ANSI 40
CL-E129 Underexcitation
Protection
Primary Injection Tests
Panama Colon PP BB001062
Power Plant Plant Code
Page: 1 of 1 Appendices:
1.
Technical data: See device coversheet
2. Primary tests
This test will be carried out, when possible, at capacitive load at the
underexcitation limit. Characteristic curves will be tested in two points each by
reducing the settings (1/xd) temporarily.
3. Evaluation
4. Remarks: