As part of the proposed airport expansion project, it is has been planned to add a
new runway to BIA to equip the airport to handle the expected increased aircraft
volumes as well as the new aircrafts such A380.
Objective
Carryout pavement design and propose suitable designs for the new runway and
taxiways.
Deliverables
Information
Group size: 6 students or less per group
Due Dates:
Final Report: within 6 weeks from the last day of the current semester examination
(Marks 30)
Late Submissions: 10% of the marks obtained will be deducted per day after the
deadline; submissions after one week from the due date will not be accepted. You are
advised to adhere to these deadlines.