PRO


Critical loads Ultimate load Service load
Design load P = 611.00 kN Ps = 476.00 kN page.44,45 -Appendix-III

Design moment about (L) ML = 29.00 kNm MLs = 25.00 kNm page.44,45 -Appendix-III

Design moment about (B) MB = 91.00 kNm MBs = 65.00 kNm page.44,45 -Appendix-III

Horizontal force along "L" HL = 84.00 kN HLs = 60.00 kN page.44,45 -Appendix-III

Horizontal force along "B" HB = 19.00 kN HBs = 16.00 kN page.44,45 -Appendix-III

2 DESIGN DATA
Width of column = b = 400 mm

Depth of column = h = 400 mm

Depth of footing = D = 450 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 152.5 kN/m2 Refer Attachment-v

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 82 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F5"

3 SIZE OF FOOTING

Length of footing = L = 2.5 m

Width of footing = B = 2.5 m

Self weight of footing = L.B.D. γc = w1 = 70.3125 kN

self wt of earth on footing= (L.B-b.h)(Dg-D) γs = w2 = 170 kN

Total design axial load= Ps+w1+w2 = Pd = 716 kN

Area of base required= Pd/qs = Areqd = 4.70 m2

Area of base provided= L*B = Aprov = 6.25 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)

Section modulus about (L)= LB2/6 = ZL = 2.60 m3

Section modulus about (B)= BL2/6 = ZB = 2.60 m3

Max. earth pressure=Pd/Aprov+MLs/ZL+MBs/ZB= qmax = 149.2 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs/ZL-MBs/ZB= qmin = 80.0 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT
(For ultimte limit state)
Total Ultimate Axial load =P+1.4(w1+w2)= Pa = 947 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML/ZL+MB/ZB = q1 = 198 kN/m2

Pa/Aprov-ML/ZL+MB/ZB = q2 = 175 kN/m2

Pa/Aprov+ML/ZL-MB/ZB = q3 = 128 kN/m2

Pa/Aprov-ML/ZL-MB/ZB = q4 = 105 kN/m2

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 83 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F5"

Pressure diagram

105 128
q4 q3
105 128
q4 Side-L2 q3

Side-B1 b Side-B2

q2 Side-L1 q1
175 198
q2 q1
175 198
b. Design moment
Conservatively assuming max. bearing pressure on both the sides

Design moment about (L)


2
= max(q1:q4)*(L-h) /8*B = MLD = 272.4 kNm

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MBD = 272.4 kNm

6 CALCULATION FOR REINFORCEMENT

a. Reinforcement along (L)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 369 mm

K' Value 0.156

K -value MLD/Ld2fcu = K1 = 0.020 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 350.6 mm "

Area of steel required = MLD/0.95fyz1 = As1 reqd = 1778 mm2 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 84 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F5"

Minimum area of steel = 0.13%LD = As1 Min. = 1462.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 45000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 16 Nos

Dia of bars provided = φ1 = 12 mm

Area of tension steel provided = As1 prov. = 1810 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 301 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 168 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 156 mm

Spacing of bars provided = 150 mm


Hence ok

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As2 = 889 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 150 mm

No of bars provided = Nb2 = 18 Nos

Area of compression steel provided = As2 prov. = 1388 mm2


Hence ok
b. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c-φ1- φ2/2 = d2 = 357 mm

K' Value 0.156

K -value MBD/Bd2fcu = K2 = 0.021 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 339.2 mm "

Area of steel required = MBD/0.95fyz2 = As3 reqd = 1838 mm2 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 85 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F5"

Minimum area of steel = 0.13%BD = As3 Min. = 1462.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 45000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb3 = 17 Nos

Dia of bars provided = φ3 = 12 mm

Area of tension steel provided = As3 prov. = 1923 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 293 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 172 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 151 mm

Spacing of bars provided = 150 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel As4 = 919 mm2

Dia of bars provided = φ4 = 10 mm

Spacing of bars 150 mm

No of bars provided = Nb4 = 18 Nos

Area of compression steel provided = As4 prov. = 1388 mm2


Hence ok

7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b+2h = S1 = 1600 mm

Actual shear stress = P/s1*min(d1&d2) = vc1 = 1.07 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.20 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 1.03 "

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 86 of 150
CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F5"

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.03

Ultimate shear stress that the footing can carry = (vc) = 0.447 N/mm2 Table-3.8 of BS8110-1
vc = (0.79*{100*Ast prov/(bd)}^(1/3)*(400/d)^(1/4)/1.25*(fcu/25)^(1/3))

Critical perimeter =12d+2b+2h = Lp = 5884 mm

Area within the perimeter =(b+3d)*(h+3d) = A' = 2.16E+06 mm2

Average earth pressure = Pavg = 187 kN/m2

Punching shear force = Vpun = 762 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.36 N/mm2


vc2 < vc Hence ok
c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(L,B)-max(b,h))/2-max(d1,d2)= Lo = 0.681 m

Shear force = Pavg*Lo*min(L,B) = Vo = 318 kN

Actual shear stress =Vo/min(B,L)*min(d1,d2)= vc3 = 0.356 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps = Pd = 716 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 286.5 kN

Total horizontal force =max(HLs,HBs) = H = 60.00 kN

Safety index = Fr/H = 4.77 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs+MBs) = Mo = 65.0 kNm

Resisting moment = Pd*max(L,B)/2 = MR = 895 kNm

Safety index = MR/Mo = 13.8 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 87 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F6"
DIAGRAM b1=400 b2=400
h1=400 h2=400
FGL

2000

12 φ ‐ 150 10 φ ‐ 200

550

16 φ - 150 16 φ - 200
L=4500 B=3000

1 LOADS: RESULTS FROM STAAD PRO-1 st COLUMN


Ultimate load Service load
Design load P1 = 541.00 kN Ps1 = 386.00 kN page.46&47 -Appe'x-III

Design moment about (L) ML1 = 100.00 kNm MLs1 = 72.00 kNm page.46&47 -Appe'x-III

Design moment about (B) MB1 = 7.00 kNm MBs1 = 5.00 kNm page.46&47 -Appe'x-III

Horizontal force along "L" HL1 = 10.00 kN HLs1 = 7.00 kN page.46&47 -Appe'x-III

Horizontal force along "B" HB1 = 40.00 kN HBs1 = 28.00 kN page.46&47 -Appe'x-III

LOADS: RESULTS FROM STAAD PRO-2 st COLUMN


Ultimate load Service load
Design load P2 = 813.00 kN Ps2 = 610.00 kN page.48&49 -Appe'x-III

Design moment about (L) ML2 = 22.00 kNm MLs2 = 16.00 kNm page.48&49 -Appe'x-III

Design moment about (B) MB2 = 99.00 kNm MBs2 = 70.00 kNm page.48&49 -Appe'x-III

Horizontal force along "L" HL2 = 105.00 kN HLs2 = 75.00 kN page.48&49 -Appe'x-III

Horizontal force along "B" HB2 = 36.00 kN HBs2 = 25.00 kN page.48&49 -Appe'x-III

2 DESIGN DATA
Width of 1 st column = b1 = 400 mm

Depth of 1 st column = h1 = 400 mm

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 88 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F6"

Width of 2 nd column = b2 = 400 mm

Depth of 2 nd column = h2 = 400 mm

Centre to centre of two column = l = 2500 mm

Footing Projection from centre of 1st column = a1 = 1000 mm

Footing Projection from centre of 2st column = a2 = 1000 mm

Depth of footing = D = 550 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 137.5 kN/m2 Refer Attachment-v

3 SIZE OF FOOTING

Length of footing = L = 4.5 m

Width of footing = B = 3 m

Self weight of footing = L.B.D. γc = w1 = 185.625 kN

self wt of earth on footin(L.B-b1.h1-b2.h2)(Dg-D) γs = w2 = 344 kN

Total design axial load= Ps+w1+w2 = Pd = 1526 kN

Area of base required= Pd/qs = Areqd = 11.10 m2

Area of base provided= L*B = Aprov = 13.5 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)
Section modulus about (L)= LB2/6 = ZL = 6.75 m3

Section modulus about (B)= BL2/6 = ZB = 10.13 m3


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 89 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F6"

Max. earth pressure=Pd/Aprov+MLs1+2/ZL+MBs1+2/ZB= qmax = 133.5 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs1+2/ZL-MBs1+2/ZB= qmin = 92.6 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT
(For ultimte limit state)
Total Ultimate Axial load =P1+2+1.4(w1+w2)= Pa = 2095 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML1+2/ZL+MB1+2/ZB = q1 = 184 kN/m2

Pa/Aprov-ML1+2/ZL+MB1+2/ZB = q2 = 148 kN/m2

Pa/Aprov+ML1+2/ZL-MB1+2/ZB = q3 = 163 kN/m2

Pa/Aprov-ML1+2/ZL-MB1+2/ZB = q4 = 127 kN/m2

Bending moment diagram

P1 P2
a1 l a2
A B C D

q= 184 kN/m2
x = distance of cg of column loads

q.a1^2/2 q.a2^2/2

.q.x^2/2-P1.(x-a1)

BMD
To find cg distance "X"

q. x - P1.(x-a1) =0
q. x - P1.x - P1.a1 =0
Therefore , x = (P1.a1) /(P1-q) = x = 1.51 m

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 90 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F6"

b. Design moment longitudinal direction

Design Sagging moment


= q.a1^2/2 = MLD = 91.9 kNm

Design Hogging moment


= .q.x^2/2-P1.(x-a1) = MBD = 143.2 kNm

c. Design moment Transverse direction

Conservatively assuming max. bearing pressure on both the sides

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MTD = 698.8 kNm

6 CALCULATION FOR REINFORCEMENT

a. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 467 mm

K' Value 0.156

K -value Max(MLD,MBD)/Ld2fcu = K1 = 0.005 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.
Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 443.7 mm "

Area of steel required = Max(MLD,MBD)/0.95fyz1 = As1 reqd = 738 mm2 "

Minimum area of steel = 0.13%LD = As1 Min. = 3217.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 99000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 17 Nos

Dia of bars provided = φ1 = 16 mm

Area of tension steel provided = As1 prov. = 3418 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 66 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 316 mm Cl 3.12.11.2.4 of
BS8110-1
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 91 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F6"

Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 271 mm

Spacing of bars provided = 200 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel = As2 = 1609 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 200 mm

No of bars provided = Nb2 = 24 Nos

Area of compression steel provided = As2 prov. = 1846 mm2


Hence ok
b. Reinforcement along (L)

