Contents
Engineering based
~ 2,000 February, 1993
Ship & Power Plant
Quality Quality
Division Administration Business Technology & Procurement Design & Engineering
Management Business
Research &
Power Ship-Repair
Team Management Ship
Plant
Development Procurement Hull Outfitting NDT QM
Business
Center
Bunkering Machinery
Business Piping
Machinery
Outfitting
Electric
1.1 Engineering
Various ship & offshore reference Eco Friendly Design Easy Maintenance & Operation
Abundant experience Reliable & Proven Design Low Fuel consumption
Co-operating global shipyards Research & Development Optimized Structure & System
Expediting from A to Z
Economy of Scale World
Wide
Procurement Biggest Logistics Center
Sharing buying Power with DSME
in Busan New Port
By $6billion per annum
By Same supplier pool Date of Establishment: Mar. 2006
Total Area: 103,681m2
Warehouse: 43, 589 m2
1.3 Quality Management
Integrated inspection services, using the most advanced equipment and World class inspection &
Commissioning Services by highly trained ASNT certified inspectors.
Quality Inspection
Global
Standard
Quality
Non Destructive Testing LNG Carrier & LNG Tank (Repair & Test)
1.4 Commissioning & Bunkering
Offshore Project Commissioning
by Highly Trained personnel
- Pre-commissioning
- Marine & Drilling system Commissioning
- Equipment Preservation & Maintenance
Quality
Service
Bunkering Service
- Marine Gas oil & HFO supply
to offshore drillship, fixed platform,
FPSO and Commercial ships
1.5 Shipyard Construction Consulting
Optimized Shipyard
DSEC
Client Objective
Quality
Cost
Delivery
LNGC
LNGC LSRBTMLNG Power Plant
Storage Gas Distribution
Barge
LNG
LNG
LNGC
LNGC Storage GE BMPP
Storage
Barge
Barge
FLPPTM (Solution as “All in One”-Floating LNG Power Plant) Power Generation Onboard
LNGC FLPPTM
3.2 Floating LNG Power Plant
Power Plant + LNG Receiving Terminal + Storage Tanks
+ Electric Transmission & Distribution Function + LNG & NG Supply
Length : approx. 276.0 m
Breadth : 44.0 m
Depth : 26.0 m
Generator Engine : 24 Gas Engines
Endurance : abt. 68days (for 200MW)
Cargo Containment System : Membrane Type, GTT NO96 (or equivalent)
Nominal Voltage : 132kV (Can be adapted to cater for national grid)
Frequency : 50 or 60Hz
Complement : 17 persons
Construction Terms : 30 months (From Contract to Sail Away)
LNG
2. Mobility
- Continuous revenue stream by relocation
- Risk-free Asset from environmental effect
(Earthquake, Volcano, Typhoon, Fire)
Site “B” and civil war
45~60 months
Land-Lock Power Plant
4. Lower CAPEX and OPEX - Curtailed Capital Expense, FLPPTM - All In ONE
: Curtailed CAPEX by Power Station, Land
Acquisition, LNG Re-Gas system, Terminal &
Storage
- Curtailed operating expense
: Below 20 persons, Easy Operation & Maintenance
& Low fuel cost
3.6 Why DSEC Floating Power Plant?
5. Convergent Technology with Shipbuilding and Power Plant
Oslo
DMHI ZVEZDA-DSME
London Mangalia, Romania Vladivostok, Russia
NASSCO
SAN DIEGO, USA
Greece DSSC
Shandong, China Tokyo
Shanghai HOUSTON
ODC
Oman
Kuala Lumpur
Singapore
PAENAL Jakarta
Porto Amboim, Angola Ecuador Rio de Janeiro
OSX
Rio de Janeiro, Brazil
Busan, Korea
Floating Crane
Floating Docks 2 x 3,600ton
50K~120K ton (5)
1 x 1,800ton
45K ton L/B (1)
1 x 1,200ton
4. Company
Overview DSME Performance Record
Delivered 1,421
Commercial Ships 897 Offshore Project & Plant 438 Naval & Special Ship 86
Ro/Ro, Car Carrier 62 Onshore and Others 372 Special Ship and Others 40