Académique Documents
Professionnel Documents
Culture Documents
Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
BINA MARGA CONSULTANT CONTRACTOR
Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
BINA MARGA CONSULTANT CONTRACTOR
Kind of Material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
BINA MARGA CONSULTANT CONTRACTOR
90
100
90
% PASSING
80
70
60
50
40
30
20
10
10/15 20
0/5 15
I Joint Venture With PT.Cipta Strada Ns 15
Cmt 2
Ac 4.9
TOTAL BATASAN
CONTRACTOR
Munib
BRD )
P)
20 8 1"
30
16
4
50
I Joint Venture With PT.Cipta Strada 1 " 3/4" 1/2"
3/8"
3/4" 1" 1 1/2 "
1 JANGAN DIRUBAH
X Fuller Larangan
1 1/2" 95 95 100
1" 90.1 90.1 83.3
3/4" 86 86.0 73.3
1/2" 79.3 79.3 60.6
3/8" 74.4 74.4 53.5
4 64.5 64.5 39.5 39.5 39.5
8 55.4 55.4 26.8 26.8 30.8
16 45.5 45.5 18.1 18.1 24.1
30 36.4 36.4 13.6 13.6 17.6
50 26.4 26.4 11.4 11.4 11.4
100 17.4 17.4 8.3
200 3.3 3.3 6.1
0.0 100.0
CONTRACTOR
Munib
19% 5700
41% 12300
5/10 47
76.1 72.4
19.6 18.6
4.3 4.1
4.82 4.82
104.8 100.0
JMF TOLERANSI
SPEC SELISIH
SPEC AMBIL ATAS BAWAH
ac bese
= 4.920 %
= 4.900 %
36.01
25.21
16.19
12.86
10.03
8.1
5.07 0.0000
0.41
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN Packag
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada Contra
Date : 17-Feb-10
NO.
Kind Of Material : Coarse Aggregate ( 10 ~ 30 mm )
NO.OF SAMPLE UNIT I II AVERAGE 1
Weight of sample oven - dry in air Gr A 3224 3608 2
Weight of sample saturated surface dry in air Gr B 3271 3660 3
Weight of sample in water Gr C 2075 2325 4
A 5
Bulk Specific Gravity ( oven dry ) Gr/cc 2.696 2.703 2.699
B-C
B
Bulk Specific Gravity ( saturated surface dry ) Gr/cc 2.735 2.742 2.738
B-C
A N0
Apparent Specific Gravity Gr/cc 2.806 2.812 2.809
A-C
(B - A) x 100
Absorption % 1.458 1.441 1.450
A 1
2
Date : 3
Kind Of Material : Fine Aggregate ( 0 ~ 5 mm ) 4
NO.OF SAMPLE UNIT I II AVERAGE 5
Weight of sample saturated surface dry in air Gr 500
Weight of sample oven - dry in air Gr A
Weight of flask + water to calibration mark Gr B
Weight of sample + flask + water to calibration Gr C
A I.
Bulk Specific Gravity ( oven dry ) Gr/cc
(B+500-C)
500
Bulk Specific Gravity ( saturated surface dry ) Gr/cc
(B+500-C) II.
A
Apparent Specific Gravity Gr/cc
(B+A-C)
(500-A) x100 III.
