Vous êtes sur la page 1sur 1

PROCESS ENGINEERING FLOW DIAGRAM

PABRIK NITROBENZNE DARI BENZENE DAN ASAM CAMPURAN

KETERANGAN
ACC : Accumulator
CD : Condensor
HE : Heat Exchanger
MD : Distillation Column

TO UTILITY

CWS
TI TC PC PI P : Pump

FLARE
LI LC
R : Reactor
RB : Reboiler
HE-04 CD-01 T : Tank
T-01 P-01
TANGKI BENZNE LI : Level Indicator

COOLING WATER
ACC-01
LI LC
LC : Level Controller
HE-01 PI : Pressure Indikator

TO UTILITY
PI : Pressure Controller

TO UTILITY
STEAM
TI : Level Indikator
LI LC TC : Level Controller
TI TC
MD-01 : Signal
: Pneumatik
T-02 P-02
TANGKI ASAM NITRAT

STEAM
HE-02
STEAM

TO UTILITY

PC

LI LC TI TC

PI RB-01 T-04
LI LC
TANGKI NITROBENZEN

T-03 P-03
TANGKI ASAM SULFAT P-05
DC-01

HE-03

TO UTILITY

CWS
PC PI
STEAM

FLARE
P-06
TO UTILITY

TO UTILITY
TI
CD-01

TI TC TC
ACC-01
LI LC

LI LC
COOLING WATER

R-01
MD-01
TO UTILITY

TI TC

P-04
COOLING WATER

STEAM
HE-07

TI TC

PC
TO UTILITY

HE-06

PI RB-01
COOLING WATER

LI LC
TO UTILITY

TO UTILITY

Vous aimerez peut-être aussi