Vous êtes sur la page 1sur 122

REPUBLIC OF INDONESIA

MINISTRY OF PUBLIC WORKS


DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYSIS AGGREGATE


Date : 17-Feb-10
Kind of Material : 10 ~ 30 mm
Total : 1854.2 Gram Total : 1795.1 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 0 0 100 1½ 0 0 100
1" 340.9 18.4 81.6 1" 525.2 29.3 70.7
3/4" 1287.3 69.4 30.6 3/4" 1291.4 71.9 28.1
1/2 " 1739.3 93.8 6.2 1/2 " 1682.0 93.7 6.3
3/8 " 1817.1 98.0 2.0 3/8 " 1743.4 97.1 2.9
# 4. 1841.0 99.3 0.7 # 4. 1784.4 99.4 0.6
# 8. 1841.4 99.3 0.7 # 8. 1784.9 99.4 0.6
# 16. 1841.8 99.3 0.7 # 16. 1785.5 99.5 0.5
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.

Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYSIS AGGREGATE


Date : 17-Feb-10
Kind of Material : 10 ~ 30 mm
Total : 1982.6 Gram Total : 1853.5 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 0 0 100 1½ 0 0 100
1" 596 30.1 69.9 1" 294.9 15.9 84.1
3/4" 1266.2 63.9 36.1 3/4" 1180.4 63.7 36.3
1/2 " 1822.6 91.9 8.1 1/2 " 1722.4 92.9 7.1
3/8 " 1921.8 96.9 3.1 3/8 " 1810.3 97.7 2.3
# 4. 1961.6 98.9 1.1 # 4. 1838.6 99.2 0.8
# 8. 1963.9 99.1 0.9 # 8. 1839.2 99.2 0.8
# 16. 1964.5 99.1 0.9 # 16. 1840.0 99.3 0.7
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.

Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYSIS AGGREGATE


Date : 13-Feb-10
Kind of Material : 10 ~ 15 mm
Total : 1506.1 Gram Total : 1509.1 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 0 0 100 100 1½ 0 0 100
1" 0 0 100 100 1" 0 0 100
3/4" 0 0 100 100 3/4" 0 0 100
1/2 " 299.0 19.9 80.1 79.4 1/2 " 322.2 21.4 78.6
3/8 " 1148.4 76.2 23.8 24.2 3/8 " 1136.8 75.3 24.7
# 4. 1493.5 99.2 0.8 0.7 # 4. 1501.7 99.5 0.5
# 8. 1494.8 99.2 0.8 0.6 # 8. 1502.4 99.6 0.4
# 16. 1495.3 99.3 0.7 0.6 # 16. 1502.7 99.6 0.4
# 30. 1495.6 99.3 0.7 0.5 # 30. 1503.9 99.7 0.3
# 50. # 50.
# 100. # 100.
# 200. # 200.

Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYSIS AGGREGATE


Date : 13-Feb-10
Kind of Material : 10 ~ 15 mm
Total : 1474.0 Gram Total : 1455.4 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 0 0 100 100 1½ 0 0 100
1" 0 0 100 100 1" 0 0 100
3/4" 0 0 100 100 3/4" 0 0 100
1/2 " 186.2 12.6 87.4 82.6 1/2 " 322.8 22.2 77.8
3/8 " 1021.8 69.3 30.7 28.1 3/8 " 1082.6 74.4 25.6
# 4. 1465.1 99.4 0.6 0.8 # 4. 1439.5 98.9 1.1
# 8. 1467.9 99.6 0.4 0.7 # 8. 1440.3 99.0 1.0
# 16. 1468.6 99.6 0.4 0.7 # 16. 1441.2 99.0 1.0
# 30. 1469.2 99.7 0.3 0.6 # 30. 1441.8 99.1 0.9
# 50. # 50.
# 100. # 100.
# 200. # 200.

Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYSIS AGGREGATE


Date : 13-Feb-10
Kind of Material : 5 ~ 10 mm
Total : 798.8 Gram Total : 730.7 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 0 0 100 100 1½ 0 0 100
1" 0 0 100 100 1" 0 0 100
3/4" 0 0 100 100 3/4" 0 0 100
1/2 " 0 0 100 100 1/2 " 0 0 100
3/8 " 3.8 0.5 99.5 99.2 3/8 " 8.6 1.2 98.8
# 4. 652.0 81.6 18.4 16.3 # 4. 626.8 85.8 14.2
# 8. 786.4 98.4 1.6 1.5 # 8. 720.8 98.6 1.4
# 16. 787.2 98.5 1.5 1.4 # 16. 721.5 98.7 1.3
# 30. 787.9 98.6 1.4 1.3 # 30. 721.8 98.8 1.2
# 50. 788.1 98.7 1.3 1.3 # 50. 722.1 98.8 1.2
# 100. 789.8 98.9 1.1 1.1 # 100. 722.6 98.9 1.1
# 200. 791.5 99.1 0.9 0.9 # 200. 723.6 99.0 1.0

Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYSIS AGGREGATE


Date : 15-Feb-10
Kind of Material : 5 ~ 10 mm
Total : 929.3 Gram Total : 952.9 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 0 0 100 100 1½ 0 0 100
1" 0 0 100 100 1" 0 0 100
3/4" 0 0 100 100 3/4" 0 0 100
1/2 " 0 0 100 100 1/2 " 0 0 100
3/8 " 16.8 1.8 98.2 98.9 3/8 " 3.9 0.4 99.6
# 4. 796.9 85.8 14.2 13.1 # 4. 838.7 88.0 12.0
# 8. 909.6 97.9 2.1 1.9 # 8. 936.3 98.3 1.7
# 16. 914.2 98.4 1.6 1.4 # 16. 941.8 98.8 1.2
# 30. 916.2 98.6 1.4 1.2 # 30. 943.0 99.0 1.0
# 50. 917.8 98.8 1.2 1.1 # 50. 944.4 99.1 0.9
# 100. 919.7 99.0 1.0 0.9 # 100. 946.2 99.3 0.7
# 200. 923.2 99.3 0.7 0.5 # 200. 948.8 99.6 0.4

Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYSIS AGGREGATE


Date : 13-Feb-10
Kind of Material :0~5 mm
Total : 891.8 Gram Total : 861.8 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 0 0 100 100 1½ 0 0 100
1" 0 0 100 100 1" 0 0 100
3/4" 0 0 100 100 3/4" 0 0 100
1/2 " 0 0 100 100 1/2 " 0 0 100
3/8 " 0 0 100 100 3/8 " 0 0 100
# 4. 16.2 1.8 98.2 97.5 # 4. 27.5 3.2 96.8
# 8. 298.8 33.5 66.5 65.5 # 8. 305.8 35.5 64.5
# 16. 531.9 59.6 40.4 39.6 # 16. 527.9 61.3 38.7
# 30. 631.8 70.8 29.2 28.7 # 30. 619.2 71.8 28.2
# 50. 692.2 77.6 22.4 22.0 # 50. 675.3 78.4 21.6
# 100. 739.3 82.9 17.1 16.8 # 100. 719.7 83.5 16.5
# 200. 793.7 89.0 11.0 10.7 # 200. 772.8 89.7 10.3

Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYSIS AGGREGATE


Date : 15-Feb-10
Kind of Material :0~5 mm
Total : 813.3 Gram Total : 783.2 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 0 0 100 100 1½ 0 0 100
1" 0 0 100 100 1" 0 0 100
3/4" 0 0 100 100 3/4" 0 0 100
1/2 " 0 0 100 100 1/2 " 0 0 100
3/8 " 0 0 100 100 3/8 " 0 0 100
# 4. 31.7 3.9 96.1 96.2 # 4. 28.7 3.7 96.3
# 8. 310.3 38.2 61.8 61.9 # 8. 297.5 38.0 62.0
# 16. 501.6 61.7 38.3 38.0 # 16. 487.6 62.3 37.7
# 30. 582.0 71.6 28.4 28.2 # 30. 564.4 72.1 27.9
# 50. 634.5 78.0 22.0 21.6 # 50. 616.5 78.7 21.3
# 100. 682.5 83.9 16.1 15.8 # 100. 661.8 84.5 15.5
# 200. 737.0 90.6 9.4 9.0 # 200. 715.4 91.3 8.7

Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYSIS AGGREGATE


Date : 15-Feb-10
Kind of Material : Filler
Total : 226.1 Gram Total : 271.5 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 0 0 100 100 1½ 0 0 100
1" 0 0 100 100 1" 0 0 100
3/4" 0 0 100 100 3/4" 0 0 100
1/2 " 0 0 100 100 1/2 " 0 0 100
3/8 " 0 0 100 100 3/8 " 0 0 100
# 4. 0 0 100 100 # 4. 0 0 100
# 8. 0 0 100 100 # 8. 0 0 100
# 16. 0 0 100 100 # 16. 0 0 100
# 30. 0 0 100 100 # 30. 0 0 100
# 50. 0 0 100 100 # 50. 0 0 100
# 100. 16.0 7.1 92.9 93.1 # 100. 18.5 6.8 93.2
# 200. 52.1 23.0 77.0 76.6 # 200. 64.6 23.8 76.2

Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

AVERAGE SIEVE ANALYSIS


Date : 17-Feb-10
Kind of Material : 10 ~ 30 mm

SIEVE SIEVE ANALISIS


AVERAGE
SIZE I II III IV V VI
1½ 100 100 100 100 100
1" 81.6 70.7 69.9 84.1 76.6
3/4" 30.6 28.1 36.1 36.3 32.8
1/2 " 6.2 6.3 8.1 7.1 6.9
3/8 " 2.0 2.9 3.1 2.3 2.6
# 4. 0.7 0.6 1.1 0.8 0.8
# 8. 0.7 0.6 0.9 0.8 0.7
# 16. 0.7 0.5 0.9 0.7 0.7
# 30. 0.0 0.0 0.0 0.0 0.0
# 50. 0.0 0.0 0.0 0.0 0.0
# 100. 0.0 0.0 0.0 0.0 0.0
# 200. 0.0 0.0 0.0 0.0 0.0

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

AVERAGE SIEVE ANALYSIS


Date : 13-Feb-10
Kind of Material : 10 ~ 15 mm

SIEVE SIEVE ANALISIS


AVERAGE
SIZE I II III IV V VI
1½ 100 100 100 100 100
1" 100 100 100 100 100
3/4" 100 100 100 100 100
1/2 " 80.1 78.6 87.4 77.8 81.0
3/8 " 23.8 24.7 30.7 25.6 26.2
# 4. 0.8 0.5 0.6 1.1 0.8
# 8. 0.8 0.4 0.4 1.0 0.7
# 16. 0.7 0.4 0.4 1.0 0.6
# 30. 0.7 0.3 0.3 0.9 0.6
# 50. 0.0 0.0 0.0 0.0 0.0
# 100. 0.0 0.0 0.0 0.0 0.0
# 200. 0.0 0.0 0.0 0.0 0.0