Absorption %
A
Date : 17-Feb-10
Kind Of Material : Coarse Aggregate ( 10 ~ 15 mm )
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample oven - dry in air Gr A 3439 3025
Weight of sample saturated surface dry in air Gr B 3502 3077
Weight of sample in water Gr C 2192 1924
A
Bulk Specific Gravity ( oven dry ) Gr/cc 2.625 2.624 2.624
B-C
B
Bulk Specific Gravity ( saturated surface dry ) Gr/cc 2.673 2.669 2.671
B-C
A
Apparent Specific Gravity Gr/cc 2.758 2.748 2.753
A-C
(B - A) x 100
Absorption % 1.832 1.719 1.775
A
Date :
Kind Of Material : Fine Aggregate ( 0 ~ 5 mm )
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample saturated surface dry in air Gr 500
Weight of sample oven - dry in air Gr A
Weight of flask + water to calibration mark Gr B
Weight of sample + flask + water to calibration Gr C
A
Bulk Specific Gravity ( oven dry ) Gr/cc
(B+500-C)
500
Bulk Specific Gravity ( saturated surface dry ) Gr/cc
(B+500-C)
A
Apparent Specific Gravity Gr/cc
(B+A-C)
(500-A) x100
Absorption %
A
Date : 16-Feb-10
Kind Of Material : Coarse Aggregate ( 5 ~ 10 mm )
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample oven - dry in air Gr A 2433 2277
Weight of sample saturated surface dry in air Gr B 2480 2322
Weight of sample in water Gr C 1547 1452
A
Bulk Specific Gravity ( oven dry ) Gr/cc 2.608 2.617 2.612
B-C
B
Bulk Specific Gravity ( saturated surface dry ) Gr/cc 2.658 2.669 2.664
B-C
A
Apparent Specific Gravity Gr/cc 2.746 2.760 2.753
A-C
(B - A) x 100
Absorption % 1.932 1.976 1.954
A
Date :
Kind Of Material : Fine Aggregate ( 0 ~ 5 mm )
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample saturated surface dry in air Gr 500
Weight of sample oven - dry in air Gr A
Weight of flask + water to calibration mark Gr B
Weight of sample + flask + water to calibration Gr C
A
Bulk Specific Gravity ( oven dry ) Gr/cc
(B+500-C)
500
Bulk Specific Gravity ( saturated surface dry ) Gr/cc
(B+500-C)
A
Apparent Specific Gravity Gr/cc
(B+A-C)
(500-A) x100
Absorption %
A
Date : 16-Feb-10
Kind Of Material :
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample oven - dry in air Gr A
Weight of sample saturated surface dry in air Gr B
Weight of sample in water Gr C
A
Bulk Specific Gravity ( oven dry ) Gr/cc
B-C
B
Bulk Specific Gravity ( saturated surface dry ) Gr/cc
B-C
A
Apparent Specific Gravity Gr/cc
A-C
(B - A) x 100
Absorption %
A
Date :
Kind Of Material : Fine Aggregate ( 0 ~ 5 mm )
NO.OF SAMPLE UNIT I II AVERAGE
Weight of sample saturated surface dry in air Gr 500 500 500
Weight of sample oven - dry in air Gr A 489.1 488.9
Weight of flask + water to calibration mark Gr B 620.0 650.2
Weight of sample + flask + water to calibration Gr C 932.1 963.4
A
Bulk Specific Gravity ( oven dry ) Gr/cc 2.603 2.617 2.610
(B+500-C)
500
Bulk Specific Gravity ( saturated surface dry ) Gr/cc 2.661 2.677 2.669
(B+500-C)
A
Apparent Specific Gravity Gr/cc 2.763 2.783 2.773
(B+A-C)
(500-A) x100
Absorption % 2.229 2.270 2.249
A
Date : 17-Feb-10
Material : Filler
Ex. : Tulung Agung
CONTAINER I II
WEIGHT PICNOMETER + SAMPLE ( W2 ) 90.59 103.27
WEIGHT PICNOMETER ( W1 ) 35.3 47.42
WEIGHT SAMPLE ( WT = W2-W1 ) 55.29 55.85
TEMPERATURE (C) 25 25
WEIGHT PICNOMETER + WATER + SAMPLE ( W3 ) 169.11 179.91
