Vous êtes sur la page 1sur 1

FOOTING SCHEDULE

No. Of.
Footing Footing Excavation Depth 1. All dimensions are in feet & inches.
Reinforcement Footing
S.No. Marked Size Size d D 2. This drawing to be read in conjunstion with

2'-9"

2'-4 1"

1"
2

2'-12
2'
1 F1 3'0"x3'6" 3'6"x4'0" 9" 15" 10mm@7"c/c bothways 1 relevant architectural drawings.
7 PB2 PB2 PB2
3. All dimensions shall be checked and verified

1"
1"

2'-42
2'-6"

2'-72
F2

3'-3"
2 4'0"x4'0" 4'6"x4'6" 12" 27" 10mm@5"c/c bothways 2
F4-C3 F5-C1 F4-C1 before execution of works.
F6-C3 2'-3" 2'-3" 3 F3
2'-3" 2'-3" 2'-6" 2'-6" 4'0"x5'6" 4'6"x6'0" 12" 27" 10mm@5"c/c bothways 3 4. Concrete Grade : - M20
2'-6" 2'-6" 7'
11'-10 1"

F4
2

4 4'6"x4'6" 5'0"x5'0" 9" 15" 10mm@6"c/c bothways 3

PB2

PB1
5. REINFORCEMENT:

11'
PB2
5 F5 5'0"x5'0" 5'6"x5'6" 9" 18" 10mm@6"c/c bothways 4
SEPTIC TANK Use high yield strength deformed bars

PB2
2'-6" 2'-6"
6 F6 6'0"x6'0" 6'6"x6'6" 9" 21" 10mm@5"c/c bothways 2 conforming to IS1786-1895 ; Fe 415 grade

3'-3"

1"
7 F7 6'0"x6'6" 6'6"x7'0" 9" 22" 12mm@6"c/c bothways 2

2'-72
6. Clear concrete cover to main bars:
6 PB2 PB2
(a).Footing : 2" (b).Column : 1 1/2"

2'-4 1"
2
2'-9"
4'-3"

F6-C3 F5-C1 (c).Plinth beam : 1"


9" 9"

2'-7 1"
2
2'-6" 2'-6" 2#12 2#16

2'
5 PB1 PB1 PB1 7. Use stone aggregates and sand conforming to

PB2

15"

15"
G.L.
2'-4 1"
C1

PB2
2
C2 PB1 IS 383( latest revision).
4'
5'-3"

F5-C1 2' 2#12 2#16


Stone aggregate size - 20mm and Down grade

3"3"

3"3"
p.c.c. 1:5:10 p.c.c. 1:5:10 plinth beam

PB2
2'-6" 2'-6"
F2-C5

PB2
4'

PB1
3' 3' 4' sand filling sand filling
2'-4 1" 1'-7 1"

F2-C5
2

4'
2' C.S. Of PB1 C.S. Of PB2 8. Use good water for concrete mixing and curing
2'-7 1"

1"
4
2

2'-72
PB1

3'
r.c.column
PB1

1'-6" conforming to IS 456(latest revision).


2

3 PB1 PB1 PB1


PB1

6"
9. Maximum water cement ratio --0.45
1"

1"
2'-42

C1 C1 reinforcement

2'-102
2'
4'-0"

3'-6"
1'-7 1"
2
1'-10 1"
2
1"
2'-12 1"
2'-42 P B1 F5-C1 ffl 18"
3#16
2'-9"

9" 6"
9"
F3-C6 2#12 10. Foundation is designed for

13'-6"
2'-6" 2'-6" 3#16
F7-C4 SUMP
1'-6" 1'-6"

d
2 PB1 Ground + 2 Floors Only

PB2
PB2
1'-9"

PB1
F1-C5 2#12
F4-C1 8'-6"
9" 3" PROPOSED
Footing size
6'-41"

3' 3'
C.S. Of Beam For RESIDENTIAL BUILDING AT
2

4' 4'
Partition Wall Eccentric footing PLOT NO : 7

1"

2'-10 1"
3'-6"
2'-102

2
GARDEN ROAD
1 PB1 PB1 ffl
12" 12"
ULTIMATE ASHRAM AVENUE

1"

2'-7 1"

5" 6"
2'-72

2
2#10 ROOF LVL
MANAPPAKKAM

3'
F3-C1 F7-C4 F3-C6
2#10 CHENNAI -

H/4
9"
C.S. Of Tie Beam FOR
Mr.VAMSI & FAMILY

H
1"
1'-12 DRG. NO. STR-01
1'-3" 3'-3" Date : 25-07-13 Job No. : 216

H/4
FLOOR LVL
5'-9" 9'-6" 10'-6" 5'-9" 6'-9" 12'-3"
A B C D E F G H J J'

3"
DRAWN - N.V

FOOTING & PLINTH BEAM LAYOUT FOUNDATION AND

H/4
LAP = 50 X Dia of
col.rod PLINTH BEAM DETAILS
Reinforcement No. Of.
2'-0"

Column Column Ties 1"


72 10mm 10mm 10mm
S.No. Marked Size Ground First Second Column @6"c/c @7"c/c @6"c/c promoters

Lap
Floor Floor Floor 5 2 2

5'3" MINIMUM
71"

H
4#16 8mm 2legged 2
9"x12" + @7"c/c
1 C1 6#16 6#16 2#12 10 1 1
RB1
RB1
6'-9"

12"
12"THK
8mm 4legged
2 C2 9"x15" 8#12 8#12 8#12 @7"c/c 1
4#16 8mm 4legged 3"
4#20
3" WelBuild

Lap
+
1'-6"
C3 9"x15" @7"c/c WelBuild Promoters Private Limited

H/4
3 8#16 4#12 8#12 3 5"
3 p.c.c 1:4:8
2'-0"

4#20 8mm 4legged 54/7 Paul Wells Road


4 C4 9"x15" + @7"c/c sand filling
8#20 4#16 8#16 2 6" 2#16 +2#12 Sripuram Colony
8mm 2legged
5 C5 9"x12" @7"c/c 3 L.S. OF RB1 (15"X18") St Thomas Mount
6#12 6#12 6#12
4#16 8mm 4legged 2'-0" 5'-9" 2'-0"
CHENNAI - 600 016
+ E F

6'-0"(MINIMUM) FROM O.G.L


6 C6 12"x12" 4#12 @7"c/c 2 T:+91 44 22321184 F:+91 44 22321183

DEPTH OF EXCAVATION
PLAN M:+91 99625 88097
EMAIL: vsraghavan@welbuild.com

3#16 3"

3"
9" 9"
5'3" MINIMUM

D
Structural Consultants

d
6" 5"
3" FOOTING SIZE 3"
W.JOE GLADE M.E.(Struct.) ,MIE
5" 1'-0" p.c.c 1:4:8 1'-0" p.c.c 1:4:8 EXCAVATION SIZE 60/40 - Valluvar Salai
5"

sand filling 6" sand filling Janakiram Colony


6" 3#16 TYPICAL SECTION THROUGH Arumbakkam
C.S AT 2-2 Chennai
C.S AT 1-1 COLUMN FOOTING
98401 88119 - 2363 6003

Vous aimerez peut-être aussi