Diseño de Elementos (Zapatas, Viga Conexión, Vigas, Columnas, Losa).

DISEÑO DE UNA ZAPATA AISLADA EXTERIOR EJE 1-C, 6-C

DATOS:
Resistencia del terreno: σt = 0.88 Kg/cm2
Coeficiente de balasto: Ko = 5000 Tn/m3
Resistencia del concreto: f´c = 210 Kg/cm2
Resistencia del acero: fy = 4200 Kg/cm2
SobreCarga S/C = 250 Kg/m2
Peso esp. Prom de relleno : γm= 1.5 Tn/m3
COLUMNA: b = 0.60 m l = 0.60 m NPT = 0.15
CARGAS DE GRAVEDAD: NTN = 0.00
PD = 14.88 Tn
PL = 0.82 Tn
MDX = 0.29 Tn-m horario
MLX = 0.05 Tn-m horario 1.20 m
MDY = 0.37 Tn-m horario
MLY = 0.13 Tn-m horario

CARGAS DE SISMO:
PSX = 0.00 Tn
PSY = 0.00 Tn
MSX = 0.00 Tn-m horario
MSY = 0.00 Tn-m horario

SOLUCION:
l
1.- ESFUERZO NETO0 DEL SUELO:
σ N = σt-S/C-(Df+NPT)*γm b
B
σ N = 6.53 Tn/m2

2.- DIMENSIONAMIENTO EN PLANTA: L


AZ = (PD+PL)/σN
AZ = 2.41 m2

Incrementamos AZ en 15% por acción de momentos:


AZ = 2.77 m2

Dimensiones de la zapata: Adoptamos:


L = 1.66 m
B = 1.66 m L = 1.70 m
B = 1.70 m

3.- VERIFICACION DE PRESIONES:


Presiones considerando unicamente cargas de gravedad: Ps 6Mx 6My
i   
L * B B * L2 B 2 * L
σ1 = 6.458 Tn/m2 6.4583757 -1.02%
AZ = 2.86 m2

Dimensiones de la zapata:
L = 1.69 m Adoptamos:
B = 1.69 m
L = 2.00 m
B = 2.00 m
SECCION FINAL:
L = 1.70 m
B = 1.70 m
Luego:
Presiones considerando cargas de gravedad
σmáx = 6.458 Tn/m2 OK CORRECTO
σmín = 4.407 Tn/m2 OK CORRECTO

Presiones considerando cargas de gravedad + sismo longitudinal (direccion X-X)


σmáx = 6.458 Tn/m2 OK CORRECTO
σmín = 4.407 Tn/m2 OK CORRECTO

Presiones considerando cargas de gravedad + sismo longitudinal (direccion Y-Y)


σmáx = 6.458 Tn/m2 OK CORRECTO
σmín = 4.407 Tn/m2 OK CORRECTO

4.- PRESIONES AMPLIFICADAS Y PRESION DE DISEÑO:

Presiones considerando cargas de gravedad


σmáx = 9.193 Tn/m2

Presiones considerando cargas de gravedad + sismo longitudinal (direccion X-X)


σmáx = 8.073 Tn/m2

Presiones considerando cargas de gravedad + sismo longitudinal (direccion Y-Y)


σmáx = 8.073 Tn/m2

PRESION ULTIMA DE DISEÑO: σu = 9.193 Tn/m2

σu = 9.19 Tn/m2

5.- VERIFICACION POR ESFUERZO CORTANTE:

Ld = 0.08*φb *fy/(f´c^0.5) φb = 1.27 cm


Ld = 29.45 cm fy = 4200 Kg/cm2
f´c = 210 Kg/cm2
rec = 7.50 cm

h = Ld+rec+φb
h = 0.40 m

Por rigidez:
h1 = 0.46 m VERIFICA
VERIFICAR
h = 0.50 m
h2 = 0.36 m R
R

VERIFICACION POR CORTANTE COMO VIGA:


DIRECCION X-X

0.60 m
db = 1" = 1.27cm
42.365 cm 67.635 cm d = 42.365 cm

0.50 m d = 42.365 cm

σu = 9.19 Tn/m2
1.70 m
Vu = σu *X*B φVc = 0.85*0.53*f´c^0.5*B*d
Vu = 10.57 Tn φVc = 47.02 Tn
Vu < φVc OK CORRECTO

DIRECCION Y - Y

0.60 m

db = 1" = 1.27cm
13.905 cm 41.095 cm d = 41.095 cm

d = 41.095 cm 0.50 m

σu = 9.19 Tn/m2
1.70 m

Vu = σu *X*B φVc = 0.85*0.53*f´c^0.5*B*d


Vu = 2.17 Tn φVc = 45.61 Tn
Vu < φVc OK CORRECTO

VERIFICACION POR CORTANTE POR PUNZONAMIENTO:


m

n 0.60 m
d/2
B = 1.70m
0.60 md/2

L = 1.70 m

m = 81.183 cm
n = 80.548 cm
bo = 2(m+n) = 323.46 cm
Ao = m*n = 6539.05 cm2
βo = l/b = 1.00

Cortante actuante por punzonamiento:


Pu = 22.23 Tn
Area = 2.89 cm2
σu = 7.69 Tn/m2
Vup = Pu-σu*Ao = 17.20 Tn

Cortante actuante por el concreto:


βc = l/b <2 = 1.00 OK CORRECTO
φVcp = φ*1.1*f´c^0.5*bo*d 158.92 Tn

Vup < φVcp OK CORRECTO

6.- DISEÑO POR FLEXION:

DIRECCION X-X

1.00 m

1.70 m

σu = 9.19 Tn/m2

1.70 m

d = 42.365 cm
Wu = 15.63 Tn/m
Mu = 7.81 Tn-m

a1 = d/5 = 8.47 cm As = 5.42 cm2


a2 = 0.750 cm As = 4.92 cm2
a3 = 0.681 cm As = 4.92 cm2
a4 = 0.681 cm As = 4.92 cm2

As mín = 12.964 cm2

As > Asmín usar Asmín

Ø 3/8'' Ø 1/2'' Ø 5/8'' AREA cm2


11 13.30

Nº varillas 10.5
Usar : Ø 1/2'' s = 16.250 cm
Diametro 1.27

DIRECCION Y-Y

1.00 m

1.70 m

σu = 9.19 Tn/m2
1.70 m

d = 41.095 cm
Wu = 15.63 Tn/m
Mu = 7.81 Tn-m

a1 = d/5 = 8.22 cm As = 5.59 cm2


a2 = 0.774 cm As = 5.08 cm2
a3 = 0.703 cm As = 5.07 cm2
a4 = 0.702 cm As = 5.07 cm2

As mín = 12.575 cm2

As > Asmín usar Asmín

Ø 3/8'' Ø 1/2'' Ø 5/8'' AREA cm2


10 12.67

Nº varillas 10
Usar : Ø 1/2'' s = 16.500 cm
Diametro 1.27

6.- VERIFICACION POR APLASTAMIENTO:

faplast = (1.4PD+1.7PL)/(l*b) = 6.17 Kg/cm2

Acontacto / Azapata Ac / Az = 0.125


Ac / Az < 1/3 OK CORRECTO

fu,ap = 0.710*f´c = 149.10 Kg/cm2

fu,ap > faplast OK CORRECTO


7.- ESQUEMA FINAL:

1.70 m

1.70 m

1Ø1/2@17cm

1 Ø1/2@17cm

1Ø1/2@17cm

. . . . . . . . .

1 Ø1/2@17cm
DISEÑO DE UNA ZAPATA AISLADA EXTERIOR EJE 1-B Y 12-B

DATOS:
Resistencia del terreno: σt = 0.88 Kg/cm2
Coeficiente de balasto: Ko = 5000 Tn/m3
Resistencia del concreto: f´c = 210 Kg/cm2
Resistencia del acero: fy = 4200 Kg/cm2
SobreCarga S/C = 250 Kg/m2
Peso esp. Prom de relleno : γm= 1.5 Tn/m3
COLUMNA: b = 0.45 m l = 0.45 m NPT = 0.25
CARGAS DE GRAVEDAD: NTN = 0.00
PD = 14.88 Tn dos direcciones
PL = 0.82 Tn dos direcciones
MDX = 0.29 Tn-m horario
MLX = 0.05 Tn-m horario 1.50 m
MDY = 0.37 Tn-m horario
MLY = 0.13 Tn-m horario

CARGAS DE SISMO:
PSX = 0.00 Tn
PSY = 0.00 Tn
MSX = 0.00 Tn-m horario
MSY = 0.00 Tn-m horario

SOLUCION:

1.- ESFUERZO NETO0 DEL SUELO:


σ N = σt-S/C-(Df+NPT)*γm
σ N = 5.93 Tn/m2
B
2.- DIMENSIONAMIENTO EN PLANTA:
AZ = (PD+PL)/σN
AZ = 2.65 m2
L
Incrementamos AZ en 15% por acción de momentos:
AZ = 3.05 m2

Dimensiones de la zapata: B = 1.75L Adoptamos:


L = 1.32 m
B = 2.31 m L = 1.40 m
B = 2.40 m

3.- VERIFICACION DE PRESIONES:


Presiones considerando unicamente cargas de gravedad: Ps 6Mx 6My
i   2
 2
L*B B*L B *L

σ1 = 5.478 Tn/m2 5.4783163 -7.54%


AZ = 3.11 m2

Dimensiones de la zapata:
L = 1.33 m Adoptamos:
B = 2.33 m
L = 1.40 m
B = 2.40 m
SECCION FINAL:
L = 1.40 m
B = 2.40 m
Luego:
Presiones considerando cargas de gravedad
σmáx = 5.478 Tn/m2 OK CORRECTO
σmín = 3.867 Tn/m2 OK CORRECTO

Presiones considerando cargas de gravedad + sismo longitudinal (direccion X-X)


σmáx = 5.478 Tn/m2 OK CORRECTO
σmín = 3.867 Tn/m2 OK CORRECTO

Presiones considerando cargas de gravedad + sismo longitudinal (direccion Y-Y)


σmáx = 5.478 Tn/m2 OK CORRECTO
σmín = 3.867 Tn/m2 OK CORRECTO

4.- PRESIONES AMPLIFICADAS Y PRESION DE DISEÑO:

Presiones considerando cargas de gravedad


σmáx = 7.791 Tn/m2

Presiones considerando cargas de gravedad + sismo longitudinal (direccion X-X)


σmáx = 6.848 Tn/m2

Presiones considerando cargas de gravedad + sismo longitudinal (direccion Y-Y)


σmáx = 6.848 Tn/m2

PRESION ULTIMA DE DISEÑO: σu = 7.791 Tn/m2

σu = 7.79 Tn/m2

5.- VERIFICACION POR ESFUERZO CORTANTE:

Ld = 0.08*φb *fy/(f´c^0.5) φb = 1.27 cm


Ld = 29.45 cm fy = 4200 Kg/cm2
f´c = 210 Kg/cm2
rec = 7.50 cm

h = Ld+rec+φb
h = 0.40 m

Por rigidez:
h1 = 0.46 m
h = 0.50 m
h2 = 0.36 m
VERIFICACION POR CORTANTE COMO VIGA:
DIRECCION X-X

0.45 m
db = 1" = 1.27cm
42.365 cm 52.635 cm d = 42.365 cm

0.50 m d = 42.365 cm

σu = 7.79 Tn/m2
1.40 m
Vu = σu *X*B φVc = 0.85*0.53*f´c^0.5*B*d
Vu = 5.74 Tn φVc = 38.72 Tn
Vu < φVc OK CORRECTO

DIRECCION Y - Y

0.45 m
db = 1" = 1.27cm
41.095 cm 56.405 cm d = 41.095 cm

0.50 m d = 41.095 cm

σu = 7.79 Tn/m2
2.40 m

Vu = σu *X*B φVc = 0.85*0.53*f´c^0.5*B*d


Vu = 10.55 Tn φVc = 64.39 Tn
Vu < φVc OK CORRECTO

VERIFICACION POR CORTANTE POR PUNZONAMIENTO:

m
d/2

n 0.45 m B = 2.40m

d/2
d/2
0.45 m

L = 1.40 m
m= 66.183 cm
n= 86.095 cm
bo = 2(m+n) = 304.56 cm
Ao = m*n = 5697.98 cm2
βo = l/b = 1.00
Cortante actuante por punzonamiento:
Pu = 22.23 Tn
Area = 3.36 cm2
σu = 6.61 Tn/m2
Vup = Pu-σu*Ao = 18.46 Tn

Cortante actuante por el concreto:


βc = l/b <2 = 1.00
φVcp = φ*1.1*f´c^0.5*bo*d 149.63 Tn

Vup < φVcp OK CORRECTO

6.- DISEÑO POR FLEXION:

DIRECCION X-X

1.00 m

2.40 m

σu = 7.79 Tn/m2

1.40 m

d = 42.365 cm
Wu = 18.70 Tn/m
Mu = 9.35 Tn-m

a1 = d/5 = 8.47 cm As = 6.49 cm2


a2 = 0.636 cm As = 5.88 cm2
a3 = 0.577 cm As = 5.88 cm2
a4 = 0.576 cm As = 5.88 cm2

As mín = 10.676 cm2

As > Asmín usar Asmín

Ø 3/8'' Ø 1/2'' Ø 5/8'' AREA cm2


9 11.40

Nº varillas 9
Usar : Ø 1/2'' s = 15.550 cm
Diametro 1.27
DIRECCION Y-Y

1.00 m

1.40 m

σu = 7.79 Tn/m2

2.40 m

d = 41.095 cm
Wu = 10.91 Tn/m
Mu = 5.45 Tn-m

a1 = d/5 = 8.22 cm As = 3.90 cm2


a2 = 0.382 cm As = 3.53 cm2
a3 = 0.346 cm As = 3.53 cm2
a4 = 0.346 cm As = 3.53 cm2

As mín = 17.753 cm2

As > Asmín usar Asmín

Ø 3/8'' Ø 1/2'' Ø 5/8'' AREA cm2


14 17.73

Nº varillas 14
Usar : Ø 1/2'' s = 17.250 cm
Diametro 1.27

6.- VERIFICACION POR APLASTAMIENTO:

faplast = (1.4PD+1.7PL)/(l*b) = 10.98 Kg/cm2

Acontacto / Azapata Ac / Az = 0.060


Ac / Az < 1/3 OK CORRECTO

fu,ap = 0.710*f´c = 149.10 Kg/cm2

fu,ap > faplast OK CORRECTO


7.- ESQUEMA FINAL:

1.40 m

2.40 m

1 Ø1/2@16cm

1Ø1/2@18cm

1 Ø1/2@16cm

. . . . . . . . .

1Ø1/2@18cm
DISEÑO DE UNA ZAPATA AISLADA EXTERIOR EJE 1-C Y 12-C

DATOS:
Resistencia del terreno: σt = 0.85 Kg/cm2
Coeficiente de balasto: Ko = 5000 Tn/m3
Resistencia del concreto: f´c = 210 Kg/cm2
Resistencia del acero: fy = 4200 Kg/cm2
SobreCarga S/C = 250 Kg/m2
Peso esp. Prom de relleno : γm= 1.6 Tn/m3
COLUMNA: b = 0.60 m l = 0.25 m NPT = 0.25
CARGAS DE GRAVEDAD: NTN = 0.00
PD = 28.95 Tn dos direcciones
PL = 4.14 Tn dos direcciones
MDX = 0.66 Tn-m horario
MLX = 0.18 Tn-m horario 1.20 m
MDY = 0.73 Tn-m horario
MLY = 0.41 Tn-m horario

CARGAS DE SISMO:
PSX = 0.00 Tn
PSY = 0.00 Tn
MSX = 0.00 Tn-m horario
MSY = 0.00 Tn-m horario

SOLUCION:

1.- ESFUERZO NETO0 DEL SUELO:


σ N = σt-S/C-(Df+NPT)*γm
σ N = 5.93 Tn/m2
B
2.- DIMENSIONAMIENTO EN PLANTA:
AZ = (PD+PL)/σN
AZ = 5.58 m2
L
Incrementamos AZ en 15% por acción de momentos:
AZ = 6.42 m2

Dimensiones de la zapata: B = 1.75L Adoptamos:


L = 1.91 m
B = 3.35 m L = 2.00 m
B = 3.40 m

3.- VERIFICACION DE PRESIONES:


Presiones considerando unicamente cargas de gravedad: Ps 6Mx 6My
i   
L * B B * L2 B 2 * L

σ1 = 5.533 Tn/m2 5.5326125 -6.70%


AZ = 6.34 m2

Dimensiones de la zapata:
L = 1.90 m Adoptamos:
B = 3.33 m
L = 2.00 m
B = 3.40 m
SECCION FINAL:
L = 2.00 m
B = 3.40 m
Luego:
Presiones considerando cargas de gravedad
σmáx = 5.533 Tn/m2 OK CORRECTO
σmín = 4.200 Tn/m2 OK CORRECTO

Presiones considerando cargas de gravedad + sismo longitudinal (direccion X-X)


σmáx = 5.533 Tn/m2 OK CORRECTO
σmín = 4.200 Tn/m2 OK CORRECTO

Presiones considerando cargas de gravedad + sismo longitudinal (direccion Y-Y)


σmáx = 5.533 Tn/m2 OK CORRECTO
σmín = 4.200 Tn/m2 OK CORRECTO

4.- PRESIONES AMPLIFICADAS Y PRESION DE DISEÑO:

Presiones considerando cargas de gravedad


σmáx = 7.984 Tn/m2

Presiones considerando cargas de gravedad + sismo longitudinal (direccion X-X)


σmáx = 6.916 Tn/m2

Presiones considerando cargas de gravedad + sismo longitudinal (direccion Y-Y)


σmáx = 6.916 Tn/m2

PRESION ULTIMA DE DISEÑO: σu = 7.984 Tn/m2

σu = 7.98 Tn/m2

5.- VERIFICACION POR ESFUERZO CORTANTE:

Ld = 0.08*φb *fy/(f´c^0.5) φb = 1.27 cm


Ld = 29.45 cm fy = 4200 Kg/cm2
f´c = 210 Kg/cm2
rec = 7.50 cm

h = Ld+rec+φb
h = 0.40 m

Por rigidez:
h1 = 0.46 m
h = 0.50 m
h2 = 0.36 m
VERIFICACION POR CORTANTE COMO VIGA:
DIRECCION X-X

0.25 m
db = 1" = 1.27cm
42.365 cm 132.635 cm d = 42.365 cm

0.50 m d = 42.365 cm

σu = 7.98 Tn/m2
2.00 m
Vu = σu *X*B φVc = 0.85*0.53*f´c^0.5*B*d
Vu = 21.18 Tn φVc = 55.31 Tn
Vu < φVc OK CORRECTO

DIRECCION Y - Y

0.60 m
db = 1" = 1.27cm
41.095 cm 98.905 cm d = 41.095 cm

0.50 m d = 41.095 cm

σu = 7.98 Tn/m2
3.40 m

Vu = σu *X*B φVc = 0.85*0.53*f´c^0.5*B*d


Vu = 26.85 Tn φVc = 91.22 Tn
Vu < φVc OK CORRECTO

VERIFICACION POR CORTANTE POR PUNZONAMIENTO:

m
d/2

n 0.60 m B = 3.40m

d/2
d/2
0.25 m

L = 2.00 m
m= 46.183 cm
n= 101.095 cm
bo = 2(m+n) = 294.56 cm
Ao = m*n = 4668.82 cm2
βo = l/b = 2.40
Cortante actuante por punzonamiento:
Pu = 47.57 Tn
Area = 6.80 cm2
σu = 7.00 Tn/m2
Vup = Pu-σu*Ao = 44.30 Tn

Cortante actuante por el concreto:


βc = l/b <2 = 2.40
φVcp = φ*1.1*f´c^0.5*bo*d 144.72 Tn

Vup < φVcp OK CORRECTO

6.- DISEÑO POR FLEXION:

DIRECCION X-X

1.00 m

3.40 m

σu = 7.98 Tn/m2

2.00 m

d = 42.365 cm
Wu = 27.15 Tn/m
Mu = 13.57 Tn-m

a1 = d/5 = 8.47 cm As = 9.42 cm2


a2 = 0.652 cm As = 8.54 cm2
a3 = 0.591 cm As = 8.54 cm2
a4 = 0.591 cm As = 8.54 cm2

As mín = 15.251 cm2

As > Asmín usar Asmín

Ø 3/8'' Ø 1/2'' Ø 5/8'' AREA cm2


12 15.20

Nº varillas 12
Usar : Ø 1/2'' s = 16.750 cm
Diametro 1.27
DIRECCION Y-Y

1.00 m

2.00 m

σu = 7.98 Tn/m2

3.40 m

d = 41.095 cm
Wu = 15.97 Tn/m
Mu = 7.98 Tn-m

a1 = d/5 = 8.22 cm As = 5.71 cm2


a2 = 0.395 cm As = 5.16 cm2
a3 = 0.357 cm As = 5.16 cm2
a4 = 0.357 cm As = 5.16 cm2

As mín = 25.150 cm2

As > Asmín usar Asmín

Ø 3/8'' Ø 1/2'' Ø 5/8'' AREA cm2


20 25.34

Nº varillas 20
Usar : Ø 1/2'' s = 17.050 cm
Diametro 1.27

6.- VERIFICACION POR APLASTAMIENTO:

faplast = (1.4PD+1.7PL)/(l*b) = 31.71 Kg/cm2

Acontacto / Azapata Ac / Az = 0.022


Ac / Az < 1/3 OK CORRECTO

fu,ap = 0.710*f´c = 149.10 Kg/cm2

fu,ap > faplast OK CORRECTO


7.- ESQUEMA FINAL:

2.00 m

3.40 m

1 Ø1/2@17cm

1Ø1/2@18cm

1 Ø1/2@17cm

. . . . . . . . .

1Ø1/2@18cm
COLUMNA C-1
Pu = 58.08Tn e/h 400 Codigo 5/8'' 1/2'' Area di
Mux = 0.15Tn-m ey = 0.26 cm 0.01 As1 2 Vari. 4 Vari. 9.026 cm2 5.75 cm
Muy = 1.29Tn-m ex = 2.22 cm 0.03 As2 2 Vari. 4 Vari. 9.026 cm2 16.92 cm
6.6325 350 As3 2 Vari. 3.959 cm2 28.08 cm
h= 45 cm 1.2987 As4 2 Vari. 3.959 cm2 39.25 cm
b= 80 cm 54.27805605 As5 0.000 cm2 50.42 cm
b/h= 1.778 300 As6 0.000 cm2 61.59 cm
FUERZAS ACTUANTES As7 0.000 cm2 72.76 cm
PU MU As8 0.000 cm2 83.93 cm
250
0 0 As9 0.000 cm2 95.10 cm
58.076 1.30Tn-m As10 0.000 cm2 106.27 cm
Ag = 3600 cm2 200 As11 0.000 cm2 117.44 cm
Ac = 3574 cm2 As12 0.000 cm2 128.61 cm
0.1 F'c Ag = 75.6 #¡DIV/0! As13 0.000 cm2 139.78 cm
Ec= 217370.6512 150 As14 0.000 cm2 150.95 cm
Carga Tn

ACERO As15 0.000 cm2 162.11 cm


εy = 0.00200 As16 0.000 cm2 173.28 cm
Fy = 4200.00 Kg/cm2 100 As17 0.000 cm2 184.45 cm
Ey = 2100000 As18 0.000 cm2 195.62 cm
F'c = 210.00 Kg/cm2 As19 0.000 cm2 206.79 cm
50
Nº capas = 4 As20 0.000 cm2 217.96 cm
Recub = 4.0 cm Ast = 25.969 cm2
Φ□ = 3/8 0 ρ actual = 0.72%
h/2 = 22.5 cm -10 10 30
sep v ert= 13.7 cm
sep hori= 9.2 cm -50

-100

-150

Nominal Pn max Momento Tn-m Diseno= Fi*Mn Pu max

balanceada e/h=0.1 Carga Evaluar Series8


COLUMNA C-2
Pu = 20.98Tn e/h 400 Codigo 5/8'' 1/2'' Area di
Mux = 0.15Tn-m ey = 0.72 cm 0.03 As1 3 Vari. 5.938 cm2 5.75 cm
Muy = 0.02Tn-m ex = 0.10 cm 0.00 As2 2 Vari. 2.534 cm2 9.12 cm
82.4054 350 As3 2 Vari. 2.534 cm2 12.50 cm
h= 25 cm 0.1513 As4 2 Vari. 2.534 cm2 15.88 cm
b= 60 cm 4.368648043 As5 3 Vari. 5.938 cm2 19.25 cm
b/h= 2.400 300 As6 0.000 cm2 22.63 cm
FUERZAS ACTUANTES As7 0.000 cm2 26.01 cm
PU MU As8 0.000 cm2 29.38 cm
250
0 0 As9 0.000 cm2 32.76 cm
20.978 0.15Tn-m As10 0.000 cm2 36.14 cm
Ag = 1500 cm2 200 As11 0.000 cm2 39.52 cm
Ac = 1481 cm2 As12 0.000 cm2 42.89 cm
0.1 F'c Ag = 31.5 #¡DIV/0! As13 0.000 cm2 46.27 cm
Ec= 217370.6512 150 As14 0.000 cm2 49.65 cm
Carga Tn

ACERO As15 0.000 cm2 53.02 cm


εy = 0.00200 As16 0.000 cm2 56.40 cm
Fy = 4200.00 Kg/cm2 100 As17 0.000 cm2 59.78 cm
Ey = 2100000 As18 0.000 cm2 63.15 cm
F'c = 210.00 Kg/cm2 As19 0.000 cm2 66.53 cm
50
Nº capas = 5 As20 0.000 cm2 69.91 cm
Recub = 4.0 cm Ast = 19.477 cm2
Φ□ = 3/8 0 ρ actual = 1.30%
h/2 = 12.5 cm -10 10 30
sep v ert= 24.3 cm
sep hori= 1.4 cm -50

-100

-150

Nominal Pn max Momento Tn-m Diseno= Fi*Mn Pu max

balanceada e/h=0.1 Carga Evaluar Series8


DISEÑO DE VP-101:

MOMENTOS SEGÚN COMB 02:

Diseño para ambas Vigas principales:

As 5/8” = 1.98 cm2

As 3/4“ = 2.65 cm2


DISEÑO DE LA LOSA ALIGERADA

PREDIMENSIONADO DE LA LOSA
En losas aligeradas continuas conformadas por viguetas de 10 cm de ancho, bloques de ladrillo de 30 cm.
de ancho y losa superior de 5 cm, con sobrecarga menor a 300 kg/m2 y luces menores a 7.5 m se cumple que:
h > = L / 25
En este proyecto Lmax. = 4.00
asumimos
Peralte de la losa = L = 4.00 = 0.16 <> 0.20 m.
25 25.00

METRADO DE CARGAS
Peso de Losa Aligerada 350 kg/m2
Piso Terminado + Cielo Raso 50 kg/m2
Tabiquería 0 kg/m2
D= 400 kg/m2

Sobrecargas L= 250 kg/m2

Wu = 1.5 D + 1.8 L Wu = 1050 kg/m2


Wu' = Wu * 1 m Wu' = 1050 kg/m
Wu'' = Wu / 2.5 Wu'' = 420 kg/m

CALCULO DE MOMENTOS USANDO COEFICIENTES ACI


Requisitos
Numero de tramos 2 ¡OK!,cumple TRAMO SIMETRICO
Diferencia entre tramos(%) 0.00 ¡OK!,cumple
Carga uniforme (cumple)
Carga Viva <= 3 Carga Muerta ¡OK!,cumple

MODULO

w l2 w l2 w l2 w l2
24 9 9 24

w l2 w l2
14 14

3.08 3.08
L= 3.08

1.- M (-) = w L2 = 442.70 kg-m 4.- M (-) = w L2 = 442.70 kg-m


9 9
2.- M(-) = w L2 = 166.01 kg-m 5.- M(-) = w L2 = 166.01 kg-m
24 24
3.- M (+) = w L2 = 284.59 kg-m 6.- M (+) = w L2 = 284.59 kg-m
14 14
CALCULO DEL ACERO

a = As * fy La = 12*d*b ó d As = Mu (kg-cm)
0.85 * f'c * b ø * fy * (d - a/2)

peralte h= 0.20 m. F'c = 210 Kg / cm2


recubrimiento r= 0.02 m.
d= 0.17 m. Fy = 4200 Kg / cm2
PRIMER TRAMO
Mto. As a As a As Cuantía N° varillas Usar Ø" La=12*d*b La=d La (mayor)
1 0.69 1.62 0.72 1.70 0.73 0.004 1 1/2 0.15 0.17 0.22
2 0.26 0.61 0.26 0.62 0.26 0.002 1 1/2 0.15 0.17 0.22
3 0.44 1.04 0.46 1.08 0.46 0.003 1 1/2 0.15 0.17 0.22

SEGUNDO TRAMO
Mto. As a As a As Cuantía N° varillas Usar Ø" La=12*d*b La=d La (mayor)
1 0.69 1.62 0.72 1.70 0.73 0.004 1 1/2 0.15 0.17 0.22
2 0.26 0.61 0.26 0.62 0.26 0.002 1 1/2 0.15 0.17 0.22
3 0.44 1.04 0.46 1.08 0.46 0.003 1 1/2 0.15 0.17 0.22

DISEÑO POR CORTANTE


PRIMER TRAMO
V1 V2 Vu Vc
646.8 743.82 672.42 1109.822

SEGUNDO TRAMO
V1 V2 Vu Vc
646.8 743.82 672.42 1109.8

Como Vu < Vc entonces NO necesita ensanche de viguetas

CALCULO DEL ACERO DE TEMPERATURA

Ast =0.0018*b*h Sep = As var usar * 1m


As requerido

2
Ast = 0.90 cm Sep = 0.36 m.

USAR 1 Ø 1/4" cada 0.35m.


VIGA DE CONEXIÓN VC- 01

Datos de Diseño:
PD1 = 16.95 tn (Carga muerta en la columna 1)
PL1 = 2.15 tn (Carga viva en la columna 1)
L= 4.00 m (Longitud entre ejes de columnas)
Df = 1.20 m (Profundidad de Cimentacion)
hpiso = 0.15 m (Altura de Piso)
t = 0.88 kg/cm² (Esfuerzo permisible del terreno)
gm = 1.50 t/m³ (Peso especifico promedio del relleno)
S/Cpiso = 250.00 kg/m² (Sobrecarga de Piso)
f'c = 210.00 kg/cm² (Resistencia cilindrica del concreto)
fy = 4200.00 kg/cm² (Esfuerzo de Fluencia del acero)

De la columna:
S1 = 0.60 m
T1 = 0.60 m
S2 = 0.80 m
T2 = 0.50 m

S1 S2

A1 =2B1 T1 b T2 A2

B2

B1 PLANTA

S1 S2

P1 P2
h = L/7
M

R1 R2
L

ELEVACION

I. Dimensionamiento de la zapata externa (A1*B1):

1. Esfuerzo Neto del Terreno:

n = t - gm*Df - S/C piso


n = 7.65 t/m²
2. Calculo del Peso Total de la columna 1 (Incluido Peso de Zapata)