WEIGHT PICNOMETER + WATER ( W4 ) 134.17 144.66
W5 = W2 - W1 + W4 189.46 200.51
VOLUME OF SOIL AT T2 C ( W5 -W3 ) 20.35 20.60
S.P.G.R OF SOIL AT T 30 C WT / ( W5 - W3 ) 2.717 2.711
AVERAGE 2.714
REMARK :
A B C D E=B/C F=B/D
Coarse Agg. ( 10 ~ 25 mm ) 28 2.699 2.809 10.374 9.968
Coarse Agg. ( 10 ~ 15 mm ) 19 2.624 2.753 7.240 6.902
Medium Agg. ( 5 ~ 10 mm ) 17 2.612 2.753 6.507 6.175
Fine Agg. ( 0 ~ 5 mm ) 35 2.610 2.773 13.409 12.622
Filler 1 2.714 2.714 0.368 0.368
Remaks :
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Air Void Stability Marshall
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien T. Film
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q R
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O ((A-C)x100)/
REMAKS :
BINA MARGA CONSULTANT CONTRACTOR
Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Date of Test : 19-Mar-10 Contractor : PT. Baita Sari
Tipe of Mix : AC Base Consultan : CECI Joint Venture With PT.Cipta Strada
Penetration of Bitumen : 60/70 Bulk Sp.Gr (U) : 2.639 Area (a) : 4.13 Temperature : 145 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test (V) : 2.488 Compaction : 112 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Air Void Stability Marshall
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien T. Film
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q R
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O ((A-C)x100)/
Spec. < 1.2 3.5 - 5.5 > 13 > 60 > 1500 > 4.5 > 300
REMAKS :
BINA MARGA CONSULTANT CONTRACTOR
Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
PROPERTIES OF ASPHALT MIXES BY MARSHALT PERCENTAGE REFUSEL DENSITY ( PRD )
Date of Test : 2-Apr-10 Contractor : PT. Baita Sari
Tipe of Mix : AC Base Consultan : CECI Joint Venture With PT.Cipta Strada
Penetration of Bitumen : 60/70 Bulk Sp.Gr (U) : 2.639 Area (a) : 4.13 Temperature : 145 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test (V) : 2.488 Compaction : 600 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Air Void Stability Marshall
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien T. Film
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q R
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O ((A-C)x100)/
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Air Void Stability Marshall
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien T. Film
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q R
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O ((A-C)x100)/
Spec. < 1.2 3.5 - 5.5 > 13 > 60 > 1500 > 4.5 > 300
28.00
25.00
25.00
21.00
20.00
19.00
air
17.00
19.00
18.00
16.00
15.00
15.00
12.00
7.00
7.00
11.00
5.00
2.00
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
80
5.0
70
4.0 60
50
3.0 40
3.4 3.9 4.4 4.9 5.4 5.9 6.4 3.4 3.9 4.4 4.9 5.4 5.9 6.4
VFB Flow
3.9 47.69 4.80
4.4 56.01 4.90
4.9 65.41 5.07
5.4 72.85 5.20
5.9 78.51 5.40
M Quo Vma
3.9 367.4 15.45
4.4 374.1 15.29
4.9 358.4 14.97
5.4 339.1 15.08
5.9 326.5 15.48
VIM.PRD
3.6
4.1 5.40
4.6 4.21
5.1 3.30
5.6
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
COMBINED GRADING
SIEVE SIZE 11/2" 1" 3/4" 1/2" 3/8" #4 #8 # 16 # 30 # 50 # 100 # 200
Design Mix Formula 100 93.4 81.2 70.3 58.5 37.8 23.9 15.1 11.3 8.8 6.8 4.3