Effective depth = D-c-φ1- φ2/2 = d2 = 451 mm

K -value MTD/Bd2fcu = K2 = 0.019 Cl 3.4.4.4 of


BS 8110-1

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 428.5 mm "

Area of steel required = MTD/0.95fyz2 = As3 reqd = 3732 mm2 "

Minimum area of steel = 0.13%BD = As3 Min. = 2145 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 66000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb2 = 19 Nos

Dia of bars provided = φ2 = 16 mm

Area of tension steel provided = As3 prov. = 3820 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 300 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 173 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 157 mm

Spacing of bars provided = 150 mm


Hence ok
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 92 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F6"

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As4 = 1866 mm2

Dia of bars provided = φ4 = 12 mm

Spacing of bars 150 mm

No of bars provided = Nb4 = 21 Nos

Area of compression steel provided = As4 prov. = 2375 mm2


Hence ok
7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b2+2h2 = S1 = 1600 mm

Actual shear stress = P2/s1*min(d1&d2) = vc1 = 1.13 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.25 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 0.97 "

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.00


Ultimate shear stress that the footing can carry = (vc) = 0.467 N/mm2 Table-3.8 of BS8110-1
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Critical perimeter for column1 =12d+2b+2h = Lp1 = 7012 mm

Critical perimeter for column2 =12d+2b+2h = Lp2 = 7012 mm

Area within the perimeter col-1 =(b+3d)*(h+3d) = A'1 = 3.07E+06 mm2

Area within the perimeter col-2 =(b+3d)*(h+3d) = A'2 = 3.07E+06 mm2

Average earth pressure = Pavg = 166 kN/m2

Punching shear force = Vpun = 1218 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.39 N/mm2


vc2 < vc Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 93 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F6"

c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(a1,a2)-min(d1,d2))/1000= Lo = 0.549 m
Shear force = Pavg*Lo*B = Vo = 273 kN

Actual shear stress =Vo/(B*min(d1,d2))= vc3 = 0.202 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps1+PS2 = Pd = 1526 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 610.2 kN

Total horizontal force =max(HLs(1+2),HBs(1+2)) = H = 82.00 kN

Safety index = Fr/H = 7.44 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs(1+2),MBs(1+2)) = Mo = 88.0 kNm

R i ti momentt = Pd*max(L,B)/2
Resisting * (L B)/2 = MR = 3433 kN
kNm

Safety index = MR/Mo = 39.0 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 7 of 6
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 94 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F7"
DIAGRAM b1=400 b2=400
h1=400 h2=400
FGL

2000

12 φ ‐ 150 10 φ ‐ 200

600

16 φ - 150 16 φ - 200
L=4500 B=3500

1 LOADS: RESULTS FROM STAAD PRO-1 st COLUMN


Ultimate load Service load
Design load P1 = 744.00 kN Ps1 = 532.00 kN page.50&51 -Appe'x-III

Design moment about (L) ML1 = 15.00 kNm MLs1 = 10.00 kNm page.50&51 -Appe'x-III

Design moment about (B) MB1 = 96.00 kNm MBs1 = 68.00 kNm page.50&51 -Appe'x-III

Horizontal force along "L" HL1 = 92.00 kN HLs1 = 66.00 kN page.50&51 -Appe'x-III

Horizontal force along "B" HB1 = 28.00 kN HBs1 = 20.00 kN page.50&51 -Appe'x-III

LOADS: RESULTS FROM STAAD PRO-2 st COLUMN


Ultimate load Service load
Design load P2 = 948.00 kN Ps2 = 752.00 kN page.52&53 -Appe'x-III

Design moment about (L) ML2 = 31.00 kNm MLs2 = 21.00 kNm page.52&53 -Appe'x-III

Design moment about (B) MB2 = 105.00 kNm MBs2 = 75.00 kNm page.52&53 -Appe'x-III

Horizontal force along "L" HL2 = 107.00 kN HLs2 = 76.00 kN page.52&53 -Appe'x-III

Horizontal force along "B" HB2 = 53.00 kN HBs2 = 36.00 kN page.52&53 -Appe'x-III

2 DESIGN DATA
Width of 1 st column = b1 = 400 mm

Depth of 1 st column = h1 = 400 mm

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 95 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F7"

Width of 2 nd column = b2 = 400 mm

Depth of 2 nd column = h2 = 400 mm

Centre to centre of two column = l = 2500 mm

Footing Projection from centre of 1st column = a1 = 1000 mm

Footing Projection from centre of 2st column = a2 = 1000 mm

Depth of footing = D = 600 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 137.5 kN/m2 Refer Attachment-v

3 SIZE OF FOOTING

Length of footing = L = 4.5 m

Width of footing = B = 3.5 m

Self weight of footing = L.B.D. γc = w1 = 236.25 kN

self wt of earth on footin(L.B-b1.h1-b2.h2)(Dg-D) γs = w2 = 389 kN

Total design axial load= Ps+w1+w2 = Pd = 1909 kN

Area of base required= Pd/qs = Areqd = 13.88 m2

Area of base provided= L*B = Aprov = 15.75 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)
Section modulus about (L)= LB2/6 = ZL = 9.19 m3

Section modulus about (B)= BL2/6 = ZB = 11.81 m3


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 96 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F7"

Max. earth pressure=Pd/Aprov+MLs1+2/ZL+MBs1+2/ZB= qmax = 136.7 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs1+2/ZL-MBs1+2/ZB= qmin = 105.7 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT

(For ultimte limit state)


Total Ultimate Axial load =P1+2+1.4(w1+w2)= Pa = 2567 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML1+2/ZL+MB1+2/ZB = q1 = 185 kN/m2

Pa/Aprov-ML1+2/ZL+MB1+2/ZB = q2 = 175 kN/m2

Pa/Aprov+ML1+2/ZL-MB1+2/ZB = q3 = 151 kN/m2

Pa/Aprov-ML1+2/ZL-MB1+2/ZB = q4 = 141 kN/m2

Bending
g moment diagram
g

P1 P2
a1 l a2
A B C D

q= 185 kN/m2
x = distance of cg of column loads

q.a1^2/2 q.a2^2/2

.q.x^2/2-P1.(x-a1)

BMD
To find cg distance "X"

q. x - P1.(x-a1) =0
q. x - P1.x - P1.a1 =0
Therefore , x = (P1.a1) /(P1-q) = x = 1.33 m

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 97 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F7"

b. Design moment longitudinal direction

Design Sagging moment


= q.a1^2/2 = MLD = 92.5 kNm

Design Hogging moment


= .q.x^2/2-P1.(x-a1) = MBD = 81.5 kNm

c. Design moment Transverse direction

Conservatively assuming max. bearing pressure on both the sides

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MTD = 1000.1 kNm

6 CALCULATION FOR REINFORCEMENT


a. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 517 mm

K' Value
K 0 156
0.156

K -value Max(MLD,MBD)/Ld2fcu = K1 = 0.002 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 491.2 mm "

Area of steel required = Max(MLD,MBD)/0.95fyz1 = As1 reqd = 431 mm2 "

Minimum area of steel = 0.13%LD = As1 Min. = 3510 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 108000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 18 Nos

Dia of bars provided = φ1 = 16 mm

Area of tension steel provided = As1 prov. = 3619 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 37 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 316 mm Cl 3.12.11.2.4 of
BS8110-1
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 98 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F7"

Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 255 mm

Spacing of bars provided = 200 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel = As2 = 1755 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 200 mm

No of bars provided = Nb2 = 24 Nos

Area of compression steel provided = As2 prov. = 1846 mm2


Hence ok
b. Reinforcement along (L)
Effective depth = D-c-φ1- φ2/2 = d2 = 501 mm

K -value MTD/Bd2fcu = K2 = 0.022 Cl 3.4.4.4 of


BS 8110-1

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 476.0 mm "

Area of steel required = MTD/0.95fyz2 = As3 reqd = 4808 mm2 "

Minimum area of steel = 0.13%BD = As3 Min. = 2730 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 84000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb2 = 24 Nos

Dia of bars provided = φ2 = 16 mm

Area of tension steel provided = As3 prov. = 4825 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 306 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 170 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 152 mm

Spacing of bars provided = 150 mm


Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 99 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F7"

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As4 = 2404 mm2

Dia of bars provided = φ4 = 12 mm

Spacing of bars 150 mm

No of bars provided = Nb4 = 24 Nos

Area of compression steel provided = As4 prov. = 2752 mm2


Hence ok
7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b2+2h2 = S1 = 1600 mm

Actual shear stress = P2/s1*min(d1&d2) = vc1 = 1.18 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.21 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 0.95 "

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.00


Ultimate shear stress that the footing can carry = (vc) = 0.437 N/mm2 Table-3.8 of BS8110-1
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Critical perimeter for column1 =12d+2b+2h = Lp1 = 7612 mm

Critical perimeter for column2 =12d+2b+2h = Lp2 = 7612 mm

Area within the perimeter col-1 =(b+3d)*(h+3d) = A'1 = 3.62E+06 mm2

Area within the perimeter col-2 =(b+3d)*(h+3d) = A'2 = 3.62E+06 mm2

Average earth pressure = Pavg = 180 kN/m2

Punching shear force = Vpun = 1531 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.40 N/mm2


vc2 < vc Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 100 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F7"

c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(a1,a2)-min(d1,d2))/1000= Lo = 0.499 m
Shear force = Pavg*Lo*B = Vo = 314 kN

Actual shear stress =Vo/(B*min(d1,d2))= vc3 = 0.179 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps1+PS2 = Pd = 1909 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 763.6 kN

Total horizontal force =max(HLs(1+2),HBs(1+2)) = H = 142.00 kN

Safety index = Fr/H = 5.38 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs(1+2),MBs(1+2)) = Mo = 143.0 kNm

R i ti momentt = Pd*max(L,B)/2
Resisting * (L B)/2 = MR = 4295 kN
kNm

Safety index = MR/Mo = 30.0 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 7 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 101 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F8"
DIAGRAM b1=400 b2=400
h1=400 h2=400
FGL

2000

12 φ ‐ 200 10 φ ‐ 200

450

16 φ - 150 12 φ - 175
L=3300 B=2700

1 LOADS: RESULTS FROM STAAD PRO-1 st COLUMN


Ultimate load Service load
Design load P1 = 664.00 kN Ps1 = 520.00 kN page.54&55 -Appe'x-III

Design moment about (L) ML1 = 74.00 kNm MLs1 = 53.00 kNm page.54&55 -Appe'x-III

Design moment about (B) MB1 = 2.00 kNm MBs1 = 2.00 kNm page.54&55 -Appe'x-III

Horizontal force along "L" HL1 = 4.00 kN HLs1 = 2.00 kN page.54&55 -Appe'x-III

Horizontal force along "B" HB1 = 78.00 kN HBs1 = 57.00 kN page.54&55 -Appe'x-III

LOADS: RESULTS FROM STAAD PRO-2 st COLUMN


Ultimate load Service load
Design load P2 = 211.00 kN Ps2 = 153.00 kN page.56&57 -Appe'x-III

Design moment about (L) ML2 = 71.00 kNm MLs2 = 51.00 kNm page.56&57 -Appe'x-III

Design moment about (B) MB2 = 7.00 kNm MBs2 = 5.00 kNm page.56&57 -Appe'x-III

Horizontal force along "L" HL2 = 13.00 kN HLs2 = 10.00 kN page.56&57 -Appe'x-III

Horizontal force along "B" HB2 = 74.00 kN HBs2 = 54.00 kN page.56&57 -Appe'x-III

2 DESIGN DATA
Width of 1 st column = b1 = 400 mm

Depth of 1 st column = h1 = 400 mm

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 102 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F8"

Width of 2 nd column = b2 = 400 mm

Depth of 2 nd column = h2 = 400 mm

Centre to centre of two column = l = 1250 mm

Footing Projection from centre of 1st column = a1 = 1025 mm

Footing Projection from centre of 2st column = a2 = 1025 mm

Depth of footing = D = 450 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 143.5 kN/m2 Refer Attachment-v

3 SIZE OF FOOTING

Length of footing = L = 3.3 m

Width of footing = B = 2.7 m

Self weight of footing = L.B.D. γc = w1 = 100.2375 kN

self wt of earth on footin(L.B-b1.h1-b2.h2)(Dg-D) γs = w2 = 240 kN

Total design axial load= Ps+w1+w2 = Pd = 1013 kN

Area of base required= Pd/qs = Areqd = 7.06 m2

Area of base provided= L*B = Aprov = 8.91 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)
Section modulus about (L)= LB2/6 = ZL = 4.01 m3

Section modulus about (B)= BL2/6 = ZB = 4.90 m3


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 103 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F8"

Max. earth pressure=Pd/Aprov+MLs1+2/ZL+MBs1+2/ZB= qmax = 141.0 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs1+2/ZL-MBs1+2/ZB= qmin = 86.3 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT

(For ultimte limit state)


Total Ultimate Axial load =P1+2+1.4(w1+w2)= Pa = 1351 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML1+2/ZL+MB1+2/ZB = q1 = 190 kN/m2

Pa/Aprov-ML1+2/ZL+MB1+2/ZB = q2 = 117 kN/m2

Pa/Aprov+ML1+2/ZL-MB1+2/ZB = q3 = 186 kN/m2

Pa/Aprov-ML1+2/ZL-MB1+2/ZB = q4 = 114 kN/m2

Bending
g moment diagram
g

P1 P2
a1 l a2
A B C D

q= 190 kN/m2
x = distance of cg of column loads

q.a1^2/2 q.a2^2/2

.q.x^2/2-P1.(x-a1)

BMD
To find cg distance "X"

q. x - P1.(x-a1) =0
q. x - P1.x - P1.a1 =0
Therefore , x = (P1.a1) /(P1-q) = x = 1.43 m

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 104 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F8"

b. Design moment longitudinal direction

Design Sagging moment


= q.a1^2/2 = MLD = 99.6 kNm

Design Hogging moment


= .q.x^2/2-P1.(x-a1) = MBD = 118.3 kNm

c. Design moment Transverse direction

Conservatively assuming max. bearing pressure on both the sides

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MTD = 413.8 kNm

6 CALCULATION FOR REINFORCEMENT


a. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 369 mm

K' Value
K 0 156
0.156

K -value Max(MLD,MBD)/Ld2fcu = K1 = 0.008 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 350.6 mm "

Area of steel required = Max(MLD,MBD)/0.95fyz1 = As1 reqd = 772 mm2 "

Minimum area of steel = 0.13%LD = As1 Min. = 1930.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 59400 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 18 Nos

Dia of bars provided = φ1 = 12 mm

Area of tension steel provided = As1 prov. = 2036 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 116 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 312 mm Cl 3.12.11.2.4 of
BS8110-1
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 105 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F8"

Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 185 mm

Spacing of bars provided = 175 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel = As2 = 965 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 200 mm

No of bars provided = Nb2 = 18 Nos

Area of compression steel provided = As2 prov. = 1374 mm2


Hence ok
b. Reinforcement along (L)

Effective depth = D-c-φ1- φ2/2 = d2 = 355 mm

K -value MTD/Bd2fcu = K2 = 0.025 Cl 3.4.4.4 of


BS 8110-1

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 337.3 mm "

Area of steel required = MTD/0.95fyz2 = As3 reqd = 2807 mm2 "

Minimum area of steel = 0.13%BD = As3 Min. = 1579.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 48600 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb2 = 14 Nos

Dia of bars provided = φ2 = 16 mm

Area of tension steel provided = As3 prov. = 2815 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 306 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 170 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 195 mm

Spacing of bars provided = 150 mm


Hence ok
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 106 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F8"

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As4 = 1404 mm2

Dia of bars provided = φ4 = 12 mm

Spacing of bars 200 mm

No of bars provided = Nb4 = 15 Nos

Area of compression steel provided = As4 prov. = 1640 mm2


Hence ok
7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b2+2h2 = S1 = 1600 mm

Actual shear stress = P2/s1*min(d1&d2) = vc1 = 0.37 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.21 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 1.03 "

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.03


Ultimate shear stress that the footing can carry = (vc) = 0.454 N/mm2 Table-3.8 of BS8110-1
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Critical perimeter for column1 =12d+2b+2h = Lp1 = 5860 mm

Critical perimeter for column2 =12d+2b+2h = Lp2 = 5860 mm

Area within the perimeter col-1 =(b+3d)*(h+3d) = A'1 = 2.15E+06 mm2

Area within the perimeter col-2 =(b+3d)*(h+3d) = A'2 = 2.15E+06 mm2

Average earth pressure = Pavg = 153 kN/m2

Punching shear force = Vpun = 709 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.34 N/mm2


vc2 < vc Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 107 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F8"

c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(a1,a2)-min(d1,d2))/1000= Lo = 0.67 m
Shear force = Pavg*Lo*B = Vo = 278 kN

Actual shear stress =Vo/(B*min(d1,d2))= vc3 = 0.290 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps1+PS2 = Pd = 1013 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 405.2 kN

Total horizontal force =max(HLs(1+2),HBs(1+2)) = H = 111.00 kN

Safety index = Fr/H = 3.65 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs(1+2),MBs(1+2)) = Mo = 104.0 kNm

R i ti momentt = Pd*max(L,B)/2
Resisting * (L B)/2 = MR = 1671 kN
kNm

Safety index = MR/Mo = 16.1 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 7 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 108 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F9"
DIAGRAM b1=400 b2=400
h1=400 h2=400
FGL

2000

12 φ ‐ 150 10 φ ‐ 175

500

16 φ - 150 16 φ - 175
L=3800 B=3000

1 LOADS: RESULTS FROM STAAD PRO-1 st COLUMN


Ultimate load Service load
Design load P1 = 664.00 kN Ps1 = 489.00 kN page.58&59 -Appe'x-III

Design moment about (L) ML1 = 121.00 kNm MLs1 = 88.00 kNm page.58&59 -Appe'x-III

Design moment about (B) MB1 = 0.00 kNm MBs1 = 0.00 kNm page.58&59 -Appe'x-III

Horizontal force along "L" HL1 = 1.00 kN HLs1 = 1.00 kN page.58&59 -Appe'x-III

Horizontal force along "B" HB1 = 99.00 kN HBs1 = 72.00 kN page.58&59 -Appe'x-III

LOADS: RESULTS FROM STAAD PRO-2 st COLUMN


Ultimate load Service load
Design load P2 = 483.00 kN Ps2 = 345.00 kN page.60&61 -Appe'x-III

Design moment about (L) ML2 = 15.00 kNm MLs2 = 11.00 kNm page.60&61 -Appe'x-III

Design moment about (B) MB2 = 99.00 kNm MBs2 = 70.00 kNm page.60&61 -Appe'x-III

Horizontal force along "L" HL2 = 89.00 kN HLs2 = 64.00 kN page.60&61 -Appe'x-III

Horizontal force along "B" HB2 = 16.00 kN HBs2 = 11.00 kN page.60&61 -Appe'x-III

2 DESIGN DATA
Width of 1 st column = b1 = 400 mm

Depth of 1 st column = h1 = 400 mm

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 109 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F9"

Width of 2 nd column = b2 = 400 mm

Depth of 2 nd column = h2 = 400 mm

Centre to centre of two column = l = 1200 mm

Footing Projection from centre of 1st column = a1 = 1300 mm

Footing Projection from centre of 2st column = a2 = 1300 mm

Depth of footing = D = 500 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 141 kN/m2 Refer Attachment-v

3 SIZE OF FOOTING

Length of footing = L = 3.8 m

Width of footing = B = 3 m

Self weight of footing = L.B.D. γc = w1 = 142.5 kN

self wt of earth on footin(L.B-b1.h1-b2.h2)(Dg-D) γs = w2 = 299 kN

Total design axial load= Ps+w1+w2 = Pd = 1276 kN

Area of base required= Pd/qs = Areqd = 9.05 m2

Area of base provided= L*B = Aprov = 11.4 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)
Section modulus about (L)= LB2/6 = ZL = 5.70 m3

Section modulus about (B)= BL2/6 = ZB = 7.22 m3


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 110 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F9"

Max. earth pressure=Pd/Aprov+MLs1+2/ZL+MBs1+2/ZB= qmax = 139.0 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs1+2/ZL-MBs1+2/ZB= qmin = 84.8 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT

(For ultimte limit state)


Total Ultimate Axial load =P1+2+1.4(w1+w2)= Pa = 1765 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML1+2/ZL+MB1+2/ZB = q1 = 192 kN/m2

Pa/Aprov-ML1+2/ZL+MB1+2/ZB = q2 = 145 kN/m2

Pa/Aprov+ML1+2/ZL-MB1+2/ZB = q3 = 165 kN/m2

Pa/Aprov-ML1+2/ZL-MB1+2/ZB = q4 = 117 kN/m2

Bending
g moment diagram
g

P1 P2
a1 l a2
A B C D

q= 192 kN/m2
x = distance of cg of column loads

q.a1^2/2 q.a2^2/2

.q.x^2/2-P1.(x-a1)

BMD
To find cg distance "X"

q. x - P1.(x-a1) =0
q. x - P1.x - P1.a1 =0
Therefore , x = (P1.a1) /(P1-q) = x = 1.83 m