P1t = P1 + 0.15P1
P1t = 21.97 tn

3. Area de Zapata Requerida (Azap):

Azap = P1t/n
Azap = 2.87 m²

4. Hallamos B1:

Azap = A1 * B1
Azap = 2B1 * B1
B1 = (Azap/2)
B1 = 1.475 m

II. Dimensionamiento de la viga de conexión:

5. Peralte y ancho de viga:


5.1 Peralte de la viga (h):
h= L/7
h= 0.57 m
h= 0.60 m ADOPTAMOS

5.2 Ancho de la viga (b):


b = Ln/20 = 0.15 m ; Ln = Luz libre entre columnas
b = P1/31L = 0.15 m
bmin = 25 cm = 0.25 m

 b= 0.25 m ADOPTAMOS

6. Calculo del peso propio de la viga de conexión (wvc):

wvc = 2.4*b*h
wvc = 0.36 tn / m

7. Idealizacion de la estructura:
L

w vc
P1 P2

2
(S1)/2

(B1)/2 R1 m = L + (S1)/2 - (B1)/2

Tomando momento con respecto al punto 2:

R1 = (P1xL + wvc(L - S1/2)²/2) / m


R1 = 15.66 tn

8. Calculo de A1:

A1 = R1t/(n*B1)
A1 = 1.40 m OK
III. Diseño de la viga de conexión:

9. Magnificando las cargas

P1u = 1.5PD1 + 1.8PL1


P1u = 29.295 tn

wvcu = 1.5wvc
wvcu = 0.54 tn / m

Tomando momentos con respecto al punto 2:

R1 = (P1uxL + wvcu(L - S1/2)²/2) / m


R1 = 33.93 tn

10. Calculo de la reaccion neta ultima del suelo, como carga uniformemente repartida:

qu1 = R1u / B1
qu1 = 23.00 tn/m

11. Determinacion de los diagramas de cortantes y momentos:

P1u/S1

w vcu P2u

B1 L1

0.60 m

4.16 tn
X
1.53 tn

-15.49 tn

1.48 m 2.83 m

Mu max = 9.99 tn - m
max (d ,12db)

S1 Y

12. Hallamos "X", el punto de cortante cero y mmento maximo:

X = (P1u - wvcu*S1)/(qu1 - wvcu)


X= 1.29 m

13. Momento maximo en la viga:

Mu max = qu1*X²/2 - Pu1( X - S1/2) - wvcu( X - S1)²/2


Mu max = 9.99 tn - m

14. Calculo de Area de Acero:

Acero en la Fibra Superior:

As = Mu / [0.9*fy*(d-a/2)] ; a= 0.2d
As = Mu / [0.9*fy*0.9d] d - a/2 = 0.9d
As = 5.34 cm²

a = As*fy / (0.85*f'c*B)
a= 3.03 cm

As = Mu / [0.9*fy*(d-a/2)]
As = 3.49 cm²

a = As*fy / (0.85*f'c*B)
a= 3.29 cm

As = 3.49 cm² Utilizar As min

Calculo del acero minimo:

As min = 14*b*d / fy
As min = 3.58 cm²

 As = 3.58 cm²

2 Ø 5/8'' = 4.00 cm²


4.00 cm²

Usar: 2 Ø 5/8''

Acero en la Fibra Inferior:

Se distribuira acero minimo en la parte inferior de la viga para resistir los esfuerzos que se
puidieran producir por acentamientos diferenciales.

As' min = 14*b*d / fy ; As' min = 0.8*raiz(f'c)*b*d/fy


As' min = 3.58 cm² As' min = 3.80 cm²

Sin embargo, no sera menor que un tercio del refuerzo en la parte superior (As/3 > As min):

As/3 = 1.16 cm²

 As' = 3.80 cm²

2 Ø 5/8'' = 4.00 cm²


4.00 cm²

Usar: 2 Ø 5/8''
15. Calculo del Acero Transversal (Ast):

El momento flector y la fuerza cortante amplificados son:

Mu = P1u*e
Mu = 12.82 tn - m

Vu = Mu / ( L-e )
Vu = 3.60 tn

La resistencia al corte aportada por el concreto es:

ØVc = 0.75*0.53*raiz(f'c)*b*d
ØVc = 7.92 tn CONFORME

ØVc > Vu

Se colocaran estribos minimos a todo lo largo de la viga para absorver los esfuerzos que se
puedan presentar por asentamientos diferenciales

Usar : 1 Ø 3/8: 1 @ .05m, 3@.15m, 4@.20, resto @ .25m

DETALLE DE LA POSICION DEL ACERO EN LA VIGA DE CONEXIÓN

0.60 m 0.80 m
+ 2 Ø 5/8''
Y = 1.45 m

0.60 m

+ 2 Ø 5/8''

ELEVACION

Vous aimerez peut-être aussi