Job Mix Formula 100 93.4 82.3 70.7 59.8 33.4 22.0 16.5 12.2 9.8 7.0 4.0
Specification 100 90-100 Max.90 19 - 45 3-7
MARSHALL PROPERTY
TEST RESULT
PROPERTIES
DMF JMF SPECIFICATION
Asphalt % 4.0 4.5 5.0 5.5
5.0 6.0
Density Gr/cc 2.322 2.338 2.359 2.369
2.361 2.370 ~
Marshall Stability Kg 1763 1833 1816 1763
1759 1763 Min. 1500
Marshall Quotient Kg/mm 367.4 374.1 358.4 339.1
340.5 326.5 Min. 300
Flow mm 4.80 4.90 5.07 5.20
5.17 5.40 Min. 4.5
Air Void % 8.08 6.72 5.18 4.10
4.96 3.33 3.5 ~ 5.5
Void Filled % 47.69 56.01 65.41 72.85
66.92 78.51 Min. 60
Void Mineral Aggregate % 15.45 15.29 14.97 15.08
14.99 15.48 Min. 13
Void Refusal ( P.R.D ) % 3.50 Min. 2.5
Absorption % 0.657 0.657 0.657 0.657 0.657 0.657 Max. 1.2
Retained Strength Index % 82.30 Min. 75
90
% PASSING
80
70
60
50
40
30
Cold Bins :
Hot Bins :
20
10
0.0 100.0
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor: PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
Weight ( Kg )
No. Aggregate Compocition ( % )
Individu Comulatif Corection Calibration
1 Hot Bin I 31 295 295 290.0
2 Hot Bin II 22 209 504 595.0
3 Hot Bin III 17 162 665 776.0
4 Hot Bin IV 29 276 941 962.0
5 Filler 1 10 950 7.7
6 Aspal 50 1000 50.0
Weight ( Kg )
No. Aggregate Compocition ( % )
Individu Comulatif Corection Calibration
1 Hot Bin I 31 295 295 290.0
2 Hot Bin II 30 285 580 595.0
3 Hot Bin III 18 171 751 776.0
4 Hot Bin IV 20 190 941 962.0
5 Filler 1 10 950 7.7
6 Aspal 50 1000 50.0
Weight ( Kg )
No. Aggregate Compocition ( % )
Individu Comulatif Corection Calibration
1 Hot Bin I 33 311.9 312
2 Hot Bin II 28 264.6 576
3 Hot Bin III 20 189.0 765
4 Hot Bin IV 17 160.7 926
5 Semen 2 18.9 945
6 Aspal 55.0 1000
Saiful ST. 0 0
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
90
% PASSING
80
70
60
50
40
30
Cold Bins :
Hot Bins :
20
10
0.0 100.0
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS Contractor : PT. Baita Sari
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
Consultant : CECI Joint Venture With PT.Cipta Strada
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
HOT - BIN GRADING
Date of Test : 22-Sep-10 Tipe of Mix : AC Base
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV FILLER
1 Weight 695.8 Gram Weight 914.3 Gram Weight 1154.8 Gram Weight 1524.9 Gram Weight 226.1 Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
11/2" 0 0 100 0 0 100 0 0 100 0 0 100 0 0 100
1" 0 0 100 0 0 100 0 0 100 415.2 27.2 72.8 0 0 100
3/4" 0 0 100 0 0 100 0 0 100 1139.7 74.7 25.3 0 0 100
1/2" 0 0 100 0 0 100 482.4 41.8 58.2 1512.6 99.2 0.8 0 0 100
3/8" 0 0 100 30.6 3.3 96.7 1123.9 97.3 2.7 1515.9 99.4 0.6 0 0 100
# 4. 10.6 1.5 98.5 812.6 88.9 11.1 1144.9 99.1 0.9 1518.7 99.6 0.4 0 0 100
# 8. 210.5 30.3 69.7 901.6 98.6 1.4 1148.2 99.4 0.6 0 0 100
# 16. 362.8 52.1 47.9 906.5 99.1 0.9 1150.2 99.6 0.4 0 0 100
# 30. 442.6 63.6 36.4 908.7 99.4 0.6 1151.5 99.7 0.3 0 0 100
# 50. 502.5 72.2 27.8 909.6 99.5 0.5 0 0 100
# 100. 559.3 80.4 19.6 911.2 99.7 0.3 16.0 7.1 92.9
# 200. 612.3 88.0 12.0 913.2 99.9 0.1 52.1 23.0 77.0
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV FILLER
2 Weight 701.3 Gram Weight 905.7 Gram Weight 1214.9 Gram Weight 1485.6 Gram Weight 271.5 Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
11/2" 0 0 100 0 0 100 0 0 100 0 0 100 0 0 100