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

AVERAGE SIEVE ANALYSIS


Date : 15-Feb-10
Kind of Material : 5 ~ 10 mm

SIEVE SIEVE ANALISIS


AVERAGE
SIZE I II III IV V VI
1½ 100 100 100 100 100
1" 100 100 100 100 100
3/4" 100 100 100 100 100
1/2 " 100 100 100 100 100
3/8 " 99.5 98.8 98.2 99.6 99.0
# 4. 18.4 14.2 14.2 12.0 14.7
# 8. 1.6 1.4 2.1 1.7 1.7
# 16. 1.5 1.3 1.6 1.2 1.4
# 30. 1.4 1.2 1.4 1.0 1.3
# 50. 1.3 1.2 1.2 0.9 1.2
# 100. 1.1 1.1 1.0 0.7 1.0
# 200. 0.9 1.0 0.7 0.4 0.7

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

AVERAGE SIEVE ANALYSIS


Date : 15-Feb-10
Kind of Material :0~5 mm

SIEVE SIEVE ANALISIS


AVERAGE
SIZE I II III IV V VI
1½ 100 100 100 100 100
1" 100 100 100 100 100
3/4" 100 100 100 100 100
1/2 " 100 100 100 100 100
3/8 " 100 100 100 100 100
# 4. 98.2 96.8 96.1 96.3 96.9
# 8. 66.5 64.5 61.8 62.0 63.7
# 16. 40.4 38.7 38.3 37.7 38.8
# 30. 29.2 28.2 28.4 27.9 28.4
# 50. 22.4 21.6 22.0 21.3 21.8
# 100. 17.1 16.5 16.1 15.5 16.3
# 200. 11.0 10.3 9.4 8.7 9.8
BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

AVERAGE SIEVE ANALYSIS


Date : 15-Feb-10
Kind of Material : Filler

SIEVE SIEVE ANALISIS


AVERAGE
SIZE I II III IV V VI
1½ 100 100 100
1" 100 100 100
3/4" 100 100 100
1/2 " 100 100 100
3/8 " 100 100 100
# 4. 100 100 100
# 8. 100 100 100
# 16. 100 100 100
# 30. 100 100 100
# 50. 100 100 100
# 100. 92.9 93.2 93.1
# 200. 77.0 76.2 76.6
BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
COMBINE GRADING AGGREGATE
Date : 6-Mar-10 Contractor : PT.Baita Sari
Type Mix : AC Base Consultant : CECI Joint Ven

SIEVE Coarse 10 -30 mm Coarse 10-15 mm Medium 5-10 mm Fine 0 - 5 mm Filler


SIZE 28% 19% 17% 35% 1%
1½ " 100 28 100 19 100 17 100 35 100 1
1" 76.6 21.4 100 19 100 17 100 35 100 1
3/4 " 32.8 9.2 100 19 100 17 100 35 100 1
1/2 " 6.9 1.9 81.0 15.4 100 17 100 35 100 1
3/8 " 2.6 0.7 26.2 5.0 99.0 16.8 100 35 100 1
#4 0.8 0.2 0.8 0.1 14.7 2.5 96.9 33.9 100 1
#8 0.7 0.2 0.7 0.1 1.7 0.3 63.7 22.3 100 1
# 16 0.7 0.2 0.6 0.1 1.4 0.2 38.8 13.6 100 1
# 30 0.0 0.0 0.6 0.1 1.3 0.2 28.4 9.9 100 1
# 50 0.0 0.0 0.0 0.0 1.2 0.2 21.8 7.6 100 1
# 100 0.0 0.0 0.0 0.0 1.0 0.2 16.3 5.7 93.1 0.9
# 200 0.0 0.0 0.0 0.0 0.7 0.1 9.8 3.4 76.6 0.8

BINA MARGA CONSULTANT C

Saiful ST. M.Sanyoto/M.Abdul Azis


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

GRAFIC COMBINE AGGREGATE


Date : 6-Mar-10 Contractor : PT.Baita Sari
Type Mix : AC Base Consultant : CECI Joint Ven

#200 #100 #50 #30 #16 #8 #4 3/8" 1/2"


100

90
100

90
% PASSING
80

70

60

50

40

30

20

10

BINA MARGA CONSULTANT

Saiful ST. M.Sanyoto/M.Abdul Azis


BRD )
P)

10/15 20

0/5 15
I Joint Venture With PT.Cipta Strada Ns 15
Cmt 2
Ac 4.9
TOTAL BATASAN

100 100 #REF! jmd.1 100.0 CA


93.4 90 - 100 #REF! 100 100.0 FA
81.2 max.90 #REF! 84.5 93.8 FF
70.3 #REF! 62.7 80.8 Aspl
58.5 #REF! 56.2 67.9
37.8 #REF! 44.7 48.0
23.9 19 - 45 #REF! 34.4 32.8
15.1 #REF! 27.3 21.0
11.3 #REF! 21.7 14.9
8.8 #REF! 13.7 11.0
6.8 #REF! 8.5 8.8
4.3 3 -7 #REF! 5.6 7.0

CONTRACTOR

Munib

BRD )
P)

20 8 1"
30
16
4

50
I Joint Venture With PT.Cipta Strada 1 " 3/4" 1/2"

3/8"
3/4" 1" 1 1/2 "
1 JANGAN DIRUBAH
X Fuller Larangan

1 1/2" 95 95 100
1" 90.1 90.1 83.3
3/4" 86 86.0 73.3
1/2" 79.3 79.3 60.6
3/8" 74.4 74.4 53.5
4 64.5 64.5 39.5 39.5 39.5
8 55.4 55.4 26.8 26.8 30.8
16 45.5 45.5 18.1 18.1 24.1
30 36.4 36.4 13.6 13.6 17.6
50 26.4 26.4 11.4 11.4 11.4
100 17.4 17.4 8.3
200 3.3 3.3 6.1

0.0 100.0

CONTRACTOR

Munib
19% 5700
41% 12300

5/10 47

76.1 72.4

19.6 18.6

4.3 4.1

4.82 4.82

104.8 100.0

JMF TOLERANSI
SPEC SELISIH
SPEC AMBIL ATAS BAWAH
ac bese

100 100.0 +5 100.0 100.0


90 100 93.4 +5 98.4 88.4
90.0 81.2 +5 86.2 76.2
70.3 +5 75.3 65.3
58.5 +5 63.5 53.5
37.8 +5 42.8 32.8
19.0 45.0 23.9 +5 28.9 18.9
15.1 +3 18.1 12.1
11.3 +3 14.3 8.3
8.8 +3 11.8 5.8
6.8 +2 8.8 4.8
3 7 4.3 +1 5.3 3.3
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

Date : 18-Mar-10 Contractor : PT. Baita Sari


Type of Mix : AC Base Consultant : CECI Joint Venture With PT.Cipta Strada

DESIGN MIX FORMULA

Pb = 0.035 ( % CA ) + 0.045 ( % FA ) + 0.18 ( % Filler ) + Constant

Pb = estimate asphalt content


CA = coarse aggregate,retained # 8 sieve
FA = fine aggregate,passing # 8 sieve and retained # 200 sieve
Filler = filler,passing # 200 sieve
Constant = 0.5 ~ 1.0

Pb = 0.035 (100 - 23.9 ) + 0.045 ( 23.9 - 4.3 ) + 0.18 ( 4.3 ) + 0.6

= 4.920 %

= 4.900 %

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
AGGREGATE GRADING COMBINED AGGREGATE GRADING Agg. Surface
ASTM SIEVE SIZE
a b c d e f I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI factor
1 "1/2
100 100 100 100 100 100
1" 76.6 100 100 100 100 93.4
3/4" 32.8 100 100 100 100 81.2 -
1/2" 6.9 81.0 100 100 100 70.3 1 X 0.41
3/8" 2.6 26.2 99.0 100 100 58.5 -
#4 0.8 0.8 14.7 96.9 100 37.8 X 0.41
#8 0.7 0.7 1.7 63.7 100 23.9 X 0.82
# 16 0.7 0.6 1.4 38.8 100 15.1 X 1.64
# 30 0.0 0.6 1.3 28.4 100 11.3 X 2.87
# 50 0.0 0.0 1.2 21.8 100 8.8 X 6.14
# 100 0.0 0.0 1.0 16.3 93.1 6.8 X 12.29
# 200 0.0 0.0 0.7 9.8 76.6 4.3 X 32.77
a. Coarse Aggregate ( 10 - 30 mm ) 28%
AGGREGATE b. Coarse Aggregate ( 10 - 15 mm ) 19%
BLENDING RATIO
(%) BY WEIGHT OF c. Medium Aggregate ( 5 - 10 mm ) 17%
TOTAL
AGGREGATE d. Fine Aggregate ( 0 - 5 mm ) 35%
e. Filler 1%
TOTAL AGGREGATE SURFACE AREA (M2/Kg) 4.132

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


100
95.01

36.01
25.21
16.19
12.86
10.03
8.1
5.07 0.0000

0.41
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN Packag
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada Contra

SPECIFIC GRAVITY AND ABSORPTION TEST

Date : 17-Feb-10
NO.
Kind Of Material : Coarse Aggregate ( 10 ~ 30 mm )
NO.OF SAMPLE UNIT I II AVERAGE 1
Weight of sample oven - dry in air Gr A 3224 3608 2
Weight of sample saturated surface dry in air Gr B 3271 3660 3
Weight of sample in water Gr C 2075 2325 4
A 5
Bulk Specific Gravity ( oven dry ) Gr/cc 2.696 2.703 2.699
B-C
B
Bulk Specific Gravity ( saturated surface dry ) Gr/cc 2.735 2.742 2.738
B-C
A N0
Apparent Specific Gravity Gr/cc 2.806 2.812 2.809
A-C
(B - A) x 100
Absorption % 1.458 1.441 1.450
A 1
2
Date : 3
Kind Of Material : Fine Aggregate ( 0 ~ 5 mm ) 4
NO.OF SAMPLE UNIT I II AVERAGE 5
Weight of sample saturated surface dry in air Gr 500
Weight of sample oven - dry in air Gr A
Weight of flask + water to calibration mark Gr B
Weight of sample + flask + water to calibration Gr C
A I.
Bulk Specific Gravity ( oven dry ) Gr/cc
(B+500-C)
500
Bulk Specific Gravity ( saturated surface dry ) Gr/cc
(B+500-C) II.
A
Apparent Specific Gravity Gr/cc
(B+A-C)
(500-A) x100 III.
Absorption %
A

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SPECIFIC GRAVITY AND ABSORPTION TEST

Date : 17-Feb-10
Kind Of Material : Coarse Aggregate ( 10 ~ 15 mm )
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample oven - dry in air Gr A 3439 3025
Weight of sample saturated surface dry in air Gr B 3502 3077
Weight of sample in water Gr C 2192 1924
A
Bulk Specific Gravity ( oven dry ) Gr/cc 2.625 2.624 2.624
B-C
B
Bulk Specific Gravity ( saturated surface dry ) Gr/cc 2.673 2.669 2.671
B-C
A
Apparent Specific Gravity Gr/cc 2.758 2.748 2.753
A-C
(B - A) x 100
Absorption % 1.832 1.719 1.775
A

Date :
Kind Of Material : Fine Aggregate ( 0 ~ 5 mm )
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample saturated surface dry in air Gr 500
Weight of sample oven - dry in air Gr A
Weight of flask + water to calibration mark Gr B
Weight of sample + flask + water to calibration Gr C
A
Bulk Specific Gravity ( oven dry ) Gr/cc
(B+500-C)
500
Bulk Specific Gravity ( saturated surface dry ) Gr/cc
(B+500-C)
A
Apparent Specific Gravity Gr/cc
(B+A-C)
(500-A) x100
Absorption %
A

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SPECIFIC GRAVITY AND ABSORPTION TEST

Date : 16-Feb-10
Kind Of Material : Coarse Aggregate ( 5 ~ 10 mm )
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample oven - dry in air Gr A 2433 2277
Weight of sample saturated surface dry in air Gr B 2480 2322
Weight of sample in water Gr C 1547 1452
A
Bulk Specific Gravity ( oven dry ) Gr/cc 2.608 2.617 2.612
B-C
B
Bulk Specific Gravity ( saturated surface dry ) Gr/cc 2.658 2.669 2.664
B-C
A
Apparent Specific Gravity Gr/cc 2.746 2.760 2.753
A-C
(B - A) x 100
Absorption % 1.932 1.976 1.954
A

Date :
Kind Of Material : Fine Aggregate ( 0 ~ 5 mm )
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample saturated surface dry in air Gr 500
Weight of sample oven - dry in air Gr A
Weight of flask + water to calibration mark Gr B
Weight of sample + flask + water to calibration Gr C
A
Bulk Specific Gravity ( oven dry ) Gr/cc
(B+500-C)
500
Bulk Specific Gravity ( saturated surface dry ) Gr/cc
(B+500-C)
A
Apparent Specific Gravity Gr/cc
(B+A-C)
(500-A) x100
Absorption %
A

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SPECIFIC GRAVITY AND ABSORPTION TEST

Date : 16-Feb-10
Kind Of Material :
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample oven - dry in air Gr A
Weight of sample saturated surface dry in air Gr B
Weight of sample in water Gr C
A
Bulk Specific Gravity ( oven dry ) Gr/cc
B-C
B
Bulk Specific Gravity ( saturated surface dry ) Gr/cc
B-C
A
Apparent Specific Gravity Gr/cc
A-C
(B - A) x 100
Absorption %
A

Date :
Kind Of Material : Fine Aggregate ( 0 ~ 5 mm )
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample saturated surface dry in air Gr 500 500 500
Weight of sample oven - dry in air Gr A 489.1 488.9
Weight of flask + water to calibration mark Gr B 620.0 650.2
Weight of sample + flask + water to calibration Gr C 932.1 963.4
A
Bulk Specific Gravity ( oven dry ) Gr/cc 2.603 2.617 2.610
(B+500-C)
500
Bulk Specific Gravity ( saturated surface dry ) Gr/cc 2.661 2.677 2.669
(B+500-C)
A
Apparent Specific Gravity Gr/cc 2.763 2.783 2.773
(B+A-C)
(500-A) x100
Absorption % 2.229 2.270 2.249
A

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SPECIFIC GRAFITY TEST FOR FILLER

Date : 17-Feb-10
Material : Filler
Ex. : Tulung Agung

CONTAINER I II
WEIGHT PICNOMETER + SAMPLE ( W2 ) 90.59 103.27
WEIGHT PICNOMETER ( W1 ) 35.3 47.42
WEIGHT SAMPLE ( WT = W2-W1 ) 55.29 55.85
TEMPERATURE (C) 25 25
WEIGHT PICNOMETER + WATER + SAMPLE ( W3 ) 169.11 179.91
WEIGHT PICNOMETER + WATER ( W4 ) 134.17 144.66
W5 = W2 - W1 + W4 189.46 200.51
VOLUME OF SOIL AT T2 C ( W5 -W3 ) 20.35 20.60
S.P.G.R OF SOIL AT T 30 C WT / ( W5 - W3 ) 2.717 2.711
AVERAGE 2.714

REMARK :

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SPECIFIC GRAVITY AND ABSORPTION TEST

AGGREGATE BULK S.S.D APPARENT ABSORBED

Coarse Agg. ( 10 ~ 30 mm ) 2.699 2.738 2.809 1.450


Coarse Agg. ( 10 ~ 15 mm ) 2.624 2.671 2.753 1.775
Medium Agg. ( 5 ~ 10 mm ) 2.612 2.664 2.753 1.954
Fine Agg. ( 0 ~ 5 mm ) 2.610 2.669 2.773 2.249
Filler 2.714 2.714 2.714

THEORETICAL SPECIFIC GRAVITY


% OF SPECIFIC GRAVITY FACTOR
AGGREGATE FRACTION BULK APPARENT BULK APPARENT

A B C D E=B/C F=B/D
Coarse Agg. ( 10 ~ 25 mm ) 28 2.699 2.809 10.374 9.968
Coarse Agg. ( 10 ~ 15 mm ) 19 2.624 2.753 7.240 6.902
Medium Agg. ( 5 ~ 10 mm ) 17 2.612 2.753 6.507 6.175
Fine Agg. ( 0 ~ 5 mm ) 35 2.610 2.773 13.409 12.622
Filler 1 2.714 2.714 0.368 0.368

TOTAL 37.899 36.036

Bulk Sp.Gr Total Agg = 100 2.639 Gr/Cm³


ΣE

Apparent Sp.Gr Total Agg = 100 2.775 Gr/Cm³


ΣF

Effective Sp.Gr Total Agg = I + II 2.707 Gr/Cm³


2

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
MAXIMUM SPECIFIC GRAVITY OF BITUMINOUS
PAVING MIXTURES
( AASHTO - T.209 )

Date : 19-Mar-10 Contractor : PT. Baita Sari


Type of Mix : AC Base Consultant : CECI Joint Venture With PT.Cipta Strada
Asphalt Content : 4.9 %

No SAMPLE No. I II III


A Weight of Sample and Bowl Gram 1717 1775
B Weight of Bowl Gram 813 813
C Weight of Sample (A-B) Gram 904 962
D Weight of Bowl and Sample in Water Gram 988 1022
E Weight of Bowl in Water Gram 447 447
F Weight of Sample in Water (D-E) Gram 541 575
G Volume of Sample ( C-F) Gram 363 387
H Max Specific Gravity (C/G) Gram/cc 2.490 2.486
I Temperature of Water ° C 25 25
J Corection of Temperature ° C 1 1
K Max Specific Gravity (HxJ) Gram/cc 2.490 2.486
L Average Gram/cc 2.488

Remaks :

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Date of Test : 19-Mar-10 Contractor : PT. Baita Sari
Tipe of Mix : AC Base Consultan : CECI Joint Venture With PT.Cipta Strada
Penetration of Bitumen : 60/70 Bulk Sp.Gr (U) : 2.639 Area (a) : 4.13 Temperature : 145 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test (V) : 2.488 Compaction : 112 Blows

Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Air Void Stability Marshall
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien T. Film
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q R
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O ((A-C)x100)/

Gmm T BxU 100 T B I E U L P (Txax(100-A))


1 3.9 2.684 0.657 3.268 2.526 3758 2171 3789 1618 2.323 140 1699 4.90
2 3767 2167 3794 1627 2.315 150 1820 4.70
3 3765 2173 3791 1618 2.327 146 1771 4.80
Average 2.322 8.08 15.45 47.69 1763 4.80 367.4 7.928
1 4.4 2.684 0.657 3.771 2.507 3769 2181 3797 1616 2.332 141 1711 4.90
2 3755 2175 3780 1605 2.340 150 1820 4.90
3 3760 2180 3785 1605 2.343 156 1968 4.90
Average 2.338 6.72 15.29 56.01 1833 4.90 374.1 9.198
1 4.9 2.684 0.657 4.275 2.488 3767 2195 3788 1593 2.365 159 1929 5.10
2 3765 2190 3785 1595 2.361 150 1820 5.00
3 3750 2175 3769 1594 2.353 140 1699 5.10
Average 2.359 5.18 14.97 65.41 1816 5.07 358.4 10.482
Spec. < 1.2 3.5 - 5.5 > 13 > 60 > 1500 > 4.5 > 300

REMAKS :
BINA MARGA CONSULTANT CONTRACTOR
Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Date of Test : 19-Mar-10 Contractor : PT. Baita Sari
Tipe of Mix : AC Base Consultan : CECI Joint Venture With PT.Cipta Strada
Penetration of Bitumen : 60/70 Bulk Sp.Gr (U) : 2.639 Area (a) : 4.13 Temperature : 145 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test (V) : 2.488 Compaction : 112 Blows

Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Air Void Stability Marshall
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien T. Film
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q R
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O ((A-C)x100)/

Gmm T BxU 100 T B I E U L P (Txax(100-A))


1 5.4 2.684 0.657 4.778 2.470 3759 2190 3776 1586 2.370 145 1759 5.20
2 3766 2195 3785 1590 2.369 139 1686 5.30
3 3754 2186 3772 1586 2.367 152 1844 5.10
Average 2.369 4.10 15.08 72.85 1763 5.20 339.1 11.779
1 5.9 2.684 0.657 5.281 2.452 3749 2182 3765 1583 2.368 140 1699 5.50
2 3754 2184 3769 1585 2.368 151 1832 5.30
3 3757 2189 3772 1583 2.373 145 1759 5.40
Average 2.370 3.33 15.48 78.51 1763 5.40 326.5 13.090

Spec. < 1.2 3.5 - 5.5 > 13 > 60 > 1500 > 4.5 > 300

REMAKS :
BINA MARGA CONSULTANT CONTRACTOR
Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
PROPERTIES OF ASPHALT MIXES BY MARSHALT PERCENTAGE REFUSEL DENSITY ( PRD )
Date of Test : 2-Apr-10 Contractor : PT. Baita Sari
Tipe of Mix : AC Base Consultan : CECI Joint Venture With PT.Cipta Strada
Penetration of Bitumen : 60/70 Bulk Sp.Gr (U) : 2.639 Area (a) : 4.13 Temperature : 145 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test (V) : 2.488 Compaction : 600 Blows

Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Air Void Stability Marshall
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien T. Film
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q R
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O ((A-C)x100)/

Gmm T BxU 100 T B I E U L P (Txax(100-A))


1 4.1 2.684 0.657 3.469 2.518 3714 2167 3726 1559 2.382
2 3747 2181 3754 1573 2.382
3
Average 2.382 5.40
1 4.6 2.684 0.657 3.973 2.499 3755 2193 3762 1569 2.393
2 3753 2197 3764 1567 2.395
3
Average 2.394 4.21
1 5.1 2.684 0.657 4.476 2.481 3759 2197 3764 1567 2.399
2 3790 2212 3792 1580 2.399
3
Average 2.399 3.30
Spec. < 1.2 > 2.5

REMAKS : BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Date of Test : 6-Apr-10 Contractor : PT. Baita Sari
Tipe of Mix : AC Base Consultan : CECI Joint Venture With PT.Cipta Strada
Penetration of Bitumen : 60/70 Bulk Sp.Gr (U) : 2.639 Area (a) : 4.13 Temperature : 145 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test (V) : 2.488 Compaction : 112 Blows

Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Air Void Stability Marshall
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien T. Film
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q R
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O ((A-C)x100)/

Gmm T BxU 100 T B I E U L P (Txax(100-A))


