Vous êtes sur la page 1sur 23

KADUGLI TRAINING CENTRE

KADUGLI – SOUTH KORDOFAN STATE

Section (4)

ELECTRICAL WORKS

BILLS OF QUANTITIES

United Nations Development Programme - Sudan 1/23 Kadugli Training Centre


BILL NO (1) – COMMON ROOM

UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE

Supply, install test commission and hand over


in good working conditions complete the
electrical system as shown on drawings,
specifications, IEE wiring regulations & as
required by Local Electrical Authorities (NEC)
for the complete project all up to the
satisfaction of the Engineer.
1.1 Sub Distribution boards as specified here
under and shown on the drawings :-

1.1.1 DB-C, 63A main isolator, TPN+E,12-ways 1 NO


1.2 Power Cables
Supply & install complete cables, for connection
of main power circuits & central AC units, water
pumps including supply of glands & lugs.
NB:- Stated cable lengths are approximate,
delivery shall be after exact measurement of
cable length on site
1.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 125 ML

1.3 Lighting & Small Power


1.3.1 Electrical Points
work to include laying of conduit , installation
of boxes & wiring from the distribution board
up to the point complete with all necessary
accessories :-
1.3.1.1 Light points ( wiring up to the switch ) 31 NO
1.3.1.2 General purpose socket–outlet point 15 NO
1.3.1.3 Ceiling fan point 12 NO
1.3.1.4 Air cooler switch point 2 NO
1.3.1.5 TV socket outlet point 1 NO
1.3.2 Electrical Devices
work to include, fixing of devices and wire
termination complete with all necessary
accessories :-
1.3.2.1 13 A , 3-pin switched socket out let 8 NO
1.3.2.2 16 A , 2-pin socket outlet 7 NO
1.3.2.3 1-gang, 1- way lighting switch 1 NO

1.3.2.4 2-gang, 1- way lighting switch 4 NO


1.3.2.5 1-gang, 2-way lighting switch 2 NO
1.3.2.6 TV socket outlet 1 NO
UNIT
QTY UNIT AMOUNT
ITEM DESCRIPTION RATE

United Nations Development Programme - Sudan 2/23 Kadugli Training Centre


1.3.2.7 Ceiling fan 56 ins. 12 NO
1.3.2.8 4000 cfm air cooler 2 NO

1.3.3 Light Fittings


work to include supply & fixing of lighting
fixtures and wire termination complete with all
necessary accessories , as per drawings,
specifications and schedule & subject to the
approval of the Engineer:-
1.3.3.1 1 x 18w IP55 weather proof outdoor type wall
7 NO
bracket lighting fixture
1.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 12 NO
1.3.3.3 1 x 36w, 4ft, batten fluorescent fixture. 12 NO

1.4 Main Earthing wire


work to include fixing & termination of main
earth wire to the sub distribution board
earthing bus bar & metal enclosures & cable
armour complete as required including all
necessary accessories
NB: - Stated wire lengths are approximate,
delivery shall be after exact measurement of
length on site.
1.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 125 ML
1.5 Lightning Protection System
Supply, install & test the following lightning
protection system
1.5.1 Earthing Pits
work to include driving of earthing rods,
testing & construction of earth pits manholes
1.5.1.1 Earthing pit 1 NO
1.5.1.2 Earthing rods including earth resistance
measurement
4 NO
NB: - Number of rods depends on the soil
characteristics.
1.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
1.5.2 Air terminals 4 NO
1.5.3 20×3 mm cu. tape down conductor 90 ML
1.5.4 Fixing & clamping accessories L L
Sum Sum
1.6 Fire Fighting
6 kg Carbon Dioxide Fire Extinguisher 1 NO

TOTAL BILL (1) CARRIED TO SUMMARY

United Nations Development Programme - Sudan 3/23 Kadugli Training Centre


BILL NO (2) - HALL – (2 Nos.)

UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE
Supply, install test commission and hand over
in good working conditions complete the
electrical system as shown on drawings,
specifications, IEE wiring regulations & as
required by Local Electrical Authorities (NEC)
for the complete project all up to the
satisfaction of the Engineer.
2.1 Sub Distribution boards as specified here
under and shown on the drawings :-

2.1.1 DB-H, 63A main isolator, TPN+E,12-ways 2 NO

2.2 Power Cables


Supply & install complete cables, for connection
of main power circuits & central AC units, water
pumps including supply of glands & lugs.
NB:- Stated cable lengths are approximate,
delivery shall be after exact measurement of
cable length on site
2.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 220 ML