1" 0 0 100 0 0 100 0 0 100 501.3 33.7 66.3 0 0 100
3/4" 0 0 100 0 0 100 0 0 100 1284.3 86.4 13.6 0 0 100
1/2" 0 0 100 0 0 100 512.2 42.2 57.8 1472.6 99.1 0.9 0 0 100
3/8" 0 0 100 36.9 4.1 95.9 1185.6 97.6 2.4 1478.3 99.5 0.5 0 0 100
# 4. 9.2 1.3 98.7 802.4 88.6 11.4 1202.4 99.0 1.0 1480.2 99.6 0.4 0 0 100
# 8. 239.7 34.2 65.8 896.2 99.0 1.0 1205.6 99.2 0.8 0 0 100
# 16. 380.1 54.2 45.8 899.4 99.3 0.7 1207.8 99.4 0.6 0 0 100
# 30. 436.1 62.2 37.8 900.8 99.5 0.5 1210.4 99.6 0.4 0 0 100
# 50. 496.9 70.9 29.1 902.4 99.6 0.4 0 0 100
# 100. 570.2 81.3 18.7 903.5 99.8 0.2 18.5 6.8 93.2
# 200. 623.6 88.9 11.1 904.2 99.8 0.2 64.6 23.8 76.2
REMAKS : BINA MARGA CONSULTANT CONTRACTOR
Saiful ST. M.Sanyoto/M.Abdul Azis Munib
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS Contractor : PT. Baita Sari
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
Consultant : CECI Joint Venture With PT.Cipta Strada
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
% PASSING
80
2"
70
1 1/2" 100 100 100 100 100
1" 100 100 100 69.5 100 60
3/4" 100 100 100 19.4 100
1/2" 100 100 58.0 0.8 100 50
ASH
BITUMEN IN MIX TOTAL
TEST WEIGHT ( Gram )
MATERIAL
NO CRUCIBLE + ASH CRUCIBLE ASH WEIGHT % BIT IN MIX ( Gram )
G H I=G-H J=C-F-I K = ( J / A )*100
1 8.9 6.1 2.8 50.3 5.012 953.3
2
SIEVE ANALYSIS
SIEVE SIZE 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0 66.3 195.3 289.3 356.9 601.2 718.5 799.5 842.5 865.1 885.6 906.8
1 Percent Retained 0 7.0 20.5 30.3 37.4 63.1 75.4 83.9 88.4 90.7 92.9 95.1
Percent Passing 100 93.0 79.5 69.7 62.6 36.9 24.6 16.1 11.6 9.3 7.1 4.9
SIEVE SIZE 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained
2 Percent Retained
Percent Passing
AVERAGE
Penetration of Bitumen : 60/70 Bulk Sp.Gr U : 2.639 Surfase Area : 4.37 Temperature : 149 ºC
Sp.Gr of Bitumen T : 1.03 Gmm Test V : 2.485 B.F.Taeknees : 10.143 Compaction : 112 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weght ( Gram ) Volume Bulk SpGr Air Void Stability Marshall
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.012 2.685 0.673 4.373 2.485 3795 2219 3829 1610 2.357 145 1804 5.20
2 3801 2224 3834 1610 2.361 151 1860 5.10
3 3811 2222 3838 1616 2.358 143 1831 5.20
Average 2.359 5.08 15.10 66.32 1832 5.17 354.5
1
2
3
Average
1
2
3
Average
1
2
3
Average
SPECIFICATION 3,5 - 5,5 > 13 > 60 > 1500 >5 > 250
REMAKS : BINA MARGA CONSULTANT CONTRACTOR
LT2
*2 *5 *9
*8 LT1
*1 *3 *4 *6 *7
RT1
RT2
Number Sta. 2+326.0 ~ 2+362.5 LT1 Passing Test Result Density ( % ) Density Loose
1 Breackdown Rolling 1 Passing Tebal awal ( cm ) Tebal Akhir ( cm ) Loose % Passing
2 Intermediate Rolling 14 Passing 97.91 10.40 8.73 19.13
3 Finishing 1 Passing 10.85 9.13 18.84
10.70 9.03 18.49
Number Sta. 2+362.5 ~ 2+397.5 LT1 Passing Test Result Density ( % ) Rata ~ Rata 18.82 14
1 Breackdown Rolling 1 Passing 12.35 10.36 19.21
2 Intermediate Rolling 16 Passing 98.85 10.65 8.87 20.07
3 Finishing 1 Passing 12.30 10.27 19.77
Rata ~ Rata 19.68 16
Number Sta. 2+397.5 ~ 2+429.6 LT1 Passing Test Result Density ( % ) 13.50 11.20 20.54
1 Breackdown Rolling 1 Passing 11.65 9.73 19.73
2 Intermediate Rolling 18 Passing 99.56 11.55 9.60 20.31
3 Finishing 1 Passing Rata ~ Rata 20.19 18
0.0 100.0
Luas permukaan
93.05 0.381
79.5
69.7
62.6
36.9 0.151
24.6 0.202
