Vous êtes sur la page 1sur 2

# 1 AMN ENGINE SCHEDULED

MAINTENANCE.
COMMENCING MONDAY, 20TH OF MARCH, 17.

1. SUMP TANK EMPTIED, CLEANED AND REFILLED WITH


SAME OIL.
2. CRANKSHAFT DEFLECTION/MAIN BEARING ALIGNMENT
MEASUREMENT.
3. ALL FUEL INJECTORS TO REMOVE, CLEAN/RECALIBRATED
AND RE-INSTALLED.
4. TURBO-INLET CASING REMOVED AND
INSPECTION/CLEANING DONE.
5. TURBO EXHAUST CASING REMOVED, NOZZLE RING AND
TURBINE CLEANED, INSPECTED AND REPLACED.
6. ECONOMISER TUBES WATER CLEANED- COMPLETED.
7. CYLINDER HEAD- INSPECTION OF ALL COMPONENTS,
LUBRICATION, ETC.
8. ALL SAFETY DEVICES, TRANSMITTERS, TRANSDUCERS,
SWITCHES, ETC TO CONTROL OPERATIONS.
9. ALL FUEL FILTERS TO CLEAN.
10. CLEAN AND SERVICE ALL FUEL PUMPS AND RACKS
AND LUBRICATE SAME.
11. REPLACE GOVENOR LUB. OIL AND PARAFIN-FLUSH
SAME.
12. COMPLETE INSPECTION AND CONTROL OF
ALTERNATOR, INCLUSIVE OF VULCAN COUPLING.
13. REMOVE ALL DEBRIS FROM INLET/OUTLET OF J.W.
COOLER.
14. CLEAN AND SERVICE LUB. OIL PURIFIER.
15. CLEAN START AIR FILTER.
16. CONTROL CONDITION OF ALL FLEXIBLE MOUNTINGS.
17. CONTROL ALL EXHAUST AND CHARGE-AIR MANIFOLDS
FITTINGS.
18. CLEAN COMPLETE ENGINE AND REPAINT WHERE
NECESSARY.
19. SWAT-AVR AND TEST OPERATE ENGINE AND SET
PARAMETERS.

Vous aimerez peut-être aussi