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 111 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F9"

b. Design moment longitudinal direction

Design Sagging moment


= q.a1^2/2 = MLD = 162.6 kNm

Design Hogging moment


= .q.x^2/2-P1.(x-a1) = MBD = 292.5 kNm

c. Design moment Transverse direction

Conservatively assuming max. bearing pressure on both the sides

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MTD = 617.9 kNm

6 CALCULATION FOR REINFORCEMENT


a. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 417 mm

K' Value
K 0 156
0.156

K -value Max(MLD,MBD)/Ld2fcu = K1 = 0.014 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 396.2 mm "

Area of steel required = Max(MLD,MBD)/0.95fyz1 = As1 reqd = 1690 mm2 "

Minimum area of steel = 0.13%LD = As1 Min. = 2470 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 76000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 13 Nos

Dia of bars provided = φ1 = 16 mm

Area of tension steel provided = As1 prov. = 2614 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 198 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 253 mm Cl 3.12.11.2.4 of
BS8110-1
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 112 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F9"

Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 303 mm

Spacing of bars provided = 175 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel = As2 = 1235 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 175 mm

No of bars provided = Nb2 = 23 Nos

Area of compression steel provided = As2 prov. = 1784 mm2


Hence ok
b. Reinforcement along (L)

Effective depth = D-c-φ1- φ2/2 = d2 = 401 mm

K -value MTD/Bd2fcu = K2 = 0.025 Cl 3.4.4.4 of


BS 8110-1

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 381.0 mm "

Area of steel required = MTD/0.95fyz2 = As3 reqd = 3712 mm2 "

Minimum area of steel = 0.13%BD = As3 Min. = 1950 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 60000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb2 = 19 Nos

Dia of bars provided = φ2 = 16 mm

Area of tension steel provided = As3 prov. = 3820 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 298 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 174 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 157 mm

Spacing of bars provided = 150 mm


Hence ok
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 113 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F9"

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As4 = 1856 mm2

Dia of bars provided = φ4 = 12 mm

Spacing of bars 150 mm

No of bars provided = Nb4 = 21 Nos

Area of compression steel provided = As4 prov. = 2375 mm2


Hence ok
7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b2+2h2 = S1 = 1600 mm

Actual shear stress = P2/s1*min(d1&d2) = vc1 = 0.75 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.22 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 1.00 "

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.00


Ultimate shear stress that the footing can carry = (vc) = 0.444 N/mm2 Table-3.8 of BS8110-1
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Critical perimeter for column1 =12d+2b+2h = Lp1 = 6412 mm

Critical perimeter for column2 =12d+2b+2h = Lp2 = 6412 mm

Area within the perimeter col-1 =(b+3d)*(h+3d) = A'1 = 2.57E+06 mm2

Area within the perimeter col-2 =(b+3d)*(h+3d) = A'2 = 2.57E+06 mm2

Average earth pressure = Pavg = 169 kN/m2

Punching shear force = Vpun = 1055 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.41 N/mm2


vc2 < vc Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 114 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F9"

c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(a1,a2)-min(d1,d2))/1000= Lo = 0.899 m
Shear force = Pavg*Lo*B = Vo = 455 kN

Actual shear stress =Vo/(B*min(d1,d2))= vc3 = 0.378 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps1+PS2 = Pd = 1276 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 510.3 kN

Total horizontal force =max(HLs(1+2),HBs(1+2)) = H = 83.00 kN

Safety index = Fr/H = 6.15 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs(1+2),MBs(1+2)) = Mo = 99.0 kNm

R i ti momentt = Pd*max(L,B)/2
Resisting * (L B)/2 = MR = 2424 kN
kNm

Safety index = MR/Mo = 24.5 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 7 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 115 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F10"
DIAGRAM b1=400 b2=400
h1=400 h2=400
FGL

2000

10 φ ‐ 150 12 φ ‐ 150

500

16 φ - 150 16 φ - 150
L=3000 B=3000

1 LOADS: RESULTS FROM STAAD PRO-1 st COLUMN


Ultimate load Service load
Design load P1 = 421.00 kN Ps1 = 315.00 kN page.62&63 -Appe'x-III

Design moment about (L) ML1 = 2.00 kNm MLs1 = 1.00 kNm page.62&63 -Appe'x-III

Design moment about (B) MB1 = 76.00 kNm MBs1 = 55.00 kNm page.62&63 -Appe'x-III

Horizontal force along "L" HL1 = 66.00 kN HLs1 = 47.00 kN page.62&63 -Appe'x-III

Horizontal force along "B" HB1 = 3.00 kN HBs1 = 2.00 kN page.62&63 -Appe'x-III

LOADS: RESULTS FROM STAAD PRO-2 st COLUMN


Ultimate load Service load
Design load P2 = 522.00 kN Ps2 = 403.00 kN page.64&65 -Appe'x-III

Design moment about (L) ML2 = 6.00 kNm MLs2 = 4.00 kNm page.64&65 -Appe'x-III

Design moment about (B) MB2 = 56.00 kNm MBs2 = 40.00 kNm page.64&65 -Appe'x-III

Horizontal force along "L" HL2 = 18.00 kN HLs2 = 13.00 kN page.64&65 -Appe'x-III

Horizontal force along "B" HB2 = 9.00 kN HBs2 = 6.00 kN page.64&65 -Appe'x-III

2 DESIGN DATA
Width of 1 st column = b1 = 400 mm

Depth of 1 st column = h1 = 400 mm

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 116 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F10"

Width of 2 nd column = b2 = 400 mm

Depth of 2 nd column = h2 = 400 mm

Centre to centre of two column = l = 430 mm

Footing Projection from centre of 1st column = a1 = 1285 mm

Footing Projection from centre of 2st column = a2 = 1285 mm

Depth of footing = D = 500 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 145 kN/m2 Refer Attachment-v

3 SIZE OF FOOTING

Length of footing = L = 3 m

Width of footing = B = 3 m

Self weight of footing = L.B.D. γc = w1 = 112.5 kN

self wt of earth on footin(L.B-b1.h1-b2.h2)(Dg-D) γs = w2 = 234 kN

Total design axial load= Ps+w1+w2 = Pd = 1065 kN

Area of base required= Pd/qs = Areqd = 7.34 m2

Area of base provided= L*B = Aprov = 9 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)
Section modulus about (L)= LB2/6 = ZL = 4.50 m3

Section modulus about (B)= BL2/6 = ZB = 4.50 m3


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 117 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F10"

Max. earth pressure=Pd/Aprov+MLs1+2/ZL+MBs1+2/ZB= qmax = 140.5 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs1+2/ZL-MBs1+2/ZB= qmin = 96.1 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT

(For ultimte limit state)


Total Ultimate Axial load =P1+2+1.4(w1+w2)= Pa = 1429 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML1+2/ZL+MB1+2/ZB = q1 = 190 kN/m2

Pa/Aprov-ML1+2/ZL+MB1+2/ZB = q2 = 186 kN/m2

Pa/Aprov+ML1+2/ZL-MB1+2/ZB = q3 = 131 kN/m2

Pa/Aprov-ML1+2/ZL-MB1+2/ZB = q4 = 128 kN/m2

Bending
g moment diagram
g

P1 P2
a1 l a2
A B C D

q= 190 kN/m2
x = distance of cg of column loads

q.a1^2/2 q.a2^2/2

.q.x^2/2-P1.(x-a1)

BMD
To find cg distance "X"

q. x - P1.(x-a1) =0
q. x - P1.x - P1.a1 =0
Therefore , x = (P1.a1) /(P1-q) = x = 2.34 m

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 118 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F10"

b. Design moment longitudinal direction

Design Sagging moment


= q.a1^2/2 = MLD = 156.7 kNm

Design Hogging moment


= .q.x^2/2-P1.(x-a1) = MBD = 595.5 kNm

c. Design moment Transverse direction

Conservatively assuming max. bearing pressure on both the sides

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MTD = 481.3 kNm

6 CALCULATION FOR REINFORCEMENT


a. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 417 mm

K' Value
K 0 156
0.156

K -value Max(MLD,MBD)/Ld2fcu = K1 = 0.029 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 396.2 mm "

Area of steel required = Max(MLD,MBD)/0.95fyz1 = As1 reqd = 3440 mm2 "

Minimum area of steel = 0.13%LD = As1 Min. = 1950 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 60000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 18 Nos

Dia of bars provided = φ1 = 16 mm

Area of tension steel provided = As1 prov. = 3619 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 291 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 177 mm Cl 3.12.11.2.4 of
BS8110-1
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 119 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F10"

Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 167 mm

Spacing of bars provided = 150 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel = As2 = 1720 mm2

Dia of bars provided = φ2 = 12 mm

Spacing of bars 150 mm

No of bars provided = Nb2 = 21 Nos

Area of compression steel provided = As2 prov. = 2375 mm2


Hence ok
b. Reinforcement along (L)

Effective depth = D-c-φ1- φ2/2 = d2 = 401 mm

K -value MTD/Bd2fcu = K2 = 0.025 Cl 3.4.4.4 of


BS 8110-1

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 381.0 mm "

Area of steel required = MTD/0.95fyz2 = As3 reqd = 2891 mm2 "

Minimum area of steel = 0.13%BD = As3 Min. = 1950 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 60000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb2 = 15 Nos

Dia of bars provided = φ2 = 16 mm

Area of tension steel provided = As3 prov. = 3016 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 294 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 176 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 202 mm

Spacing of bars provided = 150 mm


Hence ok
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 120 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F10"

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As4 = 1445 mm2

Dia of bars provided = φ4 = 10 mm

Spacing of bars 150 mm

No of bars provided = Nb4 = 21 Nos

Area of compression steel provided = As4 prov. = 1649 mm2


Hence ok
7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b2+2h2 = S1 = 1600 mm

Actual shear stress = P2/s1*min(d1&d2) = vc1 = 0.81 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.25 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 1.00 "

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.00


Ultimate shear stress that the footing can carry = (vc) = 0.466 N/mm2 Table-3.8 of BS8110-1
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Critical perimeter for column1 =12d+2b+2h = Lp1 = 6412 mm

Critical perimeter for column2 =12d+2b+2h = Lp2 = 6412 mm

Area within the perimeter col-1 =(b+3d)*(h+3d) = A'1 = 2.57E+06 mm2

Area within the perimeter col-2 =(b+3d)*(h+3d) = A'2 = 2.57E+06 mm2

Average earth pressure = Pavg = 188 kN/m2

Punching shear force = Vpun = 726 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.28 N/mm2


vc2 < vc Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 121 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F10"

c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(a1,a2)-min(d1,d2))/1000= Lo = 0.884 m
Shear force = Pavg*Lo*B = Vo = 499 kN