1a 5.0 2.684 0.657 4.375 2.484 3735 2172 3755 1583 2.359 150 1820 5.00
2a 3747 2184 3768 1584 2.366 145 1759 5.20
3a 3743 2175 3762 1587 2.359 140 1699 5.30
Average 2.361 4.96 14.99 66.92 1759 5.17 340.5 10.740
1b 5.0 2.684 0.657 4.375 2.484 3762 2191 3784 1593 2.362 122 1480 5.50
2b 3746 2178 3767 1589 2.357 122 1480 5.50
3b 3765 2191 3788 1597 2.358 114 1383 5.60
Average 2.359 5.05 15.07 66.48 1448 5.53 261.7 10.740
Remaks :
1448
Retained Marshalt Stability after 24 hours soaking at 60 Co ( % ) = x 100 % = 82.30 %
1759

Spec. < 1.2 3.5 - 5.5 > 13 > 60 > 1500 > 4.5 > 300

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
air
31.00
27.00
26.00

28.00
25.00
25.00

21.00
20.00
19.00
air
17.00
19.00
18.00

16.00
15.00
15.00
12.00
7.00

7.00
11.00

5.00
2.00
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

CURVE MARSHALL TEST


Date of Test : 2-Apr-10
Type of Mix : AC Base
STABILITY ( KG ) AIR VOID ( % )
2000
1900 5
8. 4.6%
1800
0
1700 7.
1600
5
1500 5.
1400
0
1300 4.
1200
5
1100 2.
1000 0
3.4 3.9 4.4 4.9 5.4 5.9 6.4 1.
3.4 3.9 4.4 4.9 5.4 5.9 6.4
3.5%

FLOW ( mm ) VOID FILLED ( % )


6.0
90

80
5.0
70

4.0 60

50
3.0 40
3.4 3.9 4.4 4.9 5.4 5.9 6.4 3.4 3.9 4.4 4.9 5.4 5.9 6.4

MARSHALL QUOTIENT ( Kg/mm ) V.M.A ( % )


0 18
60
17
0
50
16
0
40 15
0
30 14
0 13
20
0 12
103.4 3.9 4.4 4.9 5.4 5.9 6.4 3.4 3.9 4.4 4.9 5.4 5.9 6.4

VIM.PRD ( % ) ASPHALT CONTENT ( % )


0
8. Air Void
0
7. Void filled
0
6. VMA
0
5. Stability
0
4. Flow
0
3. M.Quotient
0
2. Vim.PRD
. 0 Asphal.Cont 3.9 4.4 4.9 5.4 5.9
1
3.4 3.9 4.4 4.9 5.4 5.9 6.4
5.0

BINAMARGA CONSULTANT CONTRACTORS


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
VIM Stab VIM
3.9 8.08 1763
4.4 6.72 1833
4.9 5.18 1816
5.4 4.10 1763
5.9 3.33 1763

VFB Flow
3.9 47.69 4.80
4.4 56.01 4.90
4.9 65.41 5.07
5.4 72.85 5.20
5.9 78.51 5.40

M Quo Vma
3.9 367.4 15.45
4.4 374.1 15.29
4.9 358.4 14.97
5.4 339.1 15.08
5.9 326.5 15.48

VIM.PRD

3.6
4.1 5.40
4.6 4.21
5.1 3.30
5.6
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

JOB MIX FORMULA


AC Base
PROPORTION COLD BIN
COLD AGGREGATE % TOTAL AGG % TOTAL MIX GATE COLD
Coarse agg. (10 ~ 30 mm ) 28 % 26.60 % 9.7 Cm
Coarse agg. (10 ~ 15 mm ) 19 % 18.05 % 12.8 Cm
Medium agg. ( 5 ~ 10 mm ) 17 % 16.15 % 11.1 Cm
Fine agg. ( 0 ~ 5 mm ) 35 % 33.25 % 13.1 Cm
Filler 1 % 0.95 %
Asphalt 5.00 %

COMBINED GRADING
SIEVE SIZE 11/2" 1" 3/4" 1/2" 3/8" #4 #8 # 16 # 30 # 50 # 100 # 200
Design Mix Formula 100 93.4 81.2 70.3 58.5 37.8 23.9 15.1 11.3 8.8 6.8 4.3
Job Mix Formula 100 93.4 82.3 70.7 59.8 33.4 22.0 16.5 12.2 9.8 7.0 4.0
Specification 100 90-100 Max.90 19 - 45 3-7

MARSHALL PROPERTY
TEST RESULT
PROPERTIES
DMF JMF SPECIFICATION
Asphalt % 4.0 4.5 5.0 5.5
5.0 6.0
Density Gr/cc 2.322 2.338 2.359 2.369
2.361 2.370 ~
Marshall Stability Kg 1763 1833 1816 1763
1759 1763 Min. 1500
Marshall Quotient Kg/mm 367.4 374.1 358.4 339.1
340.5 326.5 Min. 300
Flow mm 4.80 4.90 5.07 5.20
5.17 5.40 Min. 4.5
Air Void % 8.08 6.72 5.18 4.10
4.96 3.33 3.5 ~ 5.5
Void Filled % 47.69 56.01 65.41 72.85
66.92 78.51 Min. 60
Void Mineral Aggregate % 15.45 15.29 14.97 15.08
14.99 15.48 Min. 13
Void Refusal ( P.R.D ) % 3.50 Min. 2.5
Absorption % 0.657 0.657 0.657 0.657 0.657 0.657 Max. 1.2
Retained Strength Index % 82.30 Min. 75

Baglak Consultant Supervisi Contractor


Widang - Lamongan PT.CECI - PT.Cipta Strada Jo. PT. Baita Sari

Satuadji ST.MM. Ir.Moch. Sutotok Sukamto


Project Officer Quality Engineer Chief Laboratorium
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

COMBINE GRADING HOT BINS


Date : 02-Sep-10 Contractor : PT. Baita Sari
Type Mix : AC Base Consultan : CECI Joint Venture With PT.Cipta Strada
SIEVE Hot Bin I Hot Bin II Hot Bin III Hot Bin IV Filler
COMB. SPEC.
SIZE 31% 22% 17% 29% 1%
1½ " 100 31 100 22 100 17 100 29 100 1 100 100
1" 100 31 100 22 100 17 72.7 21.1 100 1 92.1 90 - 100
3/4 " 100 31.0 100 22 100 17 26.3 7.6 100 1 78.6 max.90
1/2 " 100 31.0 100 22.0 61.3 10 0.6 0.2 100 1 64.6
3/8 " 100 31.0 91.2 20.1 2.9 0.5 0.2 0.1 100 1 52.6
#4 96.9 30.0 7.6 1.7 0.2 0.0 0.2 0.1 100 1 32.8 19 - 45
#8 67.1 20.8 0.5 0.1 0.2 0.0 0.1 0.0 100 1 22.0
# 16 49.3 15.3 0.5 0.1 0.1 0.0 0.1 0.0 100 1 16.4
# 30 35.6 11.0 0.4 0.1 0.1 0.0 0.0 0.0 100 1 12.2
# 50 28.0 8.7 0.4 0.1 0.0 0.0 0.0 0.0 100 1 9.8
# 100 19.3 6.0 0.4 0.1 0.0 0.0 0.0 0.0 93.1 0.9 7.0
# 200 10.1 3.1 0.3 0.1 0.0 0.0 0.0 0.0 76.6 0.8 4.0 3 -7

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

GRAFIC COMBINNED HOT BINS


Date : 02-Sep-10 Contractor : PT. Baita Sari
Type of Mix : AC Base Consultant : CECI Joint Venture With PT.Cipta Strada
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2"
100

90
% PASSING

80

70

60

50

40

30
Cold Bins :

Hot Bins :
20

10

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
5/10 47
Gradasi Koreksi
Fuller Larangan Cold Hot
11/2" 97 97 100 100 100 0.0
1" 90.2 90.2 83.3 90.0 100.0 93.4 92.1 100 100 1.4
3/4" 86.2 86.2 73.3 90.0 81.2 78.6 76.2 86.2 2.5
1/2" 79.5 79.5 60.6 70.3 64.6 65.3 75.3 5.7
3/8" 74.4 74.4 53.5 58.5 52.6 53.5 63.5 5.9
4 64.6 64.6 39.5 39.5 19.0 45.0 37.8 32.8 32.8 42.8 5.0
8 55.4 55.4 26.8 30.8 23.9 22.0 20.9 26.9 1.9
16 45.5 45.5 18.1 24.1 15.1 16.4 12.1 18.1 -1.3
30 36.5 36.5 13.6 17.6 11.3 12.2 8.3 14.3 -0.9
50 26.5 26.5 11.4 11.4 8.8 9.8 6.8 10.8 -0.9
100 17.5 17.5 8.3 6.8 7.0 4.8 8.8 -0.2
200 3.4 3.4 6.1 3 7 4.3 4.0 3.3 5.3 0.4

0.0 100.0
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor: PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

HOT BINS AGGREGATE COMPOCITION


AC Base

Weight ( Kg )
No. Aggregate Compocition ( % )
Individu Comulatif Corection Calibration
1 Hot Bin I 31 295 295 290.0
2 Hot Bin II 22 209 504 595.0
3 Hot Bin III 17 162 665 776.0
4 Hot Bin IV 29 276 941 962.0
5 Filler 1 10 950 7.7
6 Aspal 50 1000 50.0

TOTAL 100 1000 1000

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


290 295
510 580
680 751
941 941
950
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor: PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

HOT BINS AGGREGATE COMPOCITION


AC Base

Weight ( Kg )
No. Aggregate Compocition ( % )
Individu Comulatif Corection Calibration
1 Hot Bin I 31 295 295 290.0
2 Hot Bin II 30 285 580 595.0
3 Hot Bin III 18 171 751 776.0
4 Hot Bin IV 20 190 941 962.0
5 Filler 1 10 950 7.7
6 Aspal 50 1000 50.0

TOTAL 100 1000 1000

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


HPP
HOT BINS AGGREGATE COMPOCITION
AC Base

Weight ( Kg )
No. Aggregate Compocition ( % )
Individu Comulatif Corection Calibration
1 Hot Bin I 33 311.9 312
2 Hot Bin II 28 264.6 576
3 Hot Bin III 20 189.0 765
4 Hot Bin IV 17 160.7 926
5 Semen 2 18.9 945
6 Aspal 55.0 1000

TOTAL 100 1000 1000

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. 0 0
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

COMBINE GRADING HOT BINS


Date : 21-Sep-10 Contractor : PT. Baita Sari
Type Mix : AC Base Consultan : CECI Joint Venture With PT.Cipta Strada
SIEVE Hot Bin I Hot Bin II Hot Bin III Hot Bin IV Filler
COMB. SPEC.
SIZE 31% 30% 14% 24% 1%
1½ " 100 31 100 30 100 14 100 24 100 1 100 100
1" 100 31 100 30 100 14 72.7 17.4 100 1 93.4 90 - 100
3/4 " 100 31.0 100 30 100 14 26.3 6.3 100 1 82.3 max.90
1/2 " 100 31.0 100 30.0 61.3 9 0.6 0.1 100 1 70.7
3/8 " 100 31.0 91.2 27.4 2.9 0.4 0.2 0.1 100 1 59.8
#4 96.9 30.0 7.6 2.3 0.2 0.0 0.2 0.0 100 1 33.4 19 - 45
#8 67.1 20.8 0.5 0.2 0.2 0.0 0.1 0.0 100 1 22.0
# 16 49.3 15.3 0.5 0.1 0.1 0.0 0.1 0.0 100 1 16.5
# 30 35.6 11.0 0.4 0.1 0.1 0.0 0.0 0.0 100 1 12.2
# 50 28.0 8.7 0.4 0.1 0.0 0.0 0.0 0.0 100 1 9.8
# 100 19.3 6.0 0.4 0.1 0.0 0.0 0.0 0.0 93.1 0.9 7.0
# 200 10.1 3.1 0.3 0.1 0.0 0.0 0.0 0.0 76.6 0.8 4.0 3 -7

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

GRAFIC COMBINNED HOT BINS


Date : 21-Sep-10 Contractor : PT. Baita Sari
Type of Mix : AC Base Consultant : CECI Joint Venture With PT.Cipta Strada
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2"
100

90
% PASSING

80

70

60

50

40

30
Cold Bins :

Hot Bins :
20

10

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
5/10 47
Gradasi Koreksi
Fuller Larangan Cold Hot
11/2" 97 97 100 100 100 0.0
1" 90.2 90.2 83.3 90.0 100.0 93.4 93.4 100 100 0.0
3/4" 86.2 86.2 73.3 90.0 81.2 82.3 76.2 86.2 -1.1
1/2" 79.5 79.5 60.6 70.3 70.7 65.3 75.3 -0.4
3/8" 74.4 74.4 53.5 58.5 59.8 53.5 63.5 -1.3
4 64.6 64.6 39.5 39.5 19.0 45.0 37.8 33.4 32.8 42.8 4.4
8 55.4 55.4 26.8 30.8 23.9 22.0 20.9 26.9 1.9
16 45.5 45.5 18.1 24.1 15.1 16.5 12.1 18.1 -1.3
30 36.5 36.5 13.6 17.6 11.3 12.2 8.3 14.3 -0.9
50 26.5 26.5 11.4 11.4 8.8 9.8 6.8 10.8 -1.0
100 17.5 17.5 8.3 6.8 7.0 4.8 8.8 -0.2
200 3.4 3.4 6.1 3 7 4.3 4.0 3.3 5.3 0.4

0.0 100.0
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS Contractor : PT. Baita Sari
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
Consultant : CECI Joint Venture With PT.Cipta Strada
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
HOT - BIN GRADING
Date of Test : 22-Sep-10 Tipe of Mix : AC Base
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV FILLER
1 Weight 695.8 Gram Weight 914.3 Gram Weight 1154.8 Gram Weight 1524.9 Gram Weight 226.1 Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
11/2" 0 0 100 0 0 100 0 0 100 0 0 100 0 0 100
1" 0 0 100 0 0 100 0 0 100 415.2 27.2 72.8 0 0 100
3/4" 0 0 100 0 0 100 0 0 100 1139.7 74.7 25.3 0 0 100
1/2" 0 0 100 0 0 100 482.4 41.8 58.2 1512.6 99.2 0.8 0 0 100
3/8" 0 0 100 30.6 3.3 96.7 1123.9 97.3 2.7 1515.9 99.4 0.6 0 0 100
# 4. 10.6 1.5 98.5 812.6 88.9 11.1 1144.9 99.1 0.9 1518.7 99.6 0.4 0 0 100
# 8. 210.5 30.3 69.7 901.6 98.6 1.4 1148.2 99.4 0.6 0 0 100
# 16. 362.8 52.1 47.9 906.5 99.1 0.9 1150.2 99.6 0.4 0 0 100
# 30. 442.6 63.6 36.4 908.7 99.4 0.6 1151.5 99.7 0.3 0 0 100
# 50. 502.5 72.2 27.8 909.6 99.5 0.5 0 0 100
# 100. 559.3 80.4 19.6 911.2 99.7 0.3 16.0 7.1 92.9
# 200. 612.3 88.0 12.0 913.2 99.9 0.1 52.1 23.0 77.0
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV FILLER
2 Weight 701.3 Gram Weight 905.7 Gram Weight 1214.9 Gram Weight 1485.6 Gram Weight 271.5 Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
11/2" 0 0 100 0 0 100 0 0 100 0 0 100 0 0 100
1" 0 0 100 0 0 100 0 0 100 501.3 33.7 66.3 0 0 100
3/4" 0 0 100 0 0 100 0 0 100 1284.3 86.4 13.6 0 0 100
1/2" 0 0 100 0 0 100 512.2 42.2 57.8 1472.6 99.1 0.9 0 0 100
3/8" 0 0 100 36.9 4.1 95.9 1185.6 97.6 2.4 1478.3 99.5 0.5 0 0 100
# 4. 9.2 1.3 98.7 802.4 88.6 11.4 1202.4 99.0 1.0 1480.2 99.6 0.4 0 0 100
# 8. 239.7 34.2 65.8 896.2 99.0 1.0 1205.6 99.2 0.8 0 0 100
# 16. 380.1 54.2 45.8 899.4 99.3 0.7 1207.8 99.4 0.6 0 0 100
# 30. 436.1 62.2 37.8 900.8 99.5 0.5 1210.4 99.6 0.4 0 0 100
# 50. 496.9 70.9 29.1 902.4 99.6 0.4 0 0 100
# 100. 570.2 81.3 18.7 903.5 99.8 0.2 18.5 6.8 93.2
# 200. 623.6 88.9 11.1 904.2 99.8 0.2 64.6 23.8 76.2
REMAKS : BINA MARGA CONSULTANT CONTRACTOR
Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS Contractor : PT. Baita Sari
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
Consultant : CECI Joint Venture With PT.Cipta Strada
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

COMBINE GRADING CHART


Date of Test : 22-Sep-10 Tipe of Mix : AC Base
AVERAGE 200 100 50 30 16 8 #4 3/8" 1/2" 3/4" 1" 11/2"
HOT BIN 100
FILLER
SIEVE I II III IV
90
SIZE % PASS % PASS % PASS % PASS % PASS

% PASSING
80
2"
70
1 1/2" 100 100 100 100 100
1" 100 100 100 69.5 100 60
3/4" 100 100 100 19.4 100
1/2" 100 100 58.0 0.8 100 50

3/8" 100 96.3 2.5 0.5 100 40


# 4. 98.6 11.3 0.9 0.4 100
# 8. 67.8 1.2 0.7 0.0 100 30
# 16. 46.8 0.8 0.5 0.0 100
20
# 30. 37.1 0.6 0.3 0.0 100 JMF
28.5 0.4 0.0 0.0 100 HOT BIN
# 50. 10
EXTRAC
# 100. 19.2 0.3 0.0 0.0 93.1
0
# 200. 11.5 0.1 0.0 0.0 76.6

HOT BIN AGGREGATE COMBINE


SIEVE SIZE 2½" 2" 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
HOT - BIN. I 31% 31.0 31.0 31.0 31.0 31.0 30.6 21.0 14.5 11.5 8.8 5.9 3.6
HOT - BIN. II 30% 30.0 30.0 30.0 30.0 28.9 3.4 0.4 0.2 0.2 0.1 0.1 0.0
HOT - BIN. III 14% 14.0 14.0 14.0 8.1 0.4 0.1 0.1 0.1 0.0 0.0 0.0 0.0
HOT - BIN. IV 24% 24.0 16.7 4.7 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0
FILLER 1% 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.8
COMBINE GRADING 100 92.7 80.7 70.3 61.4 35.2 22.5 15.8 12.7 10.0 7.0 4.4
JOB MIX FORMULA 100 93.4 81.2 70.3 58.5 37.8 23.9 15.1 11.3 8.8 6.8 4.3
TOLERANCE ±5 ±5 ±5 ±5 ±5 ±5 ±5 ±3 ±3 ±3 ±2 ±1
SPECIFICATION 100 90 ~100 max.100 17 ~ 45 3~7
REMAKS : BINA MARGA CONSULTANT CONTRACTOR
Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS Contractor : PT. Baita Sari
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
Consultant : CECI Joint Venture With PT.Cipta Strada
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

ASPHALT EXTRACTION & SIEVE ANALYSIS


Date of Test : 22-Sep-10 Tipe of Mix : AC Base
ASPHALT EXTRACTION
MIX MATERIAL EXTRACTION FILTER ( OVEN - DRIED )
TEST WEIGHT ( Gram ) WEIGHT ( Gram )
NO BEFORE AFTER DIFFERENCE BEFORE AFTER DIFFERENCE
A B C=A-B D E F=E-D
1 1003.6 946.8 56.8 51.2 54.9 3.7
2

ASH
BITUMEN IN MIX TOTAL
TEST WEIGHT ( Gram )
MATERIAL
NO CRUCIBLE + ASH CRUCIBLE ASH WEIGHT % BIT IN MIX ( Gram )
G H I=G-H J=C-F-I K = ( J / A )*100
1 8.9 6.1 2.8 50.3 5.012 953.3
2
SIEVE ANALYSIS
SIEVE SIZE 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0 66.3 195.3 289.3 356.9 601.2 718.5 799.5 842.5 865.1 885.6 906.8
1 Percent Retained 0 7.0 20.5 30.3 37.4 63.1 75.4 83.9 88.4 90.7 92.9 95.1
Percent Passing 100 93.0 79.5 69.7 62.6 36.9 24.6 16.1 11.6 9.3 7.1 4.9

SIEVE SIZE 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained
2 Percent Retained
Percent Passing
AVERAGE

REMAKS : Luas permukaan = 4.37 ²/kg BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS Contractor : PT. Baita Sari
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
Consultant : CECI Joint Venture With PT.Cipta Strada
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

MAXIMUM SPECIFIC GRAVITY OF BITUMENOUS PAVING MIXTURE


( AASHTO - T.209 )

Date of Test : 22-Sep-10 Tipe of Mix : AC Base

Asphalt Content : 5.012 %

No SAMPLE No. I II III


A Weight of Sample and Bowl Gram 1758 1712
B Weight of Bowl Gram 813 813
C Weight of Sample (A-B) Gram 945 899
D Weight of Bowl and Sample in Water Gram 1012 984
E Weight of Bowl in Water Gram 447 447
F Weight of Sample in Water (D-E) Gram 565 537
G Volume of Sample (C-F) Gram 380 362
H Max Specific Gravity (C/G) Gram/cc 2.487 2.483
I Temperature of Water ° C 25 25
J Corection of Temperature ° C 1 1
K Max Specific Gravity (HxJ) Gram/cc 2.487 2.483
L Average Gram/cc 2.485

REMAKS : BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS Contractor : PT. Baita Sari
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
Consultant : CECI Joint Venture With PT.Cipta Strada
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD


Date of Test 22-Sep-10 Tipe of Mix : AC Base

Penetration of Bitumen : 60/70 Bulk Sp.Gr U : 2.639 Surfase Area : 4.37 Temperature : 149 ºC
Sp.Gr of Bitumen T : 1.03 Gmm Test V : 2.485 B.F.Taeknees : 10.143 Compaction : 112 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weght ( Gram ) Volume Bulk SpGr Air Void Stability Marshall
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.012 2.685 0.673 4.373 2.485 3795 2219 3829 1610 2.357 145 1804 5.20
2 3801 2224 3834 1610 2.361 151 1860 5.10
3 3811 2222 3838 1616 2.358 143 1831 5.20
Average 2.359 5.08 15.10 66.32 1832 5.17 354.5
1
2
3
Average
1
2
3
Average
1
2
3
Average
SPECIFICATION 3,5 - 5,5 > 13 > 60 > 1500 >5 > 250
REMAKS : BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS Contractor : PT. Baita Sari
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
Consultant : CECI Joint Venture With PT.Cipta Strada
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

FIELD DENSITY TEST AND THICKNESS CONTROL


BY CORE DRILL MACHINE
S.T.A : 2 + 326.0 ~ 2 + 429.6 LT1
Tipe of Mix : AC Base

DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC


NO. STATION IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE ( Cm )
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
22/09/10 23/09/10 1 8.73 2 + 335 LT1,CL:0.90 1584.8 903.2 1590.7 687.5 2.305 2.359 97.73 > 98
2 9.13 2 + 340 LT1,CL:2.80 1700.9 971.2 1706.9 735.7 2.312 2.359 98.02
3 9.03 2 + 356 LT1,CL:0.90 1632.3 933.0 1639.3 706.3 2.311 2.359 97.98
8.96 2.309 2.359 97.91
4 10.36 2 + 370 LT1,CL:0.90 1879.7 1080.4 1887.1 806.7 2.330 2.359 98.79
5 8.87 2 + 375 LT1,CL:2.80 1610.9 925.7 1617.4 691.7 2.329 2.359 98.73
6 10.27 2 + 385 LT1,CL:0.90 1874.3 1078.6 1881.0 802.4 2.336 2.359 99.03
9.83 2.332 2.359 98.85
7 11.20 2 + 402 LT1,CL:0.90 2050.7 1184.8 2057.1 872.3 2.351 2.359 99.67
8 9.73 2 + 411 LT1,CL:2.00 1771.5 1022.9 1778.3 755.4 2.345 2.359 99.42
8 9.60 2 + 425 LT1,CL:2.70 1774.6 1026.0 1781.5 755.5 2.349 2.359 99.58
10.18 2.348 2.359 99.56

9.66 2.330 2.359 98.77 > 98


REMAKS : BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS Contractor : PT. Baita Sari
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
Consultant : CECI Joint Venture With PT.Cipta Strada
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

LOKASI TRIAL PAVING : AC Base

2 + 326.0 2 + 362.5 2 + 397.5 2 + 429.6

LT2

*2 *5 *9
*8 LT1
*1 *3 *4 *6 *7
RT1

RT2

Number Sta. 2+326.0 ~ 2+362.5 LT1 Passing Test Result Density ( % ) Density Loose
1 Breackdown Rolling 1 Passing Tebal awal ( cm ) Tebal Akhir ( cm ) Loose % Passing
2 Intermediate Rolling 14 Passing 97.91 10.40 8.73 19.13
3 Finishing 1 Passing 10.85 9.13 18.84
10.70 9.03 18.49
Number Sta. 2+362.5 ~ 2+397.5 LT1 Passing Test Result Density ( % ) Rata ~ Rata 18.82 14
1 Breackdown Rolling 1 Passing 12.35 10.36 19.21
2 Intermediate Rolling 16 Passing 98.85 10.65 8.87 20.07
3 Finishing 1 Passing 12.30 10.27 19.77
Rata ~ Rata 19.68 16
Number Sta. 2+397.5 ~ 2+429.6 LT1 Passing Test Result Density ( % ) 13.50 11.20 20.54
1 Breackdown Rolling 1 Passing 11.65 9.73 19.73
2 Intermediate Rolling 18 Passing 99.56 11.55 9.60 20.31
3 Finishing 1 Passing Rata ~ Rata 20.19 18

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


JANGAN DIRUBAH JMF HOT EXT TOLERANSI
SPEC SELISIH
X Fuller Larangan SPEC HOT EXT

11/2" 99.0 99.0 100 100 100 100 100


1" 91.5 91.5 83.3 90 100 93.4 92.7 93.0 +5 0.7 0.4
3/4" 86.0 86.0 73.3 81.2 80.7 79.5 +5 0.5 1.7
1/2" 78.5 78.5 60.6 70.3 70.3 69.7 +5 0.0 0.6
3/8" 74.3 74.3 53.5 58.5 61.4 62.6 +5 -2.9 -4.1
4 64.5 64.5 39.5 39.5 19.0 45.0 37.8 35.2 36.9 +5 2.6 0.9
8 54.4 54.4 26.8 30.8 23.9 22.5 24.6 +5 1.4 -0.7
16 45.5 45.5 18.1 24.1 15.1 15.8 16.1 +3 -0.7 -1.0
30 36.4 36.4 13.6 17.6 11.3 12.7 11.6 +3 -1.4 -0.3
50 26.4 26.4 11.4 11.4 8.8 10.0 9.3 +3 -1.2 -0.5
100 15.7 15.7 8.3 6.8 7.0 7.1 +2 -0.2 -0.3
200 3.3 3.3 6.1 3 7 4.3 4.4 4.9 +1 -0.1 -0.6

0.0 100.0
Luas permukaan

93.05 0.381
79.5
69.7
62.6
36.9 0.151
24.6 0.202
16.1 0.265
11.6 0.334
9.3 0.568
7.1 0.873
4.9 1.598 4.372
5.0 5.08 15.10 66.32 1832 5.17 354.5
REPUBLIC OF INDONESIA Contractor : PT. Baita Sari
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY Consultant : CECI Joint Venture With PT.Cipta Strada
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Lond No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

ASPHALT EXTRACTION & SIEVE ANALYSIS


Date of Test : 22-Sep-10 Tipe of Mix : AC Base
ASPHALT EXTRACTION
MIX MATERIAL EXTRACTION FILTER ( OVEN - DRIED )
TEST WEIGHT ( Gram ) WEIGHT ( Gram )
NO BEFORE AFTER DIFFERENCE BEFORE AFTER DIFFERENCE
A B C=A-B D E F=E-D
1 1051.6 986.1 65.5 4.2 11.0 6.8
2

ASH
BITUMEN IN MIX TOTAL
TEST WEIGHT ( Gram )
MATERIAL
NO CRUCIBLE + ASH CRUCIBLE ASH WEIGHT % BIT IN MIX ( Gram )
G H I=G-H J=C-F-I K = ( J / A )*100
1 55.9 50.3 5.6 53.1 5.049 998.5
2
SIEVE ANALYSIS
SIEVE SIZE 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0 29 161.6 266.6 374.1 615.5 754.1 827.2 869.3 889.7 910.2 950.2
1 Percent Retained 0 2.9 16.2 26.7 37.5 61.6 75.5 82.8 87.1 89.1 91.2 95.2
Percent Passing 100 97.1 83.8 73.3 62.5 38.4 24.5 17.2 12.9 10.9 8.8 4.8

SIEVE SIZE 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained
2 Percent Retained
Percent Passing
AVERAGE

REMAKS : BINA MARGA CONSULTANT CONTRACTOR


Area : 4.75 ²/kg

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA Contractor : PT. Baita Sari
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY Consultant : CECI Joint Venture With PT.Cipta Strada
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Lond No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

MAXIMUM SPECIFIC GRAVITY OF BITUMENOUS PAVING MIXTURE


( AASHTO - T.209 )

Date of Test : 22-Sep-10 Tipe of Mix : AC Base

Asphalt Content : 5.049 %

No SAMPLE No. I II III


A Weight of Sample and Bowl Gram 1726 1669
B Weight of Bowl Gram 813 813
C Weight of Sample (A-B) Gram 913 856
D Weight of Bowl and Sample in Water Gram 992 959
E Weight of Bowl in Water Gram 447 447
F Weight of Sample in Water (D-E) Gram 545 512
G Volume of Sample (C-F) Gram 368 344
H Max Specific Gravity (C/G) Gram/cc 2.481 2.488
I Temperature of Water ° C 25 25
J Corection of Temperature ° C 1 1
K Max Specific Gravity (HxJ) Gram/cc 2.481 2.488
L Average Gram/cc 2.485

REMAKS : BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA Contractor : PT. Baita Sari
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY Consultant : CECI Joint Venture With PT.Cipta Strada
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Lond No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN

PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD


Date of Test : 22-Sep-10 Tipe of Mix : AC Base

Penetration of Bitumen : 60/70 Bulk Sp.Gr U : 2.639 Surfase Area : 4.75 Temperature : 150 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.485 B.F.Taeknees : 9.386 Compaction : 112 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.049 2.686 0.689 4.395 2.485 3822 2224 3847 1623 2.355 150 1847 5.20
2 3808 2219 3832 1613 2.361 150 1847 5.00
3 3825 2228 3850 1622 2.358 148 1823 5.30
Average 2.358 5.10 15.16 66.36 1839 5.17 355.9
1
2
3
Average
1
2
3
Average
1
2
3
Average
SPECIFICATION < 1.2 3,5 - 5,5 > 13 > 60 > 1500 >5 > 250
REMAKS : BINA MARGA CONSULTANT CONTRACTOR
Saiful ST. M.Sanyoto/M.Abdul Azis Munib
886

Luas perm
Luas permukaan

100 97.096 0.398


97.1 83.8
83.8 73.3
73.3 62.5
62.5 38.4 0.157
38.4 24.5 0.2007
24.5 17.2 0.2814
17.2 12.9 0.3714
12.9 10.9 0.669
10.9 8.8 1.0868
8.8 4.8 1.5852 4.75
79
103
12.133 1
12.133 1.04
12.133 1.04

1.0 5.10 15.16 66.36 1839 5.17 355.9


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYS AGGREGATE


Date : 21-Sep-10
Kind of material : Hot Bin I
Total : 925.3 Gram Total : 832.5 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS

1½ 0 0 100 1½ 0 0 100 100


1" 0 0 100 1" 0 0 100 100
3/4" 0 0 100 3/4" 0 0 100 100
1/2 " 0 0 100 1/2 " 0 0 100 100
3/8 " 0 0 100 3/8 " 0 0 100 100
# 4. 28.7 3.1 96.9 # 4. 26.6 3.2 96.8 96.9
# 8. 314.5 34.0 66.0 # 8. 264.7 31.8 68.2 67.1
# 16. 478.8 51.7 48.3 # 16. 413 49.6 50.4 49.3
# 30. 601.1 65.0 35.0 # 30. 531.1 63.8 36.2 35.6
# 50. 670.5 72.5 27.5 # 50. 595.8 71.6 28.4 28.0
# 100. 748.8 80.9 19.1 # 100. 670.2 80.5 19.5 19.3
# 200. 832.2 89.9 10.1 # 200. 747.7 89.8 10.2 10.1

Kind of material : Hot Bin II


Total : 673.2 Gram Total : 707.6 Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS

1½ 0 0 100 1½ 0 0 100 100


1" 0 0 100 1" 0 0 100 100
3/4" 0 0 100 3/4" 0 0 100 100
1/2 " 0 0 100 1/2 " 0 0 100 100
3/8 " 57.9 8.6 91.4 3/8 " 64 9.0 91.0 91.2
# 4. 622.6 92.5 7.5 # 4. 653.4 92.3 7.7 7.6
# 8. 670.5 99.6 0.4 # 8. 702.9 99.3 0.7 0.5
# 16. 671.0 99.7 0.3 # 16. 703.5 99.4 0.6 0.5
# 30. 671.3 99.7 0.3 # 30. 703.6 99.4 0.6 0.4
# 50. 671.5 99.7 0.3 # 50. 703.8 99.5 0.5 0.4
# 100. 671.7 99.8 0.2 # 100. 704.1 99.5 0.5 0.4
# 200. 672.5 99.9 0.1 # 200. 704.7 99.6 0.4 0.3

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYS AGGREGATE


Date : 21-Sep-10
Kind of material : Hot Bin III
Total : 1569.7 Gram Total : 1307.2 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS

1½ 0 0 100 1½ 0 0 100 100


1" 0 0 100 1" 0 0 100 100
3/4" 0 0 100 3/4" 0 0 100 100
1/2 " 570.2 36.3 63.7 1/2 " 537.3 41.1 58.9 61.3
3/8 " 1534.1 97.7 2.3 3/8 " 1262.2 96.6 3.4 2.9
# 4. 1565.4 99.7 0.3 # 4. 1305.6 99.9 0.1 0.2
# 8. 1566.2 99.8 0.2 # 8. 1306.0 99.9 0.1 0.2
# 16. 1566.5 99.8 0.2 # 16. 1306.2 99.9 0.1 0.1
# 30. 1566.8 99.8 0.2 # 30. 1306.4 99.9 0.1 0.1
# 50. # 50.
# 100. # 100.
# 200. # 200.

Kind of material : Hot Bin IV


Total : 5542.0 Gram Total : 4657.0 Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS

1½ 0 0 100 1½ 0 0 100 100


1" 1540.0 27.8 72.2 1" 1249.0 26.8 73.2 72.7
3/4" 4143.0 74.8 25.2 3/4" 3381.0 72.6 27.4 26.3
1/2 " 5527.0 99.7 0.3 1/2 " 4618.0 99.2 0.8 0.6
3/8 " 5530.0 99.8 0.2 3/8 " 4647.0 99.8 0.2 0.2
# 4. 5531.0 99.8 0.2 # 4. 4648.0 99.8 0.2 0.2
# 8. 5532.0 99.8 0.2 # 8. 4652.0 99.9 0.1 0.1
# 16. 5533.0 99.8 0.2 # 16. 4653.0 99.9 0.1 0.1
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

SIEVE ANALYS AGGREGATE


Date : 21-Sep-10
Kind of material : Filler
Total : 226.1 Gram Total : 271.5 Gram
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS

1½ 0 0 100 1½ 0 0 100 100


1" 0 0 100 1" 0 0 100 100
3/4" 0 0 100 3/4" 0 0 100 100
1/2 " 0 0 100 1/2 " 0 0 100 100
3/8 " 0 0 100 3/8 " 0 0 100 100
# 4. 0 0 100 # 4. 0 0 100 100
# 8. 0 0 100 # 8. 0 0 100 100
# 16. 0 0 100 # 16. 0 0 100 100
# 30. 0 0 100 # 30. 0 0 100 100
# 50. 0 0 100 # 50. 0 0 100 100
# 100. 16.0 7.1 92.9 # 100. 18.5 6.8 93.2 93.1
# 200. 52.1 23.0 77.0 # 200. 64.6 23.8 76.2 76.6

Kind of material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS

1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


TRIAL PAVING
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
CALIBRATION OF COLD BIN
Kapasitas Produksi AMP 80 Tons / Jam

Tanggal : 10 Maret 2010 Waktu : 2 detik


Cold Bin IV : Coarse Aggregate ( 10 - 30 cm )
GATE OPENING
NO.
3 Cm 6 Cm 9 Cm
1 2369 4.264 ton 15269 27.484 ton 29869 53.764 ton
2 2741 4.934 ton 15247 27.445 ton 30154 54.277 ton
3 2661 4.790 ton 14925 26.865 ton 31205 56.169 ton
Average 4.663 ton 27.265 ton 54.737 ton

Cold Bin III : Coarse Aggregate ( 10 - 15 cm )


GATE OPENING
NO.
3 Cm 6 Cm 9 Cm
1 3410 6.138 ton 13551 24.391 ton 28828 51.890 ton
2 3304 5.947 ton 13729 24.712 ton 29368 52.862 ton
3 4063 7.313 ton 13870 24.966 ton 28131 50.636 ton
Average 6.466 ton 24.690 ton 51.796 ton
`
Cold Bin II : Medium Aggregate ( 05 - 10 cm )
GATE OPENING
NO.
3 Cm 6 Cm 9 Cm
1 2761 4.970 ton 10827 19.489 ton 21097 37.974 ton
2 3228 5.810 ton 11298 20.336 ton 23021 41.438 ton
3 2625 4.725 ton 10840 19.512 ton 22527 40.549 ton
Average 5.168 ton 19.779 ton 39.987 ton

Cold Bin I : Fine Aggregate ( 00 - 05 cm )


GATE OPENING
NO.
3 Cm 6 Cm 9 Cm
1 3747 6.745 ton 8996 16.193 ton 15132 27.237 ton
2 4328 7.790 ton 9614 17.305 ton 16324 29.383 ton
3 3565 6.417 ton 9655 17.379 ton 17015 30.627 ton
Average 6.984 ton 16.959 ton 29.083 ton

BINA MARGA CONSULTANT CONTRACTOR


Saiful ST. M.Sanyoto / M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
Capacity production AMP 60 Tons / Hours

70

60

50
WEIGHT ( Ton )

40

34.4 tons/jam
30

( 10 - 30 )
( 10 - 15 ) -- -- -- -- --
20 ( 05 - 10 ) -- - -- - -- -
17.6 tons/jam
( 00 - 05 ) ………….
15.2 tons/jam

12.0 tons/jam
10

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
GATE OPENING ( Cm )

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto / M.Abdul Azis Munib


Saiful ST. M.Sanyoto / M.Abdul Azis Munib
7075 16820 32124 1.915 6940 16498 31509
6113 20195 33115 6113 20195 33115
6422 18500 33775 6422 18500 33775

3483 13840 29443 2.09 3410 13551 28828


3304 13729 29368 3304 13729 29368
4063 13870 28131 4063 13870 28131

2900 11372 22158 4.79 2761 10827 21097


3228 11298 23021 3228 11298 23021
2625 10840 22527 2625 10840 22527

4092 9824 16524 8.425 3747 8996 15132


4328 9614 16324 4328 9614 16324
3565 9655 17015 3565 9655 17015
X 0~5 5 ~ 10 10 ~ 15 10 ~ 30
0 0 0 0 0
1
2
3 6.984 5.168 6.466 4.663
4
5
6 16.959 19.779 24.690 27.265
7
8
9 29.083 39.987 51.796 54.737
10
11
12
13
14
15

15.96
10.83
9.69
19.95
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

OPENING GATE OF COLD BINS

I : COLD BINS PROPORTION


No. Aggregate Proportion
1 Fine Aggregate ( 00 ~ 05 mm ) 35%
2 Medium Aggregate ( 05 ~ 10 mm ) 17%
3 Coarse Aggregate ( 10 ~ 15 mm ) 19%
4 Coarse Aggregate ( 10 ~ 25 mm ) 28%

II : CAPACITY OF AMP : 80 tons / hours

III : DETERMINATION OF COLD BINS OPENING GATE

1 . Cold Bin I = 35% X 80 tons/hours = 34.40 tons/hours


Fine Aggregate ( 00 ~ 05 mm )
Opening Gate = 9.7 cm.
pembacaan mistar ( 0 + 9.7 ) = 9.7 cm.
2 . Cold Bin II = 17% X 80 tons/hours = 15.20 tons/hours
Medium Aggregate ( 05 ~ 10 mm )
Opening Gate = 5.8 cm.
pembacaan mistar ( 7 + 5.8 ) = 12.8 cm.
3 . Cold Bin III = 19% X 80 tons/hours = 12.00 tons/hours
Coarse Aggregate ( 10 ~ 15 mm )
Opening Gate = 4.1 cm.
pembacaan mistar ( 7 + 4.1 ) = 11.1 cm.
4 . Cold Bin IV = 28% X 80 tons/hours = 17.60 tons/hours
Coarse Aggregate ( 10 ~ 30 mm )
Opening Gate = 5.1 cm.
pembacaan mistar ( 8 + 5.1 ) = 13.1 cm.

BINA MARGA CONSULTANT CONTRACTOR

Saiful ST. M.Sanyoto/M.Abdul Azis Munib


Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

CALIBRATION OF AMP BALANCE FOR ASPHALT

Date : 8-Jul-10

DIAL READING
NO. LOAD REMAKS
UP DOWN AVERAGE

1 0 0.4 0.4 0.4


2 5 6.0 4.6 5.3
3 10 10.0 8.8 9.4
4 15 15.0 14.1 14.6
5 20 19.6 19.0 19.3
6 25 26.0 24.6 25.3
7 30 30.2 29.9 30.1
8 35 34.6 34.8 34.7
9 40 40.2 40.0 40.1
10 45 45.2 45.2 45.2
11 50 50.0 49.6 49.8
12 55 55.0 54.4 54.7
13 60 60.0 59.4 59.7

Ko B
ntr ag
ak la
tor k BINA MARGA CONSULTANT CONTRACTOR
PT Tu
. ba
Ba n-
ita S
Sa ad
ri an
g-
Gr Saiful ST. M.Sanyoto / M.Abdul Azis Munib
es
ik REPUBLIC OF INDONESIA
Gr
es
ik
( MINISTRY OF PUBLIC WORKS
Su DIRECTORATE GENERAL OF HIGHWAY
ka International Bank For Reconstruction and Developmant ( IBRD )
mt STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
o) ( Loan No. 7786 ( 4834 ) - IND
S
Package
uk : WIDANG - LAMONGAN
Contractor
a : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
mt
o,
S CALIBRATION OF AMP BALANCE FOR ASPHALT
T
)
100

95

90

85

80

75

70
BACAAN ( Kg )

65

60

55

50

45

40

35

30

25

20

15

10

0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
BEBAN ( Kg )

BK
ago
lan
BINA MARGA CONSULTANT CONTRACTOR
ks
Tuu
balt
n-a
Sn
adS
anu Saiful ST. M.Sanyoto / M.Abdul Azis Munib
g-p
Gre
esr
ikv
p
Gre
esr
ikv
i
s
i
P
(T
S.
ukV
air
mta
o,m
Sa
TK
)a
r
y
a
&

A
s
s
.

