TESORO REFINING STANDARD | TRS-510F4
Flange/Torque Form for DATE:
Piping/ Pressure Vessel on/ae|zoes
Plant #: Equipment #:
Flange # / Description of Flange Location:
Flange Verification
Cee WEE
Verify the gasket surface is not damaged and is
lean. On the ring joint, make sure that the ring and
Groove is clean and not damaged.
Verify the correct gasket is used.
Verify the studs/nuts are correct metallurgy. Also,
make sure they are reconditioned or new as required
by TRS-510 Flanges, Gaskets, and Bolting
Verify the studs/nuts are properly lubricated.
Verify flange alignment.
Torque Verification
Required Torque (ft-lbs): "(Following directions provided in TRS-510P4.)
‘Actual Torque (ft-lbs): Cal. Due Date:
Bolt Diameter: Torque Wrench #:
Mechanic: Date:
| IMPORTAN’
Verify nuts move on the Third Pass per the torque procedure and final torque was achieved. One of the
Individuals below is required to sign the form. A minimum of one signature is required.
Print Name jal and Date:
Refinery Mechanic:
Contractor Foreman/QC:
(if done by contractor)
Tesoro Rep./ QM Rep.
Other:
Prepared by: ‘Approved by: Date:
0 { Pallser,H. Zimmerman K-Chism 3/22/2011
The information contained herein is the confidential property of Tesoro Refning & Marketing Company unless another
source Is indlated. Ths material is subject to return on demand and must nat be disclosed or reproduced without prior written
consent bya duly authorized representative of Tesoro Refining & Marketing Company.
“TRS SIO Rev docx1.0
2.0
TESORO REFINING STANDARD
TRS-510P4
Piping Flange Inspection and |, Paget of 8.
TESORO Assembly Procedure o3/2e/20%a
Contents
3.2 Inspection... wad
tT upose = 33 Assembly 3
1.2 Scope... a 3.4 Hot Torque .. 3
4.0 PIPE FLANGE TORQUE
REFERENCES 1
2.1. Tesoro Refining Standards........1 ‘SUMMARY.
4.1. Raised Face in Foot-Pounds ..
4.2 RIT in Foot-Pounds
4.3 Tongue-and-Grove (T&G)
23° Industry Codes and Flanges in Foot-pounds
" 4.4 Ring-Joint Summary
3.0 INSPECTION AND ASSEMBLY 45° Gasket Stresses
PROCEDURE
3.1 General Instructions...
2.2. Tesoro Engineering
Standards..
1.0 INTRODUCTION
1.1 Purpose
‘This standard provides the procedure for Pipe Flange Inspection and Assembly.
1.2 Scope
This standard describes the preferred procedure for sealing the gaskets in Pipe
Flange joints.
2.0 REFERENCES
2.1 Tesoro Refining Standards
> TRS-510 Flanges, Gaskets, and Bolting
> TRS-S10P1 Exchanger Flange And Gasket Surface Warpage Inspection
Procedure
> TRS-510P2 Exchanger Flange Inspection and Assembly Procedure
> TRS-510P3 Exchanger Flange Torque Procedure (Modified STAR Pattern)
> TRS-S10P5 _ Piping Star Pattern Torque Procedure
> TRS-S10F1 Exchanger Flange Warpage Form
> TRS-510F2 Exchanger Gasket Torquing Tag Form
Revision: Prepared by: ‘Approved by: Date:
0 L Palliser, H. Zimmerman K. Chism 3/22/2011
NOTICE: The information contained herein isthe confidential property of Tesoro Refining & Marketing Company unless
anotver source is indicated. This material's subject fo retum on demand and must net be dosed or reproduced without prior
writen consent by a duly authorized representative of Tesero Refining & Marketing Company.
“TRS-S10P# Rev Odo