16.1 0.265
11.6 0.334
9.3 0.568
7.1 0.873
4.9 1.598 4.372
5.0 5.08 15.10 66.32 1832 5.17 354.5
REPUBLIC OF INDONESIA Contractor : PT. Baita Sari
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY Consultant : CECI Joint Venture With PT.Cipta Strada
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Lond No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
ASH
BITUMEN IN MIX TOTAL
TEST WEIGHT ( Gram )
MATERIAL
NO CRUCIBLE + ASH CRUCIBLE ASH WEIGHT % BIT IN MIX ( Gram )
G H I=G-H J=C-F-I K = ( J / A )*100
1 55.9 50.3 5.6 53.1 5.049 998.5
2
SIEVE ANALYSIS
SIEVE SIZE 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0 29 161.6 266.6 374.1 615.5 754.1 827.2 869.3 889.7 910.2 950.2
1 Percent Retained 0 2.9 16.2 26.7 37.5 61.6 75.5 82.8 87.1 89.1 91.2 95.2
Percent Passing 100 97.1 83.8 73.3 62.5 38.4 24.5 17.2 12.9 10.9 8.8 4.8
SIEVE SIZE 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained
2 Percent Retained
Percent Passing
AVERAGE
Penetration of Bitumen : 60/70 Bulk Sp.Gr U : 2.639 Surfase Area : 4.75 Temperature : 150 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.485 B.F.Taeknees : 9.386 Compaction : 112 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm )
A B C D E F G H I J K L M N O P Q
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.049 2.686 0.689 4.395 2.485 3822 2224 3847 1623 2.355 150 1847 5.20
2 3808 2219 3832 1613 2.361 150 1847 5.00
3 3825 2228 3850 1622 2.358 148 1823 5.30
Average 2.358 5.10 15.16 66.36 1839 5.17 355.9
1
2
3
Average
1
2
3
Average
1
2
3
Average
SPECIFICATION < 1.2 3,5 - 5,5 > 13 > 60 > 1500 >5 > 250
REMAKS : BINA MARGA CONSULTANT CONTRACTOR
Saiful ST. M.Sanyoto/M.Abdul Azis Munib
886
Luas perm
Luas permukaan
Kind of material :
Total : Gram Total : Gram.
SIEVE CUMULATIVE SIEVE CUMULATIVE
AVERAGE
SIZE WT.RET % RET % PASS SIZE WT.RET % RET % PASS
1½ 1½
1" 1"
3/4" 3/4"
1/2 " 1/2 "
3/8 " 3/8 "
# 4. # 4.
# 8. # 8.
# 16. # 16.
# 30. # 30.
# 50. # 50.
# 100. # 100.
# 200. # 200.
70
60
50
WEIGHT ( Ton )
40
34.4 tons/jam
30
( 10 - 30 )
( 10 - 15 ) -- -- -- -- --
20 ( 05 - 10 ) -- - -- - -- -
17.6 tons/jam
( 00 - 05 ) ………….
15.2 tons/jam
12.0 tons/jam
10
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
GATE OPENING ( Cm )
15.96
10.83
9.69
19.95
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
Date : 8-Jul-10
DIAL READING
NO. LOAD REMAKS
UP DOWN AVERAGE
Ko B
ntr ag
ak la
tor k BINA MARGA CONSULTANT CONTRACTOR
PT Tu
. ba
Ba n-
ita S
Sa ad
ri an
g-
Gr Saiful ST. M.Sanyoto / M.Abdul Azis Munib
es
ik REPUBLIC OF INDONESIA
Gr
es
ik
( MINISTRY OF PUBLIC WORKS
Su DIRECTORATE GENERAL OF HIGHWAY
ka International Bank For Reconstruction and Developmant ( IBRD )
mt STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
o) ( Loan No. 7786 ( 4834 ) - IND
S
Package
uk : WIDANG - LAMONGAN
Contractor
a : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
mt
o,
S CALIBRATION OF AMP BALANCE FOR ASPHALT
T
)
100
95
90
85
80
75
70
BACAAN ( Kg )
65
60
55
50
45
40
35
30
25
20
15
10
0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
BEBAN ( Kg )
BK
ago
lan
BINA MARGA CONSULTANT CONTRACTOR
ks
Tuu
balt
n-a
Sn
adS
anu Saiful ST. M.Sanyoto / M.Abdul Azis Munib
g-p
Gre
esr
ikv
p
Gre
esr
ikv
i
s
i
P
(T
S.
ukV
air
mta
o,m
Sa
TK
)a
r
y
a
&
A
s
s
.