(
A
t
a
n
g
S
/
E
k
o
W
)
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
KALIBRASI TIMBANGAN AGGREGATE
Tanggal : 11 Maret 2010
Pembacaan Dial Timbangan
NO. Beban Keterangan
Naik Turun Rata-rata
1 0 3 2
2 20 14 14
3 40 27 27
4 60 46 46
5 80 64 64
6 100 83 83
7 120 100 100
8 140 120 120
9 160 140 140
10 180 162 162
11 200 184 184
12 220 204 204
13 240 222 222
14 260 242 242
15 280 264 264
16 300 286 286
17 320 304 304
18 340 324 324
19 360 343 343
20 380 364 364
21 400 387 387
22 420 408 408
23 440 428 428
24 460 450 450
25 480 468 468
26 500 494 505 500
27 520 519 528 524
28 540 540 550 545
29 560 562 573 568
30 580 590 600 595
31 600 613 623 618
32 620 633 642 638
33 640 657 664 661
34 660 677 682 680
35 680 696 703 700
36 700 718 724 721
37 720 739 745 742
38 740 760 767 764
39 760 782 788 785
40 780 801 806 804
41 800 823 828 826
42 820 843 848 846
43 840 862 868 865
44 860 884 888 886
45 880 904 908 906
46 900 926 927 927
47 920 946 948 947
48 940 967 968 968
49 960 984 984
50

Bina Marga Consultant Contractor

Saiful ST. M.Sanyoto / M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

KALIBRASI TIMBANGAN AGGREGATE

1000
Hb IV (962 Kg)

900

800 Hb III (776 Kg)

700
BACAAN ( Kg )

Hb II (595 Kg)

600

500

400

Hb I ( 310 Kg )
300

200

100

0
0 100 200 300 400 500 600 700 800 900 1000
BEBAN ( Kg )

Bina Marga Consultant Contractor

Saiful ST. M.Sanyoto / M.Abdul Azis Munib


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada

KALIBRASI TIMBANGAN FILLER

Tanggal : 11 Maret 2010

Pembacaan Dial Timbangan


NO. Beban Keterangan
Naik Turun Rata-rata

1 0 0.4 0.0 0.2


2 5 4.1 3.4 3.8
3 10 8.8 8.5 8.7
4 15 13.8 13.3 13.6
5 20 18.4 18.4 18.4
6 25 23.2 23.2

Ko B
ntr ag
ak la
tor k Bina Marga Consultant Contractor
PT Tu
. ba
Ba n-
ita S
Sa ad
ri an
g-
Gr Saiful ST. M.Sanyoto / M. Abdul Azis Munib
es
ik REPUBLIC OF INDONESIA
(
g-
Gr
es
ik
( MINISTRY OF PUBLIC WORKS
Su DIRECTORATE GENERAL OF HIGHWAY
ka International Bank For Reconstruction and Developmant ( IBRD )
mt STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
o) (
Loan No. 7786 ( 4834 ) - IND
S
Package
uk : WIDANG - LAMONGAN
Contractor
a : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
mt
o, KALIBRASI TIMBANGAN FILLER
S
T
)
30

25
BACAAN ( Kg )

20

15

10

Filler ( 7.7 Kg )

0
0 5 10 15 20 25 30
BEBAN ( Kg )

BK
ago
lan
Bina Marga Consultant Contractor
ks
Tuu
balt
n-a
Sn
adS Saiful ST. M.Sanyoto / M. Abdul Azis Munib
anu
g-p
Gre
esr
ik
adS
anu
g-p
Gre
esr
ikv
i
s
i
P
(T
S.
ukV
air
mta
o,m
Sa
TK
)a
r
y
a
&

A
s
s
.

(
A
t
a
n
g
S
/
E
k
o
W
)
SNVT PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI JAWA TIMUR
PEMELIHARAAN JALAN DAN JEMBATAN WILAYAH TUBAN - SADANG - GRESIK
PAKET : PEMELIHARAAN BERKALA TUBAN - SADANG - GRESIK
Kontraktor : PT. BAITA SARI Konsultan : PT. VIRAMA KARYA & Ass.

PERSIAPAN PEMBUATAN DESIGN MIX FORMULA


AC BASE

1. PENDAHULUAN
Persiapan pembuatan Design Mix Formula AC BASE dengan menggunakan persyaratan baru, diawali
dengan mengadakan pengujian fraksi-fraksi hasil stone crusher yang ada di stock pile Base Camp.

a. Asal Material
Coarse Aggregate ( 10 - 30 ) mm : Ex Mojokerto
Coarse Aggregate ( 10 - 15 ) mm : Ex Mojokerto
Medium Aggregate ( 5 - 10 ) mm : Ex Mojokerto
Fine Aggregate ( 0 - 5 ) mm : Ex Mojokerto
Filler : Ex Tulungagung
Asphalt pen grade 60/70 : Ex Pertamina

b. Pengujian Internal meliputi :


Analisa Saringan
Spesific Grafity
Absorpsi
Kepipihan
Sand Equivalent

c. Pengujian External meliputi :


Aspalt - Penetrasi
- Titik Lembek
- Titik Nyala
- Daktilitas
- Berat Jenis
Material Abrasi test
Analisa Saringan
Spesific Grafity
Absorpsi
Kepipihan
Sand Equivalent
Data test terlampir.

Dalam pembuatan Design Mix Formula AC BASE diambil kombinasi dibawah kurva fuller umtuk material
yang lolos saringan no. 4

Data Pengujian

Analisa Saringan
No
Coarse Agg. Coarse Agg. Medium Agg. Fine Agg. Filler
Saringan
( 10-30mm ) ( 10-15mm ) ( 05-10mm ) ( 0-05mm )
1 1/2 " 100
1" 89.8
3/4" 51.2 100
1/2" 14.1 77.1 100
3/8" 2.3 21.3 98.3 100
#4 0.4 0.8 14.8 98
#8 0.3 0.5 1.4 70.5
# 16 0.3 0.5 1.0 45.6 100
# 30 0.2 0.5 0.9 33.8 95.7
# 50 0.2 0.4 0.8 25.8 80.2
# 100 0.4 0.8 19.1 72.3
# 200 0.3 0.5 10.9 52.5

SNVT PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI JAWA TIMUR


PEMELIHARAAN JALAN DAN JEMBATAN WILAYAH TUBAN - SADANG - GRESIK
PAKET : PEMELIHARAAN BERKALA TUBAN - SADANG - GRESIK
Kontraktor : PT. BAITA SARI Konsultan : PT. VIRAMA KARYA & Ass.

Hasil pengujian Spesific Gravity dan Absorption

Coarse Agg. Coarse Agg. Medium Agg. Fine Agg. Filler


( 10-30mm ) ( 10-15mm ) ( 05-10mm ) ( 0-05mm )
Bulk Sp. Gr 2.629 2.618 2.610 2.584 2.711
App. Sp. Gr 2.719 2.721 2.726 2.721 2.711
Absorption 1.263 1.447 1.630 1.947

2 PERCOBAAN CAMPURAN DESIGN MIX FORMULA

2.1 Perhitungan
Perhitungan Bulk Sp.Gr. Gabungan

100
= 2.610
30 + 15 + 20 + 33 + 2
2.629 2.618 2.61 2.584 + 2.711

Test Gmm material pada kadar 4.9 % = 2.483

Efective Sp.Gr = 100 - 4.9


= 2.678
100 - 4.9
2.483 1.03

Komposisi Campuran
Material Komposisi Campuran
Coarse agg.10 - 30 mm 30 %
Coarse agg. 10 -15 mm 15 %
Medium agg. 5 - 10 mm 20 %
Fine agg 0 - 5 mm 33 %
Filler 2 %
Gradasi Aggregate Gabungan AC BASE

No Spesifikasi
% Lolos
Saringan Kurva Fuller Range
1 1/2 " 100 100 100
1" 96.9 83.3 90 - 100
3/4" 85.4 73.3 Max 90
1/2" 70.8 60.6
3/8" 58.5 53.5
#4 37.6 39.5
#8 25.7 26,8 - 30,8 19 - 45
# 16 17.4 18,1 - 24,1
# 30 13.4 13,6 - 17,6
# 50 10.4 11.4
# 100 8.0 8.3
# 200 4.8 6.1 3-7

SNVT PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI JAWA TIMUR


PEMELIHARAAN JALAN DAN JEMBATAN WILAYAH TUBAN - SADANG - GRESIK
PAKET : PEMELIHARAAN BERKALA TUBAN - SADANG - GRESIK
Kontraktor : PT. BAITA SARI Konsultan : PT. VIRAMA KARYA & Ass.

2.2 Perkiraan awal penggunaan kadar asphalt dan selimut asphalt terhadap batuan

Perkiraan awal penggunaan asphalt

Pb = 0.035 (CA) + 0.045 (MA) + 0.18 (FF) + K


= 0.035 70.7
+ 0.045 24.5 + 0.18 4.8
+ 0.75

= 5.19 5.2 %

Selimut asphalt terhadap batuan

Perkiraan awal penggunaan asphalt 5.2 %


Surface area 4.23 m2/kg
Berat Jenis asphalt 1.03 gram/cc
Absorpsi terhadap campuran 0.995 %

Tebal Bitument Fi = ( Kadar asphalt - Absorpsi ) x 1000


( Surf area x ( 100 - kadar asphalt ) x BJ asphalt )

= ( ( 5,4 - 0.995 ) X 1000


( ( 4,23 X (100 - 5.4 )) x 1.03

= 10.801 ų m
2.3 Hasil pengujian dengan varian kadar asphalt

TEST RESULT
PROPERTIES SPEC
3.9 4.4 4.9 5.4 5.9
Density Gr/cc 2.324 2.353 2.37 2.377 2.379
Marshall Stability Kg 1749 1935 2098 2093 1921 Min 1500
Flow mm 4.97 5.17 5.27 5.33 5.37 Min 5
Marshall Quotient Kg/mm 352.1 374.5 398.3 392.4 357.9 Min 300
Air Void % 7.81 5.93 4.57 3.56 2.77 3.5 - 5.5
Void Filled % 45.94 57.03 66.55 74.31 90.54 Min 60
Void Mineral Aggregate % 14.45 13.81 13.66 13.84 14.23 Min. 13
Absorption % 0.995 0.995 0.995 0.995 0.995 Max. 1.2
Tebal Bit.Film ųm 6.938 8.175 9.425 10.688 11.964

Baglak Konsultan Supervisi Kontraktor


Tuban-Sadang-Gresik PT. Virama Karya & Ass. PT. Baita Sari

Sukamto ST Didik Setio Anggono Sukamto


Project Officer Quality Engineer Chief Laboratorium

SNVT PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI JAWA TIMUR


PEMELIHARAAN JALAN DAN JEMBATAN WILAYAH TUBAN - SADANG - GRESIK
PAKET : PEMELIHARAAN BERKALA TUBAN - SADANG - GRESIK
Kontraktor : PT. BAITA SARI Konsultan : PT. VIRAMA KARYA & Ass.

LEMBAR PERSETUJUAN

JOB MIX FORMULA


AC BASE
UNTUK

PEMELIHARAAN RUTIN PERKERASAN

PROPORTION CAMPURAN
DRY AGGREGATE % TOTAL AGG % TOTAL MIX ACCUMULATIVE CUMMULATIVE
HOT - BIN. I 30 % 28.50 % 285.0 Kg 285.0 Kg
HOT - BIN. II 30 % 28.50 % 285.0 Kg 570.0 Kg
HOT - BIN. III 18 % 17.10 % 171.0 Kg 741.0 Kg
HOT - BIN. IV 20 % 19.00 % 190.0 Kg 931.0 Kg
FILLER 2 % 1.90 % 19.0 Kg 950.0 Kg
ASPHALT 5.00 % 50.0 Kg 1000.0 Kg

Diperiksa Oleh Dibuat Oleh


Konsultan Supervisi Kontraktor

Ir. Ismail Ir. Koeswandi


Site Engineer General Superintendent

Disetujui Oleh
Pejabat Pembuat Komitmen
Tuban - Sadang - Gresik

Ir. Erwandi Agusta, MT


Nip. 510 120 677
tuk material
2.610

2.678
Area
4.23

Abs.
0.995

Film
10.801

Vous aimerez peut-être aussi