2.3 Lighting & Small Power

2.3.1 Electrical Points


work to include laying of conduit , installation
of boxes & wiring from the distribution board
up to the point complete with all necessary
accessories :-
2.3.1.1 Light points ( wiring up to the switch ) 44 NO
2.3.1.2 General purpose socket–outlet point 18 NO
2.3.1.3 Ceiling fan point 16 NO
2.3.1.4 Air cooler switch point 4 NO
4.3.2 Electrical Devices
work to include, fixing of devices and wire
termination complete with all necessary
accessories :-
2.3.2.1 13 A , 3-pin switched socket out let 9 NO
2.3.2.2 16 A , 2-pin socket outlet 9 NO
2.3.2.3 1-gang, 1- way lighting switch 2 NO
2.3.2.4 2-gang, 1- way lighting switch 4 NO
2.3.2.5 1-gang, 2-way lighting switch 4 NO
2.3.2.6 Ceiling fan 56 ins. 16 NO
2.3.2.7 4000 cfm air cooler 4 NO
UNIT
QTY UNIT AMOUNT
ITEM DESCRIPTION RATE

United Nations Development Programme - Sudan 4/23 Kadugli Training Centre


2.3.3 Light Fittings
work to include supply & fixing of lighting
fixtures and wire termination complete with all
necessary accessories , as per drawings,
specifications and schedule & subject to the
approval of the Engineer:-
2.3.3.1 1 x 18w IP55 weather proof outdoor type wall
14 NO
bracket lighting fixture
2.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 30 NO

2.4 Main Electrical Earthing wire


work to include fixing & termination of main
earth wire to the sub distribution board
earthing bus bar & metal enclosures & cable
armour complete as required including all
necessary accessories
NB: - Stated wire lengths are approximate,
delivery shall be after exact measurement of
length on site.
2.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 220 ML

2.5 Lightning Protection System


Supply, install & test the following lightning
protection system

2.5.1 Earthing Pits


work to include driving of earthing rods,
testing & construction of earth pits manholes
2.5.1.1 Earthing pit 1 NO
2.5.1.2 Earthing rods including earth resistance
measurement
4 NO
NB: - Number of rods depends on the soil
characteristics.
2.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
2.5.2 Air terminals 4 NO
2.5.3 20×3 mm cu. tape down conductor 180 ML
2.5.4 Fixing & clamping accessories L L
Sum Sum
2.6 Fire Fighting
Supply, install & test the following fire fighting
fixtures.
2.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

TOTAL BILL (2) CARRIED TO SUMMARY

United Nations Development Programme - Sudan 5/23 Kadugli Training Centre


BILL NO (3) – LECTURE HALL

UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE
Supply, install test commission and hand over
in good working conditions complete the
electrical system as shown on drawings,
specifications, IEE wiring regulations & as
required by Local Electrical Authorities (NEC)
for the complete project all up to the
satisfaction of the Engineer.
3.1 Sub Distribution boards as specified here
under and shown on the drawings :-
3.1.1 DB-L, 63A main isolator, TPN+E,12-ways 1 NO
3.2 Power Cables
Supply & install complete cables, for connection
of main power circuits & central AC units, water
pumps including supply of glands & lugs.
NB:- Stated cable lengths are approximate,
delivery shall be after exact measurement of
cable length on site
3.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 100 ML
3.3 Lighting & Small Power
3.3.1 Electrical Points
work to include laying of conduit , installation
of boxes & wiring from the distribution board
up to the point complete with all necessary
accessories :-
3.3.1.1 Light points ( wiring up to the switch ) 30 NO
3.3.1.2 General purpose socket–outlet point 12 NO
3.3.1.3 Ceiling fan point 8 NO
3.3.1.4 Air cooler switch point 4 NO
6.3.2 Electrical Devices
work to include, fixing of devices and wire
termination complete with all necessary
accessories :-
3.3.2.1 13 A , 3-pin switched socket out let 6 NO
3.5.2.2 16 A , 2-pin socket outlet 6 NO
3.5.2.3 1-gang, 1- way lighting switch 4 NO
3.5.2.4 1-gang, 2-way lighting switch 4 NO
3.5.2.5 Ceiling fan 56 ins. 8 NO
3.5.2.6 4000 cfm air cooler 4 NO
3.3.3 Light Fittings
work to include supply & fixing of lighting
fixtures and wire termination complete with all
necessary accessories , as per drawings,
specifications and schedule & subject to the
approval of the Engineer:-
3.3.3.1 1 x 18w IP55 weather proof outdoor type wall 10 NO
United Nations Development Programme - Sudan 6/23 Kadugli Training Centre
bracket lighting fixture
3.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 20 NO
3.4 Public Address System
work to include supply & fixing of devices,
conduits , wires , wire termination & testing
complete with all necessary accessories ,
preparation of drawings, specifications and
schedule subject to the approval of the
Engineer:-
3.4.1 5 watt amplifier 1 NO
3.4.2 Goose neck desk type microphone 2 NO
3.4.3 5 watt wall mounted speakers 2 NO
3.4 Main Earthing wire
work to include fixing & termination of main
earth wire to the sub distribution board
earthing bus bar & metal enclosures & cable
armour complete as required including all
necessary accessories
NB: - Stated wire lengths are approximate,
delivery shall be after exact measurement of
length on site.
3.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 100 ML
3.5 Lightning Protection System
Supply, install & test the following lightning
protection system
Earthing Pits
3.5.1 work to include driving of earthing rods,
testing & construction of earth pits manholes
3.5.1.1 Earthing pit 1 NO
3.5.1.2 Earthing rods including earth resistance
measurement
4 NO
NB: - Number of rods depends on the soil
characteristics.
3.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
3.5.2 Air terminals 4 NO
3.5.3 20×3 mm cu. tape down conductor 90 ML
3.5.4 Fixing & clamping accessories L L
Sum Sum
3.6 Fire Fighting
Supply, install & test the following fire fighting
fixtures.
3.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
3.6.2 Fire fighting hose reel 30m x 25mm hose 1 NO

