Commissioning Check List E

Restricted
ANSI 50/ 51/ 51V/ 67
CL-E126 Overcurrent Protection
Primary Injection Tests
Panama Colon PP BB001062
Power Plant Plant Code

System: Protection/ Synchronization and Metering (Generator)

Component: CHA10-U08-F01 – generator protection

Page: 1 of 1 Appendices:

No. Activity (Items not applicable to be marked N/A) Remarks Confirmed

1. Technical Data: See device coversheet

Secondary injection checklist CL-E226 available 

2. Primary tests

- Record phase currents

Rated Current IN[A] 7 831


Phase Current L1 Ipri[A]
Phase Current L2 Ipri[A]
Phase Current L3 Ipri[A]
I>>set[A] 31 331

3. Evaluation

- No measurement monitoring functions respond 

- Current measuring plausible 

- Direction detection correct (not applicable ) 

- Tests carried out with short circuit / on load (delete as appropriate)

4. Remarks:
......................................................................................................................................................................................... 1

......................................................................................................................................................................................... 2

Department: ........................................................ Name: .......................................................................

Date:. ...................................................................... Signature: .............................................................

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization


of its content and communication thereof to others without express authorization are prohibited.
Project Site Execution Offenders will be held liable for payment of damages. All rights created by patent grant or
registration of a utility model or design patent are reserved.