(
A
t
a
n
g
S
/
E
k
o
W
)
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAY
International Bank For Reconstruction and Developmant ( IBRD )
STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
Loan No. 7786 ( 4834 ) - IND
Package : WIDANG - LAMONGAN
Contractor : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
KALIBRASI TIMBANGAN AGGREGATE
Tanggal : 11 Maret 2010
Pembacaan Dial Timbangan
NO. Beban Keterangan
Naik Turun Rata-rata
1 0 3 2
2 20 14 14
3 40 27 27
4 60 46 46
5 80 64 64
6 100 83 83
7 120 100 100
8 140 120 120
9 160 140 140
10 180 162 162
11 200 184 184
12 220 204 204
13 240 222 222
14 260 242 242
15 280 264 264
16 300 286 286
17 320 304 304
18 340 324 324
19 360 343 343
20 380 364 364
21 400 387 387
22 420 408 408
23 440 428 428
24 460 450 450
25 480 468 468
26 500 494 505 500
27 520 519 528 524
28 540 540 550 545
29 560 562 573 568
30 580 590 600 595
31 600 613 623 618
32 620 633 642 638
33 640 657 664 661
34 660 677 682 680
35 680 696 703 700
36 700 718 724 721
37 720 739 745 742
38 740 760 767 764
39 760 782 788 785
40 780 801 806 804
41 800 823 828 826
42 820 843 848 846
43 840 862 868 865
44 860 884 888 886
45 880 904 908 906
46 900 926 927 927
47 920 946 948 947
48 940 967 968 968
49 960 984 984
50
1000
Hb IV (962 Kg)
900
700
BACAAN ( Kg )
Hb II (595 Kg)
600
500
400
Hb I ( 310 Kg )
300
200
100
0
0 100 200 300 400 500 600 700 800 900 1000
BEBAN ( Kg )
Ko B
ntr ag
ak la
tor k Bina Marga Consultant Contractor
PT Tu
. ba
Ba n-
ita S
Sa ad
ri an
g-
Gr Saiful ST. M.Sanyoto / M. Abdul Azis Munib
es
ik REPUBLIC OF INDONESIA
(
g-
Gr
es
ik
( MINISTRY OF PUBLIC WORKS
Su DIRECTORATE GENERAL OF HIGHWAY
ka International Bank For Reconstruction and Developmant ( IBRD )
mt STRATEGIC ROAD INFRASTRUCTURE PROJECT ( SRIP )
o) (
Loan No. 7786 ( 4834 ) - IND
S
Package
uk : WIDANG - LAMONGAN
Contractor
a : PT. Baita Sari Consultant : CECI Joint Venture With PT.Cipta Strada
mt
o, KALIBRASI TIMBANGAN FILLER
S
T
)
30
25
BACAAN ( Kg )
20
15
10
Filler ( 7.7 Kg )
0
0 5 10 15 20 25 30
BEBAN ( Kg )
BK
ago
lan
Bina Marga Consultant Contractor
ks
Tuu
balt
n-a
Sn
adS Saiful ST. M.Sanyoto / M. Abdul Azis Munib
anu
g-p
Gre
esr
ik
adS
anu
g-p
Gre
esr
ikv
i
s
i
P
(T
S.
ukV
air
mta
o,m
Sa
TK
)a
r
y
a
&
A
s
s
.
(
A
t
a
n
g
S
/
E
k
o
W
)
SNVT PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI JAWA TIMUR
PEMELIHARAAN JALAN DAN JEMBATAN WILAYAH TUBAN - SADANG - GRESIK
PAKET : PEMELIHARAAN BERKALA TUBAN - SADANG - GRESIK
Kontraktor : PT. BAITA SARI Konsultan : PT. VIRAMA KARYA & Ass.
