Académique Documents
Professionnel Documents
Culture Documents
CK-140-PR-30-0037
CLIENT NOCL Rev. Date Made by Checked by Page
PMC CB&I LUMMUS 0 4-Jun-09 RCD NHB
Revision
Note 3
M
600
9
10
V1
11 SHELL/ENDS
300
12 Materials HIC resistence KCS (PWHT)
LT1
LT2 LT 1250
Slope 1 : 100
13 Corrosion allow. 3 mm (6 mm Boot)
14 Head type Elliptical 2:1
TT TI
15 Fluid : AMINE
3500
16 Density at T : 973-1019 kg/m³ PI
000
250
950
850
17 Insulation NO
18 Lining NO LT2
NHLL
NLLL
(Note 6)
LAH
19 Lower TL elevation above ground =
LAL
20 Notes : MH
600
21
S
100
22
150
24
UC T.L.
25
Note 2
NOTE-6
26
27 NOZZLE DATA
By Civil
28 REF. No Ø Rating SERVICE
29 IL 1 3" 150# Inlet (UG) IL
30 OL 1 1.5" 150# Pump Outlet
31 PN 1 24" 150# Pump Nozzles
32 M 1 (Note-4) (Note-4) Pump Motor
33 LT1 1 4" 150# Level Instrument
34 PI 1 2" 150# Pressure Instr
35 TT / TI 1 2" 150# Temperature Instr
36 MH 1 24" 150# Manhole
37 S 1 2" 150# Min Flow Return Special service = Yes
38 N 1 2" 150# Nitrogen Connection
39 UC 1 2" 150# Utility Connection Hydrogen service = No
40 V1 1 2" 150# Vent Sour service = Yes
41 D 1 2" 150# Drain Amine service = Yes
42 Caustic service = No
43 LT2 1 4" 150# Level Instrument
46
47
48
\\Kt001sf0005\s646\Process\5.0 Coded Document\PDS\2.0 Vessel\140-V-022_Amine Drain\Rev 0\[S646-140-PDS-V022-23-0.xls]PD017A12 PD017A12
Property of Technip KT India Ltd. To be returned upon request and used only in reference to contract or proposals of this company. Reproduction of
this print or unauthorised use of patented or patentable features disclosed hereon is prohibited.
PROCESS DATA SHEET
Project N° - Unit Doc. type Equipment N° Serial N° Rev. index
CK-140-PR-30-0037
CLIENT Rev. Date Made by Checked by Page
NOCL
PMC 0
Revision
2 Notes continued :
3 1) Controlled Draining of LP and HP Amine Absorber at a time is considered.
4 Drum Volume of 2.8 m3 between LAL and LAH is provided to accommodate the liquid hold-up of HP Amine Absorber 140-C-001
5 and LP Amine Absorber 140-C-003.
6 2) Drum is located in pit.The depth of drum, nozzle heights shall be finalized by Civil as per requirement
7 based on header slope.
8 3) Boot dimensions to be decided by DEC as per sump pump requirements Deleted.
9 4) Nozzle OL, M,V & D are located on Nozzle PN. Nozzle size of OL,M & PN shall be confirmed by DEC based
10 on Pump vendor information.
11 5) Vessel shall be designed for steam out condition : 0 barg ,120 C
12 6) Vessel to be located in pit covered by grating. Nozzles to extend above grating.
13 7) Deleted.
14 8) Refer P&ID No. CS-140-PR-15-0044.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
\\Kt001sf0005\s646\Process\5.0 Coded Document\PDS\2.0 Vessel\140-V-022_Amine Drain\Rev 0\[S646-140-PDS-V022-23-0.xls]PD017A12 (2) PD017A12
Property of Technip KT India Ltd. To be returned upon request and used only in reference to contract or proposals of this company.
Reproduction of this print or unauthorised use of patented or patentable features disclosed hereon is prohibited.