Actual shear stress =Vo/(B*min(d1,d2))= vc3 = 0.415 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps1+PS2 = Pd = 1065 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 425.9 kN

Total horizontal force =max(HLs(1+2),HBs(1+2)) = H = 60.00 kN

Safety index = Fr/H = 7.10 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs(1+2),MBs(1+2)) = Mo = 95.0 kNm

R i ti momentt = Pd*max(L,B)/2
Resisting * (L B)/2 = MR = 1597 kN
kNm

Safety index = MR/Mo = 16.8 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 7 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 122 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F11"
DIAGRAM b1=400 b2=400
h1=400 h2=400
FGL

2000

10 φ ‐ 200 10 φ ‐ 200

500

16 φ - 175 16 φ - 200
L=4000 B=2200

1 LOADS: RESULTS FROM STAAD PRO-1 st COLUMN


Ultimate load Service load
Design load P1 = 459.00 kN Ps1 = 340.00 kN page.66&67 -Appe'x-III

Design moment about (L) ML1 = 59.00 kNm MLs1 = 42.00 kNm page.66&67 -Appe'x-III

Design moment about (B) MB1 = 2.00 kNm MBs1 = 1.00 kNm page.66&67 -Appe'x-III

Horizontal force along "L" HL1 = 2.00 kN HLs1 = 2.00 kN page.66&67 -Appe'x-III

Horizontal force along "B" HB1 = 49.00 kN HBs1 = 35.00 kN page.66&67 -Appe'x-III

LOADS: RESULTS FROM STAAD PRO-2 st COLUMN


Ultimate load Service load
Design load P2 = 368.00 kN Ps2 = 263.00 kN page.68&69 -Appe'x-III

Design moment about (L) ML2 = 80.00 kNm MLs2 = 57.00 kNm page.68&69 -Appe'x-III

Design moment about (B) MB2 = 4.00 kNm MBs2 = 3.00 kNm page.68&69 -Appe'x-III

Horizontal force along "L" HL2 = 5.00 kN HLs2 = 3.00 kN page.68&69 -Appe'x-III

Horizontal force along "B" HB2 = 83.00 kN HBs2 = 59.00 kN page.68&69 -Appe'x-III

2 DESIGN DATA
Width of 1 st column = b1 = 400 mm

Depth of 1 st column = h1 = 400 mm

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 123 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F11"

Width of 2 nd column = b2 = 400 mm

Depth of 2 nd column = h2 = 400 mm

Centre to centre of two column = l = 2500 mm

Footing Projection from centre of 1st column = a1 = 750 mm

Footing Projection from centre of 2st column = a2 = 750 mm

Depth of footing = D = 500 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 140 kN/m2 Refer Attachment-v

3 SIZE OF FOOTING

Length of footing = L = 4 m

Width of footing = B = 2.2 m

Self weight of footing = L.B.D. γc = w1 = 110 kN

self wt of earth on footin(L.B-b1.h1-b2.h2)(Dg-D) γs = w2 = 229 kN

Total design axial load= Ps+w1+w2 = Pd = 942 kN

Area of base required= Pd/qs = Areqd = 6.73 m2

Area of base provided= L*B = Aprov = 8.8 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)
Section modulus about (L)= LB2/6 = ZL = 3.23 m3

Section modulus about (B)= BL2/6 = ZB = 5.87 m3


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 124 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F11"

Max. earth pressure=Pd/Aprov+MLs1+2/ZL+MBs1+2/ZB= qmax = 138.4 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs1+2/ZL-MBs1+2/ZB= qmin = 75.7 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT

(For ultimte limit state)


Total Ultimate Axial load =P1+2+1.4(w1+w2)= Pa = 1302 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML1+2/ZL+MB1+2/ZB = q1 = 192 kN/m2

Pa/Aprov-ML1+2/ZL+MB1+2/ZB = q2 = 106 kN/m2

Pa/Aprov+ML1+2/ZL-MB1+2/ZB = q3 = 190 kN/m2

Pa/Aprov-ML1+2/ZL-MB1+2/ZB = q4 = 104 kN/m2

Bending
g moment diagram
g

P1 P2
a1 l a2
A B C D

q= 192 kN/m2
x = distance of cg of column loads

q.a1^2/2 q.a2^2/2

.q.x^2/2-P1.(x-a1)

BMD
To find cg distance "X"

q. x - P1.(x-a1) =0
q. x - P1.x - P1.a1 =0
Therefore , x = (P1.a1) /(P1-q) = x = 1.29 m

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 125 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F11"

b. Design moment longitudinal direction

Design Sagging moment


= q.a1^2/2 = MLD = 54.0 kNm

Design Hogging moment


= .q.x^2/2-P1.(x-a1) = MBD = 71.6 kNm

c. Design moment Transverse direction

Conservatively assuming max. bearing pressure on both the sides

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MTD = 311.0 kNm

6 CALCULATION FOR REINFORCEMENT


a. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 417 mm

K' Value
K 0 156
0.156

K -value Max(MLD,MBD)/Ld2fcu = K1 = 0.005 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 396.2 mm "

Area of steel required = Max(MLD,MBD)/0.95fyz1 = As1 reqd = 414 mm2 "

Minimum area of steel = 0.13%LD = As1 Min. = 2600 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 80000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 13 Nos

Dia of bars provided = φ1 = 16 mm

Area of tension steel provided = As1 prov. = 2614 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 49 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 316 mm Cl 3.12.11.2.4 of
BS8110-1
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 126 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F11"

Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 320 mm

Spacing of bars provided = 200 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel = As2 = 1300 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 200 mm

No of bars provided = Nb2 = 21 Nos

Area of compression steel provided = As2 prov. = 1649 mm2


Hence ok
b. Reinforcement along (L)

Effective depth = D-c-φ1- φ2/2 = d2 = 401 mm

K -value MTD/Bd2fcu = K2 = 0.012 Cl 3.4.4.4 of


BS 8110-1

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 381.0 mm "

Area of steel required = MTD/0.95fyz2 = As3 reqd = 1868 mm2 "

Minimum area of steel = 0.13%BD = As3 Min. = 1430 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 44000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb2 = 10 Nos

Dia of bars provided = φ2 = 16 mm

Area of tension steel provided = As3 prov. = 2011 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 285 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 181 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 237 mm

Spacing of bars provided = 175 mm


Hence ok
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 127 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F11"

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As4 = 934 mm2

Dia of bars provided = φ4 = 10 mm

Spacing of bars 200 mm

No of bars provided = Nb4 = 12 Nos

Area of compression steel provided = As4 prov. = 942 mm2


Hence ok
7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b2+2h2 = S1 = 1600 mm

Actual shear stress = P2/s1*min(d1&d2) = vc1 = 0.57 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.23 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 1.00 "

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.00


Ultimate shear stress that the footing can carry = (vc) = 0.452 N/mm2 Table-3.8 of BS8110-1
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Critical perimeter for column1 =12d+2b+2h = Lp1 = 6412 mm

Critical perimeter for column2 =12d+2b+2h = Lp2 = 6412 mm

Area within the perimeter col-1 =(b+3d)*(h+3d) = A'1 = 2.57E+06 mm2

Area within the perimeter col-2 =(b+3d)*(h+3d) = A'2 = 2.57E+06 mm2

Average earth pressure = Pavg = 149 kN/m2

Punching shear force = Vpun = 545 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.21 N/mm2


vc2 < vc Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 128 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F11"

c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(a1,a2)-min(d1,d2))/1000= Lo = 0.349 m
Shear force = Pavg*Lo*B = Vo = 114 kN

Actual shear stress =Vo/(B*min(d1,d2))= vc3 = 0.130 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps1+PS2 = Pd = 942 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 376.8 kN

Total horizontal force =max(HLs(1+2),HBs(1+2)) = H = 94.00 kN

Safety index = Fr/H = 4.01 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs(1+2),MBs(1+2)) = Mo = 99.0 kNm

R i ti momentt = Pd*max(L,B)/2
Resisting * (L B)/2 = MR = 1884 kN
kNm

Safety index = MR/Mo = 19.0 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 7 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 129 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F12"
DIAGRAM b1=800 b2=800
h1=400 h2=400
FGL

2000

12 φ ‐ 175 10 φ ‐ 200

600

16 φ - 175 16 φ - 200
L=4500 B=3700

1 LOADS: RESULTS FROM STAAD PRO-1 st COLUMN


Ultimate load Service load
Design load P1 = 858.00 kN Ps1 = 613.00 kN page.70&71-Appe'x-III

Design moment about (L) ML1 = 144.00 kNm MLs1 = 103.00 kNm page.70&71-Appe'x-III

Design moment about (B) MB1 = 26.00 kNm MBs1 = 18.00 kNm page.70&71-Appe'x-III

Horizontal force along "L" HL1 = 44.00 kN HLs1 = 31.00 kN page.70&71-Appe'x-III

Horizontal force along "B" HB1 = 147.00 kN HBs1 = 105.00 kN page.70&71-Appe'x-III

LOADS: RESULTS FROM STAAD PRO-2 st COLUMN


Ultimate load Service load
Design load P2 = 855.00 kN Ps2 = 610.00 kN page.72&73-Appe'x-III

Design moment about (L) ML2 = 115.00 kNm MLs2 = 82.00 kNm page.72&73-Appe'x-III

Design moment about (B) MB2 = 19.00 kNm MBs2 = 13.00 kNm page.72&73-Appe'x-III

Horizontal force along "L" HL2 = 32.00 kN HLs2 = 23.00 kN page.72&73-Appe'x-III

Horizontal force along "B" HB2 = 99.00 kN HBs2 = 71.00 kN page.72&73-Appe'x-III

2 DESIGN DATA
Width of 1 st column = b1 = 800 mm

Depth of 1 st column = h1 = 400 mm

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 130 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F12"

Width of 2 nd column = b2 = 800 mm

Depth of 2 nd column = h2 = 400 mm

Centre to centre of two column = l = 2500 mm

Footing Projection from centre of 1st column = a1 = 1000 mm

Footing Projection from centre of 2st column = a2 = 1000 mm

Depth of footing = D = 600 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 137.5 kN/m2 Refer Attachment-v

3 SIZE OF FOOTING

Length of footing = L = 4.5 m

Width of footing = B = 3.7 m

Self weight of footing = L.B.D. γc = w1 = 249.75 kN

self wt of earth on footin(L.B-b1.h1-b2.h2)(Dg-D) γs = w2 = 403 kN

Total design axial load= Ps+w1+w2 = Pd = 1876 kN

Area of base required= Pd/qs = Areqd = 13.65 m2

Area of base provided= L*B = Aprov = 16.65 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)
Section modulus about (L)= LB2/6 = ZL = 10.27 m3

Section modulus about (B)= BL2/6 = ZB = 12.49 m3


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 131 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F12"

Max. earth pressure=Pd/Aprov+MLs1+2/ZL+MBs1+2/ZB= qmax = 133.2 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs1+2/ZL-MBs1+2/ZB= qmin = 92.2 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT

(For ultimte limit state)


Total Ultimate Axial load =P1+2+1.4(w1+w2)= Pa = 2627 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML1+2/ZL+MB1+2/ZB = q1 = 187 kN/m2

Pa/Aprov-ML1+2/ZL+MB1+2/ZB = q2 = 136 kN/m2

Pa/Aprov+ML1+2/ZL-MB1+2/ZB = q3 = 179 kN/m2

Pa/Aprov-ML1+2/ZL-MB1+2/ZB = q4 = 129 kN/m2

Bending
g moment diagram
g

P1 P2
a1 l a2
A B C D

q= 187 kN/m2
x = distance of cg of column loads

q.a1^2/2 q.a2^2/2

.q.x^2/2-P1.(x-a1)

BMD
To find cg distance "X"

q. x - P1.(x-a1) =0
q. x - P1.x - P1.a1 =0
Therefore , x = (P1.a1) /(P1-q) = x = 1.28 m

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 132 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F12"

b. Design moment longitudinal direction

Design Sagging moment


= q.a1^2/2 = MLD = 93.3 kNm

Design Hogging moment


= .q.x^2/2-P1.(x-a1) = MBD = 66.3 kNm

c. Design moment Transverse direction

Conservatively assuming max. bearing pressure on both the sides

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MTD = 882.9 kNm

6 CALCULATION FOR REINFORCEMENT


a. Reinforcement along (B)

1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 517 mm

K' Value
K 0 156
0.156

K -value Max(MLD,MBD)/Ld2fcu = K1 = 0.002 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 491.2 mm "

Area of steel required = Max(MLD,MBD)/0.95fyz1 = As1 reqd = 435 mm2 "

Minimum area of steel = 0.13%LD = As1 Min. = 3510 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 108000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 18 Nos

Dia of bars provided = φ1 = 16 mm

Area of tension steel provided = As1 prov. = 3619 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 37 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 316 mm Cl 3.12.11.2.4 of
BS8110-1
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 133 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F12"

Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 255 mm

Spacing of bars provided = 200 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel = As2 = 1755 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 200 mm

No of bars provided = Nb2 = 24 Nos

Area of compression steel provided = As2 prov. = 1846 mm2


Hence ok
b. Reinforcement along (L)

Effective depth = D-c-φ1- φ2/2 = d2 = 501 mm

K -value MTD/Bd2fcu = K2 = 0.020 Cl 3.4.4.4 of


BS 8110-1

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 476.0 mm "

Area of steel required = MTD/0.95fyz2 = As3 reqd = 4245 mm2 "

Minimum area of steel = 0.13%BD = As3 Min. = 2886 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 88800 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb2 = 22 Nos

Dia of bars provided = φ2 = 16 mm

Area of tension steel provided = As3 prov. = 4423 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 294 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 176 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 177 mm

Spacing of bars provided = 175 mm


Hence ok
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 134 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F12"

2 Top (Compression) Reinforcement


Provide 50% of tension reinforcement
Area of steel = As4 = 2122 mm2

Dia of bars provided = φ4 = 12 mm

Spacing of bars 175 mm

No of bars provided = Nb4 = 22 Nos

Area of compression steel provided = As4 prov. = 2504 mm2


Hence ok
7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b2+2h2 = S1 = 2400 mm

Actual shear stress = P2/s1*min(d1&d2) = vc1 = 0.71 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.20 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 0.95 "

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.00


Ultimate shear stress that the footing can carry = (vc) = 0.429 N/mm2 Table-3.8 of BS8110-1
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Critical perimeter for column1 =12d+2b+2h = Lp1 = 8412 mm

Critical perimeter for column2 =12d+2b+2h = Lp2 = 8412 mm

Area within the perimeter col-1 =(b+3d)*(h+3d) = A'1 = 4.38E+06 mm2

Area within the perimeter col-2 =(b+3d)*(h+3d) = A'2 = 4.38E+06 mm2

Average earth pressure = Pavg = 161 kN/m2

Punching shear force = Vpun = 1273 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.30 N/mm2


vc2 < vc Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 135 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F12"

c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(a1,a2)-min(d1,d2))/1000= Lo = 0.499 m
Shear force = Pavg*Lo*B = Vo = 298 kN

Actual shear stress =Vo/(B*min(d1,d2))= vc3 = 0.161 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps1+PS2 = Pd = 1876 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 750.5 kN

Total horizontal force =max(HLs(1+2),HBs(1+2)) = H = 176.00 kN

Safety index = Fr/H = 4.26 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs(1+2),MBs(1+2)) = Mo = 185.0 kNm

R i ti momentt = Pd*max(L,B)/2
Resisting * (L B)/2 = MR = 4221 kN
kNm

Safety index = MR/Mo = 22.8 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 7 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 136 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F13"
DIAGRAM b1=400 b2=400
h1=400 h2=400
FGL

2000

12 φ ‐ 200 10 φ ‐ 200

550

16 φ - 175 16 φ - 200
L=4500 B=2700

1 LOADS: RESULTS FROM STAAD PRO-1 st COLUMN


Ultimate load Service load
Design load P1 = 734.00 kN Ps1 = 525.00 kN page.74&75 -Appe'x-III

Design moment about (L) ML1 = 13.00 kNm MLs1 = 9.00 kNm page.74&75 -Appe'x-III

Design moment about (B) MB1 = 63.00 kNm MBs1 = 45.00 kNm page.74&75 -Appe'x-III

Horizontal force along "L" HL1 = 52.00 kN HLs1 = 37.00 kN page.74&75 -Appe'x-III

Horizontal force along "B" HB1 = 22.00 kN HBs1 = 16.00 kN page.74&75 -Appe'x-III

LOADS: RESULTS FROM STAAD PRO-2 st COLUMN


Ultimate load Service load
Design load P2 = 674.00 kN Ps2 = 481.00 kN page.74&75 -Appe'x-III

Design moment about (L) ML2 = 10.00 kNm MLs2 = 7.00 kNm page.74&75 -Appe'x-III

Design moment about (B) MB2 = 63.00 kNm MBs2 = 45.00 kNm page.74&75 -Appe'x-III

Horizontal force along "L" HL2 = 52.00 kN HLs2 = 37.00 kN page.74&75 -Appe'x-III

Horizontal force along "B" HB2 = 16.00 kN HBs2 = 12.00 kN page.74&75 -Appe'x-III

2 DESIGN DATA
Width of 1 st column = b1 = 400 mm

Depth of 1 st column = h1 = 400 mm

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 137 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F13"

Width of 2 nd column = b2 = 400 mm

Depth of 2 nd column = h2 = 400 mm

Centre to centre of two column = l = 2500 mm

Footing Projection from centre of 1st column = a1 = 1000 mm

Footing Projection from centre of 2st column = a2 = 1000 mm

Depth of footing = D = 550 mm

Clear cover of footing = c = 75 mm cl 20.1.3.1-e of


Design basis manual
Depth below finished grade level = Dg = 2 m

Unit weight of soil = γs = 18 kN/m3 (Conservatively)

Unit weight of concrete = γc = 25 kN/m3

Grade of reinforcement = fy = 460 N/mm2 cl 20.1.3.1-d of


Design basis manual
Grade of concrete = fcu = 40 N/mm2 cl 20.1.3.1-b of
Design basis manual
Safe bearing capacity of soil = qs = 137.5 kN/m2 Refer Attachment-v

3 SIZE OF FOOTING

Length of footing = L = 4.5 m

Width of footing = B = 2.7 m

Self weight of footing = L.B.D. γc = w1 = 167.0625 kN

self wt of earth on footin(L.B-b1.h1-b2.h2)(Dg-D) γs = w2 = 309 kN

Total design axial load= Ps+w1+w2 = Pd = 1482 kN

Area of base required= Pd/qs = Areqd = 10.78 m2

Area of base provided= L*B = Aprov = 12.15 m2


Hence ok
4 CHECK FOR BEARING PRESSURE
(For serviceability limit state)
Section modulus about (L)= LB2/6 = ZL = 5.47 m3

Section modulus about (B)= BL2/6 = ZB = 9.11 m3


DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 138 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F13"

Max. earth pressure=Pd/Aprov+MLs1+2/ZL+MBs1+2/ZB= qmax = 134.8 kN/m2


qmax < qs Hence ok

Min. earth pressure=Pd/Aprov-MLs1+2/ZL-MBs1+2/ZB= qmin = 109.2 kN/m2


qmin > 0 Hence ok
5 CALCULATION FOR DESIGN MOMENT

(For ultimte limit state)


Total Ultimate Axial load =P1+2+1.4(w1+w2)= Pa = 2074 kN

a. Earth pressure in each corner of footing


Pa/Aprov+ML1+2/ZL+MB1+2/ZB = q1 = 189 kN/m2

Pa/Aprov-ML1+2/ZL+MB1+2/ZB = q2 = 180 kN/m2

Pa/Aprov+ML1+2/ZL-MB1+2/ZB = q3 = 161 kN/m2

Pa/Aprov-ML1+2/ZL-MB1+2/ZB = q4 = 153 kN/m2

Bending
g moment diagram
g

P1 P2
a1 l a2
A B C D

q= 189 kN/m2
x = distance of cg of column loads

q.a1^2/2 q.a2^2/2

.q.x^2/2-P1.(x-a1)

BMD
To find cg distance "X"

q. x - P1.(x-a1) =0
q. x - P1.x - P1.a1 =0
Therefore , x = (P1.a1) /(P1-q) = x = 1.35 m

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 139 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F13"

b. Design moment longitudinal direction

Design Sagging moment


= q.a1^2/2 = MLD = 94.4 kNm

Design Hogging moment


= .q.x^2/2-P1.(x-a1) = MBD = 88.0 kNm

c. Design moment Transverse direction

Conservatively assuming max. bearing pressure on both the sides

Design moment about (B)


2
= max(q1:q4)*(B-b) /8*L = MTD = 561.6 kNm

6 CALCULATION FOR REINFORCEMENT

a. Reinforcement along (B)


1 Bottom (Tension) Reinforcement

Effective depth = D-c- φ1/2 = d1 = 467 mm

K' Value
V l 0 156
0.156

K -value Max(MLD,MBD)/Ld2fcu = K1 = 0.004 Cl 3.4.4.4 of


BS 8110-1
K < K' Compression Reinforcement is not reqd.

Lever arm(z1) =(Min of{0.95d1&d1[0.5+sqrt(0.25-k1/0.9]}) = 443.7 mm "

Area of steel required = Max(MLD,MBD)/0.95fyz1 = As1 reqd = 487 mm2 "

Minimum area of steel = 0.13%LD = As1 Min. = 3217.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%LD = As1 Max. = 99000 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb1 = 18 Nos

Dia of bars provided = φ1 = 16 mm

Area of tension steel provided = As1 prov. = 3619 mm2


Hence ok

Estimated service stress = 2/3*fy*As1 reqd/As1 prov = fs1 = 41 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs1 & 300mm)+φ1 = 316 mm Cl 3.12.11.2.4 of
BS8110-1
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 4 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 140 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F13"

Actual c/c spacing of bars = (L-2c- φ1)/(Nb1-1) = 255 mm

Spacing of bars provided = 200 mm


Hence ok
2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel = As2 = 1609 mm2

Dia of bars provided = φ2 = 10 mm

Spacing of bars 200 mm

No of bars provided = Nb2 = 24 Nos

Area of compression steel provided = As2 prov. = 1846 mm2


Hence ok
b. Reinforcement along (L)

Effective depth = D-c-φ1- φ2/2 = d2 = 451 mm

K -value MTD/Bd2fcu = K2 = 0.015 Cl 3.4.4.4 of


BS 8110-1

Lever arm(z2) =(Min of{0.95d2&d2[0.5+sqrt(0.25-k2/0.9]}) = 428.5 mm "

Area of steel required = MTD/0.95fyz2 = As3 reqd = 3000 mm2 "

Minimum area of steel = 0.13%BD = As3 Min. = 1930.5 mm2 Table-3.25 of


BS 8110-1
Maximum area of steel = 4%BD = As3 Max. = 59400 mm2 Cl 3.12.6.1 of
BS 8110-1
No of bars provided = Nb2 = 16 Nos

Dia of bars provided = φ2 = 16 mm

Area of tension steel provided = As3 prov. = 3217 mm2


Hence ok

Estimated service stress = 2/3*fy*As2 reqd/As2 prov = fs2 = 286 mm Eqn 8 of BS 8110-1

Max c/c distance between bars in tension


= min(47000/fs2 & 300mm)+φ2 = 180 mm Cl 3.12.11.2.4 of
BS8110-1
Actual c/c spacing of bars = (B-2c- φ2)/(Nb2-1) = 177 mm

Spacing of bars provided = 175 mm


Hence ok
DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153
ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 5 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 141 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F13"

2 Top (Compression) Reinforcement

Provide 50% of tension reinforcement


Area of steel = As4 = 1500 mm2

Dia of bars provided = φ4 = 12 mm

Spacing of bars 200 mm

No of bars provided = Nb4 = 15 Nos

Area of compression steel provided = As4 prov. = 1640 mm2


Hence ok
7 CHECK FOR SHEAR

a. Punching shear check at column face

Column perimeter = 2b2+2h2 = S1 = 1600 mm

Actual shear stress = P2/s1*min(d1&d2) = vc1 = 0.93 N/mm2


Vc1 < (0.8*fcu^0.5 & 5) Hence ok Cl 3.7.7.2 of
< 5.06 & 5 BS8110-1
b. Punching shear check 1.5d from column face Cl 3.7.7.6 of
BS8110-1
100*min(As1 prov & As2 prov)/min(L,B)*min(d1&d2)-value = 0.26 % Table-3.8 of BS8110-1

(400/min(d1 & d2))^(1/4)-value = 0.97 "

Therefore, the value of (400/min(d1 & d2))^(1/4) = 1.00


Ultimate shear stress that the footing can carry = (vc) = 0.474 N/mm2 Table-3.8 of BS8110-1
(1/3) (1/4) (1/3)
vc = (0.79*{100*Ast prov/(bd)}^ *(400/d)^ /1.25*(fcu/25)^ )

Critical perimeter for column1 =12d+2b+2h = Lp1 = 7012 mm

Critical perimeter for column2 =12d+2b+2h = Lp2 = 7012 mm

Area within the perimeter col-1 =(b+3d)*(h+3d) = A'1 = 3.07E+06 mm2

Area within the perimeter col-2 =(b+3d)*(h+3d) = A'2 = 3.07E+06 mm2

Average earth pressure = Pavg = 185 kN/m2

Punching shear force = Vpun = 1108 kN

Punching shear stress = Vpun/(LP*min(d1,d2) = vc2 = 0.35 N/mm2


vc2 < vc Hence ok

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 6 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 142 of 150

CALCULATION SHEET
DESIGN CALCULATION-FOUNDATION " F13"

c. One-way shear check at 1.0d from the column face

The length from the face of concrete at which the shear force
considered=(max(a1,a2)-min(d1,d2))/1000= Lo = 0.549 m
Shear force = Pavg*Lo*B = Vo = 274 kN

Actual shear stress =Vo/(B*min(d1,d2))= vc3 = 0.225 N/mm2


vc3 < vc Hence ok
8 CHECK FOR SLIDING

Total weight =w1+w2+Ps1+PS2 = Pd = 1482 kN

Coefficient of friction = μ = 0.4

Frictional resistance =Pd*μ = Fr = 592.7 kN

Total horizontal force =max(HLs(1+2),HBs(1+2)) = H = 74.00 kN

Safety index = Fr/H = 8.01 > 1.5 cl 20.1.3.1-j of


Hence ok Design basis manual
9 CHECK FOR OVERTURNING

Over turning moment = max(MLs(1+2),MBs(1+2)) = Mo = 90.0 kNm

R i ti momentt = Pd*max(L,B)/2
Resisting * (L B)/2 = MR = 3334 kN
kNm

Safety index = MR/Mo = 37.0 > 1.8 cl 20.1.3.1-j of


Hence ok Design basis manual

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 7 of 7
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 143 of 150

Project ADCOP - ABU DHABI CRUDE OIL PIPELINE PROJECT HABSHAN T REINFORCED CONCRETE COUNCIL
Client INTERNATIONAL PETROLEUM INVESTMENT COMPANY Made by Date Page
Location IPS-ADMIN BUILDING 1' to 1: H to F MP 12-Jun-2009 1
Deflection Check of Two-Way Slab Checked Revision Job No
Originated from RCC94.xls on CD © 1999 BCA for RCC NZM 0 E30153
DIMENSIONS MATERIALS STATUS VALID DESIGN
short span, lx m 5.23 fcu N/mm² 40 γc = 1.50 1' 1
long span, ly m 8.05 fy N/mm² 460 γs = 1.05 Edge 1
h mm 200 Density kN/m³ 25 H

Lx = 5.225
Top cover mm 30 (Normal weight concrete) Plan
Btm cover mm 30

Edge 4

Edge 2
LOADING characteristic EDGE CONDITIONS
Self weight kN/m² 5.00 Edge 1 C C = Continuous
xtra dead+ACSU kN/m² 3.50 Edge 2 C D = Discontinuous Ly = 8.05 m
Total Dead, gk kN/m² 8.50 γf= 1.40 Edge 3 C
Imposed, qk kN/m² 2.00 γf= 1.60 Edge 4 D F
Design load, n kN/m² 15.10 See Figure 3.8 and clauses 3.5.3.5-6 Edge 3

SHORT LONG EDGE 1 EDGE 2 EDGE 3 EDGE 4 BS8110


MAIN STEEL SPAN SPAN Continuous Continuous Continuous Free Reference
ßs 0.044 0.028 0.059 0.037 0.059 0.000 Table 3.14
M kNm/m 18.1 11.3 24.2 15.1 24.2 0.0
d mm 164.0 152.0 164.0 152.0 164.0 152.0
k' 0.156 0.156 0.156 0.156 0.156 0.156
k 0.017 0.012 0.022 0.016 0.022 0.000
Z mm 155.8 144.4 155.8 144.4 155.8 144.4 3.4.4.4
As req mm²/m 265 179 354 239 354 0
As min mm²/m 260 260 260 260 260 260 Table 3.25
As deflection mm²/m 265 179 ~ ~ ~ ~
Ø mm 12 12 12 12 12 12
Layer B1 B2 T1 T2 T1 T2
@ mm 425 250 300 425 300 425
As prov mm²/m 266 452 377 266 377 266
= % 0.162 0.298 0.230 0.175 0.230 0.175 %
S max
a mm 504
50 468
68 504
50 468
68 504
50 468
68 Clause
C ause
Subclause (a) (a) (a) (a) (a) (a) 3.12.11.2.7
DEFLECTION
fs 306 121 288 275 288 0 Eqn 8
Mod factor 1.456 Eqn 7
Perm L/d 37.86 Actual L/d 31.86 As enhanced 0.0% for deflection control Table 3.10

TORSION STEEL BOTH EDGES DISCONTINUOUS ONE EDGE DISCONTINUOUS


Ø mm 12 X Y X Y
As req mm²/m 5000 260 260 3.5.3.5
As prov T mm²/m 5000 377 266
Additional As T req mm²/m 0 0 0 0
As prov B mm²/m 266 452 266 452
Bottom steel not curtailed in edge strips at free edges

SUPPORT REACTIONS (kN/m char uno) (See Figure 3.10) Sum ßvx = 0.944 Table 3.15
EDGE 1 EDGE 2 EDGE 3 EDGE 4 Sum ßvy = 0.600
H, 1'-1 1, F-H F, 1'-1 1', F-H equations
ßv 0.472 0.360 0.472 0.240 19 & 20
Dead kN/m 20.96 15.99 20.96 10.66
Imposed kN/m 4.93 3.76 4.93 2.51
Vs kN/m 37.2 28.4 37.2 18.9
OUTPUT/SUMMARY
SHORT LONG EDGE 1 EDGE 2 EDGE 3 EDGE 4
PROVIDE SPAN SPAN H, 1'-1 1, F-H F, 1'-1 1', F-H
MAIN STEEL T12 @ 425 B1 T12 @ 250 B2 T12 @ 300 T1 T12 @ 425 T2 T12 @ 300 T1 T12 @ 425 T2

ADDITIONAL 0 CORNER 2 CORNER 3 CORNER 4


TORSION STEEL 0 1H 1F 1'F
X direction 0 placed in edge strips
Y direction 0

CHECKS BAR Ø SINGLY MIN MAX GLOBAL


Lx > Ly < COVER REINFORCED SPACING SPACING DEFLECTION STATUS
OK OK OK OK OK OK VALID DESIGN
Page 144 of 150
CALCULATION SHEET
SEISMIC BASE SHEAR CHECK

1 LOAD:

Load due to self weight of structure a = 11770.88 kN (refer page 20 of Appe'x III)

Load due to partition wall b = 11932.40 kN (refer page 20 of Appe'x III)

Load due to parapet wall,slab+roof finish c = 16656.47 kN (ref.page 21 of Appe'x III)


and fall ceiling
Load due to live load, d = 3322.93 kN (refer page 22 of Appe'x III)

Total load=a+b+c+50% of d W = 42021.22 kN

2 Design base shear "V": V = Cv x I x W (refer 1630.2.1-UBC 1997)


RxT
Where,
Seismic coefficient, Cv = 0.26 (Table 16-R-UBC 1997)
Importance factor I = 1.25 (Table 16-K-UBC 1997)
Numerical co efficient R = 5.6 (Table 16-N-UBC 1997)
3/4
Structural period T = Ct x (hn)
Ct = 0.0731 (refer 1630.2.2-UBC 1997)
Height above the base to roof hn = 8 65
8.65 m

Therefore, Structural period T = 0.369

Therefore,Design base shear "V": V = 0.157 W kN

Check 1:

1.Design base shear should not exceed = 2.5 x Ca x I x W


R
= 0.106 W kN
Where,
Seismic coefficient, Ca = 0.19 (Table 16-Q-UBC 1997)

Check 2:
2.Design base shear should not less than = 0.11 x Ca x I x W

= 0.026 W kN

Therefore,Design base shear "V": V = 0.1060 W kN

The manual & staad base shear results are same,Hence O.K (refer page 10 of Appe'x III)

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No: E30153


ADCOP -ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 1
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT -IV Rev 0 DATE : 12/06/2009
Page 145 of 150
CALCULATION SHEET
DESIGN CALCULATION-R.C.C STAIRCASE

PLINTH

1 Data:

Center to center of beams or walls (S) 5225 mm

Width of slab (b) 1200 mm

Thickness of waist considered (W) 250 mm

Rise of staircase (R) 150 mm

Tread of staircase (T) 300 mm

Going of staircase (G) 300 mm

Characteristic strength of concrete (fcu) 40 N/mm2

Characteristic strength of reinforcement steel (fy) 460 N/mm2

Unit weight of concrete (U) 25 kN/m3

Nominal cover for reinforcement 30 mm

Effective depth of slab (d) 214 mm

2 Un Factored Loads

a. Dead load

Resultant width of slab (Rf) 335.4 mm


Rf = Sqrt(G2+R2)

Floor finish,Ff 1.5 kN/m2

Dead load of slab/meter length (DL) 10.36 kN/m2


DL = ((((Rf/1000*W/1000)+(R/1000+T/1000)/2)*(1000/G))*U)+Ff

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 3
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 146 of 150
CALCULATION SHEET
DESIGN CALCULATION-R.C.C STAIRCASE

b. Live load

Live load considered for design (L) 4 kN/m2

3 Factored loads

Factor for dead load 1.4

Factored for live load 1.6

Total Factored load (TL) 20.91 kN/m2


TL = (1.4*DL+1.6*LL)

4 Moment force on slab

Bending Moment as a cantilever slab (M) 57.08 kN-m


M = (TL*S2)/10

5 Area of reinforcement for slab with flanged beam

K' value 0.156

Width of slab considered (b) 1200 mm

K value 0.026 < 0.156


K = M*10^6/(b*d^2*fcu)
Hence Compression Reinforcement Not Reqd.
Lever arm,Z 207.6 mm
Z = d*(0.5+Sqrt(0.25-(K/0.9)))

Area of reinforced required (As) 629 mm2


As = M*10^6/(0.95*fy*Z)

Minimum reinforcement required (Am) 93.31 mm2 As per BS8110-1:


Am = 0.13/100*Rf*d 1997
Table 3.25
Dia of bar (T) 12 mm

No of bars required/m length (N) 5.56 Nos


N =Max(As,Am)/( 0.785*T^2)

Spacing of bars required (Sb) 216 mm


Sb = (ws/N)

Provide 12 mm dia bar at 150 mm spacing

Area of reinforcement provided (Asp) 904 mm2


Hence Safe

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 3
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 147 of 150
CALCULATION SHEET
DESIGN CALCULATION-R.C.C STAIRCASE

6 Check for shear

Shear for in slab (V) 54.62 kN

Actual shear stress in slab (v) 0.213 N/mm2


v = V/(G*d)

2
Allowable shear stress (vu) 0.46 N/mm As per BS8110-1:
vu = 0.79(((100*As/(G*d))^(1/3))*((400/d)^(1/4))/1.25 Hence Safe 1997 Table 3.

7 Check for deflection

M/Gd2 1.04

Design service stress (fs) 213.3 N/mm2 As per BS8110-1:


fs = (2*fy*As)/(3*Asp) 1997 Table 3.

Modification factor (mf) 1.68


mf = 0.55+((477-fs)/120*(0.9+M/Gd^2))
As per BS8110-1:
Actual S/d ratio 24.42 1997 Table 3.

Allowable S/d ratio 33.67 > 24.42


Hence Safe
8 Result

Thickness of staircase slab 250 mm

Rise of staircase 150 mm

Tread of staircase 300 mm

Reinforcement detail

Provide 12 mm dia bar at 150 mm spacing

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 3
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 148 of 150
CALCULATION SHEET
DESIGN CALCULATION-STRIP FOOTING

x1 B b
z
h2
FGL

h1
x x
L
h3
z
d
1 Data:

Length of footing slab,L 1.2 m

Width of footing slab,B 0.8 m

Depth of footing slab,h3 250 mm

Total Depth of footing below FGL- h1 1 m

Depth of block wall or pedestal above FGL- h2 0 m

Width of block wall or pedestal,b 300 mm

Unit weight of concrete,U 25 kN/m3

Unit weight of block wall or pedestal, Ub 25 kN/m3

Unit weight of soil 18 kN/m3

Characteristic strength of concrete (fcu) 40 N/mm2

Characteristic strength of reinforcement steel (fy) 460 N/mm2

Nominal cover for reinforcement 75 mm

Net bearing capacity of soil 205 kN/m2

Dia of bar 10 mm

Effective cover,d 160 mm

2 Loads

Load factor for dead laods 1.4

Load factor for live load 1.6

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 1 of 3
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 149 of 150
CALCULATION SHEET
DESIGN CALCULATION-STRIP FOOTING

Dead load

Load from staircase 5 kN

Load from pedestal 6.75 kN

Load from footing 6 kN

load from soil 8.1 kN

Total dead load 25.85 kN

Live load

Load from staircase 2 kN

Total axial load ,P 39 kN

3 Check for bearing capacity

Actual bearing capacity, P/(L*B) 41.0 kN/m2


2
Allowable bearing capacity 205 kN/m
Hence Safe
4 Area of reinforcement

Moment
o e t in base sslab
ab 1.3
3 kNm/m
/

K value BS 8110-1-1997
K = M*10^6/(L*d^2*fcu) 0.0010 clause 3.4.4.4

Z value 0.999

Therefore z value = (0.5+sqrt(0.25-k/0.9) 0.95 d


z < 0.95d

Area of steel required 19.30 mm2


M/0.95*fy*z

Min area of steel required 208 mm2

Spacings of bars required 378 mm

Spacing of bars provided 200 mm


2
Area of steel provided = (1000/pi/4*d^2)/spacing of bars provided) 393 mm
Hence Safe
% of steel provided (pt) = 0.245 %

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 2 of 3
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
Page 150 of 150
CALCULATION SHEET
DESIGN CALCULATION-STRIP FOOTING

5 Check for shear


BS 8110-1-1997
Actual shear stress 0.023 N/mm2 table-3.8
c=
{ vc = 0.79(pt)1/3(400/d)1/4(fcu/25)1/3 /1.25 } 90

2
Allowable shear stress 0.58 N/mm h3
Hence Safe

DOCUMENT TITLE : ADMIN BLDG. STRUCTURAL CALCULATIONS Project No : E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT : Page 3 of 3
PROJECT HABSHAN TO FUJAIRAH
DOCUMENT No: 25-50-83-1601 ATTACHMENT - IV Rev 0 DATE :12/06/2009
`

ATTACHMENT V: TECHNICAL LAB RECOMMENDATION

(1 Page)

DOCUMENT TITLE : ADMIN BUILDING STRUCTURAL CALCULATION Project No: E30153


ADCOP - ABU DHABI CRUDE OIL PIPELINE
PROJECT: Page 12 of 12
PROJECT - HABSHAN TO FUJAIRAH
DOCUMENT No.: 25-50-83-1601 Rev 0 DATE : 24/08/2009
Table 7.1.1-11 Natural subgrade’s net allowable bearing pressure
ďBH50lBH59Đ
Depth Foundation Width BďmĐ
ďmĐ
1.0 2.0 3.0 4.0 5.0
N.A.D.D.
151.0 205 160 145 140 135
150.0 275 215 195 190 185

Table 7.1.1-12 Natural subgrade’s net allowable bearing pressure


ďBH60lBH72Đ
Depth Foundation Width BďmĐ
ďmĐ
1.0 2.0 3.0 4.0 5.0
N.A.D.D.
152.0 235 180 165 160 155
151.0 275 215 195 190 180

Table 7.1.1-13 Natural subgrade’s net allowable bearing pressure


ďBH73lBH77Đ
Depth Foundation Width BďmĐ
ďmĐ
1.0 2.0 3.0 4.0 5.0
N.A.D.D.
153.0 160 125 115 110 105
152.0 260 205 185 180 175

7.1.2 SLOPE STABILITY PARAMETERS

The slope angle and slope height listed in Table 7.1.2-1 are recommended for earth work design
and construction.

Table 7.1.2-1 Recommended safety slope angle and slope height


SLOPE SAFETY SLOPE ANGLEď°Đ
HEIGHT
ďmĐ è-1 è-2 è-3 é ê

1 26 27 28 38 80
2 26 27 28 38 80
3 26 27 28 38 50
4 26 27 28 38 45
5 26 27 28 38 45

DOCUMENT TITLE : GEOTECHNICAL INVESTIGATION


Project No: E30153
REPORT(IPS)
PROJECT: ABU DHABI CRUDE OIL PIPELINE PROJECT
Page 28 of 33
Habshan - Fujairah
DOCUMENT No.: 25.50.82.1751 Rev.B DATE : 26/04/2009