TOTAL BILL (3) CARRIED TO SUMMARY

United Nations Development Programme - Sudan 7/23 Kadugli Training Centre


BILL NO (4) – EASTERN OFFICE

UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE
Supply, install test commission and hand over
in good working conditions complete the
electrical system as shown on drawings,
specifications, IEE wiring regulations & as
required by Local Electrical Authorities (NEC)
for the complete project all up to the
satisfaction of the Engineer.
4.1 Sub Distribution boards as specified here
under and shown on the drawings :-
4.1.1 DB-O, 63A main isolator, TPN+E,12-ways 1 NO

4.2 Power Cables


Supply & install complete cables, for connection
of main power circuits & central AC units, water
pumps including supply of glands & lugs.
NB:- Stated cable lengths are approximate,
delivery shall be after exact measurement of
cable length on site
4.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 160 ML

4.3 Lighting & Small Power

4.3.1 Electrical Points


work to include laying of conduit , installation
of boxes & wiring from the distribution board
up to the point complete with all necessary
accessories :-
4.3.1.1 Light points ( wiring up to the switch ) 25 NO
4.3.1.2 General purpose socket–outlet point 22 NO
4.3.1.3 Ceiling fan point 5 NO

4.3.2 Electrical Devices


work to include, fixing of devices and wire
termination complete with all necessary
accessories :-
4.3.2.1 13 A , 3-pin switched socket out let 11 NO
4.5.2.2 16 A , 2-pin socket outlet 11 NO
4.5.2.3 1-gang, 1- way lighting switch 3 NO
4.5.2.4 2-gang, 1- way lighting switch 4 NO
4.5.2.5 1-gang, 2-way lighting switch 2 NO
4.5.2.6 Ceiling fan 56 ins. 5 NO
4.3.3 Light Fittings
work to include supply & fixing of lighting
fixtures and wire termination complete with all
necessary accessories , as per drawings,
United Nations Development Programme - Sudan 8/23 Kadugli Training Centre
specifications and schedule & subject to the
approval of the Engineer:-
4.3.3.1 1 x 18w IP55 weather proof outdoor type wall
5 NO
bracket lighting fixture
4.3.3.2 1 x 18w, 2ft, batten fluorescent fixture. 4 NO
4.3.3.3 2 x 36w, 4ft, batten fluorescent fixture. 16 NO

4.4 Main Earthing wire


work to include fixing & termination of main
earth wire to the sub distribution board
earthing bus bar & metal enclosures & cable
armour complete as required including all
necessary accessories
NB: - Stated wire lengths are approximate,
delivery shall be after exact measurement of
length on site.
4.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 160 ML

4.5 Lightning Protection System


Supply, install & test the following lightning
protection system

4.5.1 Earthing Pits


work to include driving of earthing rods,
testing & construction of earth pits manholes
4.5.1.1 Earthing pit 1 NO
4.5.1.2 Earthing rods including earth resistance
measurement
4 NO
NB: - Number of rods depends on the soil
characteristics.
4.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
4.5.2 Air terminals 4 NO
4.5.3 20×3 mm cu. tape down conductor 90 ML
4.5.4 Fixing & clamping accessories L L
Sum Sum
5.6 Fire Fighting
Supply, install & test the following fire fighting
fixtures.
5.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

TOTAL BILL (4) CARRIED TO SUMMARY

United Nations Development Programme - Sudan 9/23 Kadugli Training Centre


BILL NO (5) – WESTERN OFFICE)

UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE
Supply, install test commission and hand over
in good working conditions complete the
electrical system as shown on drawings,
specifications, IEE wiring regulations & as
required by Local Electrical Authorities (NEC)
for the complete project all up to the
satisfaction of the Engineer.
5.1 Sub Distribution boards as specified here
under and shown on the drawings :-
5.1.1 DB-O1, 63A main isolator, TPN+E,12-ways 1 NO

5.2 Power Cables


Supply & install complete cables, for connection
of main power circuits & central AC units, water
pumps including supply of glands & lugs.
NB:- Stated cable lengths are approximate,
delivery shall be after exact measurement of
cable length on site
5.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 150 ML

5.3 Lighting & Small Power

5.3.1 Electrical Points


work to include laying of conduit , installation
of boxes & wiring from the distribution board
up to the point complete with all necessary
accessories :-
5.3.1.1 Light points ( wiring up to the switch ) 22 NO
5.3.1.2 General purpose socket–outlet point 22 NO
5.3.1.3 Ceiling fan point 6 NO

5.3.2 Electrical Devices


work to include, fixing of devices and wire
termination complete with all necessary
accessories :-
5.3.2.1 13 A , 3-pin switched socket out let 11 NO
5.5.2.2 16 A , 2-pin socket outlet 11 NO
5.5.2.3 1-gang, 1- way lighting switch 6 NO
5.5.2.4 2-gang, 1- way lighting switch 1 NO
5.5.2.5 1-gang, 2-way lighting switch 2 NO
5.5.2.6 Ceiling fan 56 ins. 6 NO

5.3.3 Light Fittings


work to include supply & fixing of lighting
fixtures and wire termination complete with all
United Nations Development Programme - Sudan 10/23 Kadugli Training Centre
necessary accessories , as per drawings,
specifications and schedule & subject to the
approval of the Engineer:-
5.3.3.1 1 x 23w IP55 weather proof outdoor type wall
7 NO
bracket lighting fixture
5.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 15 NO

5.4 Main Earthing wire


work to include fixing & termination of main
earth wire to the sub distribution board
earthing bus bar & metal enclosures & cable
armour complete as required including all
necessary accessories
NB: - Stated wire lengths are approximate,
delivery shall be after exact measurement of
length on site.
5.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 150 ML

5.5 Lightning Protection System


Supply, install & test the following lightning
protection system

5.5.1 Earthing Pits


work to include driving of earthing rods,
testing & construction of earth pits manholes
5.5.1.1 Earthing pit 1 NO
5.5.1.2 Earthing rods including earth resistance
measurement
4 NO
NB: - Number of rods depends on the soil
characteristics.
5.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
5.5.2 Air terminals 4 NO
5.5.3 20×3 mm cu. tape down conductor 90 ML
5.5.4 Fixing & clamping accessories L L
Sum Sum
5.6 Fire Fighting
Supply, install & test the following fire fighting
fixtures.
5.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

TOTAL BILL (5) CARRIED TO SUMMARY

United Nations Development Programme - Sudan 11/23 Kadugli Training Centre


BILL NO (6) - RESTAURANT

UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE
Supply, install test commission and hand over
in good working conditions complete the
electrical system as shown on drawings,
specifications, IEE wiring regulations & as
required by Local Electrical Authorities (NEC)
for the complete project all up to the
satisfaction of the Engineer.
6.1 Sub Distribution boards as specified here
under and shown on the drawings :-
6.1.1 DB-R, 63A main isolator, TPN+E,24-ways 1 NO

6.2. 16 A, TPN+E weather proof isolating switches


1 NO
for cold room freezer

6.3 4 HP, TP, weather proof ON/OFF DOL starter 1 NO


for cold room freezer

6.4 Power Cables


Supply & install complete cables, for connection
of main power circuits & central AC units, water
pumps including supply of glands & lugs.
NB:- Stated cable lengths are approximate,
delivery shall be after exact measurement of
cable length on site
6.4.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 50 ML

6.5 Lighting & Small Power


6.5.1 Electrical Points
work to include laying of conduit , installation
of boxes & wiring from the distribution board
up to the point complete with all necessary
accessories :-
6.5.1.1 Light points ( wiring up to the switch ) 44 NO
6.5.1.2 General purpose socket–outlet point 23 NO
6.5.1.3 Water heater socket–outlet point 1 NO
6.5.1.4 Ceiling fan point 11 NO
6.5.1.5 Exhaust fan socket outlet point 1 NO
6.5.2 Electrical Devices
work to include, fixing of devices and wire
termination complete with all necessary
accessories :-
6.5.2.1 13 A , 3-pin switched socket out let 13 NO
6.5.2.2 16 A , 2-pin socket outlet 12 NO
6.5.2.3 1-gang, 1- way lighting switch 9 NO
QTY UNIT UNIT AMOUNT
United Nations Development Programme - Sudan 12/23 Kadugli Training Centre
ITEM DESCRIPTION RATE

6.5.2.4 2-gang, 1- way lighting witch 5 NO


6.5.2.5 1-gang, 2-way lighting switch 6 NO
6.5.2.6 Ceiling fan 56 ins. 11 NO
6.5.2.7 300 mm Ø, industrial type exhaust fan 1 NO
6.5.2.8 Cold room freezer

4.05x3.3x3m(H) completed with external cooling


unit model SHG22 / 190 - 4sl 4 horse power and 1 SET
condenser unit model CTE158M 6ED insulated
with sandwich panel 10cm thick density 40 kg/m3
and hinged insulated 7cm thick door.
6.5.3 Light Fittings
work to include supply & fixing of lighting fixtures
and wire termination complete with all necessary
accessories , as per drawings, specifications and
schedule & subject to the approval of the
Engineer:-
6.5.3.1 1 x 18 w IP55 weather proof outdoor type wall
14 NO
bracket lighting fixture
6.5.3.2 2 x 36w, 4ft, batten fluorescent fixture. 19 NO
6.5.3.3 1 x 36w, 4ft, batten fluorescent fixture. 9 NO
6.5.3.4 1 x 18w, 2ft, batten fluorescent fixture. 2 NO
2.6 Main Electrical Earthing wire
work to include fixing & termination of main
earth wire to the sub distribution board earthing
bus bar & metal enclosures & cable armour
complete as required including all necessary
accessories
NB: - Stated wire lengths are approximate,
delivery shall be after exact measurement of
length on site.
6.6.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 50 ML
6.7 Lightning Protection System
Supply, install & test the following lightning
protection system
6.7.1 Earthing Pits
work to include driving of earthing rods, testing
& construction of earth pits manholes
6.7.1.1 Earthing pit 1 NO
6.7.1.2 Earthing rods including earth resistance
measurement
4 NO
NB: - Number of rods depends on the soil
characteristics.
6.7.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
6.7.2 Air terminals for O/H water tank & Power
2 NO
House
6.7.3 20×3 mm cu. tape down conductor 270 ML
6.7.4 Fixing & clamping accessories L L
United Nations Development Programme - Sudan 13/23 Kadugli Training Centre
Sum Sum
6.8 Fire Fighting
Supply, install & test the following fire fighting
fixtures.
6.8.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
6.8.2 Fire fighting hose reel 30m x 25mm hose 1 NO

TOTAL BILL (6) CARRIED TO SUMMARY

BILL NO (7) – VIP GUEST HOUSE

UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE
Supply, install test commission and hand over
in good working conditions complete the
electrical system as shown on drawings,
specifications, IEE wiring regulations & as
required by Local Electrical Authorities (NEC)
for the complete project all up to the
satisfaction of the Engineer.
7.1 Sub Distribution boards as specified here
under and shown on the drawings :-
7.1.1 DB-V, 100A main isolator, TPN+E,24-ways 1 NO
7.2 Power Cables
Supply & install complete cables, for connection
of main power circuits & central AC units, water
pumps including supply of glands & lugs.
NB:- Stated cable lengths are approximate,
delivery shall be after exact measurement of
cable length on site
7.2.1 4 c x 35 mm2 ,CU , XLPE /SWA/ PVC 180 ML

7.3 Lighting & Small Power

7.3.1 Electrical Points


work to include laying of conduit , installation
of boxes & wiring from the distribution board
up to the point complete with all necessary
accessories :-
7.3.1.1 Light points ( wiring up to the switch ) 39 NO
7.3.1.2 General purpose socket–outlet point 19 NO
7.3.1.3 Ceiling fan point 8 NO
7.3.1.4 Air conditioner socket–outlet point 8 NO
7.3.1.5 Water heater socket–outlet point 4 NO
7.3.1.6 TV socket outlet point 8 NO
UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE
7.3.2 Electrical Devices
United Nations Development Programme - Sudan 14/23 Kadugli Training Centre
work to include, fixing of devices and wire
termination complete with all necessary
accessories :-
7.3.2.1 13 A , 3-pin switched socket out let 13 NO
7.5.2.2 16 A , 2-pin socket outlet 10 NO
7.5.2.3 15 A , 3-pin switched socket out let for AC units 8 NO
7.5.2.4 1-gang, 1- way lighting switch 10 NO
7.5.2.5 2-gang, 1- way lighting switch 8 NO
7.5.2.6 1-gang, 2-way lighting switch 4 NO
7.5.2.7 TV socket outlet 8 NO
7.5.2.8 Ceiling fan 56 ins. 8 NO
7.5.2.9 Water heater 50 Litres 4 NO
7.5.2.10 18000 BTU/H window unit air conditioner 8 NO

7.3.3 Light Fittings


work to include supply & fixing of lighting fixtures
and wire termination complete with all necessary
accessories , as per drawings, specifications and
schedule & subject to the approval of the
Engineer:-
7.3.3.1 1 x 18w IP55 weather proof outdoor type wall
10 NO
bracket lighting fixture
7.3.3.2 1 x 18w, 2ft, batten fluorescent fixture. 9 NO
7.3.3.3 1 x 36w, 4ft, batten fluorescent fixture. 20 NO

7.4 Main Earthing wire


work to include fixing & termination of main
earth wire to the sub distribution board earthing
bus bar & metal enclosures & cable armour
complete as required including all necessary
accessories
NB: - Stated wire lengths are approximate,
delivery shall be after exact measurement of
length on site.
7.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 180 ML

7.5 Lightning Protection System


Supply, install & test the following lightning
protection system
7.5.1 Earthing Pits
work to include driving of earthing rods, testing
& construction of earth pits manholes
7.5.1.1 Earthing pit 1 NO
7.5.1.2 Earthing rods including earth resistance
measurement
4 NO
NB: - Number of rods depends on the soil
characteristics.
7.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
7.5.2 Air terminals 4 NO

United Nations Development Programme - Sudan 15/23 Kadugli Training Centre


7.5.3 20×3 mm cu. tape down conductor 180 ML
7.5.4 Fixing & clamping accessories L L
Sum Sum
7.6 Fire Fighting
Supply, install & test the following fire fighting
fixtures.
7.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

TOTAL BILL (7) CARRIED TO SUMMARY

BILL NO (8) – YOUTH DORMITORY – (2 Nos.)

UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE
Supply, install test commission and hand over
in good working conditions complete the
electrical system as shown on drawings,
specifications, IEE wiring regulations & as
required by Local Electrical Authorities (NEC)
for the complete project all up to the
satisfaction of the Engineer.
8.1 Sub Distribution boards as specified here
under and shown on the drawings :-
8.1.1 DB-Y, 63A main isolator, TPN+E,18-ways 2 NO
8.2 Power Cables
Supply & install complete cables, for connection
of main power circuits & central AC units, water
pumps including supply of glands & lugs.
NB:- Stated cable lengths are approximate,
delivery shall be after exact measurement of
cable length on site
8.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 250 ML

8.3 Lighting & Small Power


8.3.1 Electrical Points
work to include laying of conduit , installation
of boxes & wiring from the distribution board
up to the point complete with all necessary
accessories :-
8.3.1.1 Light points ( wiring up to the switch ) 78 NO
8.3.1.2 General purpose socket–outlet point 88 NO
8.3.1.3 Ceiling fan point 22 NO

UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE
8.3.2 Electrical Devices
work to include, fixing of devices and wire
termination complete with all necessary

United Nations Development Programme - Sudan 16/23 Kadugli Training Centre


accessories :-
8.3.2.1 13 A , 3-pin switched socket out let 44 NO
8.3.2.2 16 A , 2-pin socket outlet 44 NO
8.3.2.3 1-gang, 1- way lighting switch 28 NO
8.3.2.4 1-gang, 2-way lighting switch 12 NO
8.3.2.5 Ceiling fan 56 ins. 22 NO

8.3.3 Light Fittings


work to include supply & fixing of lighting
fixtures and wire termination complete with all
necessary accessories , as per drawings,
specifications and schedule & subject to the
approval of the Engineer:-
8.3.3.1 1 x 18w IP55 weather proof outdoor type wall
24 NO
bracket lighting fixture
8.3.3.2 1 x 36w, 4ft, batten fluorescent fixture. 54 NO

8.4 Main Electrical Earthing wire


work to include fixing & termination of main
earth wire to the sub distribution board
earthing bus bar & metal enclosures & cable
armour complete as required including all
necessary accessories
NB: - Stated wire lengths are approximate,
delivery shall be after exact measurement of
length on site.
8.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 250 ML

8.5 Lightning Protection System


Supply, install & test the following lightning
protection system

8.5.1 Earthing Pits


work to include driving of earthing rods,
testing & construction of earth pits manholes
8.5.1.1 Earthing pit 1 NO
8.5.1.2 Earthing rods including earth resistance
measurement
4 NO
NB: - Number of rods depends on the soil
characteristics.
8.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
8.5.2 Air terminals for O/H water tank & Power
2 NO
House
8.5.3 20×3 mm cu. tape down conductor 180 ML
8.5.4 Fixing & clamping accessories L L
Sum Sum
8.6 Fire Fighting
Supply, install & test the following fire fighting
fixtures.
8.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
United Nations Development Programme - Sudan 17/23 Kadugli Training Centre
8.6.2 Fire fighting hose reel 30m x 25mm hose 1 NO

TOTAL BILL (8) CARRIED TO SUMMARY

BILL NO (9) - TOILET – (3 Nos.)

UNIT
ITEM DESCRIPTION QTY UNIT AMOUNT
RATE
Supply, install test commission and hand over
in good working conditions complete the
electrical system as shown on drawings,
specifications, IEE wiring regulations & as
required by Local Electrical Authorities (NEC)
for the complete project all up to the
satisfaction of the Engineer.

9.1 Lighting & Small Power

9.1.1 Electrical Points


work to include laying of conduit , installation
of boxes & wiring from the distribution board
up to the point complete with all necessary
accessories :-
9.1.1 Light points ( wiring up to the switch ) 42 NO
9.1.2 General purpose socket–outlet point 6 NO

7.2 Electrical Devices


work to include, fixing of devices and wire
termination complete with all necessary
accessories :-
9.2.1 13 A , 3-pin switched socket out let 6 NO
9.2.2 1-gang, 1- way lighting switch 6 NO
9.2.3 2-gang, 1-way lighting switch 18 NO

9.3 Light Fittings


work to include supply & fixing of lighting
fixtures and wire termination complete with all
necessary accessories , as per drawings,
specifications and schedule & subject to the
approval of the Engineer:-
9.3.1 1 x 18w IP55 weather proof outdoor type wall
18 NO
bracket lighting fixture
9.3.2 2 x 36w, 4ft, batten fluorescent fixture. 6 NO
9.3.3 1 x 18w, 2ft, batten fluorescent fixture. 24 NO

TOTAL BILL (9) CARRIED TO SUMMARY

United Nations Development Programme - Sudan 18/23 Kadugli Training Centre


BILL NO (10) - MAIN POWER SUPPLY, PUMPS, SECURITY GATE,
POWER HOUSE & SITE LIGHTING

ITEM DESCRIPTION QTY UNIT UNIT RATE AMOUNT

Supply, install test commission and hand over in


good working conditions complete the electrical
system as specifications, IEE wiring regulations,
as shown on the drawings,& as required by Local
Electrical Authorities (NEC) for the complete
project all up to the satisfaction of the Engineer.

10.1 Main Distribution Board (MDB- M) located in


power house containing :-
- 400A TPN+E copper busbars
- Main incoming 400A TP MCCB
- Multi digital meter & indication lamps
- Outgoings :-
- 1 x 400/320 A TP MCCB 1 SET
- 1 x 100/100 A TP MCCB
- 11 x 100/40 A TP MCCB
- 1 x 100/30 A TP MCCB

10.2 MCC-PUMPS, 63A main isolator, TPN+E Busbar,


containing:-
- 20A, TP, mcb, 2-nos.
- 7.5 HP, TP, ON/OFF DOL starter – 2 nos.
- 30A, TP, mcb, 1-no. 1 SET
- 10 HP, TP, ON/OFF DOL starter – 1 no.

10.3 Sub Distribution board for security gate house


as specified here under and shown on the
drawings :-
10.3.1 DB-S, 30A side entry main mcb, TPN+E,
1 NO
9-ways
10.3 Power Cables
Supply & install complete cables, for connection of
main power circuits & central AC units, water
pumps including supply of glands & lugs.
NB:- Stated cable lengths are approximate, delivery
shall be after exact measurement of cable length
on site

ITEM DESCRIPTION QTY UNIT UNIT RATE AMOUNT

10.3.1 4 c x 150 mm2 ,CU , XLPE /SWA/ PVC 50 ML


10.3.2 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 30 ML
10.3.3 4 c x 6 mm2 ,CU , XLPE /SWA/ PVC 40 ML
10.3.4 5c x 4 mm2 ,CU , FLEX/ PVC 250 ML
United Nations Development Programme - Sudan 19/23 Kadugli Training Centre
10.4 Cable Ducts & Trenches
work to include excavations, laying of pipes,
building of manholes,
10.4.1 100 mm diameter, 6-meter length pvc pipes 200 NO
10.4.2 Trench excavations as specified – Working drawings
shall be submitted for approval of dimensions 300 ML
10.4.3 Cable manhole 80 × 80 × 80 cm 17 NO

10.5 Site & Fence Lighting


10.5.1 Lighting poles points - for site lighting , work to
include erection of poles on concrete block
foundation & cable termination ,complete with all
necessary accessories :-
10.5.1.1 6 meters high galvanised steel pole fitted with
8 NO
single arm
10.5.1.2 6 meters high galvanised steel pole fitted with
2 NO
double arm
10.5.1.3 Wall mounted lighting point 9 NO
10.5.1.4 Pole mounted weather proof socket outlet point –
4 NO
at 50 cm above FFL

10.5.2 Lighting Fixtures


10.5.2.1 1 x 250 w, sodium vapour street lighting lantern IP
13 NO
54 -
10.5.2.2 1 x 26 w, IP55 weather proof wall mounted type
9 NO
lighting fixture for fence.
10.6 Security Gate & Power House

10.6.1 Electrical Points


work to include laying of conduit , installation of
boxes & wiring from the distribution board up to
the point complete with all necessary accessories :-
10.6.1.1 Light points ( wiring up to the switch ) 16 NO
10.6.1.2 General purpose socket–outlet point 6 NO
10.6.1.3 Ceiling fan point 2 NO
10.6.2 Electrical Devices
work to include, fixing of devices and wire
termination complete with all necessary
accessories :-