1. PENDAHULUAN
Persiapan pembuatan Design Mix Formula AC BASE dengan menggunakan persyaratan baru, diawali
dengan mengadakan pengujian fraksi-fraksi hasil stone crusher yang ada di stock pile Base Camp.
a. Asal Material
Coarse Aggregate ( 10 - 30 ) mm : Ex Mojokerto
Coarse Aggregate ( 10 - 15 ) mm : Ex Mojokerto
Medium Aggregate ( 5 - 10 ) mm : Ex Mojokerto
Fine Aggregate ( 0 - 5 ) mm : Ex Mojokerto
Filler : Ex Tulungagung
Asphalt pen grade 60/70 : Ex Pertamina
Dalam pembuatan Design Mix Formula AC BASE diambil kombinasi dibawah kurva fuller umtuk material
yang lolos saringan no. 4
Data Pengujian
Analisa Saringan
No
Coarse Agg. Coarse Agg. Medium Agg. Fine Agg. Filler
Saringan
( 10-30mm ) ( 10-15mm ) ( 05-10mm ) ( 0-05mm )
1 1/2 " 100
1" 89.8
3/4" 51.2 100
1/2" 14.1 77.1 100
3/8" 2.3 21.3 98.3 100
#4 0.4 0.8 14.8 98
#8 0.3 0.5 1.4 70.5
# 16 0.3 0.5 1.0 45.6 100
# 30 0.2 0.5 0.9 33.8 95.7
# 50 0.2 0.4 0.8 25.8 80.2
# 100 0.4 0.8 19.1 72.3
# 200 0.3 0.5 10.9 52.5
2.1 Perhitungan
Perhitungan Bulk Sp.Gr. Gabungan
100
= 2.610
30 + 15 + 20 + 33 + 2
2.629 2.618 2.61 2.584 + 2.711
Komposisi Campuran
Material Komposisi Campuran
Coarse agg.10 - 30 mm 30 %
Coarse agg. 10 -15 mm 15 %
Medium agg. 5 - 10 mm 20 %
Fine agg 0 - 5 mm 33 %
Filler 2 %
Gradasi Aggregate Gabungan AC BASE
No Spesifikasi
% Lolos
Saringan Kurva Fuller Range
1 1/2 " 100 100 100
1" 96.9 83.3 90 - 100
3/4" 85.4 73.3 Max 90
1/2" 70.8 60.6
3/8" 58.5 53.5
#4 37.6 39.5
#8 25.7 26,8 - 30,8 19 - 45
# 16 17.4 18,1 - 24,1
# 30 13.4 13,6 - 17,6
# 50 10.4 11.4
# 100 8.0 8.3
# 200 4.8 6.1 3-7
2.2 Perkiraan awal penggunaan kadar asphalt dan selimut asphalt terhadap batuan
= 5.19 5.2 %
= 10.801 ų m
2.3 Hasil pengujian dengan varian kadar asphalt
TEST RESULT
PROPERTIES SPEC
3.9 4.4 4.9 5.4 5.9
Density Gr/cc 2.324 2.353 2.37 2.377 2.379
Marshall Stability Kg 1749 1935 2098 2093 1921 Min 1500
Flow mm 4.97 5.17 5.27 5.33 5.37 Min 5
Marshall Quotient Kg/mm 352.1 374.5 398.3 392.4 357.9 Min 300
Air Void % 7.81 5.93 4.57 3.56 2.77 3.5 - 5.5
Void Filled % 45.94 57.03 66.55 74.31 90.54 Min 60
Void Mineral Aggregate % 14.45 13.81 13.66 13.84 14.23 Min. 13
Absorption % 0.995 0.995 0.995 0.995 0.995 Max. 1.2
Tebal Bit.Film ųm 6.938 8.175 9.425 10.688 11.964
LEMBAR PERSETUJUAN
PROPORTION CAMPURAN
DRY AGGREGATE % TOTAL AGG % TOTAL MIX ACCUMULATIVE CUMMULATIVE
HOT - BIN. I 30 % 28.50 % 285.0 Kg 285.0 Kg
HOT - BIN. II 30 % 28.50 % 285.0 Kg 570.0 Kg
HOT - BIN. III 18 % 17.10 % 171.0 Kg 741.0 Kg
HOT - BIN. IV 20 % 19.00 % 190.0 Kg 931.0 Kg
FILLER 2 % 1.90 % 19.0 Kg 950.0 Kg
ASPHALT 5.00 % 50.0 Kg 1000.0 Kg
Disetujui Oleh
Pejabat Pembuat Komitmen
Tuban - Sadang - Gresik
2.678
Area
4.23
Abs.
0.995
Film
10.801