ITEM DESCRIPTION QTY UNIT UNIT RATE AMOUNT

10.6.2.1 13 A , 3-pin switched socket out let 3 NO


10.6.2.2 16 A , 2-pin socket outlet 3 NO
10.6.2.3 13 A , 3-pin water proof switched socket out let 4 NO
10.6.2.4 1-gang, 1- way lighting switch 2 NO
10.6.2.5 20A, TP, ON/OFF lighting switching contactor 1 NO
10.6.2.6 Ceiling fan 56 ins. 2 NO
10.6.3 Light Fittings
United Nations Development Programme - Sudan 20/23 Kadugli Training Centre
work to include supply & fixing of lighting fixtures
and wire termination complete with all necessary
accessories , as per drawings, specifications and
schedule & subject to the approval of the Engineer:-
10.6.3.1 1 x 23w IP55 weather proof outdoor type wall
8 NO
bracket lighting fixture
10.6.3.2 1 x 36w, 4ft, IP65 weather proof outdoor type
4 NO
fluorescent fixture.
10.6.3.3 1 x 36w, 4ft, batten fluorescent fixture. 2 NO
10.6.3.4 1 x 18w, 2ft, batten fluorescent fixture. 2 NO
10.7 Electrical Earthing System
Supply, install & test the following earthing system
10.7.1 Earthing Pits
work to include driving of earthing rods, testing &
construction of earth pits manholes
10.7.1.1 Earthing pit 1 NO
10.7.1.2 Earthing rods, including earth resistance
measurement
14 NO
NB: - Number of rods depends on the soil
characteristics.
10.7.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO

10.7.2 Earthing Wires


work to include fixing & termination of earth
wires to all metal enclosures ,cable armour & then
to the earthing bus bar complete as required
including all necessary accessories
NB: - Stated wire lengths are approximate, delivery
shall be after exact measurement of length on site.
10.7.2.2 1c × 70 mm2 PVC insulated (Y/G) cu. conductor 50 ML
10.7.2.3 1c × 10 mm2 PVC insulated (Y/G) cu. conductor 30 ML
10.7.2.4 1c × 6 mm2 PVC insulated (Y/G) cu. conductor 30 ML

10.8 Lightning Protection System


Supply, install & test the following lightning
protection system

ITEM DESCRIPTION QTY UNIT UNIT RATE AMOUNT

10.8.1 Earthing Pits


work to include driving of earthing rods, testing &
construction of earth pits manholes
10.8.1.1 Earthing pit 1 NO
10.8.1.2 Earthing rods including earth resistance
measurement
4 NO
NB: - Number of rods depends on the soil
characteristics.
10.8.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
10.8.2 Air terminals for O/H water tank & Power House 2 NO
10.8.3 20×3 mm cu. tape down conductor 30 ML
United Nations Development Programme - Sudan 21/23 Kadugli Training Centre
10.8.4 Fixing & clamping accessories L
L Sum
Sum
10.9 Fire Fighting
Supply, install & test the following fire fighting
fixtures.
10.9.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
10.10 Stand-By Diesel Generators:

Note:
GENERATORS ARE NOT IN CONTRACT
Supply a stand-by diesel Generators as specified
having prime rating output at site conditions.
Work to include construction of concrete
foundation & steel cage, placing of genset ,
termination of cables, installation of power cable
& earthing , supply & erection of bulk fuel tank &
piping and any other works as required :-
10.10.1 250 KVA standby / 225 KVA prime rating,
1500 r.p.m, 415/ 240V, 50 Hz, diesel, water- 2 SET NIC NIC
cooled engine, generating set.
10.10.2 Manual Change Over Switch ,4-pole,400A 1 NO
10.10.3 20000 litres. cylindrical, horizontal steel fuel
tank
work to include construction of concrete 1 NO
foundation, placing of fuel tank & piping
connections
10.10.4 Installation, Testing, Commissioning of the above as
specified at site conditions with one year JOB JOB
maintenance

TOTAL BILL (10) CARRIED TO SUMMARY

United Nations Development Programme - Sudan 22/23 Kadugli Training Centre


KADUGLI TRAINING CENTRE
ELECTRICAL INSTALLATION WORKS
COST ESTIMATE SUMMARY

COST AMOUNT
BILL NO.
IN SDG

TOTAL BILL (1) COMMON ROOM

TOTAL BILL (2) HALLS

TOTAL BILL (3) LECTURE HALL

TOTAL BILL (4) EASTERN OFICE

TOTAL BILL (5) WESTERN OFFICE

TOTAL BILL (6) RESTAURANT

TOTAL BILL (7) VIP GUEST HOUSE

TOTAL BILL (8) YOUTH DORMITORY

TOTAL BILL (9) TOILET

TOTAL BILL (10) MAIN POWER SUPPLY, PUMPS, SECURITY

GATE, POWER HOUSE & SITE LIGHTING

OVERALL TOTAL

United Nations Development Programme - Sudan 23/23 Kadugli Training Centre

Vous aimerez peut-être aussi